KR200417925Y1 - piping inspect of a wall reclamation style - Google Patents

piping inspect of a wall reclamation style Download PDF

Info

Publication number
KR200417925Y1
KR200417925Y1 KR2020060007459U KR20060007459U KR200417925Y1 KR 200417925 Y1 KR200417925 Y1 KR 200417925Y1 KR 2020060007459 U KR2020060007459 U KR 2020060007459U KR 20060007459 U KR20060007459 U KR 20060007459U KR 200417925 Y1 KR200417925 Y1 KR 200417925Y1
Authority
KR
South Korea
Prior art keywords
pipe
wall
buried
cover
box
Prior art date
Application number
KR2020060007459U
Other languages
Korean (ko)
Inventor
윤자중
Original Assignee
(주)남호건업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)남호건업 filed Critical (주)남호건업
Priority to KR2020060007459U priority Critical patent/KR200417925Y1/en
Application granted granted Critical
Publication of KR200417925Y1 publication Critical patent/KR200417925Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/08Built-in cupboards; Masks of niches; Covers of holes enabling access to installations
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/09Component parts or accessories
    • E03B7/095Component holders or housings, e.g. boundary boxes
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C1/021Devices for positioning or connecting of water supply lines
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C2001/028Alignment aids for plumbing installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

본 고안은 빌딩과 공동주택 등의 건설 현장에서 화장실 내부에 냉,온수 이중배관을 시공시 그 점검을 위한 벽체 매립형의 배관 점검함에 관한 것이다.The present invention relates to the inspection of the wall-filled pipe for the inspection of the construction of the cold and hot water double pipe inside the toilet at the construction site, such as buildings and apartment houses.

이 같은 본 고안은, 누수 하자 보수의 편의성을 위해 벽체 매립형의 이중배관 공법을 채택하는 건식벽체 또는 조적벽체에서 먼저 시공이 가능한 배관 점검함을 제공함으로써, 배관 점검함의 시공 후 벽돌 쌓기가 이루어지도록 하면서 배관 점검함을 통한 이중배관의 점검작업이 벽체의 파손없이 용이하게 이루어지도록 함은 물론, 배관 점검함의 시공에 따른 작업시간과 공정은 물론 소요되는 비용을 절감할 수 있는 것이다.The present invention provides a pipe inspection box that can be constructed first in a drywall or masonry wall adopting a wall-filled double piping method for the convenience of repairing leaks, while allowing the brickwork to be built after the construction of the pipe inspection box. The inspection work of the double pipe through the pipe inspection box can be easily performed without damaging the wall, and the work time and the process according to the construction of the pipe inspection box can be reduced as well as the cost required.

슬리브, 브라켓트, 이중배관, 연질관, 배관보호 슬리브, 후렉시블관, 수전, 돌기, 두껑, 거푸집, 콘크리트, 벽돌쌓기, 나사못Sleeve, bracket, double pipe, soft pipe, pipe protection sleeve, flexible pipe, faucet, protrusion, lid, formwork, concrete, racking, screw

Description

벽체 매립형의 배관 점검함{piping inspect of a wall reclamation style}Piping inspection of a wall reclamation style

도 1은 본 고안의 실시예로 제 1,2 덮개가 분리된 구조를 가진 벽체 매립형의 배관 점검함에 대한 구조도.1 is a structural view of the pipe check box of the wall-filled type having a structure in which the first and second covers are separated as an embodiment of the present invention.

도 2는 본 고안의 실시예로 제 1,2 덮개가 일체화된 구조를 가진 벽체 매립형의 배관 점검함에 대한 구조도.Figure 2 is a structure diagram for the pipe check box of the wall-filled type having a structure in which the first and second covers are integrated in an embodiment of the present invention.

도 3은 본 고안의 조적벽체에 배관 점검함이 매립된 상태도.Figure 3 is a state buried in the pipe check box masonry wall of the present invention.

〈도면의 주요부분에 사용된 부호의 설명〉<Description of the code used in the main part of the drawing>

1a; 제 1 브라켓트 1b; 제 2 브라켓트1a; First bracket 1b; 2nd bracket

2 ; 나사 3 ; 고정 슬리브2 ; Screw 3; Fixed sleeve

4 : 슬리브 5a, 5b, 5c, 5d, 11, 32; 이중배관4: sleeve 5a, 5b, 5c, 5d, 11, 32; Double piping

6 ; 연질관 7 ; 셋트앙카6; Soft tube 7; Set Anchor

8 ; 너트 9 ; 수평볼트8 ; Nut 9; Horizontal bolt

10a: 제 1 매립함 10b; 제 1 덮개10a: first landfill 10b; 1st cover

13: 제 2 매립함 14; 후렉시블관
15: 원형 수전함 16 : 수전엘보
17: 제 2 덮개 18; 보조덮개
13: second buried 14; Flexible tube
15: Round Faucet 16: Faucets Elbow
17: second cover 18; Auxiliary cover

삭제delete

삭제delete

28 : 바닥 거푸집 29; 벽돌
30; 타일 34; 덮개
35; 구멍
28: floor formwork 29; brick
30; Tile 34; cover
35; hole

삭제delete

삭제delete

삭제delete

삭제delete

본 고안은 공동주택과 아파트 등의 건설현장에서 화장실 내부에 냉,온수 이중배관을 시공되었을 때 그 점검을 위한 벽체 매립형의 배관 점검함에 관한 것으로서, 보다 상세하게는 건식벽체 또는 조적벽체에 시공되어 이중관 배관의 유지 보수가 용이하게 이루어질 수 있도록 하는 벽체 매립형의 배관 점검함에 관한 것이다.The present invention relates to the inspection of wall-embedded pipes for the inspection of double and double hot and cold water pipes in a restroom at construction sites such as apartment houses and apartments. More specifically, the double pipes are constructed on drywall or masonry wall. It relates to a wall-filled pipe inspection to facilitate the maintenance of the pipe.

근래 들어 주택이나 아파트 등의 주거 공간에 마감재의 고급화로 인하여 배관 누수시 건축마감재의 손상 문제가 발생하였고, 이에 벽체 매립형으로서 배관 점검함을 사용하는 이중관 공법이 채택되어 시공되어지는 추세이다.Recently, due to the high quality of finishing materials in residential spaces such as houses and apartments, problems of damage to building finish materials have occurred due to the leakage of pipes. Therefore, the double pipe method using the pipe check box as a wall reclamation type is being adopted and constructed.

그러나, 종래의 벽체 매립형 배관 점검함은 콘크리트 벽체에 적용하기는 그리 문제가 되지 않으나, 건식 벽체나 조적벽체에 시공 적용하기에는 많은 문제점이 발생된다. 즉, 조적벽체는 0.5B 벽돌쌓기 작업을 하기 전에 배관 점검함을 철근을 세워 고정 하여야 하고, 고정 후 이중 배관을 연결해야 하는데, 이 경우 배관 점검함에 의해 벽돌 쌓기에 상당한 어려움이 따를 수 밖에 없었다.However, the conventional wall-filled pipe check box is not a problem to be applied to the concrete wall, but a lot of problems arise in the construction application to drywall or masonry wall. In other words, the masonry wall should be fixed to the reinforcement of the pipe check box before the 0.5B racking work, and must be connected to the double pipe after fixing, in this case, due to the pipe check was inevitably difficult to stack.

또한 벽돌 쌓기 작업 중에 미리 고정했던 배관 점검함과 이중배관이 앞으로 넘어지는 문제가 빈번히 발생하는 문제점도 초래되었다.In addition, the problem that the pipe check box that was fixed in advance during the brickwork and the double pipe falls down frequently occurs.

또한, 이중배관 주위에 벽돌쌓기 작업 후 몰탈을 사출하여 고정해야 하는 등, 조적벽체에 배관 점검함을 시공시 작업시간은 물론 작업공정이 늘어나면서 인건비 상승의 원인으로 작용하였고, 이에따라 종래에는 작업시간 및 작업공정을 단축하면서 시공비를 절감하기 위해 부실 시공이 많이 발생하는 구조적인 문제들이 발생할 수 밖에 없었으며, 이는 곧 저 품질로 인한 민원 발생의 원인으로 작용하였다.In addition, the inspection of the pipe on the masonry wall, such as mortar injection and fixing after the racking work around the double pipe, acted as a cause of the increase in labor costs as the work time increased as well as the work time during construction. In order to reduce the construction cost while shortening the work process, structural problems inevitably occured inevitably occurred, which was a cause of complaints due to low quality.

따라서, 본 고안은 상기와 같은 종래의 문제점을 해결하기 위해 안출된 것으로서, 벽돌쌓기 작업 전에 배관 보수용의 점검함과 배관 보호함들을 각각 선 고정하고, 배관 보호함 내부에 이중관 배관작업을 시공함에 있어 2중, 3중의 공정을 줄이고 벽돌 쌓기 작업을 원할하게 진행시킬 수 있도록 하는 벽체 매립형의 배관 점검함을 제공하려는데 그 목적이 있는 것이다.Therefore, the present invention has been devised to solve the conventional problems as described above, and before the racking work to check the line for the pipe repair and pipe protection box, respectively, and to install the double pipe piping work inside the pipe protection box The purpose is to provide a wall-mounted plumbing check box that reduces the number of double and triple processes and facilitates brickwork.

또한, 본 고안은 배관 점검함을 벽체에 매립하는 시공을 진행함에 있어, 그 시공의 품질을 높이면서 인건비를 줄이고, 아울러 이중관 배관 공법의 시공에 대한 효과를 최대한 높이고자 하는 목적을 포함하는 것이다.In addition, the subject innovation is to include the purpose of reducing the labor cost while increasing the quality of the construction in the process of embedding the pipe check box in the wall, as well as the maximum effect on the construction of the double pipe piping method.

상기 목적 달성을 위한 본 고안 배관 점검함은, 벽체 매립형으로 곡선형의 이중배관이 배치되도록 결합되는 제 1,2 브라켓트; 상기 제 1,2 브라켓트의 상측에 결합되는 벽체 매립형으로 상기 곡선형의 이중배관과 연결되는 직선형의 이중배관이 수납되는 배관 보호용의 제 1 매립함; 상기 제 1 매립함의 일면에 결합되는 제 1 덮개; 벽체 매립형으로 후렉시블관이 배치되고, 상기 제 1 매립함의 상단에 결합되는 배관 점검용의 제 2 매립함; 상기 제 2 매립함의 일면에 결합되는 제 2 덮개; 및, 상기 제 2 덮개에 결합되는 보조덮개; 의 결합으로 구성함을 특징으로 한다.
다른 일면에 따라, 상기 제 1 덮개는 일면에 타일 시공을 가능하게 하는 돌기가 마련된 판형으로 구성하고, 상기 제 2 덮개에는 보조덮개에 의해 덮혀지는 배관 점검용의 개구부를 구성하는 것을 특징으로 한다.
또 다른 일면에 따라, 상기 제 1 덮개는 제 2 덮개와 일체로 구성되는 것을 특징으로 한다.
또 다른 일면에 따라, 상기 제 2 매립함은 그 내부에 후렉시블관을 배치하되, 상기 제 2 매립함의 상부면에는 후렉시블관을 통과시키는 원형 수전함을 결합시킨 결합홀을 구성하고, 상기 제 2 매립함의 하부에는 후렉시블관에 연결되는 이중배관을 통과시키는 홀을 구성함을 특징으로 한다.
이하, 첨부된 도면에 의하여 본 고안의 실시예를 설명하면 다음과 같다.
도 1은 본 고안의 실시예로 제 1,2 덮개가 분리된 구조를 가진 배관 점검함의 구조도이고, 도 2는 본 고안의 실시예로 제 1,2 덮개가 일체화된 구조를 가진 배관 점검함의 구조도이며, 도 3은 본 고안의 조적벽체에 배관 점검함이 시공된 상태도를 도시한 것이다.
도 1 내지 도 3을 참조하면, 본 고안의 일실시예인 벽체 매립형의 배관 점검함은 제 1,2 브라켓트(1a)(1b), 제 1 매립함(10a), 제 1 덮개(10b), 제 2 매립함(13), 제 2 덮개(17), 그리고 보조덮개(18)를 포함한다.
상기 제 1,2 브라켓트(1a)(1b)는 분리형의 구조로서 벽체 매립형으로 바닥으로부터 꺽임이 이루어지는 곡선형의 이중배관(5a)(5b)(5c)(5d)이 배치되도록 결합되는 구조이다.
상기 제 1 매립함(10a)은 상기 배관 연결함의 상측에 결합되는 벽체 매립형의 배관 보호용도로서 ㄷ자의 형상으로 구성되며, 상기 제 1,2 브라켓트(1a)(1b)에 배치되는 곡선형의 이중배관(5a)(5b)(5c)(5d)과 연결되는 직선형의 이중배관(11)이 수납된다.
상기 제 1 덮개(10b)는 상기 제 1 매립함(10a)의 일면 즉, 상기 제 1 매립함(10a)이 벽체에 매립될 때 그 벽체의 외부로 직선형의 이중배관(11)이 노출되는 것을 차단하기 위해 상기 제 1 매립함(10a)의 개구부를 덮기 위해 구성되며, 상기 제 1 매립함(10a)에 분리가 가능하도록 나사(2)를 통해 결합 고정된다.
이때, 상기 제 1 덮개(10b)는 일면에 타일(30)에 대한 시공이 가능하도록 하는 돌기(20)를 마련된 판형으로 구성된다.
상기 제 2 매립함(13)은 벽체 매립형으로 상기 제 1 매립함(10a)의 상단에 결합되는 것이고, 일측면 개구형으로 그 내부에는 설치위치의 변형이 자유로운 후렉시블관(14)이 배치되는 배관 점검용의 함이다.
이때, 상기 제 2 매립함(13)의 상부면에는 후렉시블관(14)이 통과되는 원형 수전함(15)을 결합시키기 위한 결합홀(13a)이 구성되고, 그 하부면에는 후렉시블관(14)과 연결되는 직선형의 이중배관(11)을 통과시키는 홀(13b)이 마련된다.
상기 제 2 덮개(17)는 개구부를 마련한 플랜지(17a)가 형성되는 구조로서, 상기 제 2 매립함(13)의 전방 개구부에 나사(2)를 통해 결합되는 구조를 이룬다.
상기 보조덮개(18)는 상기 제 2 덮개(17)의 개구부를 덮기 위한 것으로, 상기 제 2 매립함(13)내의 배관 연결에 대한 점검이 가능하도록 상기 제 2 덮개(17)에 나사(2)를 통해 결합된다.
여기서, 도 1은 제 1 덮개(10b)가 제 2 덮개(17)와 분리되는 구조로 설명하였지만, 도 2에서와 같이 상기 제 1,2 덮개(10b)(17)를 일체형으로 구성할 수도 있는 것이다.
이와같이 구성된 본 고안의 실시예에 대한 작용을 첨부된 도 1 내지 도 3을 참조하여 설명하면 다음과 같다.
첨부된 도 1 내지 도 3에 도시된 바와같이, 바닥 거푸집(28)이 마련되는 특정공간에서 곡선형의 이중배관(5a,5b,5c,5d,32)을 연결하는 슬리브(4)를 제 1 브라켓트(1a)에 있는 각각의 구멍(35)을 통해 각각의 고정 슬리브(3)로 고정하여 제 1 브라켓트(1a)를 제 2 브라켓트(1b)에 나사(2)로 고정한다.
Inventive pipe check box for achieving the above object, the first and second brackets are coupled to be disposed double wall of the curved line buried; A first buried box for protecting pipes, in which a straight double pipe connected to the curved double pipe is accommodated in a wall buried type coupled to the upper side of the first and second brackets; A first cover coupled to one surface of the first buried compartment; Flexible buried tube is disposed in the wall buried type, the second buried for pipe inspection coupled to the upper end of the first buried box; A second cover coupled to one surface of the second buried compartment; And an auxiliary cover coupled to the second cover. It is characterized by consisting of a combination.
According to another aspect, the first cover is configured in a plate shape provided with projections to enable tile construction on one surface, and the second cover is characterized in that the opening for the pipe inspection covered by the auxiliary cover.
According to yet another aspect, the first cover is characterized in that it is configured integrally with the second cover.
According to another aspect, the second landfill is arranged in the flexible tube therein, the upper surface of the second landfill constitutes a coupling hole for coupling a circular faucet for passing the flexible tube, the second buried The lower portion of the box is characterized by configuring a hole for passing the double pipe connected to the flexible pipe.
Hereinafter, an embodiment of the present invention by the accompanying drawings as follows.
1 is a structural diagram of a pipe check box having a structure in which the first and second covers are separated as an embodiment of the present invention, and FIG. 2 is a structural diagram of a pipe check box having a structure in which the first and second covers are integrated as an embodiment of the present invention. 3 is a view illustrating a state in which a pipe check box is installed on a masonry wall of the present invention.
1 to 3, the pipe check box of the wall-filling type according to an embodiment of the present invention includes first and second brackets 1a and 1b, a first buried box 10a, a first cover 10b, and a first 2 includes a buried compartment 13, a second cover 17, and an auxiliary cover 18.
The first and second brackets (1a) (1b) is a structure that is coupled to be arranged so that the curved double pipes (5a) (5b) (5c) (5d) to be bent from the bottom in the form of a separate wall.
The first buried box (10a) is a U-shaped pipe protection for the wall-mounted pipe is coupled to the upper side of the pipe connection box, is a curved double disposed in the first and second brackets (1a) (1b) The straight double pipe 11 connected to the pipes 5a, 5b, 5c, and 5d is stored.
The first cover 10b is one surface of the first landfill box (10a), that is, when the first landfill box (10a) is embedded in the wall that the linear double pipe 11 is exposed to the outside of the wall It is configured to cover the opening of the first landfill box (10a) to block, and is fixedly coupled through the screw (2) to be detachable to the first landfill box (10a).
At this time, the first cover 10b is formed in a plate shape provided with a projection 20 to enable the construction for the tile 30 on one surface.
The second buried compartment 13 is a wall buried type is coupled to the upper end of the first buried compartment 10a, the one side opening type flexible pipe 14, the flexible pipe 14 is freely deformed in the installation position therein It is for inspection.
In this case, a coupling hole 13a for coupling the circular receiving box 15 through which the flexible tube 14 passes is formed on an upper surface of the second buried container 13, and a flexible tube 14 is provided on the lower surface thereof. A hole 13b for passing a straight double pipe 11 connected to the bottom is provided.
The second cover 17 has a structure in which a flange 17a having an opening is formed, and is coupled to the front opening of the second buried compartment 13 through a screw 2.
The auxiliary cover 18 is to cover the opening of the second cover 17, the screw (2) to the second cover 17 to enable the inspection of the pipe connection in the second buried compartment (13) Are combined through.
Here, although FIG. 1 illustrates the structure in which the first cover 10b is separated from the second cover 17, the first and second covers 10b and 17 may be integrally formed as shown in FIG. will be.
Referring to Figures 1 to 3 attached to the embodiment of the present invention configured as described above is as follows.
1 to 3, the sleeve 4 connecting the curved double pipes 5a, 5b, 5c, 5d and 32 in a specific space in which the bottom formwork 28 is provided is first. The first bracket 1a is fixed to the second bracket 1b with a screw 2 by fixing with the respective fixing sleeve 3 through each hole 35 in the bracket 1a.

그리고, 바닥 철근 작업 후 곡선형의 이중배관(5a, 5b, 5c, 5d, 32)을 각각의 슬리브(4)에 연결한 후 바닥 콘크리트를 타설한다.
그리고, 도 3에서와 같이 콘크리트를 양생한 후 벽돌(29)에 대한 쌓기의 작업 전 먹메김 작업 후, 바닥 콘크리트에 구멍을 뚫고 셋트앙카(7)를 삽입한 후 배관 보호용의 제 1 매립함(10a)을 상기 셋트앙카(7)에 너트(8)를 체결하여 고정한다. 이때 각각의 수평볼트(9)를 조정하여 제 1 매립함(10a)의 수직, 수평을 맞춘다.
After the bottom reinforcing work, the curved double pipes 5a, 5b, 5c, 5d, and 32 are connected to the sleeves 4, and the bottom concrete is poured.
And, after curing the concrete as shown in Figure 3, after the filling operation before the stacking work on the brick 29, a hole in the bottom concrete and inserting a set anchor (7) after the first landfill for pipe protection ( 10a) is fixed by fastening the nut 8 to the set anchor (7). At this time, by adjusting each of the horizontal bolt (9) to adjust the vertical, horizontal of the first buried box (10a).

삭제delete

그리고, 배관 점검을 위한 제 2 매립함(13)을 제 1 매립함(10a)의 상부에 나사(2)로 연결한다.Then, the second filling box 13 for the pipe inspection is connected to the upper portion of the first filling box (10a) with a screw (2).

그리고 직선형의 이중배관(11)을 슬리브(4)와 연결하여 제 2 매립함(13)의 하부와 체결하고, 상기 이중배관(11)의 내부에 연질관(6)을 밀어 넣은 상태에서, 상기 연질관(6)을 후렉시블관(14)의 일단에 연결한다.
다음으로, 상기 배관 점검용 제 2 매립함(13)의 상부에 원형수전함(15)을 나사(2)를 이용하여 고정하고, 상기 원형수전함(15)에 수전엘보(16)를 삽입한 후, 상기 수전엘보(16)를 후렉시블관(14)의 타단에 연결하면, 상기 후렉시블관(14)을 통해 수전엘보(16)와 연질관(6)이 서로 연결되는 구조를 이루게 된다.
In addition, the straight double pipe 11 is connected to the sleeve 4 to be fastened to the lower portion of the second buried container 13, and the soft pipe 6 is pushed into the double pipe 11. The soft pipe 6 is connected to one end of the flexible pipe 14.
Next, the circular receiving box 15 is fixed to the upper portion of the second filling box 13 for pipe inspection by using the screw 2, and the receiving elbow 16 is inserted into the circular receiving box 15. Afterwards, when the faucet elbow 16 is connected to the other end of the flexible pipe 14, the faucet elbow 16 and the soft pipe 6 are connected to each other through the flexible pipe 14.

그리고, 돌기(미도시)가 마련되면서 개구부를 형성한 제 2 덮개(17)를 나사(2)로 제 2 매립함(13)에 고정하고, 상기 제 2 덮개(17)의 개구부에는 나사(2)를 이용하여 보조덮개(18)가 덮혀지도록 고정한다.In addition, a protrusion (not shown) is provided and the second cover 17 having an opening is fixed to the second buried compartment 13 with the screw 2, and the screw 2 is inserted into the opening of the second cover 17. Fix the cover so that the auxiliary cover (18).

다음으로, 일면에 돌기(20)가 마련된 제 1 덮개(10b)를 나사(2)로 제 1 매립함(10a)에 연결한 후 벽돌(29)를 쌓아 배관 점검함의 벽체 매립을 마감한 후, 상기 제 1,2 덮개(10a)(13)를 제외한 벽체, 또는 상기 제 2 덮개(13)만을 제외한 제 1 덮개(10a)는 물론 벽체에 타일(30)을 시공한다.
그러면, 상기 벽체에는 보조덮개(18) 및 수전엘보(16)가 수납되는 원형수전함(15)만이 노출되는 구조인 바, 상기 수전엘보(16)에 수도꼭지(미도시)를 연결한다.
이때, 상기 직선형의 이중배관(11)과 후렉시블관(14)의 연결부위에 대한 점검을 하고자 하는 경우, 상기 후렉시블관(14)이 배치된 제 2 매립함(13)에 있어, 상기 제 2 매립함(13)에 결합되는 제 2 덮개(17)에서 나사(2)를 풀어 보조덮개(18)를 분리시킨다.
그러면, 상기 제 2 덮개(17)의 개구부를 통해 제 2 매립함(13)의 내부가 보여지고, 이에따라 작업자는 상기의 개구부를 통해 직선형의 이중배관(11)과 후렉시블관(14)의 연결부위에서 누수가 발생하는지 등의 불량상태를 확인할 수 있음은 물론, 그 수리가 필요로 할 경우에는 상기 제 2 덮개(17)를 제 2 매립함(13)으로부터 분리함으로써 가능하게 되는 것이다.
즉, 본 고안은 상기 보조덮개(18)의 분리만으로 수도꼭지를 수전엘보(16)에서 분리시키지 않음은 물론, 벽체에 손상을 주지 않으면서, 상기 직선형의 이중배관(11)과 곡선형의 이중배관(5a)(5b)(5c)(5d)에 대한 연결부위의 누수 발생여부를 외부에서 쉽게 확인하는 특징을 갖는 것이다.
또한, 직선형의 이중배관(11)과 곡선형의 이중배관(5a)(5b)(5c)(5d)의 연결부위를 점검하고자 하는 경우는에 대하여 살펴보면 다음과 같다.
먼저, 제 1 덮개(10b)에 타일(30)이 시공되어 있지 않으면, 상기 제 1 덮개(10b)의 바로 분리하고, 타일(30)이 시공되어 있을 경우에는 그 타일을 제거한 후 상기 제 1 덮개(10b)를 분리시킨다.
그러면, 상기 제 1 덮개(10b) 이외의 벽체에 대한 손상을 방지하면서, 상기 이중배관(11)(5a)(5b)(5c)(5d)에 대한 점검을 실시할 수 있게 되는 것이다.
여기서, 상기 제 1,2 덮개(10a)(13)는 도 2에서와 같이 일체로 구성할 수 있으며, 이 경우 상기 일체형의 구조를 가진 덮개(34)를 나사(2)를 풀어 분리시키는 경우, 상기 제 1,2 매립함(10a)(13)에서 배치되는 곡선형의 이중배관(5a)(5b)(5c)(5d)과 직선형의 이중배관(11)에 대한 연결부위는 물론, 직선형의 이중배관(11)과 후렉시블관(14)의 연결부위가 모두 노출되면서 그 점검을 동시에 실시할 수 있게 되는 것이다.
더불어, 상기 도 2는 일체형의 구조를 가진 덮개(34)를 분리시키지 않고 보조덮개(18)만을 분리시켜 개구부를 통해, 상기 직선형의 이중배관(11)과 후렉시블관(14)의 연결부위에 대한 점검만을 실시할 수 있는 것이다.
여기서, 본 고안의 일실시예인 배관 점검함은 도 3에서와 같이, 제 1 매립함(10a)과 제 1 덮개(10b)를 사용하지 않고, 상기 제 2 매립함(13)을 바로 배관 연결함의 상단에 결합시켜 구성할 수도 있으며, 이하 상기의 본 고안 실시예에서와 그 작용효과는 동일하므로 중복되는 설명은 생략한다.
Next, after connecting the first cover 10b provided with the projection 20 on one surface with the screw 2 to the first buried box 10a, and stacking bricks 29 to finish wall embedding of the pipe check box, The tile 30 is installed on the wall as well as the wall except for the first and second covers 10a and 13 or the first cover 10a except for the second cover 13.
Then, the wall is a structure in which only the circular faucet 15 in which the auxiliary cover 18 and the faucet elbow 16 are accommodated is exposed, and a faucet (not shown) is connected to the faucet elbow 16.
At this time, in the case where the connection between the straight double pipe 11 and the flexible pipe 14 is to be checked, in the second buried box 13 in which the flexible pipe 14 is disposed, the second buried Loosen the screw (2) in the second cover (17) coupled to the box (13) to separate the auxiliary cover (18).
Then, the inside of the second buried compartment 13 is seen through the opening of the second cover 17, and thus the worker at the connection portion of the straight double pipe 11 and the flexible pipe 14 through the opening. It is possible to check a defective state such as leakage or the like, and of course, if the repair is required, the second lid 17 can be detached from the second buried compartment 13.
That is, the present invention does not separate the faucet from the faucet elbow 16 only by the separation of the auxiliary cover 18, but also does not damage the wall, the straight double pipe 11 and the curved double pipe. (5a) (5b) (5c) (5d) has a feature that makes it easy to check externally whether a leak occurs in the connection portion.
In addition, the case where the connection between the straight double pipe 11 and the curved double pipe 5a, 5b, 5c, and 5d is examined will be described below.
First, if the tile 30 is not constructed on the first cover 10b, the first cover 10b is immediately removed, and when the tile 30 is installed, the tile is removed and the first cover 10b is removed. Separate (10b).
Then, the double pipes 11, 5a, 5b, 5c and 5d can be inspected while preventing damages to the walls other than the first cover 10b.
Here, the first and second covers 10a and 13 may be integrally configured as shown in FIG. 2, and in this case, when the cover 34 having the integral structure is released by unscrewing the screws 2, The connecting portion of the curved double pipes 5a, 5b, 5c and 5d and the straight double pipes 11 disposed in the first and second buried boxes 10a and 13, as well as the linear The double pipe 11 and the flexible pipe 14 are all exposed to the connection portion will be able to carry out the check at the same time.
In addition, FIG. 2 shows a connection portion of the straight double pipe 11 and the flexible pipe 14 through an opening by separating only the auxiliary cover 18 without separating the cover 34 having a unitary structure. Only inspection can be done.
Here, the pipe check box, which is an embodiment of the present invention, does not use the first buried box 10a and the first cover 10b, as shown in FIG. 3, and directly connects the second buried box 13 to the pipe box. It may be configured to be coupled to the top, it will be omitted below because the same as the operation and effect in the embodiment of the present invention.

이상 설명한 바와 같이 본 고안은 누수 하자 보수의 편의성을 위해 벽체 매립형의 이중배관 공법을 채택하는 건식벽체 또는 조적벽체에서 먼저 시공이 가능한 배관 점검함을 제공한 것으로, 이를 통해 배관 점검함의 시공 후 벽돌 쌓기가 이루어지도록 하면서 배관 점검함을 통한 이중배관의 점검작업이 벽체의 파손없이 용이하게 이루어지도록 함은 물론, 배관 점검함의 시공에 따른 작업시간과 공정은 물론 소요되는 비용을 절감하는 효과를 얻을 수 있는 것이다.As described above, the present invention provides a pipe check box that can be constructed first in a drywall or masonry wall adopting a wall-filled double pipe method for the convenience of repairing leaks, thereby stacking bricks after construction of the pipe check box. In addition, the inspection work of the double pipe through the pipe check box can be easily performed without damaging the wall, and the work time and process according to the construction of the pipe check box can be saved as well as the cost required. will be.

삭제delete

Claims (9)

벽체 매립형으로 곡선형의 이중배관과 연결되는 후렉시블관이 배치되는 배관 점검용의 제 2 매립함;A second buried box for pipe inspection in which a flexible pipe connected to a curved double pipe is disposed in a wall buried type; 상기 제 2 매립함의 일면에 결합되는 제 2 덮개; 및,A second cover coupled to one surface of the second buried compartment; And, 상기 제 2 덮개에 결합되는 보조덮개; 의 결합으로 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.An auxiliary cover coupled to the second cover; Check the pipes of the wall-mounted type, characterized in that consisting of a combination of. 제 1 항에 있어서, 상기 제 2 매립함은 벽체 매립형으로 곡선형의 이중배관이 배치되는 제 1,2 브라켓트의 상단에 결합되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.According to claim 1, wherein the second buried wall is buried in the wall buried type pipe check, characterized in that coupled to the upper end of the first and second brackets in which the curved double pipe is disposed. 제 2 항에 있어서, 상기 제 2 덮개에는 보조덮개에 의해 덮혀지는 배관 점검용의 개구부를 구성하는 것을 특징으로 하는 벽체 매립형의 배관 점검함.The wall-filling pipe inspection according to claim 2, wherein the second cover comprises an opening for pipe inspection covered by the auxiliary cover. 제 3 항에 있어서,The method of claim 3, wherein 상기 제 2 매립함은 상부면에는 결합홀을 구성하고, 상기 결합홀에는 후렉시블관과 수전엘보를 연결시키기 위한 원형 수전함을 결합 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.The second buried box to form a coupling hole in the upper surface, and the coupling hole check the pipe of the wall-filling type, characterized in that the coupling configured to connect the flexible faucet and the flexible faucet for connecting the elliptical elbow. 벽체 매립형으로 이중배관이 수납되는 배관 보호용의 제 1 매립함;A first buried box for protecting pipes, in which a double pipe is accommodated in a wall embedded type; 상기 제 1 매립함의 일면에 결합되는 제 1 덮개;A first cover coupled to one surface of the first buried compartment; 벽체 매립형으로 후렉시블관이 배치되고, 상기 제 1 매립함의 상단에 결합되는 배관 점검용의 제 2 매립함;Flexible buried tube is disposed in the wall buried type, the second buried for pipe inspection coupled to the upper end of the first buried box; 상기 제 2 매립함의 일면에 결합되는 제 2 덮개; 및,A second cover coupled to one surface of the second buried compartment; And, 상기 제 2 덮개에 결합되는 보조덮개; 의 결합으로 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.An auxiliary cover coupled to the second cover; Check the pipes of the wall-mounted type, characterized in that consisting of a combination of. 제 5 항에 있어서, 상기 제 1 덮개는 일면에 타일 시공을 가능하게 하는 돌기가 마련된 판형으로 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.According to claim 5, The first cover is a wall-filled pipe inspection, characterized in that configured as a plate provided with a projection to enable the construction of the tile on one surface. 제 6 항에 있어서, 상기 제 2 덮개는 보조덮개에 의해 덮혀지는 배관 점검용의 개구부를 구성하는 것을 특징으로 하는 벽체 매립형의 배관 점검함.7. The wall covering type pipe inspection according to claim 6, wherein the second cover constitutes an opening for pipe inspection covered by the auxiliary cover. 제 7 항에 있어서, 상기 제 1 덮개는 제 2 덮개와 일체로 구성되는 것을 특징으로 하는 벽체 매립형의 배관 점검함.8. The wall recessed pipe inspection according to claim 7, wherein the first cover is integrally formed with the second cover. 제 8 항에 있어서, 상기 제 2 매립함은 그 상부면에 결합홀을 구성하고, 상기 결합홀에는 후렉시블관과 수전엘보를 연결시키기 위한 원형 수전함을 결합 구성함을 특징으로 하는 벽체 매립형의 배관 점검함.The wall-filled pipe according to claim 8, wherein the second buried container comprises a coupling hole in an upper surface thereof, and the coupling hole comprises a circular faucet for connecting a flexible pipe and a faucet elbow. Checked.
KR2020060007459U 2006-03-21 2006-03-21 piping inspect of a wall reclamation style KR200417925Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060007459U KR200417925Y1 (en) 2006-03-21 2006-03-21 piping inspect of a wall reclamation style

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060007459U KR200417925Y1 (en) 2006-03-21 2006-03-21 piping inspect of a wall reclamation style

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020060022966 Division 2006-03-13 2006-03-13

Publications (1)

Publication Number Publication Date
KR200417925Y1 true KR200417925Y1 (en) 2006-06-02

Family

ID=41767363

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060007459U KR200417925Y1 (en) 2006-03-21 2006-03-21 piping inspect of a wall reclamation style

Country Status (1)

Country Link
KR (1) KR200417925Y1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100732939B1 (en) 2006-03-13 2007-06-28 주식회사 국민에너지 That inspect piping of wall reclamation styleand form of construction work of double pipe
KR100780797B1 (en) 2006-03-13 2007-11-29 주식회사 국민에너지 That inspect piping of wall reclamation styleand form of double pipe
KR100836741B1 (en) 2008-03-04 2008-06-10 (주)해우엔지니어링건축사사무소 Building wall with composite function
KR100860128B1 (en) 2007-02-13 2008-09-25 이도경 Drain Housing Having Integrated Function of Drainage and Water Supply and Integrated Plumbing System Using The Same
WO2009139602A2 (en) * 2008-05-16 2009-11-19 (주) 피아이피 A cold/hot water supply system with a thermo valve case facilitating control of temperature and distributtion/shutoff of mixed water, and a method of constructing the thermo valve case
KR101214570B1 (en) 2012-07-31 2012-12-24 주식회사 나우동인건축사사무소 The drain structure about parking lot water leak of apartment house
CN109339286A (en) * 2018-12-11 2019-02-15 三筑工科技有限公司 Overlapped shear wall plate, overlapped shear wall and overlapped shear wall board manufacturing method
CN109403506A (en) * 2018-12-11 2019-03-01 三筑工科技有限公司 The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100732939B1 (en) 2006-03-13 2007-06-28 주식회사 국민에너지 That inspect piping of wall reclamation styleand form of construction work of double pipe
KR100780797B1 (en) 2006-03-13 2007-11-29 주식회사 국민에너지 That inspect piping of wall reclamation styleand form of double pipe
KR100860128B1 (en) 2007-02-13 2008-09-25 이도경 Drain Housing Having Integrated Function of Drainage and Water Supply and Integrated Plumbing System Using The Same
KR100836741B1 (en) 2008-03-04 2008-06-10 (주)해우엔지니어링건축사사무소 Building wall with composite function
WO2009139602A2 (en) * 2008-05-16 2009-11-19 (주) 피아이피 A cold/hot water supply system with a thermo valve case facilitating control of temperature and distributtion/shutoff of mixed water, and a method of constructing the thermo valve case
WO2009139602A3 (en) * 2008-05-16 2010-11-25 (주) 피아이피 A cold/hot water supply system with a thermo valve case facilitating control of temperature and distributtion/shutoff of mixed water, and a method of constructing the thermo valve case
KR101214570B1 (en) 2012-07-31 2012-12-24 주식회사 나우동인건축사사무소 The drain structure about parking lot water leak of apartment house
CN109339286A (en) * 2018-12-11 2019-02-15 三筑工科技有限公司 Overlapped shear wall plate, overlapped shear wall and overlapped shear wall board manufacturing method
CN109403506A (en) * 2018-12-11 2019-03-01 三筑工科技有限公司 The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate

Similar Documents

Publication Publication Date Title
KR200417925Y1 (en) piping inspect of a wall reclamation style
KR200417638Y1 (en) piping inspect of a wall reclamation style that insulation attached
KR20090098345A (en) Structure of elbow for water supply pipe and water pressure/fixing plug and faucet constructing method thereby
KR100877990B1 (en) Box buried in wall
KR100780798B1 (en) That inspect piping of wall reclamation styleand form of double pipe
KR20080017112A (en) Korea ko total toilet sleeve system (kkttss)
KR100592115B1 (en) The drainage for the tolit water lakage prevention of the residence and the construction method
KR100732938B1 (en) That inspect piping of wall reclamation styleand form of construction work of double pipe
KR100780797B1 (en) That inspect piping of wall reclamation styleand form of double pipe
KR100732939B1 (en) That inspect piping of wall reclamation styleand form of construction work of double pipe
KR20080076279A (en) Box buried in wall having temporary fix member and pipe jointing method using the same
KR101217380B1 (en) fixed box buried in wall and pipe building method using the same
KR100742403B1 (en) Water supply system having drainpipe
KR20080042327A (en) Floor drain sleeve
KR20150081381A (en) Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby
KR101458519B1 (en) Device For Connecting Double Drainpipe Embedded On Slab
KR200435127Y1 (en) Piping inspect of a wall reclamation style
KR200338297Y1 (en) Water supply system having drainpipe
KR100751728B1 (en) A slab bottom constructing structure of dividened box and a slab bottom exposure pipe of the rectangular double pipe and the dry wall reclaim perpendicular facinf downward piping structure
KR200421792Y1 (en) Flush Pipe Check Box
KR200424768Y1 (en) The connected socket of the double drain pipe with transfer a fluid
KR100704658B1 (en) Bottom layed type elbow connector and construction method for connecting hot and cold water pipe thereby
KR101050191B1 (en) How to install the faucet
KR100874134B1 (en) A dividened box and laying bricks wall reclaim piping structure for constructing bottom having a double pipe connecting sleeve of connecting structure of slab
KR102439624B1 (en) method for constructing a water panel box

Legal Events

Date Code Title Description
U107 Dual application of utility model
N231 Notification of change of applicant
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Re-publication after modification of scope of protection [utility model]
FPAY Annual fee payment

Payment date: 20071123

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee