KR100878178B1 - 섬유강화플라스틱 관 및 그 제조방법 - Google Patents
섬유강화플라스틱 관 및 그 제조방법 Download PDFInfo
- Publication number
- KR100878178B1 KR100878178B1 KR1020070026018A KR20070026018A KR100878178B1 KR 100878178 B1 KR100878178 B1 KR 100878178B1 KR 1020070026018 A KR1020070026018 A KR 1020070026018A KR 20070026018 A KR20070026018 A KR 20070026018A KR 100878178 B1 KR100878178 B1 KR 100878178B1
- Authority
- KR
- South Korea
- Prior art keywords
- fiber
- tube
- inner assembly
- reinforced plastic
- cylindrical tube
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L9/00—Rigid pipes
- F16L9/12—Rigid pipes of plastics with or without reinforcement
- F16L9/133—Rigid pipes of plastics with or without reinforcement the walls consisting of two layers
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Moulding By Coating Moulds (AREA)
Abstract
Description
Claims (10)
- 길이방향으로 보강섬유가 배치되도록 인발 성형된 복수의 FRP 단위부재(110a)들을 접합하여 구성된 내부조립원통관(110)과,상기 내부조립원통관(110)의 원주방향으로 보강섬유가 배치되도록 상기 내부조립원통관(110)의 외면을 감싸는 FRP 외피(120)를 포함하는 것을 특징으로 하는 섬유강화플라스틱 관.
- 제 1 항에 있어서,상기 내부조립원통관(110)을 구성하는 단위부재(110a)들은, 외곽을 구성하는 외측벽(111)과 상기 외측벽(111)의 좌우 양측 끝단으로부터 각각 안쪽 반경방향으로 연장 형성된 좌측벽(112)과 우측벽(113)으로 이루어진 단면형상을 갖는 것을 특징으로 하는 섬유강화플라스틱 관.
- 제 2 항에 있어서,상기 내부조립원통관(110)의 내부에는 상기 좌우측벽(112)(113)의 끝단과 접합는 내부단일원통관(20)이 더 결합된 것을 특징으로 하는 섬유강화플라스틱 관.
- 제 2 항에 있어서,상기 단위부재(110a)들은 상기 외측벽(111)과 일정 간격을 유지하면서 상기 좌우측벽(112)(113)의 끝단을 서로 연결하는 내측벽(114)이 더 형성된 것을 특징으로 하는 섬유강화플라스틱 관.
- 제 2 항 내지 제 4 항 중 어느 한 항에 있어서,상기 단위부재(110a)들의 상기 좌우측벽(112)(113) 중 어느 하나에 끼움홈(112a)을 형성하고 나머지 하나에 대응하는 끼움돌기(113b)를 형성하여 서로 끼워 맞춰 상기 내부조립원통관(110)을 구성하는 것을 특징으로 하는 섬유강화플라스틱 관.
- 제 2 항 내지 제 4 항 중 어느 한 항에 있어서,상기 내부조립원통관(10)을 구성하는 단위부재(110a)들의 좌우측벽(112)(113)에 삽입홈(112a)(113a)을 형성하고 상기 삽입홈(112a)(113a)에 끼워지는 삽입돌기(131)를 갖는 끼움부재(130)를 이용하여 단위부재(110a)들을 서로 끼움결합한 것을 특징으로 하는 섬유강화플라스틱 관.
- 제 2 항 내지 제 4 항 중 어느 한 항에 있어서,상기 내부조립원통관(10)을 구성하는 단위부재(110a)들의 좌우측벽(112)(113)에 연결홈(112c)(113c)을 형성하고 상기 연결홈(112c)(113c)에 끼워지는 연결돌기(141)를 갖는 연결구(140)를 이용하여 단위부재(110a)들을 서로 끼움결합한 것을 특징으로 하는 섬유강화플라스틱 관.
- 제 2 항 내지 제 4 항 중 어느 한 항에 있어서,상기 내부조립원통관(110)을 구성하는 단위부재(110a)들의 일부를 상기 외피(120)보다 돌출되게 접합하여 복수의 삽입공간(h3)을 형성하고 상기 단위부재(110a)들의 돌출부분을 상기 삽입공간(h3)에 끼워 연결하고 연결부의 외면을 외피(120)로 감싼 것을 특징으로 하는 섬유강화플라스틱 관.
- 제 2 항 내지 제 4 항 중 어느 한 항에 있어서,상기 내부조립원통관(110)은 상기 내부조립원통관(110)을 길이방향으로 연결할 수 있도록 양단부가 상기 단위부재(110a)의 내부에 끼워지는 복수의 연결부재(30)를 더 포함하는 것을 특징으로 하는 섬유강화플라스틱 관.
- 길이방향으로 보강섬유가 배치된 섬유강화플라스틱을 인발하여 청구항 2 또는 청구항 4에 기재된 단면형상을 갖는 복수의 단위부재를 성형하는 단계와,상기 단위부재들을 서로 결합하여 내부조립원통관을 형성하는 단계와,유리섬유 로빙(Roving)을 수지에 함침시켜 상기 내부조립원통관의 외면에 나선방향으로 감아 외피를 성형하는 단계를 포함하는 것을 특징으로 하는 섬유강화플라스틱 관의 제조방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070026018A KR100878178B1 (ko) | 2007-03-16 | 2007-03-16 | 섬유강화플라스틱 관 및 그 제조방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070026018A KR100878178B1 (ko) | 2007-03-16 | 2007-03-16 | 섬유강화플라스틱 관 및 그 제조방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20080084362A KR20080084362A (ko) | 2008-09-19 |
KR100878178B1 true KR100878178B1 (ko) | 2009-01-12 |
Family
ID=40024733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070026018A KR100878178B1 (ko) | 2007-03-16 | 2007-03-16 | 섬유강화플라스틱 관 및 그 제조방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100878178B1 (ko) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100915630B1 (ko) * | 2008-09-30 | 2009-09-04 | 김국수 | 배관용 단열커버 및 그 시공방법 |
KR101509103B1 (ko) | 2013-01-25 | 2015-04-07 | 주식회사 카본티씨지 | 복합재 파이프, 복합재 롤러, 복합재 파이프 제조방법 및 복합재 파이프를 이용한 복합재 롤러 제조방법 |
US11225843B2 (en) | 2019-08-01 | 2022-01-18 | Saudi Arabian Oil Company | Composite dual channel drill pipes and method of manufacture |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102471836B1 (ko) * | 2021-11-29 | 2022-12-01 | 손만호 | 다열 이색 에어공급용 튜브 및 이의 제조방법 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0538764A (ja) * | 1991-08-08 | 1993-02-19 | Sekisui Jushi Co Ltd | 繊維強化樹脂複合管及びその製造方法 |
JPH0911354A (ja) * | 1995-06-29 | 1997-01-14 | Sekisui Chem Co Ltd | 繊維強化熱可塑性樹脂複合管の製造方法 |
JPH10332054A (ja) | 1997-05-28 | 1998-12-15 | Mitsubishi Cable Ind Ltd | 剛性プラスチックパイプおよびその移送方法 |
KR200254127Y1 (ko) | 2001-08-18 | 2001-12-01 | 김흥대 | 합성수지 파이프 |
KR200398500Y1 (ko) | 2005-07-26 | 2005-10-13 | (주)미라이후손관거 | 방음 피복 및 기공을 갖는 방음 파이프 |
KR20050118036A (ko) * | 2004-06-12 | 2005-12-15 | 허차순 | 프로파일 나선형 합성수지관 코팅 직관 파이프 |
-
2007
- 2007-03-16 KR KR1020070026018A patent/KR100878178B1/ko active IP Right Grant
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0538764A (ja) * | 1991-08-08 | 1993-02-19 | Sekisui Jushi Co Ltd | 繊維強化樹脂複合管及びその製造方法 |
JPH0911354A (ja) * | 1995-06-29 | 1997-01-14 | Sekisui Chem Co Ltd | 繊維強化熱可塑性樹脂複合管の製造方法 |
JPH10332054A (ja) | 1997-05-28 | 1998-12-15 | Mitsubishi Cable Ind Ltd | 剛性プラスチックパイプおよびその移送方法 |
KR200254127Y1 (ko) | 2001-08-18 | 2001-12-01 | 김흥대 | 합성수지 파이프 |
KR20050118036A (ko) * | 2004-06-12 | 2005-12-15 | 허차순 | 프로파일 나선형 합성수지관 코팅 직관 파이프 |
KR200398500Y1 (ko) | 2005-07-26 | 2005-10-13 | (주)미라이후손관거 | 방음 피복 및 기공을 갖는 방음 파이프 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100915630B1 (ko) * | 2008-09-30 | 2009-09-04 | 김국수 | 배관용 단열커버 및 그 시공방법 |
KR101509103B1 (ko) | 2013-01-25 | 2015-04-07 | 주식회사 카본티씨지 | 복합재 파이프, 복합재 롤러, 복합재 파이프 제조방법 및 복합재 파이프를 이용한 복합재 롤러 제조방법 |
US11225843B2 (en) | 2019-08-01 | 2022-01-18 | Saudi Arabian Oil Company | Composite dual channel drill pipes and method of manufacture |
Also Published As
Publication number | Publication date |
---|---|
KR20080084362A (ko) | 2008-09-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100878178B1 (ko) | 섬유강화플라스틱 관 및 그 제조방법 | |
CN101263270B (zh) | 纤维增强塑料制成的增强体 | |
CN104769280A (zh) | 风力涡轮机塔架 | |
KR100878180B1 (ko) | 콘크리트 충전 섬유강화플라스틱 합성기둥 | |
KR100608516B1 (ko) | 강성이 향상된 합성수지 다중벽관 | |
KR100878179B1 (ko) | 섬유강화플라스틱 상하수도관 | |
KR20060117039A (ko) | 이중단면구조로 제작된 섬유강화플라스틱 관을 이용한콘크리트복합체 구조물 및 그 시공방법 | |
CN207864802U (zh) | 一种内肋增强聚乙烯螺旋波纹管 | |
KR100980658B1 (ko) | 인공구조물용 이종재복합보강근 | |
JP6688026B2 (ja) | ブレース材 | |
KR20190114613A (ko) | 파이프 강성 보강재 및 이를 이용한 파이프 강성 보강 방법 | |
JP5778483B2 (ja) | 機械式鉄筋継手 | |
KR20100085700A (ko) | 광섬유 센서를 구비한 복합 쉘 파일 및 그 시공 방법 | |
KR20010002099A (ko) | 지중매설용 내압 합성수지관 | |
KR101455716B1 (ko) | 노즐의 회전에 의한 단면내 다종 섬유 배치 변경기능의 섬유보강폴리머 보강근 제조용 성형노즐, 이를 이용한 섬유보강폴리머 보강근의 제조방법 및 제조장치 | |
CN212960264U (zh) | 一种连接稳定的pp高筋增强聚乙烯缠绕管 | |
KR102646679B1 (ko) | Frp 슬리브 이음 장치 및 방법 | |
CN110242802A (zh) | 一种双高筋结构壁管 | |
KR101025314B1 (ko) | 복합 쉘 파일 및 그 시공 방법 | |
CN215445372U (zh) | 一种塑料管 | |
WO2010002049A1 (en) | Reinforcing rod, reinforcing rod coupler and coupling method thereby | |
CN214248562U (zh) | 一种内衬式混凝土复合管 | |
KR20110032556A (ko) | 철근접합형 조립식 철골튜브 및 이의 제작방법 | |
RU2467278C1 (ru) | Корпус транспортно-пускового контейнера из композиционных материалов (варианты) | |
KR101210715B1 (ko) | 섬유강화플라스틱 말뚝 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130103 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140205 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141231 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20151230 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20170105 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20190108 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20191126 Year of fee payment: 12 |