CN113550195A - One-step forming construction method for asphalt concrete road curb foundation - Google Patents

One-step forming construction method for asphalt concrete road curb foundation Download PDF

Info

Publication number
CN113550195A
CN113550195A CN202110691869.5A CN202110691869A CN113550195A CN 113550195 A CN113550195 A CN 113550195A CN 202110691869 A CN202110691869 A CN 202110691869A CN 113550195 A CN113550195 A CN 113550195A
Authority
CN
China
Prior art keywords
concrete
curb
foundation
road
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110691869.5A
Other languages
Chinese (zh)
Inventor
廖勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202110691869.5A priority Critical patent/CN113550195A/en
Publication of CN113550195A publication Critical patent/CN113550195A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/222Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A one-step forming construction method for an asphalt concrete road curb foundation is characterized by comprising the following steps: a. manufacturing a template, b, tamping roadbed plain soil, c, pouring and curing concrete, d, laying 30-thick 1:3 dry and hard cement mortar, installing a road edge stone in place, and e, laying concrete on the back side of the road edge stone. Compared with the traditional curb construction method, the one-step forming construction method of the asphalt concrete curb foundation has the advantages that the curb foundation is formed at one step while municipal road concrete construction is carried out, the curb foundation construction after the road concrete construction is finished is avoided, a large amount of labor and a large period of time are saved, the curb foundation and the road concrete foundation are integrated, the integral stability of the curb is good, the curb cannot be settled and damaged in the later period, and the integral forming is attractive after the curb construction is finished.

Description

One-step forming construction method for asphalt concrete road curb foundation
Technical Field
The invention relates to a construction method of a curb foundation, in particular to a one-step forming construction method of an asphalt concrete road curb foundation.
Background
The traditional construction method of the road edge stone foundation is that the road concrete and the road edge stone foundation are separately constructed, the road concrete is firstly poured, and then the road edge stone foundation is secondarily constructed. The traditional road edge stone construction method is complicated in process and long in construction time. And because of curbstone foundation pour and road concrete placement are the separate construction, curbstone foundation whole steadiness is poor, easily takes place to subside, and later stage collision easily takes place to destroy, and whole shaping aesthetic property is poor.
The known way of constructing a kerbstone foundation thus suffers from the inconveniences and problems described above.
Disclosure of Invention
The invention aims to provide a one-step molding construction method for an asphalt concrete road curb foundation, which saves labor and construction period.
In order to achieve the purpose, the technical solution of the invention is as follows:
a one-step forming construction method for an asphalt concrete road curb foundation is characterized by comprising the following steps:
a. making a template
The template comprises a vertical plate and a transverse plate, the width of the vertical plate is 20mm, and the vertical plate and the transverse plate are connected into a lateral T-shaped component through iron nails at a position 40mm away from the top end of the vertical plate;
b. tamping roadbed plain soil
Tamping the roadbed plain soil, and ensuring that the compaction coefficient is more than or equal to 0.93; positioning and paying off a roadbed, paving a 150-thick cement stone powder slag cushion layer, and erecting templates on two sides;
c. pouring and curing concrete
C20 concrete is poured, after the C20 concrete is finally set, templates on two sides of the road are removed, and the concrete pavement is maintained to be qualified according to requirements;
d. paving 30-thick 1:3 dry and hard cement mortar, and installing the curbstone in place;
e. and laying concrete on the back side of the road edge stone.
The one-step molding construction method of the asphalt concrete road curb stone foundation can be further realized by adopting the following technical measures.
The method of the preceding, wherein the form is a wood form.
The method of the foregoing, wherein the C20 concrete is 200mm thick.
After the technical scheme is adopted, the one-step forming construction method of the asphalt concrete road curb foundation has the advantages that compared with the traditional curb construction method, the one-step forming construction method of the curb foundation is realized while municipal road concrete construction is carried out, the curb foundation construction is avoided after the road concrete construction is finished, a large amount of labor and a construction period are saved, the curb foundation and the road concrete foundation are integrated, the integral stability of the curb is good, the curb cannot be settled and damaged in the later period, and the integral forming is attractive after the curb construction is finished.
Drawings
FIG. 1 is a schematic diagram of a template structure according to an embodiment of the present invention;
FIG. 2 is a schematic diagram illustrating the usage status of the template according to the embodiment of the present invention;
fig. 3 is a schematic view of an installed curb according to an embodiment of the present invention.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The one-step molding construction method of the asphalt concrete road curb stone foundation comprises the following steps:
a. making a template
Referring now to fig. 1, fig. 1 is a schematic diagram of a template structure according to an embodiment of the invention. As shown in the figure, the template includes riser 1, diaphragm 2, and length is 6m, and the material is wooden, and riser, diaphragm are connected the fastening through two rows of iron nails 3 about 1, 2, and each mutual interval of every row of iron nail is 0.5m, and two rows of iron nails of 1, 2 are 2cm apart from the distance of the upper and lower end of diaphragm.
b. Tamping roadbed plain soil
Compacting the roadbed plain soil 6, ensuring that the compaction coefficient is more than or equal to 0.93, positioning and setting line, paving a 150-thick cement stone powder slag cushion layer 5, and erecting templates at two sides.
c. Pouring C20 concrete 6 with the thickness of 200, removing the templates at the two sides of the road after the concrete is finally set, and curing the concrete pavement to be qualified according to requirements; fig. 2 is a schematic diagram of a template using state according to an embodiment of the present invention.
d. Paving 30-thick 1:3 dry and hard cement mortar, and installing the curbstone 8 in place;
e. concrete 7 is laid on the back side of the kerb. Fig. 3 is a schematic view of an installed curb according to an embodiment of the present invention.
The invention has substantive characteristics and obvious technical progress, and the one-step molding construction method of the asphalt concrete road curb foundation is used for a template for one-step molding of the municipal asphalt concrete road curb foundation, and solves the problem of separate construction of the concrete road and the road curb foundation. Make curbstone basis one shot forming simultaneously in town road concrete construction, carry out curbstone foundation construction again after avoiding road concrete construction to accomplish, save a large amount of manual works and time limit for a project, curbstone basis and road concrete road base form integratively, and the whole steadiness of curbstone is good, and later stage curbstone can not take place to subside and destroy, ensures that the whole shaping is pleasing to the eye after the construction of curbstone is accomplished simultaneously.
The one-step forming construction method of the asphalt concrete road curb stone foundation is applied in the road concrete construction process of the chestnut PPP project, has obvious effect, and is fully determined by a construction unit, a construction unit and a supervision unit.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (3)

1. A one-step forming construction method for an asphalt concrete road curb foundation is characterized by comprising the following steps:
a. making a template
The template comprises a vertical plate and a transverse plate, the width of the vertical plate is 20mm, and the vertical plate and the transverse plate are connected into a lateral T-shaped component through iron nails at a position 40mm away from the top end of the vertical plate;
b. tamping roadbed plain soil
Tamping the roadbed plain soil, and ensuring that the compaction coefficient is more than or equal to 0.93; positioning and paying off a roadbed, paving a 150-thick cement stone powder slag cushion layer, and erecting templates on two sides;
c. pouring and curing concrete
C20 concrete is poured, after the C20 concrete is finally set, templates on two sides of the road are removed, and the concrete pavement is maintained to be qualified according to requirements;
d. paving 30-thick 1:3 dry and hard cement mortar, and installing the curbstone in place;
e. and laying concrete on the back side of the road edge stone.
2. The asphalt concrete road curb foundation one-shot forming construction method of claim 1, wherein the form is a wooden form.
3. The one-step forming construction method of the asphalt concrete road curb foundation of claim 1, wherein the C20 concrete is 200mm thick.
CN202110691869.5A 2021-06-22 2021-06-22 One-step forming construction method for asphalt concrete road curb foundation Pending CN113550195A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110691869.5A CN113550195A (en) 2021-06-22 2021-06-22 One-step forming construction method for asphalt concrete road curb foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110691869.5A CN113550195A (en) 2021-06-22 2021-06-22 One-step forming construction method for asphalt concrete road curb foundation

Publications (1)

Publication Number Publication Date
CN113550195A true CN113550195A (en) 2021-10-26

Family

ID=78102268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110691869.5A Pending CN113550195A (en) 2021-06-22 2021-06-22 One-step forming construction method for asphalt concrete road curb foundation

Country Status (1)

Country Link
CN (1) CN113550195A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030067927A (en) * 2002-02-09 2003-08-19 주식회사 대영토건 A road border construction process
KR20050079965A (en) * 2005-06-23 2005-08-11 이정락 The road boundary stone jointer filling device and the construction method with this
KR100777153B1 (en) * 2006-09-21 2007-11-16 신 오 황 Construction method of boundary stone
KR20090059022A (en) * 2007-12-05 2009-06-10 신 오 황 Dry construction method of boundary stone
CN104005313A (en) * 2014-06-16 2014-08-27 葛洲坝集团第二工程有限公司 Construction method for asphalt concrete pavement separation zone kerbs
CN209114271U (en) * 2018-11-06 2019-07-16 中建三局第二建设工程有限责任公司 A kind of municipal road construction curb stone foundation
CN211006214U (en) * 2018-07-31 2020-07-14 山东鲁桥建设有限公司 Stone curb installation fixed knot constructs
CN111996859A (en) * 2020-08-20 2020-11-27 山西四建集团有限公司 One-time pouring construction process for ramp double-lane road isolating tooth and main body structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030067927A (en) * 2002-02-09 2003-08-19 주식회사 대영토건 A road border construction process
KR20050079965A (en) * 2005-06-23 2005-08-11 이정락 The road boundary stone jointer filling device and the construction method with this
KR100777153B1 (en) * 2006-09-21 2007-11-16 신 오 황 Construction method of boundary stone
KR20090059022A (en) * 2007-12-05 2009-06-10 신 오 황 Dry construction method of boundary stone
CN104005313A (en) * 2014-06-16 2014-08-27 葛洲坝集团第二工程有限公司 Construction method for asphalt concrete pavement separation zone kerbs
CN211006214U (en) * 2018-07-31 2020-07-14 山东鲁桥建设有限公司 Stone curb installation fixed knot constructs
CN209114271U (en) * 2018-11-06 2019-07-16 中建三局第二建设工程有限责任公司 A kind of municipal road construction curb stone foundation
CN111996859A (en) * 2020-08-20 2020-11-27 山西四建集团有限公司 One-time pouring construction process for ramp double-lane road isolating tooth and main body structure

Similar Documents

Publication Publication Date Title
US5487526A (en) Mold device for forming concrete pathways
CN111576121B (en) Floor tile paving structure and floor tile paving construction process
CN206553851U (en) roadbed widening structure
CN108360570B (en) Lifting construction method for asphalt pavement inspection well
CN112814116B (en) Construction method of cast-in-situ drainage ditch
CN210086000U (en) Town road curb construction equipment
CN113550195A (en) One-step forming construction method for asphalt concrete road curb foundation
CN111335355A (en) Special-shaped block post-pouring type light retaining wall supporting structure and construction method thereof
CN211006214U (en) Stone curb installation fixed knot constructs
KR100432863B1 (en) Method for dry constructing road boundary stones and road boundary stone supporting device
CN203411862U (en) Prefabricated embedded track board
CN212336084U (en) Special-shaped block post-pouring type light retaining wall supporting structure
CN209854513U (en) Town road curb mounting structure and construction equipment
CN210766280U (en) Curb prefabricated assembly side form
CN213538565U (en) Road bridge linkage segment becomes rigidity road bed
CN111996859A (en) One-time pouring construction process for ramp double-lane road isolating tooth and main body structure
CN113308960A (en) High-turnover assembly type curb cushion block and mold and construction method thereof
CN219410557U (en) Cast-in-situ template structure of bridge sidewalk
CN208121523U (en) Cast-in-place curb stone sliding form apparatus
CN214401296U (en) Antiskid anti-crack pavement structure
KR20090059022A (en) Dry construction method of boundary stone
CN111042287A (en) Method for accelerating drainage by embedding PVC pipe in concrete flat stone
KR20050089576A (en) Precast concrete block for retaining wall and construction method using the same
CN110258246B (en) Pedestrian road structure and construction method thereof
CN213925714U (en) Novel curb fixed knot constructs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20211026