KR100781809B1 - Method for constructing underground structure - Google Patents

Method for constructing underground structure Download PDF

Info

Publication number
KR100781809B1
KR100781809B1 KR1020060046601A KR20060046601A KR100781809B1 KR 100781809 B1 KR100781809 B1 KR 100781809B1 KR 1020060046601 A KR1020060046601 A KR 1020060046601A KR 20060046601 A KR20060046601 A KR 20060046601A KR 100781809 B1 KR100781809 B1 KR 100781809B1
Authority
KR
South Korea
Prior art keywords
underground structure
underground
guide pillar
ground
pillar
Prior art date
Application number
KR1020060046601A
Other languages
Korean (ko)
Other versions
KR20070112975A (en
Inventor
성 길 위
Original Assignee
최일산
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최일산 filed Critical 최일산
Priority to KR1020060046601A priority Critical patent/KR100781809B1/en
Publication of KR20070112975A publication Critical patent/KR20070112975A/en
Application granted granted Critical
Publication of KR100781809B1 publication Critical patent/KR100781809B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

본 발명은 지하 구조물 축조 공법에 관한 것으로, 이 공법은, 지하 구조물의 외벽 설치 위치를 따라 복수의 지점에서 지중에 복수의 지지 기둥을 형성하는 제1 단계; 상기 복수의 지지 기둥의 상부에 각각 가이드 기둥을 설치하는 제2 단계; 상기 가이드 기둥 둘레에 가이드 기둥보다 큰 직경의 중공 부재를 설치하는 제3 단계; 각 2개의 중공 부재 사이에 중공 부재와 일체가 되도록 외벽을 형성하고 상기 복수의 외벽의 상단에 토사 굴착 및 인양을 위한 작업구가 형성된 슬라브를 형성하여 지상에서 하나의 구조물을 완성하는 제4 단계; 상기 가이드 기둥 상에 압입 장치를 장착하는 제5 단계; 상기 압입 장치를 작동하여, 상기 지지 기둥에 의해 가이드 되는 중공 부재와 함께 구조물을 지중에 압입하고, 상기 작업구를 통하여 토사를 굴착한 후 굴착된 깊이만큼 지하 구조물을 재압입하는 과정을 필요한 깊이까지 반복하여 구조물을 압입하는 제6 단계; 상기 제3 단계 내지 제6 단계를 반복하여 지하 본 구조물을 형성하는 제7 단계;를 포함한다. The present invention relates to an underground structure construction method, comprising: a first step of forming a plurality of support pillars in the ground at a plurality of points along an outer wall installation position of an underground structure; A second step of respectively installing guide pillars on the plurality of support pillars; A third step of installing a hollow member having a diameter larger than that of the guide pillar around the guide pillar; A fourth step of forming an outer wall between the two hollow members so as to be integral with the hollow member, and forming a slab having work tools for excavation and lifting of earth and sand on top of the plurality of outer walls to complete one structure on the ground; A fifth step of mounting a press-fit device on the guide pillar; By operating the indentation apparatus, the structure is pressed into the ground together with the hollow member guided by the support pillar, excavating the soil through the work tool and then reindenting the underground structure to the required depth to the required depth Repeatingly indenting the structure; And a seventh step of forming the underground bone structure by repeating the third to sixth steps.

이러한 지하 구조물 축조 공법은 구조물의 형상, 용도, 위치 및 축조되는 심도에 관계없이 용이하게 시공이 가능하며, 복수 층의 구조물 형성이 간편한 장점이 있다. The underground structure construction method can be easily constructed regardless of the shape, use, location and depth of construction of the structure, there is an advantage that easy to form a plurality of layers of structures.

Description

지하 구조물 축조 공법{Method for constructing underground structure}Method for constructing underground structure

도 1은 본 발명의 지하 구조물 축조 공법의 일 실시예를 도시한 도면,1 is a view showing an embodiment of the underground structure construction method of the present invention,

도 2a 내지 도 2d는 본 발명의 공법에 따라 지중에 지지 기둥을 형성하는 과정을 도시한 도면,2a to 2d is a view showing a process of forming a support pillar in the ground according to the method of the present invention,

도 3은 도 2c에 도시된 오버 커팅 헤드를 더 상세히 도시한 도면,3 shows the overcut head shown in FIG. 2c in more detail;

도 4는 지중에 지지 기둥을 형성하는 다른 실시예를 도시한 도면,4 is a view showing another embodiment of forming a support pillar in the ground,

도 5는 본 발명의 공법에서, 복수의 중공 부재 사이에 선단슈가 설치된 형태를 도시한 평면도,5 is a plan view showing a form in which tip shoes are installed between a plurality of hollow members in the method of the present invention;

도 6는 본 발명의 공법에서, 복수의 중공 부재 사이에 외벽이 형성된 형태를 도시한 평면도,6 is a plan view showing a form in which an outer wall is formed between a plurality of hollow members in the method of the present invention;

도 7은 본 발명의 공법에서, 외벽에 슬라브가 형성된 모습을 도시한 평면도,7 is a plan view showing a state in which the slab is formed on the outer wall in the method of the present invention,

도 8은 도 1의 일부를 확대 도시한 사시도,8 is an enlarged perspective view of a part of FIG. 1;

도 9는 압입 장치의 일부를 도시한 사시도,9 is a perspective view showing a part of the indentation apparatus;

도 10은 오거 스크루 가이드의 다른 설치예를 도시한 사시도,10 is a perspective view showing another installation example of the auger screw guide;

도 11은 본 발명에 따라 지하 1층 구조물이 축조된 실시예를 도시한 도면,11 is a view showing an embodiment in which the first floor underground structure is constructed according to the present invention;

도 12는 본 발명에 따라 지하 4층 구조물이 축조된 실시예를 도시한 도면,12 is a view showing an embodiment in which a four-story underground structure is constructed according to the present invention;

도 13은 원형의 지하 구조물 축조에 관한 실시예를 도시한 도면이다.FIG. 13 is a view showing an embodiment regarding the construction of a circular underground structure.

<도면의 주요 부분에 대한 부호 설명><Description of the symbols for the main parts of the drawings>

100: 지지 기둥 200: 압입 장치100: support pillar 200: press-fit device

210: 가이드 기둥 220: 스키210: guide pillar 220: ski

230: 유압잭 300: 외벽230: hydraulic jack 300: outer wall

310: 중공 부재 320: 선단슈310: hollow member 320: tip shoe

330: 오거 스크루 가이드 홀 510: 빔장착 스키330: Auger screw guide hole 510: beam mounted ski

520: 오거 스크루 장착 빔 530: 오거 스크루520: Auger screw mounting beam 530: Auger screw

550: 크레인 600,700,800: 지하 구조물 층550: crane 600,700,800: underground structure floor

본 발명은 지하 구조물 축조 공법에 관한 것으로, 보다 상세하게는 지하 구조물을 지상에서 형성하여 가이드 기둥 또는 지지 기둥을 따라 지중에 압입하는 지하 구조물 축조 공법에 관한 것이다.The present invention relates to an underground structure construction method, and more particularly to an underground structure construction method for forming the underground structure on the ground and press-fitted into the ground along the guide pillar or support pillar.

종래 일반적인 지하실 시공 방법은 지하실 축조 위치에 가시설 시공 후 토사를 굴착하여 소정의 공간을 마련한 다음 다수의 H형강과 토류판을 이용하여 토사 붕괴를 방지하는 벽체를 설치한 후 거푸집을 조립하고 콘크리트를 타설하여 지하실 벽체를 시공하는, 소위 가설흙막이 공법이 주류를 이루었다.Conventionally, the basement construction method is to excavate the earth and sand after installing the temporary facility in the basement construction position, install a wall to prevent the earth and earth collapse by using a number of H-beams and earth plate, then assemble the formwork and cast concrete The so-called temporary construction, which constructs the basement walls, was the mainstream.

그러나 상기와 같은 가설흙막이 공법에 의하여 지하 구조물을 축조할 경우, 지하수 유입이 과다하여 지하 터파기 공사가 곤란할 때에는 H형강과 차수그라우팅 토류판을 이용하여 토사 붕괴 방지 구조를 시공한 다음 터파기 굴착 작업을 하고 지하 구조물을 시공해야 하여, 공정수가 증가하고 공기가 연장된다는 단점이 있다.However, when the underground structure is constructed by the temporary construction method as described above, when the underground excavation work is difficult due to excessive groundwater inflow, construct the earth and sand collapse prevention structure using H-beam and order grouting earth plate, and then excavate the excavation work. And the underground structure must be constructed, there is a disadvantage that the process water increases and the air is extended.

또한, H형강 인발공간과 토류판 설치시의 공간 되메우기 및 토류판 해체 부위의 완벽한 다짐이 불가능하여 장기적인 지층변형의 가능성이 있으며, 이로 인해 주변 위해가 발생되고 완공 후에도 주변 침하 현상이 계속되는 폐단이 발생할 수 있다. 즉, 흙이 충진되는 공간이 매우 협소하여 장비를 이용한 완벽한 다짐 작업이 원활히 이루어지지 못하며, 또 되메워진 부위는 주변의 안정지층에 변형을 유도함으로써 주변 건축물을 지지하고 있던 지층이 변형되거나 침하되어 상술한 바와 같이 건축물 및 도로 등이 피해를 입게 된다.In addition, there is a possibility of long-term stratum deformation due to impossibility of perfect backfilling of H-shaped steel drawing space and earth plate installation and earth plate dismantling site, which may result in peripheral hazards and closures that continue to settle after completion. . In other words, the space filled with soil is so narrow that perfect compaction work cannot be performed smoothly. Also, the backfilled area is deformed or settled by inducing deformation to the surrounding stable ground floor. As mentioned above, buildings and roads are damaged.

따라서, 본 발명은 지하 구조물을 지상에서 형성하여 보다 간단한 방법으로 정확하게 압입하여 지하 구조물을 축조할 수 있는 공법을 제공하는 것을 목적으로 한다.Accordingly, an object of the present invention is to provide a construction method that can form the underground structure to be precisely indented in a simpler way to build the underground structure on the ground.

이러한 목적을 달성하기 위한 본 발명의 지하 구조물 축조 공법은, 지하 구조물의 외벽 설치 위치를 따라 복수의 지점에서 지중에 복수의 지지 기둥을 형성하 는 제1 단계; 상기 복수의 지지 기둥의 상부에 각각 가이드 기둥을 설치하는 제2 단계; 상기 가이드 기둥 둘레에 가이드 기둥보다 큰 직경의 중공 부재를 설치하는 제3 단계; 각 2개의 중공 부재 사이에 중공 부재와 일체가 되도록 외벽을 형성하고 상기 복수의 외벽의 상단에 토사 굴착 및 인양을 위한 작업구가 형성된 슬라브를 형성하여 지상에서 하나의 구조물을 완성하는 제4 단계; 상기 가이드 기둥 상에 압입 장치를 장착하는 제5 단계; 상기 압입 장치를 작동하여, 상기 지지 기둥에 의해 가이드 되는 중공 부재와 함께 구조물을 지중에 압입하고, 상기 작업구를 통하여 토사를 굴착한 후 굴착된 깊이만큼 지하 구조물을 재압입하는 과정을 필요한 깊이까지 반복하여 구조물을 압입하는 제6 단계; 상기 제3 단계 내지 제6 단계를 반복하여 지하 본 구조물을 형성하는 제7 단계;를 포함한다. Underground structure construction method of the present invention for achieving this object, the first step of forming a plurality of support pillars in the ground at a plurality of points along the outer wall installation position of the underground structure; A second step of respectively installing guide pillars on the plurality of support pillars; A third step of installing a hollow member having a diameter larger than that of the guide pillar around the guide pillar; A fourth step of forming an outer wall between the two hollow members so as to be integral with the hollow member, and forming a slab having work tools for excavation and lifting of earth and sand on top of the plurality of outer walls to complete one structure on the ground; A fifth step of mounting a press-fit device on the guide pillar; By operating the indentation apparatus, the structure is pressed into the ground together with the hollow member guided by the support pillar, excavating the soil through the work tool and then reindenting the underground structure to the required depth to the required depth Repeatingly indenting the structure; And a seventh step of forming the underground bone structure by repeating the third to sixth steps.

다른 실시 형태에서는, 상기 제7 단계에서, 상기 제3 단계 내지 제6 단계를 2회 이상 반복하여 2층 이상의 지하 본 구조물을 형성할 수 있다. In another embodiment, in the seventh step, the third to sixth steps may be repeated two or more times to form two or more underground bone structures.

바람직하게는, 상기 지지 기둥을 형성하는 단계는, 토사 아래에 암반이 존재하는 경우, 지중에 강관 파이프를 압입하고 오거 스크류로 강관 파이프 내의 토사를 굴착하는 단계; 상기 강관 파이프 내에 소정 곡률로 휘어진 소구경 파이프를 삽입하고 휘어진 소구경 파이프를 따라 천공 해머를 삽입하여 암반을 천공하는 과정을 반복하여 암반에 사방으로 적절한 간격을 두고 천공하는 단계; 상기 강관 파이프 및 암반에 천공된 구멍에 철근 콘크리트를 타설하여 기둥을 형성하는 단계;를 포함할 수 있다. Preferably, the step of forming the support pillar, if there is a rock under the soil, the step of pressing the steel pipe in the ground and excavating the soil in the steel pipe pipe with an auger screw; Inserting a small diameter pipe bent at a predetermined curvature into the steel pipe pipe and inserting a punching hammer along the curved small diameter pipe to perforate the rock, and drilling the rock at an appropriate interval in all directions; It may include; and the step of forming a pillar by pouring reinforced concrete in the hole drilled in the steel pipe and rock.

또한, 상기 제4 단계를 최초 실행하는 경우, 외벽을 형성하기에 앞서 각 2개 의 중공 부재 사이 하단에 침상 단부를 가지는 철판으로 제작된 선단슈가 제공될 수 있다. In addition, when the fourth step is performed for the first time, a tip shoe made of an iron plate having a needle end at the lower end between each of the two hollow members may be provided prior to forming the outer wall.

상기 압입 장치는, 가이드 기둥의 외주면에 상하 이동할 수 있게 설치되는 스키; 상기 스키의 일 측면에 결합되는 하나 이상의 유압잭;을 포함할 수 있다. The indentation apparatus, the ski is installed to move up and down on the outer peripheral surface of the guide pillar; It may include; one or more hydraulic jacks coupled to one side of the ski.

바람직하게는, 상기 외벽에는 복수의 오거 스크루 가이드 홀이 형성되고, 상기 가이드 기둥에 상하 이동 가능하게 설치된 두 개의 스키에 양 단부가 결합되는 오거 스크루 장착 빔에는 상기 가이드 홀을 관통하는 복수의 오거 스크루가 장착되도록 구성될 수 있다. Preferably, a plurality of auger screw guide holes are formed in the outer wall, and auger screw mounting beams having both ends coupled to two skis provided to be movable up and down on the guide pillar are provided with a plurality of auger screws passing through the guide holes. Can be configured to be mounted.

달리, 상기 가이드 홀을 관통하는 복수의 오거 스크루는 상기 가이드 기둥의 상부에 설치된 크레인에 장착되고, 상기 크레인은 유압 실린더에 의해 높이가 조절되도록 구성될 수도 있다. Alternatively, the plurality of auger screws passing through the guide hole may be mounted to a crane installed on the guide pillar, and the crane may be configured to adjust the height by a hydraulic cylinder.

이와 같이 구성되는 지하 구조물 축조 공법은 지하 구조물을 지상에서 형성하여 가이드 기둥 또는 지지 기둥을 따라 압입하므로, 지하 구조물의 형태, 용도 또는 설치되는 심도에 관계없이 용이하게 축조가 가능할 뿐 아니라 여러 층의 지하 구조물도 손쉽게 축조할 수 있는 장점이 있다. The underground structure construction method constructed in this way forms an underground structure on the ground and presses it along the guide pillar or support pillar, so that it can be easily constructed regardless of the shape, use, or depth of installation of the underground structure, and multiple layers of underground The structure also has the advantage that it can be easily constructed.

또한, 종래의 토사를 굴착한 후 구조물을 축조하는 것이 아니라, 구조물을 지중에 압입한 후 토사를 굴착하므로, 가시설 흙막이의 시공이 필요 없고, 토사 붕괴나 지하수 유입의 염려 없이 지하 구조물을 축조할 수 있다.In addition, it is not necessary to construct the structure after excavating the conventional soil, but to excavate the soil after pressing the structure into the ground, so it is not necessary to construct a temporary earthquake, and it is possible to construct an underground structure without fear of soil collapse or groundwater inflow. have.

이하, 첨부도면을 참조하여 본 발명에 따른 지하 구조물 축조 공법의 실시예 를 설명한다.Hereinafter, with reference to the accompanying drawings will be described an embodiment of the underground structure construction method according to the present invention.

도 1은 본 발명의 일 실시예를 도시한 것이다. 본 발명의 지하 구조물 축조 공법에서는, 먼저 지하 구조물의 외벽 설치 위치를 따라 복수의 지점에서 지중에 복수의 지지 기둥(100)을 형성한다. 1 illustrates an embodiment of the present invention. In the underground structure construction method of the present invention, first, a plurality of support pillars 100 are formed in the ground at a plurality of points along the outer wall installation position of the underground structure.

도 2a 내지 도 2d를 참조하여 이 단계를 살펴보면, 지중에 강관 파이프(STPIPE, 20)를 압입하고(도 1a), 오거 스크류(30)를 이용하여 상기 강관 파이프(20) 내의 토사를 굴착한 후(도 1b), 철근 콘크리트를 타설하여 기둥을 형성한다. Referring to this step with reference to Figures 2a to 2d, after pressing the steel pipe (STPIPE, 20) in the ground (Fig. 1a), using the auger screw 30 to excavate the soil in the steel pipe pipe 20 (FIG. 1B), the reinforced concrete is poured to form columns.

이때, 지하 구조물의 압입시 압입 장치에 작용하는 반력을 견딜 수 있도록, 하부는 직경이 크고 상부는 상대적으로 직경이 작은 모양으로 형성되는 것이 바람직하다. 그러기 위하여, 강관 파이프(20) 내의 토사를 굴착한 후, 오거 스크루(30)의 단부에 오버 커팅 헤드(400)를 결합하여 강관 파이프(20) 하단 아래의 중공 직경을 확장한다(도 1c). At this time, in order to withstand the reaction force acting on the indentation device during the indentation of the underground structure, it is preferable that the lower portion is formed in a shape having a large diameter and a relatively small diameter. To this end, after excavating the soil in the steel pipe pipe 20, the overcut head 400 is coupled to the end of the auger screw 30 to expand the hollow diameter below the bottom of the steel pipe pipe 20 (FIG. 1C).

상기 오버 커팅 헤드(400)는 도 3에 더 상세히 도시된 바와 같이 파이프에 삽입될 때는 확장 날개(430)가 접힌 채로 삽입되고, 회전을 시작하면 확장 날개(430)가 펴져 더 큰 직경으로 토사를 굴착할 수 있는 구조를 갖는다. When the over-cutting head 400 is inserted into the pipe as shown in more detail in FIG. 3, the expansion blade 430 is inserted while being folded, and when the rotation starts, the expansion blade 430 is expanded to spread the soil to a larger diameter. It has a structure that can be excavated.

더 구체적으로, 상기 오버 커팅 헤드(400)는 중심 로드(410)와, 상기 중심 로드(410)의 외측에 결합되는 고정부(420)와, 일측 단부가 상기 고정부(420)에 절첩 가능하게 결합하며 타측 단부에는 굴착용 커팅 날(432)이 결합된 확장 날개(430)를 포함한다.More specifically, the over cutting head 400 has a center rod 410, a fixing portion 420 coupled to the outside of the center rod 410, and one end of the over cutting head 400 can be folded in the fixing portion 420 The other end includes an expansion blade 430 coupled to the excavation cutting blade 432 at the other end.

상기 중심 로드(410)는, 토사 굴착을 위해 사용되는 통상적인 오커 스크루의 단부에 결합되도록 형성되는 것이 바람직하다. 상기 중심 로드(410)의 외주면에 결합되는 상기 고정부(420)는 확장 날개(430)를 절첩 가능하게 고정시킬 수 있다면 어떠한 형태를 갖더라도 무방하며, 도 3에 도시된 바와 같은 플레이트일 수 있다. 상기 고정부(420)에는 확장날개(430)의 일측 단부가 절첩 가능하게 결합되는데, 통상적인 힌지결합부(431)를 이용하여 결합될 수 있다. 상기 확장 날개(430)는, 고정부의 외측 단부에서 안쪽으로 소정 거리만큼 들어간 위치에 결합되어, 고정부와 확장날개가 결합되는 지점과, 고정부의 외측 단부와의 사이에 지지공간(421)이 형성되도록 하는 것이 바람직하다. 상기 지지 공간(421)은 확장 날개가 도 3에서와 같이 확장되는 경우, 확장 날개가 반대편으로 완전히 제껴지지 않도록 지지하여, 확장된 상태를 유지할 수 있도록 하는 역할을 한다. 도 3에서 실선은 확장 날개(430)가 접혀 있는 모습을, 점선은 확장된 모습을 도시한다. 확장 날개(430)의 반대쪽 단부에는 토사 굴착을 위한 커팅 날(432)이 결합된다. 한편 상기 고정부(420)의 아래쪽 부분은 하부로 갈수록 점점 폭이 좁아지게 형성되며, 그 외측에는 커팅 날(422)이 결합되는 것이 바람직하다. The center rod 410 is preferably formed to be coupled to the end of a conventional ocher screw used for earth excavation. The fixing part 420 coupled to the outer circumferential surface of the center rod 410 may have any shape as long as the extension blade 430 can be foldably fixed, and may be a plate as shown in FIG. 3. . One end of the expansion blade 430 is coupled to the fixed portion 420 so that it can be folded, it can be coupled using a conventional hinge coupling portion 431. The expansion blade 430 is coupled to a position that enters a predetermined distance inward from the outer end of the fixing portion, the support space 421 between the point where the fixing portion and the extension wings are coupled, and the outer end of the fixing portion It is desirable to allow this to be formed. The support space 421 serves to maintain the expanded state by supporting the extension blades so as not to be completely removed from the opposite side when the extension blades are expanded as shown in FIG. 3. In FIG. 3, the solid line shows the expansion wing 430 folded and the dotted line shows the expanded state. Opposite ends of the expansion blade 430 are coupled to the cutting blade 432 for earth excavation. On the other hand, the lower portion of the fixing portion 420 is formed to gradually become narrower toward the bottom, the cutting edge 422 is preferably coupled to the outside.

오버 커팅 헤드(400)를 통해 강관 파이프(30) 하부의 굴착이 끝나면, 오거 스크루 및 이에 결합된 오버 커팅 헤드(400)를 빼낸 후, 철근 등을 배치한 다음 콘크리트를 타설하여 도 1d에 도시된 바와 같은 형상의 지지 기둥(100)을 지중에 형성한다. 즉, 이러한 지지 기둥은 강관 파이프의 외경과 동일한 직경의 상부 기둥(110)과, 그 하부에 위치하는 보다 큰 직경의 하부 기둥(120)으로 구성된다.After the excavation of the lower portion of the steel pipe pipe 30 through the over-cutting head 400, the auger screw and the over-cutting head 400 coupled thereto are removed, and the rebar is placed, and then concrete is poured and the concrete is shown in FIG. 1D. A support pillar 100 having a shape as described above is formed in the ground. That is, the support pillar is composed of an upper pillar 110 having the same diameter as the outer diameter of the steel pipe pipe, and a lower pillar 120 having a larger diameter located below it.

다른 예로서, 도 4에 도시된 바와 같이 지지 기둥을 형성할 수도 있다. 이는 특히 토사(1) 아래에 암반(2)이 존재하는 경우에 이용될 수 있는 공법으로, 먼저 지중에 강관 파이프(20)를 압입하고 오거 스크류(30)로 강관 파이프(20) 내의 토사를 굴착한다. 그리고, 상기 강관 파이프(20) 내에 소정 곡률로 휘어진 소구경 파이프(40)를 삽입하고 이 휘어진 소구경 파이프(40)를 따라 천공 해머(50)를 삽입하여 암반(2)을 천공한다. 서로 다른 곡률의 여러 소구경 파이프(40)를 사용하여 이러한 과정을 반복함으로써 암반에 사방으로 천공한다. 다음으로, 상기 강관 파이프(20) 및 암반의 천공된 구멍에 철근 콘크리트를 타설하여 기둥을 형성한다. As another example, the support pillar may be formed as shown in FIG. 4. This is a process that can be used, especially when rock 2 is present below the earth and sand 1, first press the steel pipe 20 in the ground and excavate the sand in the steel pipe 20 with an auger screw 30. do. Then, the small diameter pipe 40 bent in a predetermined curvature is inserted into the steel pipe pipe 20, and the punching hammer 50 is inserted along the curved small diameter pipe 40 to drill the rock 2. Repeat this process using several small diameter pipes 40 of different curvature to perforate the rock in all directions. Next, reinforced concrete is poured into the perforated holes of the steel pipe 20 and the rock to form a column.

지중에 지지 기둥(100)이 형성되면, 그 상부에 가이드 기둥(210, 도 1 참조)을 결합한다. 상기 가이드 기둥(210)은 지지 기둥(100) 상부 지상에 위치하며, 완성된 구조물의 외벽 및 압입 장치의 이동을 가이드하기 위한 것이다. 이 가이드 기둥(210)은 상기 지지 기둥(100)이 지상으로 연장된 것일 수도 있다.When the support pillars 100 are formed in the ground, the guide pillars 210 (see FIG. 1) are coupled thereto. The guide pillar 210 is located on the upper ground of the support pillar 100 and is intended to guide the movement of the outer wall and the indentation device of the completed structure. The guide pillar 210 may be one in which the support pillar 100 extends to the ground.

가이드 기둥(210)을 고정한 후, 그 외주면에 강관 파이프 등으로 형성되는 중공 부재(310, 도 1 참조)를 삽입한다. 상기 중공 부재(310)는 지지 기둥(100) 및 가이드 기둥(210) 보다 큰 직경을 가지고, 지지 기둥(100) 및 가이드 기둥(210)과 동심으로 배치된다. After fixing the guide pillar 210, the hollow member 310 (see FIG. 1) formed of a steel pipe or the like is inserted into the outer circumferential surface thereof. The hollow member 310 has a larger diameter than the support pillar 100 and the guide pillar 210 and is disposed concentrically with the support pillar 100 and the guide pillar 210.

중공 부재(310)를 삽입한 다음에는, 도 5에 도시된 바와 같이 서로 인접한 2개의 중공 부재(310) 사이에 선단슈(320)를 고정한다. 상기 선단슈(320)는 지하 구조물을 지중에 압입할 때 토사를 절개하면서 용이하게 압입될 수 있도록 침상 단부를 가지는 화살촉 모양이나 편화살촉 모양으로 형성되며, 철판으로 제작된다. 이러 한 선단슈(320)는 볼트 체결, 용접 등에 의해 상기 중공 부재(310)에 고정된다. After the hollow member 310 is inserted, the tip shoe 320 is fixed between the two hollow members 310 adjacent to each other, as shown in FIG. 5. The tip shoe 320 is formed in the shape of an arrowhead or knitted arrowhead having a needle end so that it can be easily indented while cutting the earth and sand when pressing the underground structure in the ground, it is made of an iron plate. The tip shoe 320 is fixed to the hollow member 310 by bolting, welding, or the like.

그 후, 선단슈(320)의 상부에 외벽을 형성하기 위한 거푸집을 설치하고, 상기 거푸집 내에 오거 스크루 가이드 홀을 형성하기 위한 파이프를 배치한 후, 인양고리를 소정 위치에 배치한 다음 콘크리트를 타설하여 도 6에 도시된 바와 같은 외벽(300)을 형성한다. Thereafter, a formwork for forming an outer wall is installed on the upper end of the tip shoe 320, a pipe for forming an auger screw guide hole is disposed in the formwork, and then a lifting ring is disposed at a predetermined position and then concrete is poured. To form an outer wall 300 as shown in FIG.

이때, 외벽(300)은 중공 부재(310)와 연결되도록 형성되며, 따라서 구조물이 압입될 때 외벽(300)은 중공 부재(310)와 함께 가이드 기둥(210)에 의해 가이드되면서 압입된다. At this time, the outer wall 300 is formed to be connected to the hollow member 310, so when the structure is press-fitted the outer wall 300 is guided by the guide pillar 210 together with the hollow member 310 is pressed.

외벽(300)이 형성된 후에는 도 7에 도시된 바와 같이 외벽(300)의 상단에 가로 방향으로 슬라브(390)를 형성한다. 상기 슬라브(390)에는 토사 굴착 및 인양을 위한 작업구(380)가 형성될 수 있다. After the outer wall 300 is formed, as shown in FIG. 7, the slab 390 is formed in the horizontal direction at the top of the outer wall 300. The slab 390 may be formed with a work tool 380 for earth excavation and lifting.

도시된 바와 같이 필요에 따라 외벽(300)으로 둘러싸인 공간을 가로질러 크로스 빔(400)이 제공될 수도 있다. 외벽의 넓은 면에 작용하는 힘에 의해 외벽이 변형되는 것을 막기 위해 마주보는 두 개의 외벽 사이에 크로스 빔(400)을 고정하는 것이다.As shown, a cross beam 400 may be provided across the space surrounded by the outer wall 300 as necessary. In order to prevent the outer wall from being deformed by a force acting on a wide surface of the outer wall, the cross beam 400 is fixed between two facing outer walls.

도 1의 일부를 확대 도시한 도 8에 도시된 바와 같이, 일체로 형성된 중공 부재(310)와 외벽(300) 상부 가이드 기둥(210)에는 압입 장치(200)가 설치된다. 도 9에 더 상세하게 도시한 바와 같이, 이 압입 장치(200)는 가이드 기둥(210)의 외주면에서 상하 이동할 수 있는 스키(220)와, 상기 스키(220)의 일 측면에 결합되는 복수의 유압잭(230)을 포함한다. 상기 유압잭(230)의 하단에는 상기 외벽의 인양고 리(340)에 체결될 수 있는 고리(231)가 제공된다. As shown in FIG. 8 in an enlarged view of a part of FIG. 1, an indentation device 200 is installed in the hollow member 310 and the upper guide pillar 210 of the outer wall 300. As shown in more detail in FIG. 9, the press-fit device 200 includes a ski 220 that can move up and down on an outer circumferential surface of the guide pillar 210, and a plurality of hydraulic jacks coupled to one side of the ski 220. 230. The lower end of the hydraulic jack 230 is provided with a ring 231 that can be fastened to the lifting ring 340 of the outer wall.

상기 스키(220)는 가이드 기둥(210)에서 상하로 슬라이딩할 수 있는 것이라면 어떠한 구성을 갖더라도 무방하며, 구조물 압입 작업시 미끄러짐을 방지하기 위해 도시된 바와 같은 핀(240)을 이용하여 가이드 기둥(210) 상에 고정될 수 있다. 유압잭(230)의 갯수는 필요에 따라 변화될 수 있다. 예컨대 지하 구조물이 도 1과 같이 사각 구조인 경우 가이드 기둥(210)의 위치에 따라 하나의 스키(220)에 1 내지 4개의 유압잭(230)이 설치될 수 있다. 압입 장치(200)가 가이드 기둥(210) 상에 장착되면 유압잭(230) 하단의 고리(231)와 인양 고리(240)를 결합하여 압입 장치(200)가 작용할 때 유압잭(230)의 힘이 외벽에 작용할 수 있도록 한다. The ski 220 may have any configuration as long as it can slide up and down in the guide pillar 210, and the guide pillar (using a pin 240 as shown in order to prevent slipping in a press-fitting structure) may be used. And may be fixed on 210. The number of hydraulic jacks 230 may be changed as needed. For example, when the underground structure has a rectangular structure as shown in FIG. 1, one to four hydraulic jacks 230 may be installed in one ski 220 according to the position of the guide pillar 210. When the indentation device 200 is mounted on the guide pillar 210, the force of the hydraulic jack 230 is applied to the outer wall when the indentation device 200 is operated by combining the hook 231 and the lifting ring 240 at the bottom of the hydraulic jack 230. To work.

상기 가이드 기둥(210)에 압입 장치(200)를 설치한 후에는 오거 스크루 가이드 홀(330)에 오거 스크루(530)를 삽입한다. 이 오거 스크루는 구조물이 압입되는 위치의 토사를 교란하기 위한 것으로, 도 8에 도시된 바와 같이 오거 스크루 장착 빔(520)에 장착될 수 있으며, 이 오거 스크루 장착 빔(520)은 가이드 기둥(210)에 상하 이동 가능하게 설치된 두 개의 빔 이동 스키(510)에 양 단부가 결합된다. After installing the press-fit device 200 on the guide pillar 210, the auger screw 530 is inserted into the auger screw guide hole 330. This auger screw is for disturbing the soil in the position where the structure is press-fitted, it can be mounted to the auger screw mounting beam 520, as shown in Figure 8, the auger screw mounting beam 520 is guide pillar 210 Both ends are coupled to two beam moving skis 510 installed to be movable up and down.

달리, 오거 스크루(530)는 도 10에 도시된 바와 같이 가이드 기둥(210) 상부에 설치된 크레인(550)에 매달린 오거 스크루 장착 빔(520)에 장착될 수 있으며, 상기 크레인(550)은 유압 실린더(540)에 의하여 높이가 조절되도록 구성될 수 있다. 그 외에도 동일한 기능을 위한 다양한 형태로 설치될 수 있다. Alternatively, the auger screw 530 may be mounted to the auger screw mounting beam 520 suspended on a crane 550 installed on the guide pillar 210 as shown in FIG. 10, wherein the crane 550 is a hydraulic cylinder. The height may be adjusted by 540. In addition, it can be installed in various forms for the same function.

이와 같이 구성되는 오거 스크루(530)를 이용하여 토사를 교란하고, 유압잭을 작동시켜 구조물을 소정 깊이로 압입한다. 유압잭 작동 후 유압잭을 하강시켜 유압잭을 재작동시키는 과정을 반복하여, 구조물을 지중의 소정 깊이까지 압입할 수 있다. 이때, 중공 부재(310)는 가이드 기둥(210) 및 지중의 지지 기둥(100)을 슬라이딩하여 함께 압입되므로, 결과적으로 구조물은 가이드 기둥(210) 및 지지 기둥(100)에 의해 가이드 되면서 압입된다.Using the auger screw 530 configured as described above, the soil is disturbed, and the hydraulic jack is operated to press the structure to a predetermined depth. After the hydraulic jack is operated, the process of repeatedly lowering the hydraulic jack to restart the hydraulic jack may press the structure to a predetermined depth of the ground. At this time, since the hollow member 310 is pushed together by sliding the guide pillar 210 and the support pillar 100 of the ground, as a result, the structure is pressed while being guided by the guide pillar 210 and the support pillar 100.

이때, 지상에서 형성된 구조물을 지면까지 압입한 후에는 상기 슬라브(390)의 작업구(380)를 통해 하부의 토사를 굴착한 후 굴착된 깊이만큼 외벽(300)을 압입한다. 이러한 과정을 반복하여 구조물을 필요한 깊이까지 압입할 수 있다. At this time, after press-fitting the structure formed on the ground to the ground through the working tool 380 of the slab 390 and excavated the soil of the lower and presses the outer wall 300 to the depth of the excavation. This process can be repeated to indent the structure to the required depth.

최초 압입된 이러한 구조물은 지하 본 구조물의 바닥을 형성한다. 즉, 최초 압입된 구조물은 도 11에 도시된 바와 같이 지하 본 구조물(600)의 베이스 구조물(500)로서 본 구조물(600)의 바닥면을 형성하면서 지하 구조물 전체를 지지하고 지하수 유입 등을 방지하는 기능을 한다. This first indented structure forms the base of the underground present structure. That is, the first press-fitted structure is the base structure 500 of the basement structure 600 as shown in Figure 11 to form the bottom surface of the structure 600 while supporting the entire underground structure and prevent the inflow of groundwater, etc. Function

베이스 구조물(500)이 압입된 후에는, 다시 가이드 기둥(210, 도 1 및 도 8 참조) 둘레에 중공 부재(310)를 설치하고, 외벽(300) 및 슬라브(390)를 형성하여 구조물을 완성한 후, 압입 장치(200)를 통해 베이스 구조물(500) 위로 압입하여 지하 본 구조물(600)을 형성한다. After the base structure 500 is press-fitted, the hollow member 310 is installed again around the guide pillar 210 (see FIGS. 1 and 8), and the outer wall 300 and the slab 390 are formed to complete the structure. Thereafter, the base structure 500 is press-fitted through the indentation apparatus 200 to form the underground main structure 600.

다만, 지하 본 구조물(600)을 형성 단계에서는, 이미 베이스 구조물(500) 압입에 의해 압입 경로가 형성된 상태이므로, 외벽(300) 형성에 앞서 선단슈(320)를 설치할 필요는 없다. However, in the step of forming the underground main structure 600, since the indentation path is already formed by the indentation of the base structure 500, it is not necessary to install the tip shoe 320 before the outer wall 300 is formed.

이와 같이 하여, 지하 1층의 구조물 축조가 완성된다. 그러나, 도 12에 도시된 바와 같이, 지하 본 구조물을 형성 단계를 수회 반복함으로써, 복수 층(600,700,800)의 지하 구조물을 간단하게 축조할 수 있다. In this way, the structure construction of the first basement floor is completed. However, as shown in Figure 12, by repeating the step of forming the underground bone structure several times, it is possible to simply build an underground structure of a plurality of layers (600, 700, 800).

또한, 상기한 실시예에서는 사각 형상의 지하 구조물을 예로 들어 설명하였으나, 도 13에 도시된 바와 같은 수직갱 또는 교각의 기초 등으로 사용하기 위하여 원형 지하 구조물을 축조할 수도 있으며, 또는 필요에 따라 다른 형태의 지하 구조물을 축조할 수도 있다. In addition, in the above-described embodiment, a rectangular underground structure has been described as an example, but a circular underground structure may be constructed to be used as a foundation of a vertical shaft or a pier as illustrated in FIG. 13, or another form as required. You can also build underground structures.

이상에서 살펴본 바와 같이, 본 발명의 지하 구조물 축조 공법에 따르면, 지하 구조물을 지상에서 형성하여 가이드 기둥 또는 지지 기둥을 따라 압입하게 되므로, 지하 구조물의 형태, 용도 또는 설치되는 심도에 관계없이 용이하게 축조가 가능할 뿐 아니라 여러 층의 지하 구조물도 손쉽게 축조할 수 있는 장점이 있다. As described above, according to the underground structure construction method of the present invention, since the underground structure is formed on the ground and press-fitted along the guide pillar or support pillar, it is easy to build regardless of the shape, use or depth of installation of the underground structure In addition to this, there is an advantage that it is easy to build a multi-storey underground structure.

또한, 종래의 토사를 굴착한 후 구조물을 축조하는 것이 아니라, 구조물을 지중에 압입한 후 토사를 굴착하므로, 가시설 흙막이의 시공이 필요 없고, 토사 붕괴나 지하수 유입의 염려 없이 지하 구조물을 축조할 수 있다.In addition, it is not necessary to construct the structure after excavating the conventional soil, but to excavate the soil after pressing the structure into the ground, so it is not necessary to construct a temporary earthquake, and it is possible to construct an underground structure without fear of soil collapse or groundwater inflow. have.

Claims (7)

지하 구조물의 외벽 설치 위치를 따라 복수의 지점에서 지중에 복수의 지지 기둥(100)을 형성하는 제1 단계;A first step of forming a plurality of support pillars in the ground at a plurality of points along the outer wall installation position of the underground structure; 상기 복수의 지지 기둥(100)의 상부에 각각 가이드 기둥(210)을 설치하는 제2 단계;A second step of installing guide pillars 210 on the upper portions of the plurality of support pillars 100; 상기 가이드 기둥(210) 둘레에 가이드 기둥(210)보다 큰 직경의 중공 부재(310)를 설치하는 제3 단계;A third step of installing a hollow member 310 having a diameter larger than that of the guide pillar 210 around the guide pillar 210; 각 2개의 중공 부재 사이에 중공 부재와 일체가 되도록 외벽(300)을 형성하고 상기 복수의 외벽(300)의 상단에 토사 굴착 및 인양을 위한 작업구(380)가 형성된 슬라브(390)를 형성하여 지상에서 하나의 구조물을 완성하는 제4 단계;An outer wall 300 is formed between the two hollow members so as to be integral with the hollow member, and a slab 390 having a work tool 380 for earth excavation and lifting is formed on the upper ends of the plurality of outer walls 300. A fourth step of completing a structure on the ground; 상기 가이드 기둥(210) 상에 압입 장치(200)를 장착하는 제5 단계;A fifth step of mounting the indentation device 200 on the guide pillar 210; 상기 압입 장치(200)를 작동하여, 상기 지지 기둥(100)에 의해 가이드 되는 중공 부재와 함께 구조물을 지중에 압입하고, 상기 작업구를 통하여 토사를 굴착한 후 굴착된 깊이만큼 지하 구조물을 재압입하는 과정을 필요한 깊이까지 반복하여 구조물을 압입하는 제6 단계;By operating the indentation apparatus 200, the structure is pressed into the ground together with the hollow member guided by the support pillar 100, and excavated the earth and sand through the work tool and then re-indent the underground structure to the excavated depth A sixth step of pressing the structure by repeating the process to the required depth; 상기 제3 단계 내지 제6 단계를 반복하여 지하 본 구조물을 형성하는 제7 단계;를 포함하는 것을 특징으로 하는 지하 구조물 축조 공법.And a seventh step of forming the underground bone structure by repeating the third to sixth steps. 제1항에 있어서,The method of claim 1, 상기 제7 단계에서, 상기 제3 단계 내지 제6 단계를 2회 이상 반복하여 2층 이상의 지하 본 구조물을 형성하는 것을 특징으로 하는 지하 구조물 축조 공법.In the seventh step, the underground structure construction method, characterized in that to form two or more underground bone structures by repeating the third to six times at least two times. 제1항에 있어서, The method of claim 1, 상기 지지 기둥(100)을 형성하는 단계는,Forming the support pillar 100, 토사(1) 아래에 암반(2)이 존재하는 경우, If rock (2) is present below the soil (1), 지중에 강관 파이프(20)를 압입하고 오거 스크류(30)로 강관 파이프(20) 내의 토사를 굴착하는 단계;Press-fitting the steel pipe 20 into the ground and digging soil in the steel pipe 20 with an auger screw 30; 상기 강관 파이프(20) 내에 소정 곡률로 휘어진 소구경 파이프(40)를 삽입하고 휘어진 소구경 파이프(40)를 따라 천공 해머(50)를 삽입하여 암반(2)을 천공하는 과정을 반복하여 암반에 사방으로 적절한 간격을 두고 천공하는 단계;Insert the small diameter pipe 40 bent at a predetermined curvature into the steel pipe pipe 20 and insert the punched hammer 50 along the curved small diameter pipe 40 to repeat the process of drilling the rock 2 to the rock. Perforating at appropriate intervals in all directions; 상기 강관 파이프(20) 및 암반에 천공된 구멍에 철근 콘크리트를 타설하여 기둥을 형성하는 단계;를 포함하는 것을 특징으로 하는 지하 구조물 축조 공법. And constructing a pillar by placing reinforced concrete in the hole drilled in the steel pipe pipe (20) and the rock. 제1항에 있어서, The method of claim 1, 상기 제4 단계를 최초 실행하는 경우, 외벽(300)을 형성하기에 앞서 각 2개의 중공 부재 사이 하단에 침상 단부를 가지는 철판으로 제작된 선단슈(320)가 제공되는 것을 특징으로 하는 지하 구조물 축조 공법.When the fourth step is performed for the first time, before the outer wall 300 is formed, the structure of the underground structure, characterized in that the tip shoe 320 made of an iron plate having a needle end at the lower end between the two hollow members is provided. Method. 제1항 또는 제2항에 있어서, The method according to claim 1 or 2, 상기 압입 장치(200)는,The press-fit device 200, 가이드 기둥(210)의 외주면에 상하 이동할 수 있게 설치되는 스키(220); Ski 220 is installed to move up and down on the outer peripheral surface of the guide pillar 210; 상기 스키(220)의 일 측면에 결합되는 하나 이상의 유압잭(230);을 포함하는 것을 특징으로 하는 지하 구조물 축조 공법.Underground structure construction method comprising a; at least one hydraulic jack (230) coupled to one side of the ski (220). 제1항 또는 제2항에 있어서, The method according to claim 1 or 2, 상기 외벽(300)에는 복수의 오거 스크루 가이드 홀(330)이 형성되고,A plurality of auger screw guide holes 330 are formed in the outer wall 300, 상기 가이드 기둥(210)에 상하 이동 가능하게 설치된 두 개의 스키(510)에 양 단부가 결합되는 오거 스크루 장착 빔(520)에는 상기 가이드 홀(330)을 관통하는 복수의 오거 스크루(530)가 장착되는 것을 특징으로 하는 지하 구조물 축조 공법.Auger screw mounting beams 520 having both ends coupled to two skis 510 mounted to the guide pillar 210 so as to be movable upward and downward are mounted with a plurality of auger screws 530 passing through the guide hole 330. Underground structure construction method characterized in that. 제1항 또는 제2항에 있어서, The method according to claim 1 or 2, 상기 외벽(300)에는 복수의 오거 스크루 가이드 홀(330)이 형성되고,A plurality of auger screw guide holes 330 are formed in the outer wall 300, 상기 가이드 기둥(210)의 상부에 설치된 크레인(550)에는 상기 가이드 홀(330)을 관통하는 복수의 오거 스크루(530)가 장착되며, A plurality of auger screws 530 penetrating the guide hole 330 is mounted to the crane 550 installed on the guide pillar 210. 상기 크레인(550)은 유압 실린더(540)에 의해 높이가 조절되는 것을 특징으로 하는 지하 구조물 축조 공법.The crane 550 is an underground structure construction method characterized in that the height is adjusted by the hydraulic cylinder (540).
KR1020060046601A 2006-05-24 2006-05-24 Method for constructing underground structure KR100781809B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060046601A KR100781809B1 (en) 2006-05-24 2006-05-24 Method for constructing underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060046601A KR100781809B1 (en) 2006-05-24 2006-05-24 Method for constructing underground structure

Publications (2)

Publication Number Publication Date
KR20070112975A KR20070112975A (en) 2007-11-28
KR100781809B1 true KR100781809B1 (en) 2007-12-04

Family

ID=39091035

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060046601A KR100781809B1 (en) 2006-05-24 2006-05-24 Method for constructing underground structure

Country Status (1)

Country Link
KR (1) KR100781809B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101168803B1 (en) 2010-04-30 2012-07-25 위성배 The Method for constructing Underground Structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0449317A (en) * 1990-06-18 1992-02-18 Japan Steel & Tube Constr Co Ltd Circular arc pile with widened head and head widening method of circular arc pile
KR950033544U (en) * 1994-05-07 1995-12-16 이춘봉 APPARATUS FOR SUPPORTING THE PLURAL ROPS OF EARTH DRILL
KR200358095Y1 (en) * 2004-04-30 2004-08-07 (주)동양엠티 Hydraulic jack apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0449317A (en) * 1990-06-18 1992-02-18 Japan Steel & Tube Constr Co Ltd Circular arc pile with widened head and head widening method of circular arc pile
KR950033544U (en) * 1994-05-07 1995-12-16 이춘봉 APPARATUS FOR SUPPORTING THE PLURAL ROPS OF EARTH DRILL
KR200358095Y1 (en) * 2004-04-30 2004-08-07 (주)동양엠티 Hydraulic jack apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101168803B1 (en) 2010-04-30 2012-07-25 위성배 The Method for constructing Underground Structure

Also Published As

Publication number Publication date
KR20070112975A (en) 2007-11-28

Similar Documents

Publication Publication Date Title
KR100938916B1 (en) Downward method by front reaming
KR20170005991A (en) soil retaining wall using PHC pile and its construction method
KR101377019B1 (en) Reactive forcing device using guide rail and foundation reinforcing method therewith
JP5259510B2 (en) Retaining wall and its construction method
JP3850785B2 (en) Caisson laying method using main foundation pile
KR102017731B1 (en) Reaction bed for pressing in reinforcing pile and pressing in method of reinforcing pile using the same
KR100781809B1 (en) Method for constructing underground structure
KR100625115B1 (en) downward reinforced-concrete underground structure using temporary assistant columns
JPH07145616A (en) Cast-in-place concrete piling method
JP2868651B2 (en) Earth retaining method above existing underground structure
KR101623342B1 (en) Earth retaining structure utilizing in-situ soil and earth retaining structure construction Method
KR101052363B1 (en) Freestanding Digging Method for Deep Excavation
KR20090013554A (en) Constructing method of top-down type retaining wall
KR100663109B1 (en) Method for Constructing an Underground Structure Using Up-down Method
KR101951684B1 (en) Expandable cast-in-place pile construction method
KR20220067892A (en) Structure for reinforcing foundation using steel piles and construction method thereof
KR100781810B1 (en) Method for constructing walls of underground structure
KR20180112453A (en) Soil Retaining Wall using PHC Pile and Construction Method
JP2007107233A (en) Construction method for earth retaining structure
KR20100136900A (en) Reinforcing method for structure base
KR100638841B1 (en) Method for constructing cellar
KR102645823B1 (en) Top-down and bottom-up parallel decommissioning of existing building
KR101079188B1 (en) The Method for Construction Walls of Underground Structure
KR102601694B1 (en) Method for demolishing underground building
JP2019183495A (en) Construction method of cast-in-place concrete pile

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
LAPS Lapse due to unpaid annual fee