CN105200889B - Avoid the vertical along stone construction method of installation of inspection shaft - Google Patents

Avoid the vertical along stone construction method of installation of inspection shaft Download PDF

Info

Publication number
CN105200889B
CN105200889B CN201510537992.6A CN201510537992A CN105200889B CN 105200889 B CN105200889 B CN 105200889B CN 201510537992 A CN201510537992 A CN 201510537992A CN 105200889 B CN105200889 B CN 105200889B
Authority
CN
China
Prior art keywords
vertical
cover plate
inspection shaft
stone
along stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510537992.6A
Other languages
Chinese (zh)
Other versions
CN105200889A (en
Inventor
高瑞
李征
张少康
孙丽丽
王远鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201510537992.6A priority Critical patent/CN105200889B/en
Publication of CN105200889A publication Critical patent/CN105200889A/en
Application granted granted Critical
Publication of CN105200889B publication Critical patent/CN105200889B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It is more particularly to a kind of to avoid the vertical along stone construction method of installation of inspection shaft the present invention relates to urban road construction technical field.The present invention first bypasses inspection shaft by vertical using " concave shape " installation method along stone, cover plate is processed according to actual size, cover plate is arranged on inspection shaft top, cover plate bottom paving rubber cushion is easy to cover plate to open, surrounding uses kerb drop-over, it is ensured that vertical with standard paragraphs concordant along stone after cover plate installation.The present invention do not reduce sidewalk width and manhole cover it is normally-open on the premise of, both met manhole cover and avoided the vertical requirement along stone, in turn ensure that the overall aesthetics of road, obtain good social benefit.

Description

Avoid the vertical along stone construction method of installation of inspection shaft
(One)Technical field
It is more particularly to a kind of to avoid the vertical along stone installation of inspection shaft the present invention relates to urban road construction technical field Method.
(Two)Background technology
During urban road construction, because underground utilities are complicated, often there is pipeline top inspection shaft and stand edge with fast traffic lane The situation of stone conflict, influences sidewalk width and road overall aesthetics.
(Three)The content of the invention
The present invention is in order to make up the deficiencies in the prior art, there is provided one kind ensures sidewalk width, keeps road integrated beauty The avoidance inspection shaft of the property seen it is vertical along stone construction method of installation.
The present invention is achieved through the following technical solutions:
It is a kind of to avoid the vertical along stone construction method of installation of inspection shaft, to be basis of constructing with the vertical inspection shaft Chong Die along stone, Comprise the following steps:
(1)Centered on inspection shaft, " concave shape " bottom land is dug in its periphery, install vertical along stone in bottom land, stood along stone group Into space for square;
(2)Prefabricated cover plate is installed along stone vertical, the bottom of cover plate is equipped with rubber blanket, then pacifies in cover plate perimeter Dress kerb, the height of kerb and cover plate, the gradient are consistent, and the outward flange of kerb overlaps with curb outward flange.
The present invention first bypasses inspection shaft by vertical using " concave shape " installation method along stone, and cover plate is processed according to actual size, Cover plate is arranged on inspection shaft top, cover plate bottom paving rubber cushion is easy to cover plate to open, and surrounding uses kerb drop-over, it is ensured that cover plate It is vertical with standard paragraphs concordant along stone after installation.
Specific construction step of the invention is as follows:Manhole cover installs → it is vertical along stone installation → cover plate and kerb it is prefabricated → Cover plate installation → kerb is installed.
More excellent technical scheme of the invention is:
Step(1)In, the inspection shaft spacing along stone edge-on with two is consistent, and integrated symmetric, is provided with not in bottom land The cement mortar seat slurry thick less than 3cm.
Step(1)In, the vertical height along stone in bottom land is 11cm.
Step(2)In, the height of cover plate is vertical with periphery along the highly consistent of stone, 1cm after the rubber blanket of cover plate bottom, cover plate A width of uniform 3mm is stitched between the kerb on periphery.
Step(2)In, cover plate, kerb are identical along the material of stone with vertical.
The present invention do not reduce sidewalk width and manhole cover it is normally-open on the premise of, both met manhole cover and kept away Allow and stand along the requirement of stone, in turn ensure that the overall aesthetics of road, obtain good social benefit.
(Four)Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings.
Accompanying drawing is constructing structure schematic diagram of the invention.
In figure, 1 is vertical along stone, 2 cover plates, 3 kerbs, 4 inspection shafts.
(Five)Specific embodiment
Following detailed description of is made to the method for the present invention with reference to Figure of description.
As shown in drawings, construction method of the invention is, using the cover plate with the vertical thick 10cm along stone equivalent material, first to adopt Inspection shaft is bypassed along stone by vertical with " concave shape " installation method, while will be vertical along stone whereabouts 11cm, processed according to actual size and covered Plate, inspection shaft top is arranged on by cover plate, and cover plate bottom paving 1cm thick rubber cushion is easy to cover plate to open, surrounding using thickness 10cm, The kerb drop-over of width 10cm, it is ensured that vertical with standard paragraphs concordant along stone after cover plate installation.Specific construction step is as follows:Inspection Look into well lid install → it is vertical along stone installations → cover plate and kerb it is prefabricated → installation of cover plate installation → kerb.
Key technology:Cover plate length and width and thickness, manhole cover with it is vertical intersect along stone when expose and stand along the length of stone.Lid is installed The height fallen along stone is found during plate.
Technical indicator:By planning in advance, make cover plate that neither influence inspection shaft to be installed and use, sidewalk width is can guarantee that again And overall aesthetics.Cover plate should be able to be easy to open, and be installed along the specific dimensioned of stone according to the vertical of inspection shaft is bypassed.
The scope of application:Application and popularizations make construction method of the invention preferably in the complicated urban road construction of underground utilities With.
The purpose and meaning of the project research:The vertical method along stone is avoided using traditional inspection shaft, influence is vertical along stone entirety Aesthetic property, and the width on pavement can be reduced, certain influence is caused on normal coming into operation.Avoid inspection shaft vertical along stone construction Construction method, both ensure that sidewalk width, also improve road overall aesthetics, while reducing construction cost.The technique ratio Traditional handicraft compares, and with good Social benefit and economic benefit, in road reformation engineering, especially underground utilities are complex Engineering in have promotional value.
The situation applied and promoted:
First Application is in Jinan City Shan great north of a road section road reformation engineering.This method is applied to old town rebuilding old road engineering Middle application, uses in the particularly suitable engineering more in primary tube ray examination well, and carrying out road along with many big and medium-sized cities opens up It is wide, promote, consummating function, this method will be more widely used.
Concretely comprise the following steps:
(1)Manhole cover is installed
After the completion of middle grain formula bitumen construction, installed by normal process and reinforce inspection shaft.
(2)It is vertical to be installed along stone
Survey calculation standard paragraphs are vertical along stone modulus in advance, it is necessary to assure inspection shaft is edge-on with two consistent along stone spacing, overall Symmetrically.Installing when " concave shape " is stood along stone need to consider horizontal wall inscription, if being installed by the pavement gradient when outside is pavement, it is ensured that with people Trade ornamental slab for paving the floor linking is smoothed out, the gradient is consistent.
After the completion of the vertical excavation along stone cistern bottom, using 3cm thickness 1:2 cement mortar seat slurry, the necessary full, thickness of seat slurry is uniform.
Height according to measuring and calculating hangs up properly construction line, starts to install vertical along stone, is installed using guiding ruler and horizon rule side during installation Frontier inspection is surveyed, and is allowed to smooth vertical and horizontal.
(3)Cover plate and kerb it is prefabricated and install
Statistics scene conflict inspection shaft quantity with vertical along stone, and the size of the cover plate is calculated according to site inspection well size, adds in advance Work is molded cover plate and kerb.
Stand along cover plate is installed after stone installation, 1cm thickness rubber blankets are first laid in bottom, it is ensured that rubber cushion is smooth, convenient to open Cover plate.Finally carry out surrounding kerb installation, the elevation of kerb and cover plate, the gradient are consistent, and seam is wide uniform(By 3mm controls).
(4)Quality control
Ensure former material quality.Former material size is determined according to field measurement data, material must be vertical with standard paragraphs along stone material matter Unanimously, intensity meets design requirement, if stone material exposed face must be polished.
Improve construction precision.The strict vertical Installation Elevation along stone, cover plate and kerb of control, vertical to be firmly installed along stone, seat Slurry is full.Cover plate is wide with the seam of kerb consistent along stone with vertical.Flatness, head fall is controlled to be stood with standard paragraphs using 3m rulers Consistent along stone, cross fall is consistent with pavement ornamental slab for paving the floor.

Claims (5)

1. it is a kind of to avoid the vertical along stone construction method of installation of inspection shaft, to be basis of constructing with the vertical inspection shaft Chong Die along stone, its It is characterized as, comprises the following steps:(1)Centered on inspection shaft, " concave shape " bottom land is dug in its periphery, vertical edge is installed in bottom land Stone, it is square to stand the space constituted along stone;(2)Prefabricated cover plate is installed along stone vertical, the bottom of cover plate is equipped with rubber Pad, then installs kerb in cover plate perimeter, and the height of kerb and cover plate, the gradient are consistent, and kerb outward flange and road Overlapped along stone outward flange.
It is 2. according to claim 1 to avoid the vertical along stone construction method of installation of inspection shaft, it is characterised in that:Step(1)In, The inspection shaft spacing along stone edge-on with two is consistent, and integrated symmetric, and the cement mortar thick not less than 3cm is provided with bottom land Seat slurry.
It is 3. according to claim 1 to avoid the vertical along stone construction method of installation of inspection shaft, it is characterised in that:Step(1)In, The vertical height along stone in bottom land is 11cm.
It is 4. according to claim 1 to avoid the vertical along stone construction method of installation of inspection shaft, it is characterised in that:Step(2)In, The thickness of cover plate is 10cm, and it is highly vertical with periphery along the highly consistent of stone, rubber blanket the thickness 1cm, cover plate perimeter of cover plate bottom The a width of uniform 3mm of seam between kerb.
It is 5. according to claim 1 to avoid the vertical along stone construction method of installation of inspection shaft, it is characterised in that:Step(2)In, Cover plate, kerb are identical along the material of stone with vertical.
CN201510537992.6A 2015-08-28 2015-08-28 Avoid the vertical along stone construction method of installation of inspection shaft Active CN105200889B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510537992.6A CN105200889B (en) 2015-08-28 2015-08-28 Avoid the vertical along stone construction method of installation of inspection shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510537992.6A CN105200889B (en) 2015-08-28 2015-08-28 Avoid the vertical along stone construction method of installation of inspection shaft

Publications (2)

Publication Number Publication Date
CN105200889A CN105200889A (en) 2015-12-30
CN105200889B true CN105200889B (en) 2017-05-31

Family

ID=54948822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510537992.6A Active CN105200889B (en) 2015-08-28 2015-08-28 Avoid the vertical along stone construction method of installation of inspection shaft

Country Status (1)

Country Link
CN (1) CN105200889B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021423A (en) * 2019-12-31 2020-04-17 合肥格林工程材料有限公司 Kerbstone manhole cover

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH093808A (en) * 1995-06-15 1997-01-07 Sekisui Jushi Co Ltd Stone for road edge
CN202610678U (en) * 2012-02-27 2012-12-19 罗明 Multi-function curb
CN103233409B (en) * 2013-04-18 2016-08-10 济南城建集团有限公司 Vertical along stone construction method of installation
CN203593986U (en) * 2013-11-25 2014-05-14 王爱红 Conveniently-constructed road edge stone for residential areas
CN104005313B (en) * 2014-06-16 2015-12-02 中国葛洲坝集团第二工程有限公司 Asphalt concrete pavement dividing strip road kerb construction method

Also Published As

Publication number Publication date
CN105200889A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN103205979B (en) Method for constructing large raft foundation under high temperature
Katebi et al. Assessment the influence of ground stratification, tunnel and surface buildings specifications on shield tunnel lining loads (by FEM)
CN205711788U (en) A kind of underground piping protection is contained
CN206636602U (en) Vault song wall tunnel structure
CN209227580U (en) The tower-crane foundation structure of raft foundation is placed under a kind of
CN102758451A (en) Concrete cable channel construction process
WO2014015739A1 (en) Inspection well apparatus resistant to differential settlement and method of constructing same
CN101343869A (en) Underground continuous wall construction method of city-across pipeline
CN203403438U (en) Inspection well cover with protective construction die ring
CN109372019A (en) Cable duct original position rest construction method
CN104652444B (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN108611985A (en) Framed underpass bridge construction method that special geology is overweight
CN105200889B (en) Avoid the vertical along stone construction method of installation of inspection shaft
CN101349057A (en) Underground continuous wall construction method crossing city pipelines
CN103306306A (en) Anti-differential settlement inspection well device and construction method thereof
CN107700299A (en) A kind of elevated bridge lower floor road structure and its construction method
CN105926665A (en) Large block assembled type prefabricated concrete drainage pipeline base and construction method thereof
CN206888997U (en) Tunnel plain concrete lining construction auxiliary equipment
CN103334771A (en) Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN206308570U (en) The Prefabricated road installed for city pedestrian guardrail is mated formation plate
CN102926403B (en) Roof construction method by cover-excavation method
CN201883440U (en) Separate reinforced retaining structures
CN205171363U (en) Bridge floor infiltration water's edge is along drainage system
CN107100648A (en) Tunnel plain concrete lining construction auxiliary equipment and method
CN204570718U (en) A kind of raft foundation with fluid pipeline path

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant