KR100732938B1 - That inspect piping of wall reclamation styleand form of construction work of double pipe - Google Patents

That inspect piping of wall reclamation styleand form of construction work of double pipe Download PDF

Info

Publication number
KR100732938B1
KR100732938B1 KR1020060046728A KR20060046728A KR100732938B1 KR 100732938 B1 KR100732938 B1 KR 100732938B1 KR 1020060046728 A KR1020060046728 A KR 1020060046728A KR 20060046728 A KR20060046728 A KR 20060046728A KR 100732938 B1 KR100732938 B1 KR 100732938B1
Authority
KR
South Korea
Prior art keywords
pipe
double
box
wall
cover
Prior art date
Application number
KR1020060046728A
Other languages
Korean (ko)
Inventor
윤자중
Original Assignee
주식회사 국민에너지
(주)오폼프
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 국민에너지, (주)오폼프 filed Critical 주식회사 국민에너지
Application granted granted Critical
Publication of KR100732938B1 publication Critical patent/KR100732938B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/08Vertical ducts; Channels, e.g. for drainage for receiving utility lines, e.g. cables, pipes
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B9/00Methods or installations for drawing-off water
    • E03B9/02Hydrants; Arrangements of valves therein; Keys for hydrants
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/01Domestic plumbing installations for fresh water or waste water; Sinks for combinations of baths, showers, sinks, wash-basins, closets, urinals, or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/07Arrangement or mounting of devices, e.g. valves, for venting or aerating or draining

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

A pipe inspection box of wall reclamation style and a method for constructing a double pipe is provided to reduce working process while laying bricks, to repair without damage of finish material. A pipe inspection box of wall reclamation style includes a pipe fixing unit(10), a protective burying box, and a pipe connection unit(40). A bent piece(11) is fixed through a screw(5) as a separable type by being arranged in parallel to a ground surface in a wall and provided with a plurality of slot portions(11a) with a predetermined length. The protective burying box includes a first bury box(21) and a first cover(25). The protective burying box is coupled to a top side of a fixing frame(12) included in the pipe fixing unit to protect the second double pipe connected to the first double pipe. The pipe connection unit is a structure to connect first and second double pipes (1,1'). The pipe connection unit is composed of first and second connection units(41,42).

Description

벽체 매립형의 배관 점검함 및 이중관 시공방법{That inspect piping of wall reclamation styleand form of construction work of double pipe}That inspect piping of wall reclamation styleand form of construction work of double pipe}

도 1은 본 발명의 제 1 실시예로 분리형 덮개를 적용한 배관점검함의 구조를 보인 분해사시도.1 is an exploded perspective view showing a structure of a pipe check box to which a detachable cover is applied as a first embodiment of the present invention.

도 2는 본 발명의 제 1 실시예로 배관점검함의 구조를 보인 결합사시도.Figure 2 is a perspective view showing a structure of the pipe check box in the first embodiment of the present invention.

도 3은 본 발명의 제 1 실시예로 배관점검함과 이중관의 시공상태를 보인 단면도.Figure 3 is a cross-sectional view showing a construction state of the pipe check and the double pipe in a first embodiment of the present invention.

도 4는 본 발명의 제 1 실시예로 배관고정부의 높낮이 조절상태도.Figure 4 is a height adjustment state of the pipe fixing portion in the first embodiment of the present invention.

도 5는 본 발명의 제 1 실시예로 배관점검함의 높낮이 조절상태도.Figure 5 is a height adjustment state of the pipe check in the first embodiment of the present invention.

도 6은 본 발명의 제 1 실시예로 배관점검함과 이중관이 시공된 후 조적벽체를 시공한 상태의 사시도.Figure 6 is a perspective view of a state in which the masonry wall construction after the pipe check and double pipe construction in the first embodiment of the present invention.

도 7은 본 발명의 제 2 실시예로 일체형 덮개가 적용된 배관점검함의 구조를 보인 분해도.Figure 7 is an exploded view showing the structure of the pipe inspection box to which the integrated cover is applied in a second embodiment of the present invention.

도 8은 본 발명의 제 2 실시예로 도 7의 결합단면도.8 is a cross-sectional view of the combination of Figure 7 as a second embodiment of the present invention.

도 9는 본 발명의 제 3 실시예로 원형수전함이 결합되는 배관점검함의 구조를 보인 구조의 단면도.9 is a cross-sectional view showing a structure of a pipe check box to which a circular faucet is coupled as a third embodiment of the present invention.

도 10은 본 발명의 제 4 실시예로 인접하는 배관점검함을 이중관을 통해 연 결하는 상태의 구조도.Figure 10 is a structural diagram of a state of connecting the adjacent pipe check through a double pipe in a fourth embodiment of the present invention.

도 11은 본 발명의 제 4 실시예로 도 10의 단면도.11 is a sectional view of FIG. 10 as a fourth embodiment of the present invention;

*도면의 주요부분에 사용된 부호의 설명** Explanation of symbols used in the main part of the drawing *

1,1',1" ; 이중관 2 ; 후렉시블관1,1 ', 1 "; Double tube 2; Flexible tube

3 ; 수전엘보 7 ; 수전3; Faucet elbow 7; Faucet

8 ; 조적벽체 10; 배관고정부8 ; Masonry wall 10; Plumbing Fixation

20; 보호매립함 21,31; 제 1,2 매립함20; Protective landfill 21,31; 1st and 2nd landfill

22; 고정함 23; 유동함22; Securing 23; Fluid

25,32; 제 1,2 덮개 30; 점검매립함25,32; First and second covers 30; Landfill

33; 보호덮개 40; 관결합부33; Protective cover 40; Pipe joint

41,42; 제 1,2 결합부 a ; 연질관41,42; First and second coupling parts a; Soft tube

본 발명은 공동주택과 아파트 등의 건설현장에서 수도전, 난방, 소방, 가스, 냉매 등에 사용되는 이중관을 시공하는 기술 및 그 이중관이 시공되는 배관 점검함에 관한 것으로서, 보다 상세하게는 건식벽체 또는 조적벽체내에 배관 점검함을 매립한 상태에서, 유지 보수가 용이한 이중관을 용이하게 시공할 수 있도록 하는 벽체 매립형의 배관 점검함 및 이중관의 시공방법에 관한 것이다.The present invention relates to a technology for constructing a double pipe used in waterworks, heating, fire fighting, gas, refrigerant, etc. in the construction sites of apartments and apartments, and to check the pipe that the double pipe is constructed, more specifically drywall or masonry wall The present invention relates to a wall-filled pipe check box and a method of constructing a double pipe that facilitate the construction of a double pipe that is easy to maintain in a state where the pipe check box is embedded in the body.

근래 들어 주택이나 아파트 등의 주거 공간에 마감재의 고급화로 인하여 배관 누수시 건축마감재의 손상 문제가 발생하였고, 이에 벽체 매립형으로서 배관 점검함을 사용하는 이중관 공법이 채택되어 시공되어지는 추세이다.Recently, due to the high quality of finishing materials in residential spaces such as houses and apartments, problems of damage to building finish materials have occurred due to the leakage of pipes. Therefore, the double pipe method using the pipe check box as a wall reclamation type is being adopted and constructed.

일예로, 냉온수 배관의 경우 단일 파이프를 두 개의 라인으로 적용한 이중관으로 시공되는 것이며, 상기 냉온수 배관을 철근에 결속선을 이용하여 고정함과 아울러, 수전의 설치위치에 세팅된 배관 점검함으로 유도하여 배관 점검함에 냉온수배관을 고정하는 것이다.For example, in the case of cold and hot water piping, a single pipe is constructed as a double pipe applied with two lines, and the cold and hot water piping is fixed to the rebar using a binding line, and guided by a pipe check set at the installation position of the faucet. It is to fix the hot and cold water pipe in the inspection box.

이때, 상기 배관 점검함으로 냉온수배관을 유도하기 전에, 분배기로 냉온수배관을 유도하여 상기 분배기를 통해 건물 내부의 각 수요처(예; 화장실, 주방, 배란다 등)로 냉온수배관을 분배하게 된다.In this case, before inducing the cold and hot water pipes by checking the pipe, the hot and cold water pipes are guided to the distributor to distribute the cold and hot water pipes to the respective demand destinations (eg, toilets, kitchens, bathrooms, etc.) inside the building.

그러나, 종래 벽체 매립형의 배관 점검함은 물론, 이를 이용한 이중관의 시공은 콘크리트 벽체에 적용하기에는 별다른 문제가 없지만, 건식 벽체나 조적벽체에 시공 적용하기에는 많은 문제점이 발생된다.However, as well as the conventional wall-filled pipe inspection, the construction of the double pipe using the same, there is no problem to apply to the concrete wall, but there are many problems to apply to the construction of drywall or masonry wall.

즉, 조적벽체는 0.5B 벽돌쌓기 작업을 하기 전에 배관 점검함을 철근을 세워 고정해야 하고, 고정 후 연질관이 삽입되는 이중관을 연결해야 하는데, 이 경우 배관 점검함에 의해 벽돌쌓기가 상당히 어려워지는 문제점이 있다.In other words, the masonry wall should be fixed by reinforcing the pipe check box before the 0.5B racking work, and must be connected to the double pipe into which the soft pipe is inserted after fixing, in this case, the problem of racking becomes very difficult by checking the pipe. There is this.

또한, 벽돌쌓기 작업 중에 미리 고정했던 배관 점검함과 이중관이 앞으로 넘어지는 문제가 빈번히 발생하는 문제점도 초래되었다.In addition, the pipe check box that was fixed in advance during the racking work and the problem that the double pipes fall forward frequently occurred.

또한, 이중관 주위에 벽돌쌓기 작업 후 몰탈을 사출하여 고정해야 하는 등, 조적벽체에 배관 점검함과 이중관의 시공시 작업시간과 작업공정이 늘어나면서 인 건비 상승의 원인으로 작용하였고, 이에따라 종래에는 작업시간 및 공정을 단축하면서 시공비를 절감하기 위해 부실 시공이 많이 발생하는 구조적인 문제들이 있었으며, 이는 저 품질로 인한 민원 발생의 원인으로 작용하였다.In addition, after racking work around the double pipes, it is necessary to inject and fix the mortar, such as checking the pipes on the masonry wall and increasing the working time and work process during the construction of the double pipes, which contributed to the increase in labor costs. In order to reduce the construction cost while reducing the time and process, there were structural problems in which a lot of poor construction occurred, which caused the complaints due to low quality.

또한, 종래에는 분배기로부터 수요처로 분배되는 이중관을 고정하는 방식이 결속선을 통해 철근에 고정하는 관계로, 타설되는 콘크리트에 의해 이중관의 고정위치가 변경되는 단점이 있고, 이에따라 종래에는 콘크리트 타설시 이중관이 위치를 벗어나지 않도록 하는 별도의 공정을 실시해야 하는 불편함이 따랐다.In addition, the conventional method of fixing the double pipe distributed from the distributor to the demand destination is fixed to the reinforcing bars through the binding line, there is a disadvantage that the fixed position of the double pipe is changed by the concrete to be poured, accordingly conventionally double pipe when pouring concrete It was inconvenient to carry out a separate process to avoid leaving this position.

또한, 종래 벽체에 매립되는 배관 점검함은 전면 개구부를 벽체 외부의 방향으로 노출시킨 상태에서 그 노출된 개구부를 덮개가 덮도록 하되, 상기 덮개에는 홀을 마련하고, 상기 홀에 결합구를 결합시킨 상태에서, 상기 결합구에 이중관의 연질관과 수전을 각각 연결함은 물론, 상기 수전과 연질관이 연결이 완료된 후에는 덮개의 외부면을 타일 등의 건축마감재로 마감처리하였다.In addition, the pipe check box embedded in the conventional wall is to cover the exposed opening in the state in which the front opening is exposed in the direction of the outside of the wall, the cover is provided with a hole, the coupling hole is coupled to the hole In the state, as well as connecting the soft pipe and the faucet of the double pipe to the coupler, respectively, after the faucet and the soft pipe is completed, the outer surface of the cover was finished with a building finish such as tiles.

그러나, 상기와 같이 배관 점검함의 덮개에 수전을 연결하는 경우, 배관 점검함내에서 누수가 발생되었을 때 덮개를 배관 점검함으로부터 분리시켜야 하는데, 이 경우 수전과 연질관의 연결상태를 반드시 해제하여야만 배관 점검함의 내부를 확인할 수 있는 구조적인 단점이 있다.However, when the faucet is connected to the cover of the pipe check box as described above, when the leak occurs in the pipe check box, the cover must be separated from the pipe check box. There is a structural drawback to the interior of the ship.

또한, 상기와 같이 수전을 분리할 때 종래에는 덮개의 외부면에 시공된 건축마감재를 파손시킬 수 밖에 없는 등, 그 유지 보수에 상당한 불편함이 따랐다.In addition, when separating the faucet as described above, there was a considerable inconvenience in the maintenance, such as inevitably damage the building finish material constructed on the outer surface of the cover.

따라서, 본 발명은 상기와 같은 종래의 문제점을 해결하기 위해 안출된 것으 로서, 벽돌쌓기 작업 전에 배관 점검함을 벽체내에 매립하여 선 고정하고, 배관 점검함 내부에 이중관을 시공시 그 시공에 따른 작업공정을 단축함은 물론, 벽돌쌓기 작업이 원할하게 진행될 수 있도록 하는 벽체 매립형의 배관 점검함 및 이중관의 시공방법을 제공하려는데 그 목적이 있는 것이다.Therefore, the present invention has been made in order to solve the conventional problems as described above, and before the racking work to bury the pipe check box in the wall to fix the line, the work according to the construction of the double pipe inside the pipe check box The purpose is to shorten the process, and to provide a wall-mounted pipe check box and a double pipe construction method that allows the brickwork to proceed smoothly.

또한, 본 발명은 배관의 시공 후 누수 발생시 수전을 분리하지 않은 물론, 건축마감재에 전혀 손상을 주지 않고 보수가 이루어질 수 있도록 함으로써, 벽체 매립형 배관 점검함들의 많은 단점을 보완하여 관련분야에서의 시공성을 높임은 물론, 시공에 따른 비용을 절감하려는데 또 다른 목적이 있는 것이다.In addition, the present invention does not separate the faucet when the leakage occurs after the construction of the pipe, as well as to be repaired without damaging the building finish at all, to compensate for the many shortcomings of the wall-filled pipe check box construction in the relevant field In addition to raising the cost of construction, there is another purpose.

상기 목적 달성을 위한 본 발명 벽체 매립형의 배관 점검함은,Pipe check box of the present invention wall buried type for achieving the above object,

분배기로부터 분배되는 1차 이중관을 정렬하여 고정하는 배관고정부;A pipe fixing part for aligning and fixing the primary double pipe distributed from the distributor;

상기 배관고정부의 상측에 결합되고, 상기 배관고정부에 의해 정렬되는 1차 이중관과 연결되는 2차 이중관을 보호하는 보호매립함;A buried protective shield coupled to an upper side of the pipe fixing part and protecting a second double pipe connected to a first double pipe arranged by the pipe fixing part;

상기 보호매립함의 상측에 결합되고, 상기 보호매립함에 의해 보호되는 2차 이중관을 통해 연질관이 인출시 그 연질관을 수전 연결용의 수전엘보와 연결시키기 위한 후렉시블관을 배치시킨 점검매립함; 을 포함하여 구성함을 특징으로 한다.An inspection buried coupled to an upper side of the protection buried box and having a flexible pipe arranged to connect the soft pipe to the faucet elbow for connecting the faucet when the soft pipe is drawn out through the secondary double pipe protected by the protective buried; Characterized in that comprises a configuration.

다른 일면에 따라, 상기 배관고정부는 벽체내의 바닥면에 고정되는 분할형의 절편; 상기 분할형 절편에 양측면이 결합되고, 상면에 1차 이중관이 결합되는 다수의 홀을 마련한 고정프레임; 을 포함하여 구성함을 특징으로 한다.According to another aspect, the pipe fixing portion is divided section of the fixed to the bottom surface in the wall; A fixed frame having a plurality of holes coupled to both sides of the split section and having a first double pipe coupled to an upper surface thereof; Characterized in that comprises a configuration.

또 다른 일면에 따라, 상기 고정프레임은 1차 이중관의 길이에 따라 높낮이 가 조절되도록, 상기 절편에는 소정길이의 슬롯부를 형성하고, 상기 고정프레임에는 고정홀을 형성하는 것을 특징으로 한다.According to another aspect, the fixing frame is characterized in that the slot is formed in the slot portion of a predetermined length so that the height is adjusted according to the length of the primary double pipe, and the fixing frame is formed with a fixing hole.

또 다른 일면에 따라, 상기 고정프레임의 높낮이 조절은, 상기 슬롯부와 고정홀에 체결되는 조절구에 의해 제어되는 구조인 것을 특징으로 한다.According to yet another aspect, the height adjustment of the fixed frame is characterized in that the structure is controlled by the adjustment hole is fastened to the slot portion and the fixing hole.

또 다른 일면에 따라, 상기 1,2차 이중관은 관결합부에 의해 그 연결이 이루어지는 것을 특징으로 한다.According to yet another aspect, the first and second double pipes are characterized in that the connection is made by the pipe joint.

또 다른 일면에 따라, 상기 관결합부는 1차 이중관과 결합되는 제 1 결합부, 그리고 2차 이중관과 결합되는 제 2 결합부로 분할 구성하고, 상기 제 1,2 결합부는 고정프레임의 홀을 통해 결합되는 구조인 것을 특징으로 한다.According to another aspect, the pipe coupling portion is divided into a first coupling portion coupled to the primary double tube, and a second coupling portion coupled to the secondary double tube, the first and second coupling portions are coupled through the hole of the fixed frame It is characterized in that the structure.

또 다른 일면에 따라, 상기 제 1,2 결합부의 결합부위 및, 상기 제 1,2 결합부와 결합되는 1,2차 이중관의 결합부위에는 누수 방지를 위한 실링재(예; 링 형상의 고무패킹)가 형성되는 것을 특징으로 한다.According to yet another aspect, the coupling portion of the first and second coupling portions, and the coupling portion of the first and second double pipes coupled to the first and second coupling portions for sealing to prevent leakage (for example, ring-shaped rubber packing) Characterized in that is formed.

또 다른 일면에 따라, 상기 보호매립함은 배관고정부를 통해 정렬 고정된 1차 이중관과 연결되는 2차 이중관을 수납하는 제 1 매립함; 및, 상기 제 1 매립함의 일면에 결합되는 제 1 덮개; 를 포함하여 구성함을 특징으로 한다.According to another aspect, the protective buried box is a first buried to receive a secondary double pipe connected to the primary double pipe is aligned and fixed through the pipe fixing; And a first cover coupled to one surface of the first filling box. Characterized in that comprises a configuration.

또 다른 일면에 따라, 상기 제 1 매립함은 벽체 매립형으로 2차 이중관의 길이에 따라 높낮이가 조절되는 고정함 및 유동함으로 분할 구성하고, 상기 고정함에는 소정길이의 슬롯부를 형성하며, 상기 유동함에는 고정홀을 형성하는 것을 특징으로 한다.According to another aspect, the first landfill is divided into a wall and a fixing box and the flow path is adjusted to the height according to the length of the secondary double pipe, the fixing box to form a slot portion of a predetermined length, Is characterized in that to form a fixing hole.

또 다른 일면에 따라, 상기 유동함의 높낮이 조절은, 상기 슬롯부와 고정홀 에 체결되는 조절구에 의해 제어되는 구조인 것을 특징으로 한다.According to yet another aspect, the height adjustment of the flow box is characterized in that the structure is controlled by the adjustment hole is fastened to the slot portion and the fixing hole.

또 다른 일면에 따라, 상기 제 1 덮개는 일면에 타일 시공을 위한 다수의 돌기가 배열되는 것을 특징으로 한다.According to yet another aspect, the first cover is characterized in that a plurality of protrusions for tile construction on one side is arranged.

또 다른 일면에 따라, 상기 제 1 매립함과 제 1 덮개의 사이에는 실링재(예; 링 형상의 고무패킹)가 마련되는 구조인 것을 특징으로 한다.According to yet another aspect, a sealing material (eg, ring-shaped rubber packing) is provided between the first buried compartment and the first cover.

또 다른 일면에 따라, 상기 점검매립함은 상기 보호매립함에 수납되는 연질관과 일단이 연결되고, 타단이 수전 연결용의 수전엘보와 연결되는 후렉시블관을 배치한 제 2 매립함; 상기 제 2 매립함의 일면에 결합되는 제 2 덮개; 및, 상기 제 2 덮개에 결합되는 보조덮개; 를 포함하여 구성함을 특징으로 한다.According to yet another aspect, the check-filling box is a second buried in which a flexible tube which is connected to one end and the flexible tube accommodated in the protective landfill, the other end is connected to the faucet elbow for connecting the faucet; A second cover coupled to one surface of the second buried compartment; And an auxiliary cover coupled to the second cover. Characterized in that comprises a configuration.

또 다른 일면에 따라, 상기 제 2 매립함은 이중관이 결합되는 다수의 홀을 하부면에 형성하고, 상부면에는 수전 연결용의 수전엘보를 후렉시블관의 타단에 결합시키기 위한 관인출부를 구성함을 특징으로 한다.According to another aspect, the second buried box is formed in the lower surface a plurality of holes that the double pipe is coupled, the upper surface constitutes a pipe outlet for coupling the faucet elbow for connecting the faucet to the other end of the flexible pipe It features.

또 다른 일면에 따라, 상기 관인출부는 제 2 매립함의 상부면에서 연장시켜 돌출시킨 박스형 구조로 하되, 상기 박스형 구조의 일면에는 후렉시블관 인출용의 인출홀을 다수 형성시킨 것을 특징으로 한다.According to another aspect of the present invention, the pipe drawing part has a box-like structure extending from the upper surface of the second buried box to protrude, wherein one side of the box-shaped structure is formed with a plurality of drawing holes for flexible tube withdrawing.

또 다른 일면에 따라, 상기 관인출부는 제 2 매립함의 상부면에 다수의 결합홀을 형성하고, 상기 결합홀에 후렉시블관의 인출경로를 안내하는 원형수전함이 결합되는 구조인 것을 특징으로 한다.According to yet another aspect, the pipe outlet is characterized in that a plurality of coupling holes formed in the upper surface of the second buried box, the circular faucet to guide the withdrawal path of the flexible pipe to the coupling hole is characterized in that the structure is coupled.

또 다른 일면에 따라, 상기 제 2 매립함과 제 2 덮개의 사이에는 실링재(예; 링 형상의 고무패킹)가 마련되는 구조인 것을 특징으로 한다.According to yet another aspect, a sealing material (eg, ring-shaped rubber packing) is provided between the second buried compartment and the second cover.

또 다른 일면에 따라, 상기 제 2 덮개는 이중관 점검용의 개구부를 마련한 결합플랜지가 구성되는 것을 특징으로 한다.According to yet another aspect, the second cover is characterized in that the coupling flange is provided with an opening for inspecting the double pipe.

또 다른 일면에 따라, 상기 제 2 덮개의 일면에는 타일 시공을 위한 다수의 돌기가 구성되는 것을 특징으로 한다.According to yet another aspect, one surface of the second cover is characterized in that a plurality of projections for the construction of the tile is configured.

또 다른 일면에 따라, 상기 보조덮개는 제 1,2 커버로 분할 구성되는 것을 특징으로 한다.According to yet another aspect, the auxiliary cover is characterized in that divided into first and second cover.

또 다른 일면에 따라, 상기 제 1 커버는 배관 점검용의 개구부를 덮는 투명한 재질로 구성되는 것을 특징으로 한다.According to yet another aspect, the first cover is characterized in that it is made of a transparent material covering the opening for the pipe inspection.

또 다른 일면에 따라, 상기 제 2 커버는 벽체 외부면에 노출되는 구조로서, 상기 제 1 커버를 덮는 불투명한 재질로 구성되는 것을 특징으로 한다.According to yet another aspect, the second cover is a structure that is exposed to the outer surface of the wall, characterized in that composed of an opaque material covering the first cover.

또 다른 일면에 따라, 상기 결합플랜지와 제 1 커버의 사이에는 실링재(예; 링 형상의 고무패킹)이 마련되는 구조인 것을 특징으로 한다.According to yet another aspect, a sealing material (eg, ring-shaped rubber packing) is provided between the coupling flange and the first cover.

또 다른 일면에 따라, 상기 제 1 덮개는 제 2 덮개와 일체로 구성되는 것을 특징으로 한다.According to yet another aspect, the first cover is characterized in that it is configured integrally with the second cover.

한편, 본 발명에서 개시되는 이중관의 시공방법은,On the other hand, the construction method of the double pipe disclosed in the present invention,

분배기로부터 건물내의 각 수요처로 1차 이중관을 유도하여 분배하는 제 1 공정;A first process of guiding and distributing a primary double pipe from a distributor to each demand in the building;

상기 분배기로부터 1차 이중관이 분배될 때 그 분배되는 1차 이중관은 각 수요처에 배치된 배관고정부를 이용하여 정렬 고정한 후 콘크리트를 타설하여 양생시키는 제 2 공정;When the primary double pipe is distributed from the distributor, the distributed primary double pipe is a second process of placing and curing concrete after aligning and fixing by using a pipe fixing unit disposed at each demand destination;

상기 배관고정부의 상면에 배관점검함을 결합 고정한 후 1차 이중관에 2차 이중관을 연결하고, 분배기로부터 배관점검함으로 1,2차 이중관을 통해 연질관을 인출하는 제 3 공정;A third step of coupling and fixing the pipe check box to the upper surface of the pipe fixing part, connecting the second double pipe to the first double pipe, and drawing the soft pipe through the first and second double pipes by checking the pipe from the distributor;

상기 배관 점검함내에 플렉시블관이 연결된 ∪자형의 수전티를 배치한 후 ∪자형 수전티에 연결된 일측방향의 플렉시블관에 연질관을 연결하는 제 4 공정;A fourth step of arranging the U-shaped power receiver tee connected to the flexible tube in the pipe check box and then connecting the soft tube to the flexible tube in one direction connected to the U-shaped power tee;

상기 ∪자형 수전티에 연결된 타측방향의 플렉시블관을 배관 점검함의 상면에 일체화된 인출부를 통해 상면 외부로 인출하고, 그 인출된 플렉시블관에 수전엘보를 연결하는 제 5 공정; 및,A fifth step of drawing the flexible tube in the other direction connected to the U-shaped faucet to the outside through the withdrawal unit integrated with the upper surface of the pipe check box, and connecting the receiving elbow to the withdrawn flexible tube; And,

상기 수전엘보에 수전을 연결한 후 배관 점검함의 개구부에 덮개를 결합한 후 그 덮개가 외부에 노출되도록 건식벽체 또는 조적벽체를 시공하는 제 6 공정; 으로 진행함을 특징으로 한다.Connecting the faucet to the faucet elbow, joining the cover to the opening of the pipe check box, and constructing a drywall or masonry wall such that the cover is exposed to the outside; It is characterized by proceeding to.

다른 일면에 따라, 상기 제 2 공정은 분배기로부터 분배되는 1차 이중관의 길이에 따라 배관고정부의 높낮이를 조절하는 공정; 을 더 포함하는 것을 특징으로 한다.According to another aspect, the second process is a step of adjusting the height of the pipe fixing portion according to the length of the primary double pipe distributed from the distributor; It characterized in that it further comprises.

또 다른 일면에 따라, 상기 제 3 공정은 1차 이중관에 연결되는 2차 이중관의 길이에 따라 배관점검함의 높낮이를 조절하는 공정; 을 더 포함하는 것을 특징으로 한다.According to another aspect, the third process is a step of adjusting the height of the pipe check according to the length of the secondary double pipe connected to the primary double pipe; It characterized in that it further comprises.

또 다른 일면에 따라, 상기 제 5 공정은 배관 점검함의 상면 외부에 원형수전함을 결합하고 그 원형수전함을 따라 ∪자형 수전티에 연결된 타측방향의 플렉시블관을 점검함 외부로 인출한 후 그 인출된 플렉시블관에 수전엘보를 연결하는 공 정; 으로 이루어지는 것을 특징으로 한다.According to another aspect, the fifth step is to combine the circular faucet on the outside of the upper surface of the pipe check box and to check the flexible pipe in the other direction connected to the U-shaped faucet along the circular faucet and withdrawn to the outside Connecting the faucet elbow to the flexible pipe; Characterized in that consists of.

또 다른 일면에 따라, 상기 이중관의 시공방법에는,According to yet another aspect, the construction method of the double pipe,

건물내의 각 수요처에 위치하는 벽체 매립형의 배관점검함은 인접하는 배관점검함과 3차 이중관을 통해 다단으로 연결하여 하나의 공급부를 통해 순차적으로 공급수를 공급받도록 하는 제 7 공정; 을 더 포함하는 것을 특징으로 한다.The wall-filled pipe inspection checker located at each demand location in the building includes a seventh step of connecting the adjacent pipe inspection checker with the third double pipe in multiple stages so as to receive supply water sequentially through one supply unit; It characterized in that it further comprises.

또 다른 일면에 따라, 상기 제 7 공정에서,According to yet another aspect, in the seventh step,

3차 이중관은 배관고정부에 결합되어 배관점검함내의 2차 이중관과 관결합부를 통해 연결한 후, 상기 2,3차 이중관을 통해 연질관을 인출하고, 상기 인출된 연질관은 ∪자형 수전티에 마련되는 후렉시블관과 연결되는 것을 특징으로 한다.The third double pipe is coupled to the pipe fixing part and connected to the second double pipe and the pipe joint in the pipe inspection box, and the soft pipe is drawn out through the second and third double pipes, and the drawn soft pipe is connected to the U-shaped faucet. It is characterized in that it is connected to the flexible pipe is provided.

이하, 첨부된 도면에 의하여 본 발명의 제 1 실시예를 설명하면 다음과 같다.Hereinafter, a first embodiment of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 제 1 실시예로 분리형 덮개를 적용한 배관점검함의 구조를 보인 분해사시도이고, 도 2는 본 발명의 제 1 실시예로 배관점검함의 구조를 보인 결합사시도이며, 도 3은 본 발명의 제 1 실시예로 배관점검함과 이중관의 시공상태를 보인 단면도 이다.1 is an exploded perspective view showing a structure of a pipe check box to which a detachable cover is applied as a first embodiment of the present invention, and FIG. 2 is a combined perspective view showing a structure of a pipe check box as a first embodiment of the present invention. The first embodiment of the invention is a cross-sectional view showing the construction of the pipe inspection and double pipe.

도 4는 본 발명의 제 1 실시예로 배관고정부의 높낮이 조절상태도이고, 도 5는 본 발명의 제 1 실시예로 배관점검함의 높낮이 조절상태도이며, 도 6은 본 발명의 제 1 실시예로 배관점검함과 이중관이 시공된 후 조적벽체를 시공한 상태의 사시도를 도시한 것이다.Figure 4 is a height adjustment state diagram of the pipe fixing portion in the first embodiment of the present invention, Figure 5 is a height adjustment state diagram of the pipe inspection check in the first embodiment of the present invention, Figure 6 is a first embodiment of the present invention It shows a perspective view of the construction state of the masonry wall after the pipe inspection and the double pipe is constructed.

도 1 내지 도 6을 참조하면, 본 발명의 제 1 실시예인 벽체 매립형의 배관 점검함은 배관고정부(10), 보호매립함(20), 점검매립함(30), 그리고 관결합부(40)를 포함한다.1 to 6, the pipe inspection box of the wall embedded type according to the first embodiment of the present invention includes a pipe fixing part 10, a protection buried box 20, an inspection buried box 30, and a pipe fitting part 40. ).

상기 배관고정부(10)는 벽체내에 매립되는 구조물로서 분배기(미도시)로부터 분배되는 1차 이중관(1)을 정렬하여 고정하는 것으로, 절편(11)과 고정프레임(12)을 포함한다.The pipe fixing part 10 is a structure embedded in the wall to align and fix the primary double pipe (1) distributed from a distributor (not shown), and includes a section 11 and a fixing frame 12.

상기 절편(11)은 분할형으로 벽체내의 바닥면에 나란하게 배열되어 나사(5)를 통해 고정되며, 각각 소정길이의 슬롯부(11a)가 마련된다.The segments 11 are divided and arranged side by side on the bottom surface of the wall and are fixed by screws 5, and slot portions 11a of predetermined lengths are provided, respectively.

상기 고정프레임(12)은 상면에 1차 이중관(1')이 결합되는 다수의 홀(12b)을 마련한 것으로 그 양측면으로는 상기 분할형 절편(11)이 결합되어, 상기 1차 이중관(1')의 길이에 따라 높낮이가 조절되는 것으로, 그 높낮이 조절을 위해 양측면에는 고정홀(12a)이 마련된다.The fixed frame 12 is provided with a plurality of holes (12b) is coupled to the primary double tube (1 ') on the upper surface of the split type segment (11) is coupled to both sides, the primary double tube (1') Height is adjusted according to the length of), the fixing hole 12a is provided on both sides for adjusting the height.

이때, 상기 고정프레임(12)의 높낮이 조절은 조임작업을 위한 조절구(13)에 의해 이루어지는 것으로, 상기 조절구(13)는 상기 고정홀(12a) 및 슬롯부(11a)에 체결 구성된다.At this time, the height adjustment of the fixing frame 12 is made by the adjusting opening 13 for the tightening operation, the adjusting opening 13 is configured to be fastened to the fixing hole (12a) and the slot portion (11a).

상기 보호매립함(20)은 상기 배관고정부(10)에 의해 정렬되는 1차 이중관(1)과 연결되는 2차 이중관(1')을 보호하도록 상기 배관고정부(10)에 포함되는 고정프레임(12)의 상측에 결합되는 것으로, 제 1 매립함(21)과 제 1 덮개(25)를 포함한다.The protection buried box 20 is a fixed frame included in the pipe fixing portion 10 to protect the secondary double pipe (1 ') connected to the primary double pipe (1) aligned by the pipe fixing portion (10) It is coupled to the upper side of the (12), and includes a first buried compartment 21 and the first lid (25).

상기 제 1 매립함(21)은 상기 배관고정부(10)를 통해 정렬 고정된 1차 이중관(1)과 연결되는 2차 이중관(1')을 수납하는 것으로, 일체형의 함 구조, 또는 고 정함(22)과 유동함(23)으로 분할 구성된다.The first buried box 21 is to accommodate the secondary double pipe (1 ') connected to the primary double pipe (1) aligned and fixed through the pipe fixing portion 10, an integral box structure, or fixed It is divided into 22 and flow 23.

상기 고정함(22)은 나사(5)를 통해 배관고정부(10)에 포함된 고정프레임(12)의 상측에 결합되며, 그 양측면에는 소정길이의 슬롯부(22a)가 마련된다.The fixing box 22 is coupled to the upper side of the fixing frame 12 included in the pipe fixing part 10 through the screw 5, the slot portion 22a of a predetermined length is provided on both sides thereof.

상기 유동함(23)은 상기 고정함(22)에 결합되면서 2차 이중관(1')의 길이에 따라 높낮이가 조절되는 것으로, 이를 위해 상기 유동함(23)의 양측에는 고정홀(23a)이 마련된다.The flow box 23 is coupled to the fixing box 22, the height is adjusted according to the length of the secondary double pipe (1 '), for this purpose fixed holes (23a) on both sides of the flow box (23) To be prepared.

이때, 상기 유동함(23)의 높낮이 조절은 조임작업을 위한 조절구(24)에 의해 이루어지는 것으로, 상기 조절구(24)는 상기 고정홀(22a) 및 슬롯부(23a)에 체결 구성된다.At this time, the height adjustment of the flow box 23 is made by the adjustment opening 24 for the tightening operation, the adjustment opening 24 is configured to be fastened to the fixing hole (22a) and the slot portion (23a).

상기 제 1 덮개(25)는 상기 제 1 매립함(21)의 일면에 결합되는 것으로, 그 일면에는 타일 시공을 위한 다수의 돌기(25a)가 마련된다.The first cover 25 is coupled to one surface of the first buried compartment 21, and a plurality of protrusions 25a for tile construction are provided on one surface of the first cover 25.

여기서, 상기 제 1 매립함(21)과 제 1 덮개(25)의 결합부위에는 도시하지 않았지만 링 형상의 고무패킹으로 이루어진 실링재가 마련되도록 하였다.Here, although not shown in the coupling portion of the first filling box 21 and the first cover 25, a sealing material made of a ring-shaped rubber packing is provided.

상기 점검매립함(30)은 그 내부에 상기 보호매립함(20)에 의해 보호되는 2차 이중관(1')을 통해 연질관(도면에는 표시하지 않음)을 인출시 그 연질관을 수전 연결용의 수전엘보(3)와 연결시키기 위한 후렉시블관(2)이 배치되는 것으로, 제 2 매립함(31)과 제 2 덮개(32), 그리고 보조덮개(33)를 포함한다.The check filling box 30 is for receiving the soft pipe (not shown in the drawing) through the secondary double pipe (1 ') protected by the protective filling box 20 therein for connecting the soft pipe to the faucet. Flexible tube (2) for connecting with the faucet elbow (3) is disposed, and includes a second buried box 31, a second cover 32, and an auxiliary cover (33).

상기 제 2 매립함(31)은 상기 보호매립함(20)에 수납되는 연질관과 일단이 연결되고, 타단이 수전 연결용의 수전엘보(3)와 연결되는 후렉시블관(2)이 배치되는 공간을 제공하는 것으로, 그 하부면에는 2차 이중관(1')이 결합되는 다수의 홀(31a)이 마련되고, 상부면에는 수전연결용의 수전엘보(3)를 후렉시블관(2)의 타단에 결합시키기 위한 관인출부(31b)가 구성되며, 상기 유동함(23)의 상면에 나사(5)의 체결동작으로부터 결합된다.The second buried compartment 31 is a space in which a flexible tube (2) is connected to one end and the flexible tube (2) connected to the faucet elbow (3) for the faucet connection, the other end is connected to the flexible tube received in the protective buried box (20) To provide, the lower surface is provided with a plurality of holes (31a) are coupled to the secondary double pipe (1 '), the upper surface of the faucet elbow (3) for connecting the faucet to the other end of the flexible pipe (2) A pipe lead portion 31b for engaging is configured, and is coupled from the fastening operation of the screw 5 to the upper surface of the flow box 23.

여기서, 상기 후렉시블관(2)은 ∪자형 수전티(6)에 의해 분배되는 구조를 이루도록 하였다.In this case, the flexible tube 2 is configured to be distributed by the U-shaped faucet 6.

상기 관인출부(31b)는 상기 제 2 매립함(31)의 상부면에 연장되어 돌출된 박스형 구조로 그 박스형 구조의 전면에는 후렉시블관(2)이 인출될 수 있는 다수의 인출홀(31c)이 마련된다.The pipe outlet 31b is a box-shaped structure that extends and protrudes from an upper surface of the second buried box 31, and a plurality of outlet holes 31c through which the flexible tube 2 can be drawn out on the front of the box-shaped structure. Is provided.

상기 제 2 덮개(32)는 일면에 타일 시공을 위한 다수의 돌기(32b)가 마련되어 상기 제 2 매립함(31)의 개구부를 덮도록 구성되며, 배관 점검용의 개구부(미도시)를 마련한 결합플랜지(32a)가 돌출되는 구조를 이룬다.The second cover 32 has a plurality of projections (32b) for tile construction on one surface is configured to cover the opening of the second landfill 31, the coupling provided with an opening (not shown) for pipe inspection The flange 32a is formed to protrude.

이때, 상기 제 2 매립함(31)과 제 2 덮개(32)의 사이에는 링 형상의 고무패킹으로 이루어진 실링재(300)가 마련되며, 이는 상기 제 2 매립함(31)으로 제 2 덮개(32)가 나사(5)에 의해 결합되고, 상기 결합플랜지(32a)에 마련된 개구부를 보조덮개(33)로 덮었을 때, 상기 제 2 매립함(31)을 거치는 공급수의 흐름에 의한 소음을 1차 차단하는 등 1차적인 방음과 방수의 효과를 제공하기 위함이다.At this time, a sealing material 300 made of a ring-shaped rubber packing is provided between the second filling box 31 and the second cover 32, which is the second filling box 31. ) Is coupled by a screw (5), and when the opening provided in the coupling flange (32a) covered with the auxiliary cover 33, the noise caused by the flow of the supply water passing through the second buried compartment (31) 1 This is to provide the primary soundproofing and waterproofing effect such as blocking the car.

상기 보조덮개(33)는 상기 제 2 덮개(32)의 결합플랜지(32a)에 나사(5)를 통해 결합되는 것으로, 제 1,2 커버(33a)(33b)로 분할 구성된다.The auxiliary cover 33 is coupled to the coupling flange 32a of the second cover 32 through a screw 5, and is divided into first and second covers 33a and 33b.

상기 제 1 커버(33a)는 상기 결합플랜지(32a)에 마련된 배관 점검용의 개구부를 덮는 투명한 재질로서, 이는 작업자가 제 2 매립함(31)의 내부를 관찰할 수 있도록 하기 위함이다.The first cover 33a is a transparent material covering an opening for inspecting a pipe provided in the coupling flange 32a, which is to allow an operator to observe the inside of the second buried compartment 31.

이때, 상기 결합플랜지(32a)와 제 1 커버(33a)에도 링 형상의 고무패킹으로 이루어진 실링재(미도시)가 위치하며, 이는 상기 제 2 매립함(31)으로 제 2 덮개(32)가 나사(5)에 의해 결합되고, 상기 결합플랜지(32a)에 마련된 개구부를 보조덮개(33)로 덮었을 때, 상기 제 2 매립함(31)을 거치는 공급수의 흐름에 의한 소음을 2차 차단하는 등 2차적인 방음과 방수의 효과를 제공하기 위함이다.At this time, a sealing material (not shown) made of a ring-shaped rubber packing is also located on the coupling flange 32a and the first cover 33a, which is screwed into the second cover 32 by the second cover 32. (5) coupled to, and when the opening provided in the coupling flange (32a) covered with the auxiliary cover 33, the second blocking the noise caused by the flow of the feed water passing through the second buried box (31) Etc. to provide secondary sound insulation and waterproof effect.

상기 제 2 커버(33b)는 벽체 외부면에 노출되는 구조로 불투명한 재질 또는 투명한 재질로 구성할 수 있으며, 상기 제 2 커버(33b)의 일면 즉, 외부로 노출되는 면에는 타일 시공이 용이하게 이루어질 수 있도록 하는 다수의 돌기(33c)가 마련된다.The second cover 33b may be formed of an opaque material or a transparent material exposed to the outer surface of the wall, and tile construction may be easily performed on one surface of the second cover 33b, that is, the surface exposed to the outside. A plurality of protrusions 33c are provided to make it possible.

상기 관결합부(40)는 1,2차 이중관(1)(1')을 연결하기 위한 구조물로서, 제 1,2 결합부(41)(42)로 분할 구성된다.The pipe coupling portion 40 is a structure for connecting the first and second double pipes (1) (1 '), is divided into first and second coupling portions (41, 42).

상기 제 1 결합부(41)는 배관고정부(10)의 고정프레임(12)에 마련되는 홀의 일단에 결합된 상태에서 1차 이중관(1)이 연결되는 것이고, 상기 제 2 결합부(41)는 상기 홀을 통해 상기 제 1 결합부(41)에 결합되는 상태에서 2차 이중관(1')의 일단이 연결되는 구조를 이루며, 상기 제 1,2 결합부(41)(42)는 상호 연결 결합이 이루어진다.The first coupling part 41 is to be connected to the primary double pipe 1 in a state coupled to one end of the hole provided in the fixing frame 12 of the pipe fixing part 10, the second coupling part 41 Is a structure in which one end of the secondary double pipe 1 'is connected to the first coupling portion 41 through the hole, and the first and second coupling portions 41 and 42 are connected to each other. The bond is made.

이때, 상기 제 1,2 결합부(41)(42)의 의 결합부위 및, 상기 제 1,2 결합부(41)(42)와 결합되는 1,2차 이중관(1)(1')의 결합부위에는 방음 및 방수를 위한 실링재(미도시)가 마련된다.At this time, the coupling portion of the first and second coupling parts 41 and 42 and the first and second double pipes 1 and 1 'coupled to the first and second coupling parts 41 and 42. The coupling portion is provided with a sealing material (not shown) for soundproofing and waterproofing.

그리고, 상기의 배관 점검함을 이용하여 이루어지는 이중관의 시공방법은 다음과 같이 이루어진다.Then, the construction method of the double pipe made by using the above pipe inspection box is made as follows.

분배기로부터 건물내의 각 수요처인 욕실, 주방 등으로 다수의 1차 이중관(1)을 분배시킨다.A plurality of primary double pipes 1 are distributed from the distributors to the bathrooms, kitchens, and the like in each building.

상기 1차 이중관(1)의 분배가 완료된 후, 각 수요처의 벽체내 바닥면에 배관고정부(10)를 고정하고, 상기 1차 이중관(1)을 상기 배관고정부(10)에 고정한다.After the distribution of the primary double pipe (1) is completed, the pipe fixing part 10 is fixed to the bottom surface in the wall of each customer, and the primary double pipe (1) is fixed to the pipe fixing part (10).

즉, 상기 배관고정부(10)는 절편(11)과 고정프레임(12)의 결합구조로서, 상기 절편(11)을 바닥면에 나사(5)로 고정한 후, 상기 절편(11)에 고정프레임(12)을 높낮이 조절이 가능하도록 조절구(13)를 통해 결합시킨다.That is, the pipe fixing portion 10 is a coupling structure of the section 11 and the fixing frame 12, and after fixing the section 11 to the bottom surface with a screw (5), the fixing frame to the section 11 (12) is coupled through the adjuster (13) to enable height adjustment.

이때, 상기 1차 이중관(1)의 길이가 길어 상기 고정프레임(12)의 높이를 높이고자 하는 경우, 상기 조절구(13)의 조임상태를 해제시켜, 상기 고정프레임(12)을 위로 올리고, 그 높이의 세팅이 완료되면 상기 조절구(13)를 조여, 상기 고정프레임(12)이 유동되지 않도록 한다.At this time, when the length of the primary double pipe (1) is long to increase the height of the fixing frame 12, by releasing the tightening state of the adjusting mechanism 13, to raise the fixing frame 12 up, When the setting of the height is completed, tighten the adjusting device 13 so that the fixed frame 12 does not flow.

이후, 상기 고정프레임(12)에 마련된 홀에 제 1,2 결합부(41)(42)로 이루어지면서 실링재(43)를 포함하는 관결합부(40)를 결합시킨 후, 상기 제 1 결합부(41)에 1차 이중관(1)을 연결한다.Subsequently, the first coupling portion 40 is formed by coupling the pipe coupling portion 40 including the sealing material 43 to the holes provided in the fixing frame 12 and including the first and second coupling portions 41 and 42. Connect primary double pipe (1) to (41).

다음으로, 바닥 철근 작업 후 바닥 콘크리트를 타설하여 상기 배관고정부(10)를 매몰시킨 후 양생을 완료한다.Next, after the bottom reinforcement work to pour the bottom concrete to bury the pipe fixing part 10 and complete the curing.

그러면, 상기 1차 이중관(1)은 상기 바닥 콘크리트의 타설작업이 이루어지더라도 상기 배관고정부(10)에 의해 그 배열 고정상태가 견고하게 유지될 수 있는 것 이다.Then, the primary double pipe (1) is that the arrangement fixed state can be maintained firmly by the pipe fixing part 10 even if the floor concrete is placed.

다음으로, 벽돌쌓기를 통한 조적벽체(8)의 시공전에, 상기 고정프레임(12)의 위에 높낮이 조절이 가능한 보호매립함(20)을 나사(5)를 통해 결합하고, 상기 보호매립함(20)의 위로는 점검매립함(30)을 나사(5)를 통해 결합시킨다.Next, before the construction of the masonry wall (8) through the racking, the protective buried box 20 is adjustable on the fixed frame 12 through the screw (5), the protective buried (20) ) Is coupled to the check landfill box 30 through the screw (5).

즉, 상기 고정프레임(12)의 위에 보호매립함(20)에는 제 1 매립함(21)이 포함되고, 상기 제 1 매립함(21)은 고정함(22)과 유동함(23)로 분할 구성되는 바,That is, the protection buried box 20 includes a first buried box 21 on the fixing frame 12, and the first buried box 21 is divided into a fixed box 22 and a flow box 23. Bar composed,

상기 고정함(22)을 나사(5)를 이용하여 고정프레임(12)의 상면에 고정한다.The fixing box 22 is fixed to the upper surface of the fixing frame 12 by using the screw (5).

그리고, 상기 고정함(22)에는 조절구(24)를 이용하여 유동함(23)을 결합시킨 후, 상기 유동함(23)의 상면에는 점검매립함(30)에 포함되는 제 2 매립함(31)을 결합시킨다.In addition, the fixing box 22 is coupled to the flow box 23 by using the adjusting mechanism 24, and then the second buried box included in the check filling box 30 on the upper surface of the flow box 23 ( 31).

다음으로, 상기 고정함(22)과 유동함(23)의 결합으로 이루어진 제 1 매립함(21)내에 2차 이중관(1')을 위치시킨 후, 상기 2차 이중관(1')의 하측부위는 관결합부(40)의 제 2 결합부(42)에 연결하고, 상측부위는 제 2 매립함(31)의 홀(31a)에 연결한다.Next, after placing the secondary double pipe (1 ') in the first buried box 21 made of a combination of the fixing box 22 and the flow box 23, the lower portion of the secondary double pipe (1') Is connected to the second coupling portion 42 of the pipe coupling portion 40, the upper portion is connected to the hole (31a) of the second buried compartment (31).

이때, 상기 고정함(22)과 유동함(23)의 전체 길이와 2차 이중관(1')의 길이가 서로 일치하지 않을 경우, 상기 고정함(22)과 유동함(23)을 연결 고정하는 조절구(24)의 조임상태를 해제한 후, 상기 2차 이중관(1')의 길이에 맞춰 유동함(23)의 높낮이를 조절한 후, 상기 조절구(24)를 조여 유동함(23)의 유동을 방지한다.At this time, when the total length of the fixing box 22 and the flow box 23 and the length of the secondary double pipe (1 ') does not match each other, the fixing box 22 and the flow box 23 is connected and fixed After releasing the tightening state of the control unit 24, after adjusting the height of the flow container 23 to the length of the secondary double pipe (1 '), tighten the control unit 24 to flow (23) To prevent flow.

다음으로, 분배기에서 분배가 이루어지는 1차 이중관(1)의 인입부에서 연질관(a)을 밀어넣어, 상기 연질관(a)을 제 2 매립함(31)으로 인출한 후, 상기 인출된 연질관(a)에 체결구(미도시)를 결합시킨 후, 상기 연질관(a)의 체결구를 제 2 매립함(31)내에서 ∪자형의 수전티(6)에 다수 마련되는 후렉시블관(2) 중 어느 하나와 연결시킨다.Next, the soft pipe (a) is pushed into the inlet portion of the primary double pipe (1) in which the dispenser is dispensed, and the soft pipe (a) is drawn out to the second filling box 31, and then the drawn soft After coupling a fastener (not shown) to the pipe (a), a flexible pipe provided in the number of the U-shaped faucet (6) in the second buried box 31 of the fastener of the flexible pipe (a) ( 2) Connect with either.

다음으로, 상기 ∪자형 수전티(6)에 마련되는 하나의 후렉시블관(2)을 제 2 매립함(31)의 상면에 위치하는 관인출부(31b)로 안내한 후, 상기 관인출부(31b)의 전면에 마련된 인출홀(31c)을 통해 제 2 매립함(31)의 외부로 인출시킨다.Next, the flexible pipe 2 provided in the U-shaped faucet 6 is guided to the pipe lead-out part 31b positioned on the upper surface of the second buried box 31, and then the pipe lead-out part ( It is withdrawn to the outside of the second buried compartment 31 through the withdrawal hole 31c provided on the front surface of 31b).

다음으로, 상기 제 2 매립함(31)의 상면에 인출된 후렉시블관(2)에 수전엘보(3)를 연결하고, 상기 수전엘보(3)에는 수전(7)을 연결하여 1,2차 이중관(1)(1')의 연결 시공을 완료한다.Next, a faucet elbow 3 is connected to the flexible pipe 2 drawn out on the upper surface of the second buried box 31, and a faucet 7 is connected to the faucet elbow 3 to connect the first and second double pipes. (1) Complete the connection construction of (1 ').

다음으로, 상기 제 1 매립함(21)의 전면 개구부는 나사(5)를 이용하여 제 1 덮개(25)를 결합시켜 밀폐하고, 상기 제 2 매립함(21)의 전면 개구부에는 나사(5)를 이용하여 제 2 덮개(32)를 결합시킨다.Next, the front opening of the first buried compartment 21 is sealed by coupling the first cover 25 using the screw 5, and the screw 5 is attached to the front opening of the second buried compartment 21. The second cover 32 is combined using.

이때, 상기 제 2 덮개(32)에는 배관 점검용의 개구부를 마련한 결합플랜지(32a)가 형성되어 있는 바,At this time, the second cover 32 is formed with a coupling flange 32a provided with an opening for inspecting the pipe,

상기 배관 점검용의 개구부는 제 1,2 커버(33a)(33b)로 이루어진 보조덮개(33)를 나사(5)로 결합시켜 밀폐시킨다.The opening for the pipe inspection is sealed by coupling the auxiliary cover 33 made of the first and second covers 33a and 33b with the screw 5.

이후, 상기 제 1,2 덮개(25)(32)가 외부면으로 노출되도록, 상기 보호매립함(20)과 점검매립함(30)의 측부로 벽돌쌓기를 실시하여 조적벽체를 완성한다.Subsequently, the first and second covers 25 and 32 are exposed to the outer surface, so that the protection buried box 20 and the check buried box 30 are stacked to complete the masonry wall.

이때, 상기와 같이 보호매립함(20)과 점검매립함(30)의 측부로 벽돌쌓기로 조적벽체(8)의 공사가 이루어질 때, 상기 보호매립함(20)내에 배치되는 2차 이중 관(1')은 그 쓰러짐이 방지됨으로써, 상기 벽돌쌓기가 용이하게 이루어질 수 있는 것이다.At this time, when the construction of the masonry wall (8) by the racking to the sides of the protective landfill box 20 and the check filling box 30 as described above, the secondary double pipe disposed in the protective landfill box ( 1 ') is to prevent the fall, so that the racking can be made easily.

따라서, 상기와 같이 배관 점검함과 이중관, 그리고 조적벽체(8)의 시공이 완료된 상태에서, 이중관에 대한 누수 여부의 확인은, 상기 외부면에 노출되는 제 2 커버(33b)를 분리하면 투명으로 이루어진 제 1 커버(33a)를 통해 벽체내에 매립된 제 1 매립함(21)의 내부는 제 2 덮개(32)의 결합플랜지(32a)에 마련되는 배관 점검용의 개구부를 통해 용이하게 확인할 수 있게 되는 것이다.Therefore, in the state where the pipe inspection, the double pipe, and the construction of the masonry wall 8 are completed as described above, the confirmation of leakage of the double pipe is transparent when the second cover 33b exposed to the outer surface is removed. The interior of the first buried compartment 21 embedded in the wall through the first cover 33a made can be easily identified through the opening for pipe inspection provided in the coupling flange 32a of the second cover 32. Will be.

더불어, 본 발명은 상기의 확인결과 제 1 매립함(21)내에서 누수가 확인될 경우, 그 보수를 수전(7)을 분리하지 않고 가능한데, 이를 위해 먼저 제 2 커버(33b)를 분리하고 다음으로 제 1 커버(33a)를 분리한다.In addition, the present invention can be repaired without removing the faucet (7) when the leak is confirmed in the first landfill 21, the first cover 33b and then to remove To separate the first cover 33a.

그러면, 상기 제 1,2 커버(33a)(33b)의 분리로부터 결합플랜지(32a)에 마련디는 배관 점검용의 개구부를 통해 작업자가 바로 누수가 발생된 배관부위를 보수할 수 있게 되는 것이다.Then, the operator can directly repair the leaked pipe portion through the opening for the pipe inspection provided in the coupling flange 32a from the separation of the first and second covers 33a and 33b.

즉, 본 발명은 종래와 같이 덮개에 수전에 연결하여 초래되는 수전의 분리 작업을 없애려는데 특징이 있고, 아울러 이중관의 시공시 그 움직임을 방지하도록 배관고정부(10)를 사용함은 물론, 1,2차 이중관(1)(1')의 연결을 관결합부(40)를 통해 실시함으로써 콘크리트 타설에 의한 이중관의 위치 변경을 방지하면서 벽돌쌓기를 통한 조적벽체(8)의 시공이 이루어질 때 수직으로 직립되는 2차 이중관(1')이 쓰러지는 문제를 개선하는 특징을 갖는 것이다.That is, the present invention is characterized in eliminating the separation work of the faucet caused by connecting the faucet to the cover as in the prior art, and also using the pipe fixing part 10 to prevent its movement during construction of the double pipe, of course, 1, By connecting the secondary double pipes (1) and (1 ') through the pipe coupling part 40, the construction of the masonry wall (8) through the stacking while preventing the change of the position of the double pipes by concrete placing The upright secondary double pipe (1 ') is to have a feature that improves the problem of falling.

여기서, 상기와 같이 조적벽체(8)의 시공이 완료된 후 마감공사로서, 상기 조적벽체(8)에 타일을 시공하는 경우, 상기 제 1,2 덮개(25)(32)의 일면에는 다수의 돌기(25a)(32b)를 형성하고 있는 바,Here, as a finish after the construction of the masonry wall (8) as described above, in the case of constructing a tile on the masonry wall (8), a plurality of projections on one surface of the first and second covers (25, 32) Bars 25a and 32b are formed.

상기 돌기(25a)(32b)에 의해 제 1,2 덮개(25)(32)로도 타일의 시공이 용이하게 이루어지는 특징을 제공할 수 있는 것이다.The protrusions 25a and 32b may provide a feature in which the first and second lids 25 and 32 are also easily constructed.

한편, 도 7,8은 본 발명의 제 2 실시예로, 이는 제 1,2 덮개(25)(32)를 일체화시킨 후, 상기 일체화된 구조를 가진 덮개(100)의 상측에 배관 점검용의 개구부를 마련하는 결합플랜지(32a)를 형성한 것을 도시한 것으로, 이하 본 발명의 제 1 실시예에서와 그 작용 및 효과가 동일하므로 동일부분에 대하여는 동일부호로 표시하면서 그 중복되는 설명은 생략한다.On the other hand, Figure 7 and 8 is a second embodiment of the present invention, which integrates the first and second cover 25, 32, and then for pipe inspection on the upper side of the cover 100 having the integrated structure The coupling flange 32a is formed to provide an opening, and since the operation and effect are the same as in the first embodiment of the present invention, the same reference numerals are used to designate the same parts, and the overlapping description thereof will be omitted. .

또한, 도 9는 본 발명의 제 3 실시예로, 이는 제 2 매립함(31)의 상면에 형성되는 관인출부(31b)를 박스형 구조로 형성하지 않고, 그 상부면에 직접 다수의 결합홀(미도시)을 형성한 후 그 결합홀에 후렉시블관(2)의 인출경로를 안내하는 원형수전함(4)을 나사(5)를 통해 결합시킨 구조로서, 이 또한 본 발명의 제 1 실시예에서와 그 작용 및 효과가 동일하므로 동일부분에 대하여는 동일부호로 표시하면서 그 중복되는 설명은 생략한다.In addition, FIG. 9 is a third embodiment of the present invention, which does not form a tube drawing portion 31b formed on the upper surface of the second filling box 31 in a box-like structure, and has a plurality of coupling holes directly on the upper surface thereof. (Not shown) is a structure in which the circular receiving box (4) for guiding the withdrawal path of the flexible pipe (2) to the coupling hole through the screw (5), which is also a first embodiment of the present invention. Since the operation and effect are the same as in, the same parts are denoted by the same reference numerals and redundant description thereof will be omitted.

한편,, 도 10,11은 인접하는 배관점검함을 이중관을 통해 서로 연결하는 본 발명의 제 4 실시예로, 이는 관결합부(40)의 제 2 결합부(42)에 2차 이중관(1')이 연결될 때, 상기 제 2 결합부(42)와 연결되는 상기 관결합부(40)의 제 1 결합부(41)에 3차 이중관(1")의 일단을 연결하고, 상기 3차 이중관(1")의 타단은 다음 수요처에 위치하는 관결합부의 제 1 결합부에 결합시킴으로써, 상기 3차 이중 관(1")을 통해 복수의 수요처에 각각 위치하는 2차 이중관(1')을 상호 연결시킬 수 있도록 한 것이다.On the other hand, Figures 10 and 11 is a fourth embodiment of the present invention for connecting adjacent pipe check each other through a double pipe, which is a secondary double pipe (1) to the second coupling portion 42 of the pipe coupling portion (40) ') Is connected, one end of the tertiary double pipe (1 ") to the first coupling portion 41 of the pipe coupling portion 40 is connected to the second coupling portion 42, the third double pipe The other end of (1 ″) is coupled to the first coupling portion of the pipe joint located at the next demand source, thereby mutually connecting the secondary double pipes 1 'respectively positioned at the plurality of demand destinations through the tertiary double pipe 1 ″. I could connect it.

다음으로, 상기 2,3차 이중관(1')(1")을 통해 연질관(a)을 인출한 후 그 인출된 연질관(a)을 ∪자형 수전티(6)에 마련되는 후렉시블관(2)과 연결하면, 건물내의 각 수요처에 위치하는 벽체 매립형의 배관점검함은 인접하는 배관점검함과 3차 이중관(1")을 통해 다단으로 연결되면서, 상기 다단 연결된 배관점검함에 시공된 수전(7)으로는 하나의 공급부를 통해 순차적으로 공급수를 공급받을 수 있게 되며, 이와같이 시공이 이루어지면 각 수요처마다 별도의 배관라인을 구축하는데 따른 작업공정과 비용을 절감할 수 있게 되는 것이다.Next, the flexible pipe (a) is drawn out through the second and third double pipes (1 ') (1 ") and the flexible pipe (a) is provided in the U-shaped faucet (6). In connection with 2), the wall-filled pipe check box located at each demand point in the building is connected to the multi-stage through the adjacent pipe check box and the tertiary double pipe (1 "), and the faucets constructed in the multi-stage connected pipe check ( 7) In order to receive the supply water sequentially through a single supply unit, if the construction is made in this way it is possible to reduce the work process and cost of building a separate piping line for each customer.

이상에서 설명한 바와같이 본 발명은 벽돌쌓기 작업 전에 배관 점검함을 벽체내에 매립하여 선 고정하므로, 배관 점검함 내부에 이중관을 시공시 그 시공에 따른 작업공정을 단축하면서 벽돌쌓기 작업이 원할하게 이루어지고, 아울러 배관의 시공 후 누수 발생시 수전을 분리하지 않은 물론, 건축마감재에 전혀 손상을 주지 않고 보수가 이루어지므로, 벽체 매립형 배관 점검함들의 많은 단점을 보완하여 관련분야에서의 시공성을 높임은 물론, 시공에 따른 비용을 절감하는 효과를 얻을 수 있는 것이다.As described above, in the present invention, since the pipe check box is fixed in the wall before the racking work, the rack is fixed smoothly while shortening the work process according to the construction when the double pipe is installed inside the pipe check box. In addition, when water leakage occurs after the construction of the pipe, the water faucet is not separated, and repair is performed without damaging the building finishing material. Therefore, many defects of the wall-filled pipe inspection boxes are compensated for, thereby increasing construction in related fields. It is possible to obtain the effect of reducing the cost.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그 와같은 변경은 청구범위 기재의 범위내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

Claims (31)

분배기로부터 분배되는 1차 이중관을 정렬하여 고정하는 배관고정부;A pipe fixing part for aligning and fixing the primary double pipe distributed from the distributor; 상기 배관고정부의 상측에 결합되고, 상기 배관고정부에 의해 정렬되는 1차 이중관과 연결되는 2차 이중관을 보호하는 보호매립함;A buried protective shield coupled to an upper side of the pipe fixing part and protecting a second double pipe connected to a first double pipe arranged by the pipe fixing part; 상기 보호매립함의 상측에 결합되고, 상기 보호매립함에 의해 보호되는 2차 이중관을 통해 연질관이 인출시 그 연질관을 수전 연결용의 수전엘보와 연결시키기 위한 후렉시블관을 배치시킨 점검매립함; 을 포함하여 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.An inspection buried coupled to an upper side of the protection buried box and having a flexible pipe arranged to connect the soft pipe to the faucet elbow for connecting the faucet when the soft pipe is drawn out through the secondary double pipe protected by the protective buried; Check the pipe of the wall-filled type, characterized in that the configuration including a. 제 1 항에 있어서, 상기 배관고정부는,According to claim 1, The pipe fixing portion, 벽체내의 바닥면에 고정되는 분할형의 절편; 상기 분할형 절편에 양측면이 결합되고, 상면에 1차 이중관이 결합되는 다수의 홀을 마련한 고정프레임; 을 포함하여 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.Segmented sections fixed to the bottom surface in the wall; A fixed frame having a plurality of holes coupled to both sides of the split section and having a first double pipe coupled to an upper surface thereof; Check the pipe of the wall-filled type, characterized in that the configuration including a. 제 2 항에 있어서, 상기 고정프레임은,The method of claim 2, wherein the fixed frame, 1차 이중관의 길이에 따라 높낮이가 조절되도록, 상기 절편에는 소정길이의 슬롯부를 형성하고, 상기 고정프레임에는 고정홀을 형성하는 것을 특징으로 하는 벽체 매립형의 배관 점검함.In order to adjust the height according to the length of the primary double pipe, the section is formed in the slot portion of a predetermined length, and the fixing frame to the wall-filled pipe check, characterized in that forming a fixing hole. 제 3 항에 있어서, 상기 고정프레임의 높낮이 조절은 상기 슬롯부와 고정홀에 체결되는 조절구에 의해 제어되는 구조인 것을 특징으로 하는 벽체 매립형의 배관 점검함.According to claim 3, wherein the height adjustment of the fixed frame is wall-mounted pipe inspection, characterized in that the structure is controlled by the control mechanism fastened to the slot portion and the fixing hole. 제 1 항에 있어서, 상기 1,2차 이중관은 관결합부에 의해 그 연결이 이루어지는 것을 특징으로 하는 벽체 매립형의 배관 점검함.According to claim 1, wherein the first and second double pipe is a wall-mounted pipe inspection, characterized in that the connection is made by the pipe joint. 제 5 항에 있어서, 상기 관결합부는 1차 이중관과 결합되는 제 1 결합부, 그리고 2차 이중관과 결합되는 제 2 결합부로 분할 구성하고, 상기 제 1,2 결합부는 고정프레임의 홀을 통해 결합되는 구조인 것을 특징으로 하는 벽체 매립형의 배관 점검함.The method of claim 5, wherein the pipe coupling portion is divided into a first coupling portion coupled to the primary double tube, and a second coupling portion coupled to the secondary double tube, wherein the first and second coupling portions are coupled through the hole of the fixed frame Checking the pipe of the wall-filled type, characterized in that the structure. 제 6 항에 있어서, 상기 제 1,2 결합부의 결합부위 및, 상기 제 1,2 결합부와 결합되는 1,2차 이중관의 결합부위에는 누수 방지를 위한 실링재가 형성되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.The wall-filling type of claim 6, wherein a sealing material for preventing leakage is formed at a coupling portion of the first and second coupling portions and a coupling portion of the first and second double pipes coupled to the first and second coupling portions. Check piping. 제 1 항에 있어서, 상기 보호매립함은,The method of claim 1, wherein the protective buried, 배관고정부를 통해 정렬 고정된 1차 이중관과 연결되는 2차 이중관을 수납하는 제 1 매립함; 및, 상기 제 1 매립함의 일면에 결합되는 제 1 덮개; 를 포함하여 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.A first buried box for receiving a second double pipe connected to the primary double pipe aligned and fixed through the pipe fixing part; And a first cover coupled to one surface of the first filling box. Check the pipe of the wall-mounted pipe, characterized in that the configuration including a. 제 8 항에 있어서, 상기 제 1 매립함은 벽체 매립형으로 2차 이중관의 길이에 따라 높낮이가 조절되는 고정함 및 유동함으로 분할 구성하고, 상기 고정함에는 소정길이의 슬롯부를 형성하며, 상기 유동함에는 고정홀을 형성하는 것을 특징으로 하는 벽체 매립형의 배관 점검함.The method of claim 8, wherein the first landfill is divided into a wall and a fixing box and the flow path of the height is adjusted according to the length of the secondary double pipe, the fixing box forms a slot portion of a predetermined length, Check the pipe of the wall-filled type, characterized in that to form a fixing hole. 제 9 항에 있어서, 상기 유동함의 높낮이 조절은, 상기 슬롯부와 고정홀에 체결되는 조절구에 의해 제어되는 구조인 것을 특징으로 하는 벽체 매립형의 배관 점검함.10. The method of claim 9, wherein the height adjustment of the flow box is a pipe check of the wall-filling type, characterized in that the structure is controlled by the control mechanism fastened to the slot portion and the fixing hole. 제 8 항에 있어서, 상기 제 1 덮개는 일면에 타일 시공을 위한 다수의 돌기가 배열되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.10. The method of claim 8, wherein the first cover is a pipe inspection of the wall-filled, characterized in that a plurality of protrusions for tile construction on one surface is arranged. 제 8 항에 있어서, 상기 제 1 매립함과 제 1 덮개의 사이에는 실링재가 마련되는 구조인 것을 특징으로 하는 벽체 매립형의 배관 점검함.The wall-filling pipe inspection according to claim 8, wherein a sealing material is provided between the first filling box and the first cover. 제 1 항에 있어서, 상기 점검매립함은 상기 보호매립함에 수납되는 연질관과 일단이 연결되고, 타단이 수전 연결용의 수전엘보와 연결되는 후렉시블관을 배치한 제 2 매립함; 상기 제 2 매립함의 일면에 결합되는 제 2 덮개; 및, 상기 제 2 덮개에 결합되는 보조덮개; 를 포함하여 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.The method of claim 1, wherein the check-filling box is a second buried box having a flexible pipe is connected to one end and the other end is connected to the faucet elbow for connecting the faucet and the flexible tube accommodated in the protective buried; A second cover coupled to one surface of the second buried compartment; And an auxiliary cover coupled to the second cover. Check the pipe of the wall-mounted pipe, characterized in that the configuration including a. 제 13 항에 있어서, 상기 제 2 매립함은 이중관이 결합되는 다수의 홀을 하부면에 형성하고, 상부면에는 수전 연결용의 수전엘보를 후렉시블관의 타단에 결합시키기 위한 관인출부를 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.15. The method of claim 13, wherein the second buried box is formed in the lower surface a plurality of holes coupled to the double pipe, the upper surface comprises a pipe lead-out for coupling the faucet elbow for connecting the faucet to the other end of the flexible pipe Characterized in the wall flush pipe check. 제 14 항에 있어서, 상기 관인출부는 제 2 매립함의 상부면에서 연장시켜 돌출시킨 박스형 구조로 하되, 상기 박스형 구조의 일면에는 후렉시블관 인출용의 인출홀을 다수 형성시킨 것을 특징으로 하는 벽체 매립형의 배관 점검함.15. The method of claim 14, wherein the pipe lead-out portion has a box-shaped structure extending from the upper surface of the second buried box and protruding, wherein one side of the box-shaped structure has a plurality of draw holes for flexible pipe withdrawal. Check piping. 제 14 항에 있어서, 상기 관인출부는 제 2 매립함의 상부면에 다수의 결합홀을 형성하고, 상기 결합홀에 후렉시블관의 인출경로를 안내하는 원형수전함이 결합되는 구조인 것을 특징으로 하는 벽체 매립형의 배관 점검함.15. The wall structure according to claim 14, wherein the pipe drawing part forms a plurality of coupling holes on the upper surface of the second buried box, and a circular faucet for guiding the drawing path of the flexible pipe is coupled to the coupling hole. Check the buried piping. 제 13 항에 있어서, 상기 제 2 매립함과 제 2 덮개의 사이에는 실링재가 마련되는 구조인 것을 특징으로 하는 벽체 매립형의 배관 점검함.The wall-filling pipe inspection according to claim 13, wherein a sealing material is provided between the second filling box and the second cover. 제 13 항에 있어서, 상기 제 2 덮개는 이중관 점검용의 개구부를 마련한 결합플랜지가 구성되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.The wall-filling pipe inspection according to claim 13, wherein the second cover comprises a coupling flange having an opening for inspecting the double pipe. 제 13 항에 있어서, 상기 제 2 덮개의 일면에는 타일 시공을 위한 다수의 돌기가 구성되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.According to claim 13, One side of the second cover is wall-filled pipe inspection, characterized in that a plurality of projections for the construction of the tile is configured. 제 13 항에 있어서, 상기 보조덮개는 제 1,2 커버로 분할 구성되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.15. The method of claim 13, wherein the auxiliary cover is divided into the first and second cover wall mounting type pipe inspection. 제 20 항에 있어서, 상기 제 1 커버는 결합플랜지에 마련된 배관 점검용의 개구부를 덮는 투명한 재질로 구성되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.21. The method of claim 20, wherein the first cover is made of a transparent material covering an opening for inspecting a pipe provided in the coupling flange. 제 20 항에 있어서, 상기 제 2 커버는 벽체 외부면에 노출되는 구조로서, 상기 제 1 커버를 덮는 불투명한 재질로 구성되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.21. The method of claim 20, wherein the second cover has a structure exposed to an outer surface of the wall and is made of an opaque material covering the first cover. 제 21 항에 있어서, 상기 결합플랜지와 제 1 커버의 사이에는 실링재가 마련되는 구조인 것을 특징으로 하는 벽체 매립형의 배관 점검함.22. The method of claim 21, wherein a sealing member is provided between the coupling flange and the first cover. 제 8 항 또는 제 13 항에 있어서, 상기 제 1 덮개는 제 2 덮개와 일체로 구성되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.The wall-mounted pipe inspection according to claim 8 or 13, wherein the first cover is integrally formed with the second cover. 분배기로부터 건물내의 각 수요처로 1차 이중관을 유도하여 분배하는 제 1 공정;A first process of guiding and distributing a primary double pipe from a distributor to each demand in the building; 상기 분배기로부터 1차 이중관이 분배될 때 그 분배되는 1차 이중관은 각 수요처에 배치된 배관고정부를 이용하여 정렬 고정한 후 콘크리트를 타설하여 양생시키는 제 2 공정;When the primary double pipe is distributed from the distributor, the distributed primary double pipe is a second process of placing and curing concrete after aligning and fixing by using a pipe fixing unit disposed at each demand destination; 상기 배관고정부의 상면에 배관점검함을 결합 고정한 후 1차 이중관에 2차 이중관을 연결하고, 분배기로부터 배관점검함으로 1,2차 이중관을 통해 연질관을 인출하는 제 3 공정;A third step of coupling and fixing the pipe check box to the upper surface of the pipe fixing part, connecting the second double pipe to the first double pipe, and drawing the soft pipe through the first and second double pipes by checking the pipe from the distributor; 상기 배관 점검함내에 플렉시블관이 연결된 수전티를 배치한 후 수전티에 연결된 일측방향의 플렉시블관에 연질관을 연결하는 제 4 공정;A fourth step of arranging a faucet connected to the flexible tube in the pipe check box, and then connecting the soft tube to the flexible tube in one direction connected to the faucet; 상기 수전티에 연결된 타측방향의 플렉시블관을 배관 점검함의 상면 외부로 인출하고, 그 인출된 플렉시블관에 수전엘보를 연결하는 제 5 공정; 및,A fifth step of drawing the flexible pipe in the other direction connected to the faucet tee to the outside of the upper surface of the pipe check box and connecting the power receiving elbow to the drawn flexible pipe; And, 상기 수전엘보에 수전을 연결한 후 배관 점검함의 개구부에 덮개를 결합한 후 그 덮개가 외부에 노출되도록 건식벽체 또는 조적벽체를 시공하는 제 6 공정; 으로 진행함을 특징으로 하는 이중관의 시공방법.Connecting the faucet to the faucet elbow, joining the cover to the opening of the pipe check box, and constructing a drywall or masonry wall such that the cover is exposed to the outside; Construction method of the double pipe, characterized in that to proceed to. 분배기로부터 건물내의 각 수요처로 1차 이중관을 유도하여 분배하는 제 1 공정;A first process of guiding and distributing a primary double pipe from a distributor to each demand in the building; 상기 분배기로부터 1차 이중관이 분배될 때 그 분배되는 1차 이중관은 각 수요처에 배치된 배관고정부를 이용하여 정렬 고정한 후 콘크리트를 타설하여 양생시 키는 제 2 공정;When the primary double pipe is distributed from the distributor, a second process of distributing the primary double pipe to be fixed by aligning and fixing by using a pipe fixing part disposed at each demand place and curing the concrete; 상기 배관고정부의 상면에 배관점검함을 결합 고정한 후 1차 이중관에 2차 이중관을 연결하고, 분배기로부터 배관점검함으로 1,2차 이중관을 통해 연질관을 인출하는 제 3 공정;A third step of coupling and fixing the pipe check box to the upper surface of the pipe fixing part, connecting the second double pipe to the first double pipe, and drawing the soft pipe through the first and second double pipes by checking the pipe from the distributor; 상기 배관 점검함내에 플렉시블관이 연결된 수전티를 배치한 후 수전티에 연결된 일측방향의 플렉시블관에 연질관을 연결하는 제 4 공정;A fourth step of arranging a faucet connected to the flexible tube in the pipe check box, and then connecting the soft tube to the flexible tube in one direction connected to the faucet; 상기 수전티에 연결된 타측방향의 플렉시블관을 배관 점검함의 상면 외부로 인출하고, 그 인출된 플렉시블관에 수전엘보를 연결하는 제 5 공정; 및,A fifth step of drawing the flexible pipe in the other direction connected to the faucet tee to the outside of the upper surface of the pipe check box and connecting the power receiving elbow to the drawn flexible pipe; And, 상기 수전엘보에 수전을 연결한 후 배관 점검함의 개구부에 덮개를 결합한 후 그 덮개가 외부에 노출되도록 건식벽체 또는 조적벽체를 시공하는 제 6 공정; 으로 진행되고,Connecting the faucet to the faucet elbow, joining the cover to the opening of the pipe check box, and constructing a drywall or masonry wall such that the cover is exposed to the outside; Proceeds to 건물내의 각 수요처에 위치하는 벽체 매립형의 배관점검함은 인접하는 배관점검함과 3차 이중관을 통해 다단으로 연결하여 하나의 공급부를 통해 순차적으로 공급수를 공급받도록 하는 제 8 공정; 을 더 포함하는 것을 특징으로 하는 이중관의 시공방법.The wall-filled pipe check box located at each demand location in the building includes: an eighth process of connecting the adjacent pipe check box and the third pipe through multiple stages to receive water sequentially through a single supply; Construction method of a double pipe further comprising a. 제 25 항 또는 제 26 항에 있어서, 상기 제 2 공정은 분배기로부터 분배되는 1차 이중관의 길이에 따라 배관고정부의 높낮이를 조절하는 공정; 을 더 포함하는 것을 특징으로 하는 이중관의 시공방법.27. The method according to claim 25 or 26, wherein the second process comprises the steps of adjusting the height of the pipe fixing part in accordance with the length of the primary double pipe distributed from the distributor; Construction method of a double pipe further comprising a. 제 25 항 또는 제 26 항에 있어서, 상기 제 3 공정은 1차 이중관에 연결되는 2차 이중관의 길이에 따라 배관점검함의 높낮이를 조절하는 공정; 을 더 포함하는 것을 특징으로 하는 이중관의 시공방법.27. The method of claim 25 or 26, wherein the third process comprises the steps of adjusting the height of the pipe check according to the length of the secondary double pipe connected to the primary double pipe; Construction method of a double pipe further comprising a. 제 25 항 또는 제 26 항에 있어서, 상기 제 5 공정은, The method of claim 25 or 26, wherein the fifth step, 배관 점검함의 상면에 원형수전함을 결합하고, 그 원형수전함을 따라 수전티에 연결된 타측방향의 플렉시블관을 점검함 외부로 인출한 후 이에 수전엘보를 연결하는 공정을 포함하는 것을 특징으로 하는 이중관의 시공방법.Combine the circular faucet on the upper surface of the pipe check box, and check the flexible pipe in the other direction connected to the faucet along the circular faucet. Construction method. 제 26 항에 있어서, 상기 제 8 공정에서,The method of claim 26, wherein in the eighth step, 3차 이중관은 배관고정부에 결합되어 배관점검함내의 2차 이중관과 관결합부를 통해 연결한 후, 상기 2,3차 이중관을 통해 연질관을 인출하고, 상기 인출된 연질관은 수전티에 마련되는 후렉시블관과 연결되는 것을 특징으로 하는 이중관의 시공방법.The third double pipe is coupled to the pipe fixing part and connected to the second double pipe and the pipe joint in the pipe check box, and then the soft pipe is drawn out through the second and third double pipes, and the drawn soft pipe is provided in the faucet tee. Construction method of a double pipe, characterized in that connected to the flexible pipe. 분배기로부터 건물내의 각 수요처로 이중관과 연질관을 유도하여 배관 점검함에 배치한 후 연질관에 수전을 연결하는 이중관 시공방법에 있어서,In the double pipe construction method of connecting the faucet to the soft pipe after arranging the double pipe and soft pipe from the distributor to each demand in the building and placing it in the pipe check box, 상기 건물내의 각 수요처에 위치하는 벽체 매립형의 배관점검함은 하나의 공급부를 통해 순차적으로 공급수를 공급받도록 인접하는 배관점검함과 이중관을 통해 다단으로 연결하는 것을 특징으로 하는 이중관의 시공방법.The wall-filled pipe inspection checker located at each demand location in the building is a double pipe construction method characterized in that connected to the adjacent pipe checker and the double pipe through the double pipe so as to receive the supply water sequentially through one supply.
KR1020060046728A 2006-03-13 2006-05-24 That inspect piping of wall reclamation styleand form of construction work of double pipe KR100732938B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020060022966 2006-03-13
KR1020060022966 2006-03-13

Publications (1)

Publication Number Publication Date
KR100732938B1 true KR100732938B1 (en) 2007-06-28

Family

ID=38373596

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060046728A KR100732938B1 (en) 2006-03-13 2006-05-24 That inspect piping of wall reclamation styleand form of construction work of double pipe

Country Status (1)

Country Link
KR (1) KR100732938B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160027510A (en) * 2014-08-30 2016-03-10 주식회사 한 에너지 시스템 A hot water distributing apparatus of wall built-in type and construction method thereof
CN109339286A (en) * 2018-12-11 2019-02-15 三筑工科技有限公司 Overlapped shear wall plate, overlapped shear wall and overlapped shear wall board manufacturing method
CN109403506A (en) * 2018-12-11 2019-03-01 三筑工科技有限公司 The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate
CN115306948A (en) * 2022-07-28 2022-11-08 中广核工程有限公司 Pipeline installation process for on-line components of nuclear power station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001324052A (en) 2000-05-12 2001-11-22 Kazuo Ohata Piping box unit for building and its construction method
KR100489440B1 (en) 2002-11-19 2005-05-17 주식회사 피아이피 Wall water panel
JP2005194835A (en) 2004-01-09 2005-07-21 Nichiei Intec Co Ltd Transverse branch parallel support hardware for connection of drainage header
KR100515761B1 (en) * 2005-02-23 2005-09-16 주식회사 피아이피 Execute method of water pipe arrangement

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001324052A (en) 2000-05-12 2001-11-22 Kazuo Ohata Piping box unit for building and its construction method
KR100489440B1 (en) 2002-11-19 2005-05-17 주식회사 피아이피 Wall water panel
JP2005194835A (en) 2004-01-09 2005-07-21 Nichiei Intec Co Ltd Transverse branch parallel support hardware for connection of drainage header
KR100515761B1 (en) * 2005-02-23 2005-09-16 주식회사 피아이피 Execute method of water pipe arrangement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160027510A (en) * 2014-08-30 2016-03-10 주식회사 한 에너지 시스템 A hot water distributing apparatus of wall built-in type and construction method thereof
KR101627180B1 (en) * 2014-08-30 2016-06-07 주식회사 한 에너지 시스템 A hot water distributing apparatus of wall built-in type and construction method thereof
CN109339286A (en) * 2018-12-11 2019-02-15 三筑工科技有限公司 Overlapped shear wall plate, overlapped shear wall and overlapped shear wall board manufacturing method
CN109403506A (en) * 2018-12-11 2019-03-01 三筑工科技有限公司 The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate
CN115306948A (en) * 2022-07-28 2022-11-08 中广核工程有限公司 Pipeline installation process for on-line components of nuclear power station

Similar Documents

Publication Publication Date Title
KR200417638Y1 (en) piping inspect of a wall reclamation style that insulation attached
KR200417925Y1 (en) piping inspect of a wall reclamation style
KR100696318B1 (en) Device of connecting a connector for a pipeline
KR100732938B1 (en) That inspect piping of wall reclamation styleand form of construction work of double pipe
KR100780798B1 (en) That inspect piping of wall reclamation styleand form of double pipe
KR100742352B1 (en) Water supply distributor box and pipe laying method using the same
CN101128634B (en) Method of constructing cold and hot water piping system
KR101537035B1 (en) Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby
KR100732939B1 (en) That inspect piping of wall reclamation styleand form of construction work of double pipe
KR100780797B1 (en) That inspect piping of wall reclamation styleand form of double pipe
KR101156099B1 (en) Guide-point of hydroelectricity box for masonry wall and the installation method of hydroelectricity box using it
KR20080017112A (en) Korea ko total toilet sleeve system (kkttss)
KR100761927B1 (en) Hot and cold water distributting box of slave laying type
RU2645315C1 (en) Engineering module and method of its installation
KR100719882B1 (en) Cable distribution box structure for use in apartment house
KR101217380B1 (en) fixed box buried in wall and pipe building method using the same
KR200424768Y1 (en) The connected socket of the double drain pipe with transfer a fluid
KR20100037227A (en) A water supply facilities and construction method thereof
KR20080076279A (en) Box buried in wall having temporary fix member and pipe jointing method using the same
JP5074254B2 (en) Temporary water supply installation structure and installation method
KR101050191B1 (en) How to install the faucet
SK54695A3 (en) Sanitary house plumbing device with two instalation registers
KR200338297Y1 (en) Water supply system having drainpipe
EP3399113A1 (en) Plumbing unit
KR20070097227A (en) Connect joint for flexible pipe to double piping

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee