KR100832848B1 - 교각 시공방법 및 이에 적용되는 콘크리트 영구거푸집 - Google Patents
교각 시공방법 및 이에 적용되는 콘크리트 영구거푸집 Download PDFInfo
- Publication number
- KR100832848B1 KR100832848B1 KR1020070053844A KR20070053844A KR100832848B1 KR 100832848 B1 KR100832848 B1 KR 100832848B1 KR 1020070053844 A KR1020070053844 A KR 1020070053844A KR 20070053844 A KR20070053844 A KR 20070053844A KR 100832848 B1 KR100832848 B1 KR 100832848B1
- Authority
- KR
- South Korea
- Prior art keywords
- permanent
- pier
- concrete
- formwork
- permanent formwork
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
Abstract
Description
Claims (29)
- 거푸집 내에 기초철근을 배근한 후 콘크리트를 타설하여 양생 전의 교각기초를 준비하는 단계;양생완료 전의 상기 교각기초 상에 레벨링용 영구거푸집을 설치하여 사후 양생될 교각의 수직도 유지를 위한 수평내기작업(Leveling)을 수행하는 단계;상기 레벨링용 영구거푸집 내에 확장용 철근을 입설 배근하는 단계;상기 레벨링용 영구거푸집 상에 확장용 영구거푸집을 적층시켜 설치하는 단계;상기 확장용 영구거푸집 내에 콘크리트를 타설하는 단계;상기 확장용 영구거푸집 내에 확장용 철근을 재차 입설 배근하는 단계;상기 확장용 영구거푸집 상에 마감처리용 영구거푸집을 적층시켜 설치하는 단계; 및상기 마감처리용 영구거푸집 내에 콘크리트를 재차 타설하는 단계;를 포함하여 이루어짐을 특징으로 하는 교각 시공방법.
- 제 1 항에 있어서,상기 확장용 영구거푸집의 적층 설치 이전에, 상호 접촉되는 양 영구거푸집이 긴밀하게 결합될 수 있도록 이들을 연결시켜주는 고정수단을 설치하는 단계가 더 포함되어 이루어짐을 특징으로 하는 교각 시공방법.
- 제 2 항에 있어서,상기 고정수단 설치단계는 상기 레벨링용 또는 확장용 영구거푸집에 형성된 키 홀에 철근 키(다우얼 바아)를 설치하는 것에 의해 이루어짐을 특징으로 하는 교각 시공방법.
- 제 1 항 또는 제 2 항에 있어서,상기 각 영구거푸집의 적층접촉부 간에는, 인접 배치되는 영구거푸집 간의 완충작용 및 그 내부공간으로 타설되는 콘크리트의 누설을 방지하기 위한 고무링 설치단계가 더 포함되어 이루어짐을 특징으로 하는 교각 시공방법.
- 제 1 항에 있어서,상기 확장용 또는 마감처리용 영구거푸집의 적층 설치 후, 그 최상측의 영구거푸집 상부둘레에 작업자가 이동할 수 있는 안전발판을 설치하는 단계와, 해당위치에서의 작업완료 후 상기 안전발판을 제거하는 단계가 더 포함되어 이루어짐을 특징으로 하는 교각 시공방법.
- 제 1 항, 제 2 항 또는 제 5 항 중 어느 한 항에 있어서,시공 전에 기 설정된 교각 높이만큼 확장될 수 있도록 상기 확장용 영구거푸집을 적층하고 콘크리트를 타설하는 일련의 작업을 필요한 회수만큼 연속 반복적으 로 더 수행함을 특징으로 하는 교각 시공방법.
- 제 1 항에 있어서,상기 각 영구거푸집으로서, 교각의 하중조건을 감안한 기 설정의 교각직경과 일치하는 크기의 외경을 갖는 프리캐스트 콘크리트 원통관체를 적용함에 의해, 상기 각 영구거푸집이 교각 구조물에 완전 합성되게 함을 특징으로 하는 교각 시공방법.
- 제 1 항에 있어서,상기 각 영구거푸집으로서, 교각의 하중조건을 감안한 기 설정의 교각직경 이상의 크기의 외경을 갖는 프리캐스트 콘크리트 원통관체를 적용함에 의해, 상기 각 영구거푸집이 교각 구조물에 일부 합성되게 함을 특징으로 하는 교각 시공방법.
- 거푸집 내에 기초철근을 배근한 후 콘크리트를 타설하여 양생 전의 교각기초를 준비하는 단계;관 둘레 내측에 연직방향으로 일정길이의 필요철근이 다수 돌출된 레벨링용 영구거푸집을 양생완료 전의 상기 교각기초 상에 설치하여 사후 양생될 교각의 수직도 유지를 위한 수평내기작업(Leveling)을 수행하는 단계;관 둘레 내측에 연직방향으로 일정길이의 필요철근이 다수 돌출된 확장용 영구거푸집을 상기 레벨링용 영구거푸집 상에 적층시켜 설치하되 상기 양 영구거푸집 간의 각 필요철근이 상하위치에서 일체화된 직렬형태로 연장되게 고정하여 적층 설치하는 단계;상기 확장용 영구거푸집 내에 콘크리트를 타설하는 단계;관 둘레 내측에 연직방향으로 일정길이의 필요철근이 다수 돌출된 마감처리용 영구거푸집을 상기 확장용 영구거푸집 상에 적층시켜 설치하되 상기 양 영구거푸집 간의 각 필요철근이 상하위치에서 일체화된 직렬형태로 연장되게 고정하여 적층 설치하는 단계; 및상기 마감처리용 영구거푸집 내에 콘크리트를 재차 타설하는 단계;를 포함하여 이루어짐을 특징으로 하는 교각 시공방법.
- 제 9 항에 있어서,상기 각 영구거푸집의 적층접촉부 간에는, 인접 배치되는 영구거푸집 간의 완충작용 및 그 내부공간으로 타설되는 콘크리트의 누설을 방지하기 위한 고무링 설치단계가 더 포함되어 이루어짐을 특징으로 하는 교각 시공방법.
- 제 9 항에 있어서,상기 확장용 또는 마감처리용 영구거푸집의 적층 설치 후, 그 최상측의 영구거푸집 상부둘레에 작업자가 이동할 수 있는 안전발판을 설치하는 단계와, 해당위치에서의 작업완료 후 상기 안전발판을 제거하는 단계가 더 포함되어 이루어짐을 특징으로 하는 교각 시공방법.
- 제 9 항 내지 제 11 항 중 어느 한 항에 있어서,시공 전에 기 설정된 교각 높이만큼 확장될 수 있도록 상기 확장용 영구거푸집을 적층하고 콘크리트를 타설하는 일련의 작업을 필요한 회수만큼 연속 반복적으로 더 수행함을 특징으로 하는 교각 시공방법.
- 제 9 항에 있어서,상기 각 영구거푸집으로서, 교각의 하중조건을 감안한 기 설정의 교각직경과 일치하는 크기의 외경을 갖는 프리캐스트 콘크리트 원통관체를 적용함에 의해, 상기 각 영구거푸집이 교각 구조물에 완전 합성되게 함을 특징으로 하는 교각 시공방법.
- 제 9 항에 있어서,상기 각 영구거푸집으로서, 교각의 하중조건을 감안한 기 설정의 교각직경 이상의 크기의 외경을 갖는 프리캐스트 콘크리트 원통관체를 적용함에 의해, 상기 각 영구거푸집이 교각 구조물에 일부 합성되게 함을 특징으로 하는 교각 시공방법.
- 설계기준에 의해 산정된 관경과 높이 및 두께를 유지하며 교각기초 상에 순차적으로 적층 결합되는 프리캐스트 콘크리트 원통관체의 각 부품들로서,상부 적층 관체의 연속 적층에 의해 사후 양생될 교각의 수직도를 유지할 수 있도록 수평내기작업(Leveling)을 수행하기 위하여 양생완료 전의 교각기초 상에 설치되는 레벨링용 영구거푸집;시공 전에 기 설정된 교각 높이만큼 확장될 수 있도록 상기 레벨링용 영구거푸집 상에 적층 설치되는 적어도 하나 이상의 확장용 영구거푸집; 및정확한 기 설정 교각 높이에 대한 유지 시공이 가능하도록 상기 확장용 영구거푸집 상에 적층 설치하여 부족한 잔여 교각높이만큼의 미소확장 및 교각 상단부의 마감시공을 수행하기 위하여 설치되는 마감처리용 영구거푸집;을 포함하여 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 15 항에 있어서,상기 각 영구거푸집은 그 관경 또는 높이와, 두께간의 상관치수가 동시 증감하는 상호 비례관계를 유지하도록 설계되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 15 항에 있어서,상기 각 영구거푸집의 양단부 둘레에는 다수의 키 홀이 형성되고, 인접한 영구거푸집의 대응되는 각 키 홀 간에 각각 개재되어 그 양 영구거푸집을 일체로 고정시켜주는 다수의 철근 키(다우얼 바아)가 더 구비되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 15 항에 있어서,상기 각 영구거푸집의 적층접촉부 간에는, 인접 배치되는 영구거푸집 간의 완충작용 및 그 내부공간으로 타설되는 콘크리트의 누설을 방지하기 위하여 개재되는 고무링이 더 구비되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 18 항에 있어서,상기 고무링은, 다수의 철근 키(다우얼 바아)를 각각 삽입 수용할 수 있는 키 관통공이 상기 고무링의 둘레를 따라 일정간격을 두고 다수 개 관통 형성된 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 15 항 내지 제 19 항 중 어느 한 항에 있어서,상기 각 영구거푸집의 양단측 적층접촉부에는, 적층 배치되는 영구거푸집의 안착성 향상을 도모함과 아울러 이들 사이에 개재되는 고정수단 또는 고무링 등과 같은 추가 삽입물의 원활한 설치를 위한 표면적을 확보할 수 있도록, 그 원통 관 본체에 비해 두께를 확장시켜서 된 플랜지부가 형성된 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 15 항 내지 제 19 항 중 어느 한 항에 있어서,상기 각 영구거푸집의 내주면 상에는, 그 내측으로 타설될 콘크리트와의 완 전합성을 위한 다수의 전단보강철근이 각각 돌출 형성되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 15 항에 있어서,상기 확장용 또는 마감처리용 영구거푸집의 상부둘레에는, 작업자의 안전 및 원활한 이동을 위하여 임시 설치 및 해당위치에서의 작업완료 후 제거되는 안전발판이 더 구비되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 설계기준에 의해 산정된 관경과 높이 및 두께를 유지하되 그 원통관체 내부로의 콘크리트 타설에 의해 사후 양생될 교각심재에 배근되어야 할 필요철근의 구성을 대체할 수 있도록 상기 필요철근이 각 원통관체의 둘레를 따라 일정간격을 두고 각 관체 방향으로 다수 매립 배근됨과 아울러 상기 각 필요철근의 일부가 각 원통관체의 상·하단부 외측으로 일정 길이만큼 돌출 형성되어 있으며, 교각기초 상에 순차적으로 적층 결합되는 프리캐스트 콘크리트 원통관체의 각 부품들로서,상부 적층 관체의 연속 적층에 의해 사후 양생될 교각의 수직도를 유지할 수 있도록 수평내기작업(Leveling)을 수행하기 위하여 양생완료 전의 교각기초 상에 설치되는 레벨링용 영구거푸집;시공 전에 기 설정된 교각 높이만큼 확장될 수 있도록 상기 레벨링용 영구거푸집 상에 적층 설치되는 적어도 하나 이상의 확장용 영구거푸집; 및정확한 기 설정 교각 높이에 대한 유지 시공이 가능하도록 상기 확장용 영구 거푸집 상에 적층 설치하여 부족한 잔여 교각높이만큼의 미소확장 및 교각 상단부의 마감시공을 수행하기 위하여 설치되는 마감처리용 영구거푸집;을 포함하여 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 23 항에 있어서,상기 각 영구거푸집은, 상기 필요철근의 배근밀도와 원통관체의 두께간의 상관치수에 따라 그 배근밀도가 조밀하면 원통관체의 두께는 얇아지고 상기 배근밀도가 조방하면 원통관체의 두께는 상대적으로 두꺼워지는, 상호 반비례관계를 유지하도록 설계되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 23 항에 있어서,상기 각 영구거푸집의 상·하단부 둘레에는 내측으로 철근노출 공간을 형성하기 위한 단턱부가 형성되고 그 단턱부 상에 상기 필요철근이 돌출 형성된 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 23 항에 있어서,상기 각 영구거푸집의 적층접촉부 간에는, 인접 배치되는 영구거푸집 간의 완충작용 및 그 내부공간으로 타설되는 콘크리트의 누설을 방지하기 위하여 개재되는 고무링이 더 구비되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 23 항 내지 제 26 항 중 어느 한 항에 있어서,상기 각 영구거푸집의 양단측 적층접촉부에는, 적층 배치되는 영구거푸집의 안착성 향상을 도모함과 아울러 이들 사이에 개재되는 고무링 등과 같은 추가 삽입물의 원활한 설치를 위한 표면적을 확보할 수 있도록, 그 원통 관 본체에 비해 두께를 확장시켜서 된 플랜지부가 형성된 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 23 항 내지 제 26 항 중 어느 한 항에 있어서,상기 각 영구거푸집의 내주면 상에는, 그 내측으로 타설될 콘크리트와의 완전합성을 위한 다수의 전단보강철근이 각각 돌출 형성되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
- 제 23 항에 있어서,상기 확장용 또는 마감처리용 영구거푸집의 상부둘레에는, 작업자의 안전 및 원활한 이동을 위하여 임시 설치 및 해당위치에서의 작업완료 후 제거되는 안전발판이 더 구비되어 이루어진 것을 특징으로 하는 교각 시공용 콘크리트 영구거푸집.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070053844A KR100832848B1 (ko) | 2007-06-01 | 2007-06-01 | 교각 시공방법 및 이에 적용되는 콘크리트 영구거푸집 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070053844A KR100832848B1 (ko) | 2007-06-01 | 2007-06-01 | 교각 시공방법 및 이에 적용되는 콘크리트 영구거푸집 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100832848B1 true KR100832848B1 (ko) | 2008-05-28 |
Family
ID=39665387
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070053844A KR100832848B1 (ko) | 2007-06-01 | 2007-06-01 | 교각 시공방법 및 이에 적용되는 콘크리트 영구거푸집 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100832848B1 (ko) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102031755A (zh) * | 2010-11-26 | 2011-04-27 | 哈尔滨工程大学 | 梁桥重力式桥墩用多功能永久模板 |
KR101118508B1 (ko) | 2011-09-16 | 2012-03-12 | 주식회사 피피에스브릿지 | 콘크리트 표면 정착판석 설치구조 및 그의 시공방법 |
CN104963289A (zh) * | 2015-06-09 | 2015-10-07 | 沈阳市政集团有限公司 | 一种异形墩柱大体积混凝土整体一次性浇筑施工方法 |
CN105672672A (zh) * | 2016-02-03 | 2016-06-15 | 广东远大桥梁钢结构租赁有限公司 | 一种墩柱施工系统及施工方法 |
CN106368117A (zh) * | 2016-09-29 | 2017-02-01 | 上海市政工程设计研究总院(集团)有限公司 | 一种桥梁立柱与承台的拼装方法 |
CN107299764A (zh) * | 2017-07-24 | 2017-10-27 | 中国十七冶集团有限公司 | 一种便于构造柱主筋定位的混凝土装置及施工方法 |
CN107604820A (zh) * | 2017-09-19 | 2018-01-19 | 芜湖铁路桥梁制造有限公司 | 桥梁墩身的浇筑方法 |
CN110468694A (zh) * | 2019-09-06 | 2019-11-19 | 郑州大学 | 承插式自复位多节段预制桥墩及其装配方法 |
CN110886234A (zh) * | 2019-12-17 | 2020-03-17 | 中交路桥建设有限公司 | 用于桥梁墩柱的接长模板及施工方法 |
CN112609565A (zh) * | 2021-01-13 | 2021-04-06 | 安徽六安公路桥梁工程有限公司 | 一种钢管混凝土预制桥墩 |
CN113187224A (zh) * | 2021-04-23 | 2021-07-30 | 安徽华骅桥梁设备制造有限公司 | 一种免螺栓安装的圆柱模板工作平台防护装置 |
CN113417215A (zh) * | 2021-07-06 | 2021-09-21 | 中铁二十局集团第六工程有限公司 | 桥梁建造施工方法 |
CN114370001A (zh) * | 2021-12-01 | 2022-04-19 | 中铁九局集团第五工程有限公司 | 一种高墩模板平台施工垂度监测报警装置 |
KR102385958B1 (ko) | 2021-11-15 | 2022-04-22 | 주식회사 케이씨산업 | 콘크리트 존치거푸집을 이용한 교각 및 그 시공방법 |
CN114439222A (zh) * | 2022-03-03 | 2022-05-06 | 中国建筑第八工程局有限公司 | 一种混凝土圆柱的施工装置 |
CN116180613A (zh) * | 2023-04-25 | 2023-05-30 | 中铁二十二局集团第二工程有限公司 | 一种桥体支撑部的施工养护方法 |
KR20230082089A (ko) | 2021-12-01 | 2023-06-08 | 에스비엔지니어링 주식회사 | Rc 기둥과 코핑의 접합 연결구 및 그 시공방법 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100319434B1 (ko) | 1999-06-26 | 2002-01-09 | 이용철 | 교각철근설치용 안전대 |
KR20040098872A (ko) * | 2003-05-16 | 2004-11-26 | 진성토건 주식회사 | 조립식 교각 구조물 시공 방법 및 그 구조물 |
KR20050098357A (ko) * | 2004-04-06 | 2005-10-12 | 정재용 | 프리캐스트 콘크리트 거푸집을 이용한 교각 구조물 및 그시공방법 |
KR200424776Y1 (ko) | 2006-06-15 | 2006-08-28 | 차진이 | 프리캐스트 콘크리트 중공관 거푸집을 이용한 콘크리트교각 |
-
2007
- 2007-06-01 KR KR1020070053844A patent/KR100832848B1/ko active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100319434B1 (ko) | 1999-06-26 | 2002-01-09 | 이용철 | 교각철근설치용 안전대 |
KR20040098872A (ko) * | 2003-05-16 | 2004-11-26 | 진성토건 주식회사 | 조립식 교각 구조물 시공 방법 및 그 구조물 |
KR20050098357A (ko) * | 2004-04-06 | 2005-10-12 | 정재용 | 프리캐스트 콘크리트 거푸집을 이용한 교각 구조물 및 그시공방법 |
KR200424776Y1 (ko) | 2006-06-15 | 2006-08-28 | 차진이 | 프리캐스트 콘크리트 중공관 거푸집을 이용한 콘크리트교각 |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102031755A (zh) * | 2010-11-26 | 2011-04-27 | 哈尔滨工程大学 | 梁桥重力式桥墩用多功能永久模板 |
KR101118508B1 (ko) | 2011-09-16 | 2012-03-12 | 주식회사 피피에스브릿지 | 콘크리트 표면 정착판석 설치구조 및 그의 시공방법 |
CN104963289A (zh) * | 2015-06-09 | 2015-10-07 | 沈阳市政集团有限公司 | 一种异形墩柱大体积混凝土整体一次性浇筑施工方法 |
CN105672672A (zh) * | 2016-02-03 | 2016-06-15 | 广东远大桥梁钢结构租赁有限公司 | 一种墩柱施工系统及施工方法 |
CN106368117A (zh) * | 2016-09-29 | 2017-02-01 | 上海市政工程设计研究总院(集团)有限公司 | 一种桥梁立柱与承台的拼装方法 |
CN107299764A (zh) * | 2017-07-24 | 2017-10-27 | 中国十七冶集团有限公司 | 一种便于构造柱主筋定位的混凝土装置及施工方法 |
CN107604820A (zh) * | 2017-09-19 | 2018-01-19 | 芜湖铁路桥梁制造有限公司 | 桥梁墩身的浇筑方法 |
CN110468694A (zh) * | 2019-09-06 | 2019-11-19 | 郑州大学 | 承插式自复位多节段预制桥墩及其装配方法 |
CN110886234A (zh) * | 2019-12-17 | 2020-03-17 | 中交路桥建设有限公司 | 用于桥梁墩柱的接长模板及施工方法 |
CN112609565A (zh) * | 2021-01-13 | 2021-04-06 | 安徽六安公路桥梁工程有限公司 | 一种钢管混凝土预制桥墩 |
CN113187224A (zh) * | 2021-04-23 | 2021-07-30 | 安徽华骅桥梁设备制造有限公司 | 一种免螺栓安装的圆柱模板工作平台防护装置 |
CN113417215A (zh) * | 2021-07-06 | 2021-09-21 | 中铁二十局集团第六工程有限公司 | 桥梁建造施工方法 |
KR102385958B1 (ko) | 2021-11-15 | 2022-04-22 | 주식회사 케이씨산업 | 콘크리트 존치거푸집을 이용한 교각 및 그 시공방법 |
CN114370001A (zh) * | 2021-12-01 | 2022-04-19 | 中铁九局集团第五工程有限公司 | 一种高墩模板平台施工垂度监测报警装置 |
KR20230082089A (ko) | 2021-12-01 | 2023-06-08 | 에스비엔지니어링 주식회사 | Rc 기둥과 코핑의 접합 연결구 및 그 시공방법 |
CN114370001B (zh) * | 2021-12-01 | 2024-04-05 | 中铁九局集团第五工程有限公司 | 一种高墩模板平台施工垂度监测报警装置 |
CN114439222A (zh) * | 2022-03-03 | 2022-05-06 | 中国建筑第八工程局有限公司 | 一种混凝土圆柱的施工装置 |
CN114439222B (zh) * | 2022-03-03 | 2023-09-01 | 中国建筑第八工程局有限公司 | 一种混凝土圆柱的施工装置 |
CN116180613A (zh) * | 2023-04-25 | 2023-05-30 | 中铁二十二局集团第二工程有限公司 | 一种桥体支撑部的施工养护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100832848B1 (ko) | 교각 시공방법 및 이에 적용되는 콘크리트 영구거푸집 | |
KR100744693B1 (ko) | 콘크리트 스틸 하우스 및 이를 이용한 말뚝기초 푸팅시공방법 | |
KR101195516B1 (ko) | 프리캐스트 콘크리트 셸을 이용한 피어캡부 설치구조 및 이의 시공방법 | |
KR20130113315A (ko) | 건축 구조체 | |
WO2011071671A1 (en) | Structural support system and method | |
US10641247B2 (en) | Pre-assembly slab system for concrete wind turbine towers and method for assembling a pre-assembly slab system for concrete wind turbine towers | |
US20090121373A1 (en) | Method and Apparatus for Construction | |
KR101636473B1 (ko) | L형강을 이용한 중심부재가 구비된 개량형 콘크리트 충전 기둥(lfc 5) 및 이의 시공방법 | |
WO2016020932A2 (en) | Deployable pre-fabricated reinforcement cage system | |
KR101428539B1 (ko) | 중심부재가 구비된 개량형 콘크리트 충전 기둥 및 이의 시공방법 | |
EP1781865A1 (en) | Construction elements and methods of construction | |
CN113738157B (zh) | 建筑物后浇带两侧临时支撑及用该支撑施工构造柱的方法 | |
JP2016205051A (ja) | 構造物の施工方法 | |
JPH1129910A (ja) | コンクリート橋脚の構築方法 | |
JP7016106B2 (ja) | 軽量盛土構造、および軽量盛土の構築方法 | |
JP7145717B2 (ja) | 建築物の構築方法 | |
KR102149661B1 (ko) | 피씨 슬래브를 이용한 건축물의 지상 전이층 시공방법 | |
CN219604686U (zh) | 一种柱内置组合金属模板的中空钢骨架预制柱 | |
KR101577704B1 (ko) | 모서리 보강부재가 구비된 개량형 콘크리트 충전 기둥 및 이의 시공방법 | |
JP6032568B2 (ja) | 中空深礎基礎及びその施工方法 | |
JP2019148108A (ja) | 橋脚構築方法 | |
KR101962709B1 (ko) | 트랜치가 형성된 합성 데크 슬래브 시공 방법 | |
KR20000074712A (ko) | 철골철근콘크리트 아치교의 아치링 구축방법 | |
CN110512776B (zh) | 一种装配式钢结构多腔体钢板组合剪力墙的施工方法 | |
CN211524841U (zh) | 一种蛋形隧洞的装配式模板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130521 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20140519 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20150520 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20160608 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20170519 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20180605 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20190521 Year of fee payment: 12 |