CN104005313B - Asphalt concrete pavement dividing strip road kerb construction method - Google Patents

Asphalt concrete pavement dividing strip road kerb construction method Download PDF

Info

Publication number
CN104005313B
CN104005313B CN201410264640.3A CN201410264640A CN104005313B CN 104005313 B CN104005313 B CN 104005313B CN 201410264640 A CN201410264640 A CN 201410264640A CN 104005313 B CN104005313 B CN 104005313B
Authority
CN
China
Prior art keywords
road kerb
dividing strip
frame
concrete layer
asphalt concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410264640.3A
Other languages
Chinese (zh)
Other versions
CN104005313A (en
Inventor
龚政休
马玉芽
谢从英
关文洲
马江权
叶卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Ge Zhou Ba Group Is Second Project Co Ltd
Original Assignee
China Ge Zhou Ba Group Is Second Project Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Ge Zhou Ba Group Is Second Project Co Ltd filed Critical China Ge Zhou Ba Group Is Second Project Co Ltd
Priority to CN201410264640.3A priority Critical patent/CN104005313B/en
Publication of CN104005313A publication Critical patent/CN104005313A/en
Application granted granted Critical
Publication of CN104005313B publication Critical patent/CN104005313B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Asphalt concrete pavement dividing strip road kerb construction method of the present invention, the method comprises the following steps: 1) make mould; 2) construction of cement stable macadam base; 3) Coarse Graded Bituminous Concrete layer construction; 4) particulate formula asphalt concrete layer construction; 5) dividing strip road kerb concrete is built.The present invention, under the prerequisite can guaranteeing cement stabilized macadam base and pavement asphalt concrete construction quality, reduces construction cost, reduces the waste of cement stabilized macadam base and pavement asphalt concrete.

Description

Asphalt concrete pavement dividing strip road kerb construction method
technical field:
What the present invention relates to is asphalt concrete pavement construction technology, particularly be highway asphalt concrete pavement road kerb construction method.
background technology:
At present, the conventional construction method of type asphalt concrete pavement dividing strip road kerb concrete construction has two kinds: the first construction method is that the decking and rolling first carrying out whole cement stabilized macadam base fills, then carry out pavement asphalt concrete decking and rolling to fill, finally excavate cement stabilized macadam base and pavement asphalt concrete that dividing strip road kerb basic part rolled, carry out road kerb concreting.Above-mentioned construction method Problems existing is, the cement stabilized macadam base rolled excavated and pavement asphalt concrete cannot re-use, and increases construction costs, brings the increase of construction cost.The second construction method is first pre-buried prefabricated profiled dividing strip road kerb concrete, then carries out the decking and rolling of cement stabilized macadam base and pavement asphalt concrete respectively.Above-mentioned construction method Problems existing is that in cement stabilized macadam base and pavement asphalt concrete decking and rolling process, prefabricated dividing strip road kerb cannot accurately be located, and is carrying out rolling quality and cannot being guaranteed of dividing strip road kerb and cement stabilized macadam base and pavement asphalt concrete binding site simultaneously.
summary of the invention:
The object of the invention is to overcome above deficiency, under a kind of prerequisite guaranteeing cement stabilized macadam base and pavement asphalt concrete construction quality is provided, reduce construction cost, reduce the asphalt concrete pavement dividing strip road kerb construction method of the waste of cement stabilized macadam base and pavement asphalt concrete.
The object of the present invention is achieved like this:
Asphalt concrete pavement dividing strip road kerb construction method of the present invention, the method comprises the following steps:
1) mould is made: mould forms by dividing strip road kerb frame with the posting that dividing strip road kerb frame all-in-one-piece mates with nonmotorized vehicle lane;
2) construction of cement stable macadam base: pave cement stabilized macadam base on subbase, lay mould, excavate the part of the opposing spaced apart band road kerb frame position in cement stabilized macadam base, in the space stayed by cutouts in cement stabilized macadam base, rubble is laid by dividing strip road kerb frame, remove mould, roll cement stabilized macadam base;
3) Coarse Graded Bituminous Concrete layer construction: pave Coarse Graded Bituminous Concrete layer, lay mould, dividing strip road kerb frame be placed on relative cement stabilized macadam base laying rubble position, excavate the part of opposing spaced apart band road kerb frame position in Coarse Graded Bituminous Concrete layer, in the space stayed by cutouts in Coarse Graded Bituminous Concrete layer, rubble is laid by dividing strip road kerb frame, remove mould, roll Coarse Graded Bituminous Concrete layer;
4) particulate formula asphalt concrete layer construction: the particulate formula that paves asphalt concrete layer, lay mould, dividing strip road kerb frame is placed in relative Coarse Graded Bituminous Concrete layer lays rubble position, excavate the part of opposing spaced apart band road kerb frame position in particulate formula asphalt concrete layer, in the space stayed by cutouts in particulate formula asphalt concrete layer, rubble is laid by dividing strip road kerb frame, remove mould, roll particulate formula asphalt concrete layer;
5) dividing strip road kerb concrete is built: excavate dividing strip road kerb position rubble, frame shuttering, build dividing strip road kerb concrete.
Handle is equipped with in above-mentioned mould, posting, easy to use.
Construction method of the present invention is used to carry out the construction of asphalt concrete pavement dividing strip road kerb, only need to adopt steel bar meter to make a dividing strip Kerb mould voluntarily, carrying out cement stabilized macadam base, the asphalt concrete pavement excavated by manual work in work progress that paves fills material except in opposing mold dividing strip road kerb frame position, perfusion rubble is filled and is rolled, later stage excavates rubble again, carries out the concrete construction of dividing strip road kerb.Dividing strip Kerb mould adopts steel bar meter, and processing technology thereof is simple, does not need too large cost; The cement stabilized macadam base material excavated in work progress and bituminous concrete can be utilized effectively, and adopt rubble filler to substitute cement stabilized macadam base and bituminous concrete, and every side can save material cost about 3000 yuan.This method is safe and reliable, technical feasibility, saving construction cost.
Asphalt concrete pavement dividing strip road kerb construction method of the present invention is tried out in helping the third-largest bridge project in Malian Bamako, respond well.Both ensure that roadbed, construction quality of pavement, the consumption simultaneously greatly reducing again cement reduces construction cost.
The inventive method can ensure the construction quality of cement stabilized macadam base, asphalt concrete pavement and dividing strip road kerb binding site.
accompanying drawing illustrates:
Fig. 1 is asphalt concrete pavement dividing strip road kerb layout plan.
Fig. 2 is asphalt concrete pavement dividing strip curb structure profile.
The mold plane figure that Fig. 3 uses for asphalt concrete pavement dividing strip road kerb.
Fig. 4 is the upward view of Fig. 3.
detailed description of the invention:
The present embodiment asphalt concrete pavement dividing strip road kerb construction method comprises the following steps (see Fig. 1, Fig. 2):
1) make mould: see Fig. 3, Fig. 4, mould 1 is by the rectangle dividing strip road kerb frame 2 adopting Φ 25 reinforcing bar to make and form with the rectangle posting 3 that dividing strip road kerb frame all-in-one-piece mates with nonmotorized vehicle lane.Handle 4 posting is equipped with;
2) construction of cement stable macadam base: pave cement stabilized macadam base 6 on subbase 5, lay mould, excavate the part of the opposing spaced apart band road kerb frame position in cement stabilized macadam base, in the space stayed by cutouts in cement stabilized macadam base, rubble is laid by dividing strip road kerb frame, remove mould, roll cement stabilized macadam base;
3) Coarse Graded Bituminous Concrete layer construction: pave Coarse Graded Bituminous Concrete layer 7, lay mould, dividing strip road kerb frame being placed in relative cement stabilized macadam base lays on rubble position, excavate the part of opposing spaced apart band road kerb frame position in Coarse Graded Bituminous Concrete layer, in the space stayed by cutouts in Coarse Graded Bituminous Concrete layer, rubble is laid by dividing strip road kerb frame, remove mould, roll Coarse Graded Bituminous Concrete layer;
4) particulate formula asphalt concrete layer construction: the particulate formula that paves asphalt concrete layer 8, lay mould, dividing strip road kerb frame be placed in relative Coarse Graded Bituminous Concrete layer laying rubble position, excavate the part of opposing spaced apart band road kerb frame position in particulate formula asphalt concrete layer, in the space stayed by cutouts in particulate formula asphalt concrete layer, rubble is laid by dividing strip road kerb frame, remove mould, roll particulate formula asphalt concrete layer;
5) dividing strip road kerb concrete is built: excavate dividing strip road kerb position rubble, frame shuttering, build dividing strip road kerb concrete.
Sequence number 9,10,11 in Fig. 1, Fig. 2 is respectively runway, nonmotorized vehicle lane, dividing strip road kerb.
Asphalt concrete pavement dividing strip road kerb construction method of the present invention, effectively can solve roadbed, surface layer and road kerb binding site construction quality, can effectively utilize dividing strip road kerb to excavate material, reduces construction costs.Safe and reliable.
Above-described embodiment is further described foregoing of the present invention, but this should be interpreted as that the scope of the above-mentioned theme of the present invention is only limitted to above-described embodiment.All technology realized based on foregoing all belong to scope of the present invention.

Claims (2)

1. asphalt concrete pavement dividing strip road kerb construction method, the method comprises the following steps:
1) mould is made: mould forms by dividing strip road kerb frame with the posting that dividing strip road kerb frame all-in-one-piece mates with nonmotorized vehicle lane;
2) construction of cement stable macadam base: pave cement stabilized macadam base on subbase, lay mould, excavate the part of the opposing spaced apart band road kerb frame position in cement stabilized macadam base, in the space stayed by cutouts in cement stabilized macadam base, rubble is laid by dividing strip road kerb frame, remove mould, roll cement stabilized macadam base;
3) Coarse Graded Bituminous Concrete layer construction: pave Coarse Graded Bituminous Concrete layer, lay mould, dividing strip road kerb frame be placed on relative cement stabilized macadam base laying rubble position, excavate the part of opposing spaced apart band road kerb frame position in Coarse Graded Bituminous Concrete layer, in the space stayed by cutouts in Coarse Graded Bituminous Concrete layer, rubble is laid by dividing strip road kerb frame, remove mould, roll Coarse Graded Bituminous Concrete layer;
4) particulate formula asphalt concrete layer construction: the particulate formula that paves asphalt concrete layer, lay mould, dividing strip road kerb frame is placed in relative Coarse Graded Bituminous Concrete layer lays rubble position, excavate the part of opposing spaced apart band road kerb frame position in particulate formula asphalt concrete layer, in the space stayed by cutouts in particulate formula asphalt concrete layer, rubble is laid by dividing strip road kerb frame, remove mould, roll particulate formula asphalt concrete layer;
5) dividing strip road kerb concrete is built: excavate dividing strip road kerb position rubble, frame shuttering, build dividing strip road kerb concrete.
2. asphalt concrete pavement dividing strip road kerb construction method as claimed in claim 1, is characterized in that, in mould, posting is equipped with handle.
CN201410264640.3A 2014-06-16 2014-06-16 Asphalt concrete pavement dividing strip road kerb construction method Active CN104005313B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410264640.3A CN104005313B (en) 2014-06-16 2014-06-16 Asphalt concrete pavement dividing strip road kerb construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410264640.3A CN104005313B (en) 2014-06-16 2014-06-16 Asphalt concrete pavement dividing strip road kerb construction method

Publications (2)

Publication Number Publication Date
CN104005313A CN104005313A (en) 2014-08-27
CN104005313B true CN104005313B (en) 2015-12-02

Family

ID=51366203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410264640.3A Active CN104005313B (en) 2014-06-16 2014-06-16 Asphalt concrete pavement dividing strip road kerb construction method

Country Status (1)

Country Link
CN (1) CN104005313B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105200889B (en) * 2015-08-28 2017-05-31 济南城建集团有限公司 Avoid the vertical along stone construction method of installation of inspection shaft
CN106592368A (en) * 2016-11-01 2017-04-26 济南汇通联合市政工程有限责任公司 Asphalt pavement paving no-cutting construction method
CN108625249B (en) * 2018-04-13 2020-11-17 杭州江润科技有限公司 Asphalt concrete pavement reserved replacement cast-in-place curb and construction method
CN112501996B (en) * 2018-12-03 2022-07-19 日照三和建设工程有限公司 Kerbstone paving process
CN111549606A (en) * 2020-05-14 2020-08-18 西藏天源路桥有限公司 Method for preventing paving aggregate from segregation in asphalt mixture
CN111896341A (en) * 2020-07-06 2020-11-06 江西省交通工程集团建设有限公司 Indoor forming method of gravel seal
CN111996859A (en) * 2020-08-20 2020-11-27 山西四建集团有限公司 One-time pouring construction process for ramp double-lane road isolating tooth and main body structure
CN113550195A (en) * 2021-06-22 2021-10-26 中国五冶集团有限公司 One-step forming construction method for asphalt concrete road curb foundation
CN114855563A (en) * 2022-06-09 2022-08-05 保利长大工程有限公司 Slip form construction method of auxiliary concrete member

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090011214A (en) * 2007-07-25 2009-02-02 이경환 Boundary stone setting method
KR20090059022A (en) * 2007-12-05 2009-06-10 신 오 황 Dry construction method of boundary stone
CN101481901A (en) * 2009-01-15 2009-07-15 广东省长大公路工程有限公司 Pouring type asphalt concrete construction method for central strip
CN201865023U (en) * 2010-11-30 2011-06-15 江苏省淮安市公路管理处 Closed waterproof type central dividing strip for highway
CN202559206U (en) * 2012-04-20 2012-11-28 安徽省交通规划设计研究院 Kerb system of road central reserve

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090011214A (en) * 2007-07-25 2009-02-02 이경환 Boundary stone setting method
KR20090059022A (en) * 2007-12-05 2009-06-10 신 오 황 Dry construction method of boundary stone
CN101481901A (en) * 2009-01-15 2009-07-15 广东省长大公路工程有限公司 Pouring type asphalt concrete construction method for central strip
CN201865023U (en) * 2010-11-30 2011-06-15 江苏省淮安市公路管理处 Closed waterproof type central dividing strip for highway
CN202559206U (en) * 2012-04-20 2012-11-28 安徽省交通规划设计研究院 Kerb system of road central reserve

Also Published As

Publication number Publication date
CN104005313A (en) 2014-08-27

Similar Documents

Publication Publication Date Title
CN104005313B (en) Asphalt concrete pavement dividing strip road kerb construction method
CN105926406A (en) Splicing method and structure for new and old roads in reconstruction and extension of pavement
CN103866668B (en) A kind of cement permeable concrete ground structure of surface pervious asphalt and preparation method thereof
CN104652238B (en) A kind of urban road accessible base layer construction method
CN106592368A (en) Asphalt pavement paving no-cutting construction method
CN104911974A (en) Inclined prestress cement concrete-asphalt concrete composite pavement and construction method thereof
CN113047137A (en) Layered slip-form paving construction method for road shoulder
CN108316089A (en) It is a kind of that road surface method is repaired using plain concrete and reinforced concrete
CN110172887A (en) The big thickness steady layer of water one-pass molding construction method of big width
CN104532716A (en) Assembly asphalt pavement for desert highway and construction method of assembly asphalt pavement
CN103835205A (en) Construction method for road edge stone sliding mode
CN108625249A (en) The reserved displacement cast-in-place curb stone of asphalt concrete pavement and construction method
CN204662193U (en) Oblique prestressing force cement concrete-bituminous concrete composite pavement
Mampearachchi Handbook on concrete block paving
CN204435150U (en) A kind of desert highway assembling flexible pavement
CN203212967U (en) Thermal probe type expressway subgrade widening structure on ice-rich and ice-saturated segment
CN202194048U (en) Pavement structure for joining part of new and old roads
CN209443368U (en) The overhead anti-ponding structure in bridge floor edge
CN104894942B (en) The recyclable combination construction sidewalk of drainage type
CN109594448A (en) The temporary road construction method of linear engineering
CN208121523U (en) Cast-in-place curb stone sliding form apparatus
CN113089410A (en) Asphalt pavement structure for permanent structure conversion of highway precast beam field pavement
CN207277109U (en) The quick repaving asphalt coat structure of cement concrete pavement
CN112095394A (en) Composite pavement with excellent drainage function and construction method thereof
KR101016193B1 (en) Road on low supporting force ground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Applicant after: China Ge Zhou Ba group is second project Co., Ltd.

Address before: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Applicant before: Gezhouba Group No.2 Engineering Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant