KR20150081381A - Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby - Google Patents

Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby Download PDF

Info

Publication number
KR20150081381A
KR20150081381A KR1020140000632A KR20140000632A KR20150081381A KR 20150081381 A KR20150081381 A KR 20150081381A KR 1020140000632 A KR1020140000632 A KR 1020140000632A KR 20140000632 A KR20140000632 A KR 20140000632A KR 20150081381 A KR20150081381 A KR 20150081381A
Authority
KR
South Korea
Prior art keywords
pipe
piping
elbow
slab
fixing
Prior art date
Application number
KR1020140000632A
Other languages
Korean (ko)
Other versions
KR101537035B1 (en
Inventor
황혜자
이용춘
이근기
한창완
Original Assignee
황혜자
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황혜자 filed Critical 황혜자
Priority to KR1020140000632A priority Critical patent/KR101537035B1/en
Publication of KR20150081381A publication Critical patent/KR20150081381A/en
Application granted granted Critical
Publication of KR101537035B1 publication Critical patent/KR101537035B1/en

Links

Images

Abstract

The present invention relates to a household unit slab concrete partial built-in type connecting structure of wastewater and drainage vertical pipes to allow the installation of wastewater and drainage vertical pipes in a slab form for a toilet of each household unit in the field using a skeleton staff as the pre-installation assembly of pipes in each section can be done in advance and an installation method thereof. To achieve this, the household unit slab concrete partial built-in type connecting structure of wastewater and drainage vertical pipes includes: a pipe (21) having a plurality of waterproof protrusions on the outer circumference in a horizontal direction; various pipe joint parts (26) and wall penetration sleeves (25) having one or more pairs of flange parts on the left and right sides at the top; a partially opened pipe connecting socket (23) having a protective cover (231) to open the top of a section where an elbow and a PVC pipe are joined together; and a built-in housing (22) for an elbow having a hollow inside to accept the elbow of a toilet bowl, a washbowl, and a bathtub.

Description

TECHNICAL FIELD [0001] The present invention relates to a piping pipe having a soundproof air layer and a sliding index joint of a double pipe structure, a piping connection part and a partially open type pipe connection socket, of Wastewater and Drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method Thus,

[0001] The present invention relates to a piping connection structure for a slab part-embedded type oval and drain pipe, and more particularly, A piping pipe, and various piping coupling parts for forming a soundproof air layer for preventing noise and vibration transmission of the double pipe structure at an inner center portion of the thickness, forming a plurality of sliding expense coupling portions at the inner side, It is combined with the buried housing for the elbow which accommodates the penetrating sleeve, the toilet seat, the drainage ground, and the bathtub elbow. It is possible to open and close only one side to facilitate the position adjustment when connected with the elbow, so that the water is not leaked to the lower layer through the open part. The outer surface of the housing is made to have a cross exponent structure and is buried through the partially open portion A partially open type pipe connection socket for connecting a PVC pipe, which is a main pipe in the inner hollow of the housing, through a sliding pocket connection port disclosed in the applicant's earlier patent application No. 2013-137574, and a pipe pipe fixture for supporting the pipe assembly in which the components are assembled Pipe and pipe fixing band, the pipe pipe of the length used for each section according to the construction drawing is semi-assembled with the delivery or fitting parts and is supplied to the site or the pipe is installed on the site. It is possible to use the space of manpower to facilitate assembling before installation of piping, so that it can be installed on the slope form of the household toilets in the field, can be installed with the minimum number of people in the installation of the drainpipe, is flexible in utilization of the piping workforce, Pipe Pipe Fixing By fixing the pipe without distortion and sagging phenomenon, PVC piping that was supplied on the basis of construction drawing with a slight finishing deviation length of the construction structure to be stretched while avoiding damages of drainage pipe caused by lap reinforcement work and concrete pouring, It provides excellent workability, efficient operation of the work space and efficient operation of the work force and reduction of the work force, and it is possible to reduce the number of worker in the generation and the lower layer It is possible to provide a high-quality construction state in which water leakage, noise and vibration transmission are prevented, If water is used in the bathroom after the completion, the drainage on the floor of the toilet penetrates into the floor even if there is a gap due to the expansion or contraction due to the temperature deviation of the piping pipe and piping connection parts and the watertight mortar parts embedded in the floor slab. And a plurality of index joint parts slidingly coupled to the inside and the outside of the wall penetration sleeve, and a partial open-type pipe connection socket is provided at the position where the toilet and bathtub are installed, A plurality of exponents of the structure are provided to prevent water from the bottom of the toilet from leaking into the lower layer through the gap of the buried housing through the various embedding housings and a sliding pocket connection port for receiving and coupling the PVC pipe And the remaining piping connection structures are all of an airtightly coupled structure It is convenient to be installed with a wall penetration sleeve of one dimension irrespective of the thickness of the concrete before the installation of the concrete partition wall of the toilet compartment and the waterproof jaw installation of the wall penetration sleeve, It's easy to test. A piping connection structure of a generation slab part embedded type including a piping pipe, a pipe fitting part and a partially open type piping connection socket having a double pipe structure sound insulation air layer and a sliding index connection part which are easy to maintain, and a construction method and a construction method thereof will be.

Generally, in the multipurpose building and the apartment building, the drain pipes are connected to the slab concrete from the bathroom, the sink, and the laundry room vertically through the ceiling of the lower-level households, and the collected pipes are connected by pipe shift (P / S) or pipe duct , P / D), a sink wall, and behind the wall of the washing room. Through the granular piping and the sextia and drainage connectors that pass through the slab concrete vertically, , And drainage are integrated and discharged.

However, as shown in FIG. 1, such a conventional drainage pipe connection structure is provided so as to be gathered from the ceiling of the lower-layer generation, so that the corresponding part ceiling of the lower-layer generation is conspicuously lowered and the average discharge noise This is very high, and the problem of the inter-floor noise, the leakage caused by the slab waterproofing of the toilet floor, or the apartment where many people live is old, When the replacement is inevitable, it is impossible to repair the ozone drainage piping and the main drainage piping generation piping, which are used jointly by the majority, in the next generation of the house, so the toilet and laundry room, There are problems that cause mental and physical damages due to maintenance work that needs to be done, There is a problem that the toxic gas moves from the lower layer to the upper layer through the slab penetration hole of the drain pipe and the interlayer slab P / S or P / D through which the drain pipe penetrates.

In order to solve such a problem, as shown in FIG. 2, when comparing the slope bottom structure of the conventional toilet with the connection structure of the drainage pipe and the drain pipe, it is necessary to prevent water from penetrating into the living room and the room through the toilet floor wall when using toilet water Floor slab in the place where the bathroom floor is lower than the floor of the room or living room by 50 ~ 80mm and the partition wall is to be placed in the brick floor. Slab Before the concrete is laid, the molder structure is made so that the carpenter's waterproofing jaw (105) The concrete slab construction with the slab and the waterproof chin (105) as one unit was constructed so that the drainage pipe on the lower floor ceiling of the generational bathroom was installed on the floor slab concrete Slide down to the bottom of the well, After waterproofing the part, it is exposed on the pipe. Then, after the pipe (110) is piped, it is necessary to wrap the pipe with cement mortar for fixing the pipe and fix the pipe, And the cement mortar filled in the downed well area is additionally consumed, which causes a waste of building materials and an increase in the load of the building structure. Also, there is a problem that the toilet slope of the toilet slab can not be installed before the waterproofing work, It is a piping system in which the water pressure inspection of the pipe joint part of the drain pipe can not be performed. In this case, only slight visual inspection of the pipe is replaced with a slight leakage of the pipe connection part. Toilets Partitions Concrete retaining walls are to be fitted with different wall penetration sleeves to fit the inside thickness of the mold The drainage pipe is exposed in the state of being exposed, the drainage pipe 110 is difficult to be managed on the spot, the worker's foot is caught in the process of other processes, the installation pipe is moved and the installation position is shifted There is a problem that piping exposed by the impact is broken and the risk of safety accidents occurring in other process workers in the well space where the slab suddenly goes down during the construction is high and the depth is estimated when the water in the down- In order to solve this problem, in order to solve this problem, the upper part of the stratified slab and the water pipe connection structure are constructed so as to remove the water accumulated inside the water container, There is a separate water drainage sandbox and a drain for the toilet. Water is squeezed through the mortar layer and drained to the sandbox and the drainage line. The waste water is drained by the granulation piping. Often the drainage water is sanded and the drainage is filled in the sandbox. There has been a problem that the floor of the mortar layer is leaked to the lower or upper living room and the room and the odor of decaying is generated through the floor of the toilet.

In addition, the U-shaped uneven grooves (not shown) before the concrete slab are inserted into the generation floor slab, and the uneven sleeve is removed after the slab concrete is laid. U-shaped concave groove formed on the floor of the toilet when waterproofing the toilet floor and wall. Waterproofing solution mixed with cement and waterproofing liquid flows to the lower side U-shaped concave groove like water and most U-shaped concave groove is filled. According to the working tendency of the waterproof work ball, the thickness of the waterproof layer is unevenly formed inside the U-shaped concave groove, and the U-shaped concave groove waterproof layer filled with the waterproof layer can not be disposed inside the U- It is difficult to fix the pipe even if the drain pipe is seated after installing the waterproofing and waterproofing work after watering again. I can not get protection from the other pipe processing operations of these pipes were way too many problems, such as those described above.

Also, since the lengths of the water supply and drainage pipes used for each household are slightly different in accordance with a slight finishing deviation of the finished building structure for each generation in the household toilet piping, It is difficult to install pipes without ordering, so it is difficult to install pipes without cutting pipes. For that reason, order PVC pipes of the length expected to be cut when ordering PVC pipes, In each generation, the location where the drainage piping is installed is calculated by measuring the direct dimension with the tape measure in each section, cutting and using the pipe of the standard size length, and the waste of the material and workload There is a problem that the working period is long and the labor cost is increased, There is a problem that it is not possible to confirm the complete waterproofing of the drainage piping connection part, the buried piping and the waterproofing layer gap.

In addition, the conventional and recent layered water pipe and drain pipe connection structure has a disadvantage in that the waterproofing jaw 105 and the wall penetration sleeve 106, which meet the thickness of the concrete retaining wall of the toilet partition, are required to be installed when the household toilet wall penetration sleeve 106 is installed.

In order to solve such a problem, as shown in FIG. 3, in the applicant's patent application No. 2013-144331, various pipes and lower buried housing are fixed on the upper surface of the slab formwork and partially buried in the slab concrete to expose the upper surface thereof, Various piping and upper and lower buried housings are provided with a plurality of exponential projections on the outer circumferential surface in the longitudinal direction and exponential grooves integrally on the inner circumferential surface so that they can be pushed into the sliding index joint portion to be inserted further in accordance with the construction structure finishing deviation when the pipes are connected to each other, It is easy to construct according to the situation of the site because it is possible to adjust the length to accommodate the deviation of the construction structure by the sliding coupling structure which is drawn out to insure the insufficiency when insufficient, and it penetrates into the gap between the plurality of index joint parts inside the slab concrete after the concrete is poured. By bonding and curing with concrete It prevents leakage of water through the gap between the drain slab and the drain pipe, and it is possible to construct the drainage pipe in the main layer of the existing drain slab from the slab-down height slab without lowering the slab too much. In consideration of the finishing deviation length of the building structure during piping, the PVC pipe 123 is ordered with the same dimensions, and the sliding pocket connection port 150, which receives and combines the length of the construction structure deviation without cutting the PVC pipe 123, The present invention has been made to provide a piping connection structure of a generation slab part embedding type owing to its ease of use and excellent efficiency.

The Applicant has found that even after the development of the above-mentioned generation slab partially buried type o / pipe pipe connection structure, it has been possible to connect the pipe in the field by using the applicant's pipe connection structure to the car which has been continuously studied and developed, The slab concrete 101 is buried and a separate PVC pipe 123 is bonded and bonded to the engaging parts of the various embedding housings, And the water penetration into the inner bottom surface of the coupling part and the gap between the upper cover when the defective connection of the inner bottom surface of the buried lower housing coupling part occurs and the leakage of water is likely to occur and that the wall penetration sleeve 125 is waterproof And is formed to have the same length as the thickness of the concrete retaining wall or the cast wall, Oh my discomfort and, five, using a multiple pipe is not limited to be installed, the vibration in the noise and vibration caused by the drainage pipe that flow, and to determine the problems to be transferred to the lower layer through the concrete floor slab and to improve them.

Disclosure of Invention Technical Problem [8] Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art, and an object of the present invention is to provide a sound absorbing structure, A variety of pipe fittings and wall through sleeves each having a soundproof air layer for preventing noise and vibration from being transmitted through the double pipe structure on the inner side of the thickness, forming a plurality of sliding index joints on the inner side and forming one or more flanges on the upper left and right sides, It is combined with the landfill housing for the elbow which accommodates the toilet bowl, drainage land, and bathtub elbow, and it is possible to open and close only one side for easy positioning when connected with the elbow, so that the water is not leaked to the lower layer through the open part. Cross-index structure, and through the partially open part, inside the embedding housing Which is a main pipe, through a sliding pocket connection opening disclosed in the applicant's prior-art patent publication No. 2013-137574, an angle-open type pipe connection socket for supporting a pipe assembly in which the components are assembled, By using the pipe connection structure including the fixed band, the pipe pipe of the length used for each section according to the construction drawing is semi-assembled with the delivery or coupling part according to the construction drawing, or is delivered to the site on site, It is possible to construct the piping system easily before assembling the piping, so that it can be installed on the slope form of the household toilets in the field, can be installed with the minimum number of persons in the piping installation, is flexible in utilization of the piping workforce, By directly supporting it without distortion and sagging phenomenon, the slab reinforcement works after installation of drainage pipe PVC piping, which is supplied based on the construction drawing, can be accommodated without using pipe cutting by using sliding pockets when installing on site, while avoiding damages of drainage pipe caused by concrete pouring, It provides excellent workability by repeatedly providing homogeneous construction for each generation of each floor, and it is possible to shorten work space, efficiently operate workforce, and reduce workforce, so that excellent efficiency and water leakage and noise And a high quality construction state in which vibration transmission is prevented, If water is used in the bathroom after the completion, the drainage on the floor of the toilet penetrates into the floor even if there is a gap due to the expansion or contraction due to the temperature deviation of the piping pipe and piping connection parts and the watertight mortar parts embedded in the floor slab. And a plurality of index joint parts slidingly coupled to the inside and the outside of the wall penetration sleeve, and a partial open-type pipe connection socket is provided at the position where the toilet and bathtub are installed, A plurality of exponents of the structure are provided to prevent water from the bottom of the toilet from leaking into the lower layer through the gap of the buried housing through the various embedding housings and a sliding pocket connection port for receiving and coupling the PVC pipe And the remaining piping connection structures are all of an airtightly coupled structure It is convenient to be installed with a wall penetration sleeve of one dimension irrespective of the thickness of the concrete before the installation of the concrete partition wall of the toilet compartment and the waterproof jaw installation of the wall penetration sleeve, It's easy to test. Provides a piping connection structure, a construction method, and a construction method of a slab-type buried type drainage pipe including a piping pipe, a pipe fitting part, and a partially open type pipe connection socket having a double pipe structure sound insulation air layer and a sliding index connection part that are easy to maintain. It has its purpose.

In order to accomplish the above object, the present invention provides a slab part-embedded type owing to the fact that the slab concrete is fixed on the upper surface of the slab form before the floor slab concrete is poured so as to partially or entirely be embedded in the slab concrete, A piping connection structure, comprising: a pipe pipe (21) for forming a plurality of exponential protrusions in a horizontal direction on an outer peripheral surface so as to be slidably inserted along an exponential groove upon mutual coupling; Various pipe coupling parts 26 and wall penetration sleeves 25 formed in a horizontal direction on the inner circumferential surface of the exponential groove corresponding to the exponential protrusions and forming one or more pairs of flanges at upper left and right sides; In order to adjust the position of the water pipe to be connected to the toilet, the drainage water, and the bathtub, a portion to be connected with the pipe pipe 21 is formed in a closed structure, and the upper side of the portion, which is coupled with the elbow pipe and the PVC pipe, A partially open type pipe connecting socket 23 having a protective cover 231 opened to open; Further comprising a landfill housing (22) for an elbow having a hollow interior formed therein for receiving an elbow of a toilet, a toilet, a tub, and an upper housing cover (221) openable and closable; The present invention has been accomplished to provide a piping connection pipe having a double pipe structure sound insulation air layer and a sliding index connection portion, a piping coupling part and a partially open type piping connection socket. .

In addition, in the generation slab partial embedding type o / water pipe connection structure including the pipe pipe having the sound insulation air layer of double pipe structure and the sliding index joint part, the pipe coupling part and the partially open type pipe connection socket, The piping coupling part 26, the wall penetration sleeve 25, the partially open type pipe connection socket 23 and the embedding housing 22 for the elbow have a double pipe structure in order to minimize noise and vibration transmission, and a sound insulation air layer 21a .

In addition, in the generation slab partial embedding type o / water pipe connection structure including the pipe pipe having the sound insulation air layer of double pipe structure and the sliding index joint part, the pipe coupling part and the partially open type pipe connection socket, It is preferable that the piping coupling part 26 and the partially open type pipe connection socket 23 are formed in a flat top surface so that the cross section is circular or incised so as to be easily repaired.

In addition, in the generation slab partial embedding type o / water pipe connection structure including the pipe pipe having the sound insulation air layer of double pipe structure and the sliding index joint part, the pipe coupling part and the partially open type pipe connection socket, The pipe joint member 26, the wall penetration sleeve 25, the partially open type pipe connection socket 23 and the embedding housing 22 for the elbow are formed so as to be totally or partially transparent so as to be visually inspected desirable.

In addition, in the generation slab partial embedding type o / pipe pipe connection structure including the piping pipe having the double pipe structure sound insulation air layer and the sliding index joint part, the pipe coupling part and the partially open type pipe connection socket, The various pipe coupling parts 26, the wall through sleeves 25, the partially open type pipe connection socket 23 and the embedding housing 22 for the elbow are assembled by assembling all or a part of the manufacturing company according to the construction drawing, It is preferable that the pipeline assembly is delivered to the site with the piping assembly bonded thereto.

In addition, the piping pipe (21) includes a piping pipe having a double pipe structure sound insulation air layer and a sliding index joint part, a piping coupling part and a partially open piping connection socket, It is preferable that the product is produced and supplied to the manufacturer in accordance with the construction drawing so as to be able to be installed without cutting in the field, so as to accommodate the construction finish deviation.

In addition, in the generation slab partial buried type o / drain pipe connection structure including the pipe pipe having the sound insulation air layer of double pipe structure and the sliding index joint part, the pipe coupling part and the partially open type pipe connection socket, The piping coupling part 26, the partially open type pipe connection socket 23 and the embedding housing 22 for the elbow are installed in the slab formwork 2 so as to prevent the pipe from sagging and breakage, And a plurality of angular pipe fixing bands 362 extending in a predetermined length on both sides of the angular pipe 361 to form a coupling hole 362a; A through hole 37a is formed so as to be slidably coupled along the outer circumference of the pipe pipe 21 and the upper end thereof is extended to the left and right by a predetermined length so as to correspond to the engagement hole 362a of the pipe fixing band 362, And a pipe pipe fixing band 37 in which a support bar insertion groove 37b is formed so that a support bar 37c having a predetermined length is inserted into the bottom surface thereof.

The pipe assembly 20 includes a piping pipe having a double pipe structure sound insulation air layer and a sliding index joint, a piping coupling part, and a partially open piping connection socket. The piping assembly 20 includes: (362a) of each of the pipe fixing bands (362) and the through holes (362a) of the pipe pipe fixing band (37) in order to form a gradient according to a standard specification applied to the field for the flow gradient of the pipe assembly And a plurality of gradient bases 33 having different heights inserted and installed between the guide rails 37a.

In addition, in the generation slab partial embedding type o / pipe pipe connection structure including the piping pipe having the sound insulation air layer of the double pipe structure and the sliding index joint part, the pipe coupling part and the partially open type pipe connection socket, The embedding housing 22 for the elbow has a second exponential protrusion 291 formed in the vertical direction so as to surround the outer circumferential surface in addition to the exponential protrusion 291 in the vertical and horizontal directions on the outer circumferential surface in order to prevent leakage in the vertical direction as well as in the left- ) Is formed to have a cross structure.

In addition, in the generation slab partial buried type o / double pipe connection structure including the piping pipe having the double-pipe structure sound insulation air layer and the sliding index joint portion, the pipe coupling part and the partially open type pipe connection socket, Can be easily attached and detached using a compression o-ring and a tightening member by inserting a water-pressure plug 232 into the sliding pocket connection port 50. Therefore, the water pressure can be easily inspected and removed after installation of the pipe without any additional equipment .

In order to accomplish the above object, according to the present invention, a piping pipe 21, various pipe coupling parts 26, a wall penetration sleeve 25, an embedding housing 22 for an elbow, a partially open type pipe connection socket 23, (S100) of ordering a manufacturer for the quantity of the product; A pipe pipe 21 for forming a soundproofing air layer 21a for preventing sound and vibration transmission of the double pipe structure at the inner center of the thickness and forming a sliding exponent protrusion 291 on the outer circumferential surface thereof, A plurality of pipe coupling parts (not shown) for forming a sound insulation air layer 21a at the inner center of the thickness and forming a sliding index groove 292 corresponding to the exponent projections 291 on the inner circumferential surface, (25), a wall through sleeve (25), a toilet seat, a drainage groove, and a bathtub, a hollow portion is opened at one side thereof and a sliding pocket connection port (50) An openable pipe connection socket 23 having a soundproofing air layer 21a on the upper side thereof and a housing cover 221 having a hollow inside to accommodate the elbows of the toilet, (S110) a buried housing (22) for an elbow having a plurality of projections; (S130) transferring the manufactured pipe pipe and parts to the site; The pipe fixing frame 30 protruding from the upper surface of the slab formwork 2 and being fixed to the pipe pipe 21 and the flange portion 222 of the partially open type pipe connection socket 23 while being spaced apart from each other, (S140); A step (S150) of assembling each pipe pipe fixing bar 36 by connecting a plurality of pipe pipe fixing bands 362 to each pipe 361; The piping pipe 21, the various pipe coupling parts 26 and the wall penetration sleeve 25, the embedding housing 22 for the elbow, and the partially open type pipe connection socket 23 according to the construction drawings are provided with the sliding index protrusions 291 And an index joint 29 including an index groove 292. By inserting a required number of pipe pipe fixing bands 37 into the outer circumferential surface while bonding them to the exponential joining portion 29 by bonding, (S160); A pipe fixing band 37 previously coupled to the pipe assembly 20 and each pipe fixing band 362 of each pipe pipe fixing bar 36 manufactured in advance are fixed by fixing means, (S170) of inserting another gradient pedestal (33) to form a gradient in the pipe assembly (20); And the water inlet connector is fitted to the wall through sleeve 25 after the water inlet connector 28 is fitted to the installation position of the pipe fixing block 30 and the straight pipe landing housing 27 connected between the water inlet connector and the water inlet connector is adjusted according to the finishing deviation, And engaging the housing cover 221 (S180); A step (S190) of installing a support rod (37c) in the support rod insertion groove (37b) of the pipe pipe fixing band (37) so as to have a height corresponding to each drain port; A step S200 of fixing the piping pipe 21, the various pipe coupling parts 26, the wall through sleeves 25 and the embedding housing 22 for the elbow by tightening the fastening bolts 32 of the pipe fixing table 30, Wow; A step (S210) of placing and curing the slab concrete by pouring and curing; Disassembling the slab formwork (S220); A step (S230) of unscrewing the pipe pipe fixing bars 36 from the pipe assembly 20 by unscrewing the nuts which are fastening means of the pipe pipe fixing bars 36; The open cover 231 of the open-ended pipe connection socket 23, the housing cover 221 of the straight tube buried housing 27 and the sextia, the water inlet connector embedding housing 28, Step S240; (S250) screwing the sliding pocket connection port (50) after inserting the rubber packing into the partially open type pipe connection socket (23), the sextia, the wall penetration sleeve (25) of the water inlet connector housing housing (28) side; After the PVC pipe 233 is bonded to the elbow 234, the elbow 234 is inserted into the sliding pocket connection port 50 coupled to the partially open type pipe connection socket 23 and pulled out to align the elbow installation position. Using the O-ring and the tightening member (S260); After confirming the abnormality through the pipe assembly made of a transparent material, the pressure o-ring and the fastening member of the sliding pocket connection port (50) are loosened to insert a hydraulic cylinder, tighten the compression o-ring and fastening member, 231); When the leakage occurs, the upper surface of the relevant part is cut, the gap is filled with adhesive, the damaged part is sanded with sand paper to remove the foreign substance, the damaged part is arranged, the upper part is opened and the overflow pipe which is closely attached to the inner surface of the pipe is attached with the adhesive, A step (S280) of bonding and repairing the larger damper plate 38 with a fixing means after applying silicone; A step (S300) of opening the housing cover (221) of the sextier, water inlet connector housing (28) to install the granular pipe (3) and the sextia and water connector (60); Removing the hydraulic plug 232 of the sliding pocket connection port 50 connected to the wall penetration sleeve 25 and connecting the PVC pipe to connect the common drain pipe to the drainage pipe; (S320) connecting the sliding pocket connecting port (50) to the upper granulating pipe connecting side of the water tank connector (60) and installing the granulating pipe; A toilet partition wall is built up (S330) and an elbow 234 is installed (S340); When the position is corrected by the construction finish deviation, the compression o-ring and the fastening member of the sliding pocket connection port 50 are released and the PVC pipe 233 bonded with the elbow 234 is inserted / extracted, and then the compression o- A step (S360) of finishing pipe modification by tightening the member; Waterproofing the upper surface of the cured slab concrete 1 and the partition wall (S370); A bathtub is installed (S400) and a wall tile is constructed (S410); Pouring and curing foam concrete (S420); (S450), and a floor tile is constructed (S450). Then, a toilet, a washstand, and a bathtub are installed (S460). On the floor, (S470). The double-pipe structure is constructed by embedding the drainage pipes of the main-layer generation in the main floor and constructing various piping assemblies, thereby facilitating construction in the field and improving quality and waterproofing The present invention provides a construction method using a piping pipe having a sound insulation air layer and a sliding index joint portion, a piping coupling part, and a partially open type piping connection socket.

Also, a method for constructing a piping assembly having a sound insulation air layer and a sliding index joint of the double pipe structure, a piping coupling part, and a partial open type piping connection socket, 20 and the respective pipe fixing bands 362 of the pre-fabricated pipe pipe fixing bars 36 are fixed by fixing means, and the pipe base fixing bands 362 of the pipe base fixing bars 36 of the pre- The step of forming a gradient in the pipe assembly 20 by inserting the flange portion 33 into the pipe assembly fixing bar 36 is performed by aligning the installation position of the embedding housing 22 for the elbow and attaching the flange portion 222 to the pipe pipe fixing bar 36 A step (S171) of fitting the height of the gradient with the gradient holder (33) and fixing the gradient with the pipe fixing band (362); An adhesive agent is applied to the exponential protrusion 291 of the embedding housing 22 for the elbow and the exponential groove 292 of the partially open type pipe connection socket 23 and is slidingly engaged with the installation position of the pipe fixing table 30, And fixing the partial open type pipe connection socket 23 to the pipe fixture 30 with the pipe fixation band 362 while fitting the partial open pipe connection socket 23 to the pipe pipe fixture 30 and adjusting the gradient height to the gradient fixture 33 S172); An adhesive is applied to the exponent groove 292 of the partially open type pipe connection socket 23 and the exponential protrusion 291 of the pipe pipe 21 and is slidingly engaged with the exponent protrusion 291 of the pipe pipe 21, An adhesive is applied to the index groove 292 of the fitting 26 and the flange portion 222 of the pipe coupling fitting is slidably engaged with the pipe pipe fixing bar 36 and the gradient height is adjusted by the gradient plate 33, (S173) fixing the pipe fixing band 30 to the installation position with the pipe fixing band 362; After the wall penetration sleeve 25 is aligned with the pipe fixing table 30 at the installation position, the exponential protrusion 291 of the wall through sleeve 25 and the other exponential groove 292 of the pipe coupling member 26 are coated with an adhesive (Step S174) of fitting the flange part 222 of the wall through sleeve to the pipe pipe fixing bar 36 and fixing the pipe pipe fixing bar 36 to the piping fixing band 30 by aligning the height of the pipe with the gradient pipe ). ≪ / RTI >

In addition, in the construction method using a piping pipe having a sound insulation air layer having a double pipe structure and a sliding index joint, a piping coupling part, and a partial open type piping connection socket, and a generation slab partial embedding type o- and drain pipe connection structure, The inside of the drainage main body 241, which is the bathtub side pipe coupling portion after the protective cover of the drainage main body 241 is dismounted, between the step of waterproofing the upper surface of the partition wall 1 and the step of waterproofing the partition wall (S370) A step (S380) of bonding the elbow toward the bottom surface to install the bathtub trapping part 242; A step (S390) of installing and maintaining a drainage upper end finishing section (244) after adjusting the height of the toilet floor finishing height by using an extension member (243) coupled to the inside of the upper part of the drainage main body (241); .

The effects of the present invention are as follows.

A pipe pipe for forming a sound insulation air layer for preventing noise and vibration transmission of the double pipe structure at the inner center of the thickness and forming a plurality of sliding index joints at the outer side, and a soundproof air layer for preventing the noise and vibration transmission of the double pipe structure, A plurality of pipe coupling parts and a wall penetration sleeve which form a plurality of sliding expansible coupling parts on the inner side and form one or more flange parts on the upper left and right sides of the upper part and an embedding housing for an elbow which accommodates a toilet seat, In order to easily adjust the position when connecting with the elbow, only one side can be opened and closed. In order to prevent water from leaking into the lower layer through the open part of the opening, the outer side of the housing is made to have a cross exponent structure, A PVC pipe is disclosed in U.S. Patent Application No. 2013-137574 Using a piping connection structure including a partially open type pipe connection socket which is coupled through a riding pocket connection port and an angle pipe pipe fixing bar and a pipe pipe fixing band for supporting a pipe assembly in which the components are assembled, The piping pipes of the lengths used for each section are assembled semi-assembled with the delivery or fitting parts, or they can be installed on site in the field, and the drainage contractor can easily assemble the piping before installation by utilizing the initial manpower blank. It is possible to install with minimum number of personnel in the slab form of the bathroom, flexible use of piping workforce, and also to fix and support the piping assembly without distortion and deflection of the pipe piping, Preventing the damages of drainage pipe caused by working and concrete pouring, PVC piping that has been supplied on the basis of construction drawings with a slight finishing deviation length can be piped by using sliding pockets without piping and pipes are piped and repeatedly homogeneous construction is provided for each layer. It is possible to provide a high quality construction which prevents water leakage, noise and vibration transmission to the lower layer when using water and drainage from the generation, If water is used in the bathroom after the completion, the drainage on the floor of the toilet penetrates into the floor even if there is a gap due to the expansion or contraction due to the temperature deviation of the piping pipe and piping connection parts and the watertight mortar parts embedded in the floor slab. And a plurality of index joint parts slidingly coupled to the inside and the outside of the wall penetration sleeve, and a partial open-type pipe connection socket is provided at the position where the toilet and bathtub are installed, A plurality of exponents of the structure are provided to prevent water from the bottom of the toilet from leaking into the lower layer through the gap of the buried housing through the various embedding housings and a sliding pocket connection port for receiving and coupling the PVC pipe And the remaining piping connection structures are all of an airtightly coupled structure It is convenient to be installed with a wall penetration sleeve of one dimension irrespective of the thickness of the concrete before the installation of the concrete partition wall of the toilet compartment and the waterproof jaw installation of the wall penetration sleeve, It's easy to test. Provides piping connection structure, construction method, and construction method of slab part buried type drainage pipe including piping pipe, pipe joint part and partial open pipe connection socket having double pipe structure sound insulation air layer and sliding index joint part that can be easily maintained It is a very useful invention that can be done.

1 is a schematic view showing a connection structure of a conventional lower-
Fig. 2 is a schematic view showing a connection structure of a drainage pipe in the present layer
Figure 3 is a schematic view of a generic slab partial buried oval and drain connection structure of the applicant's prior patent application No. 2013-144331
Fig. 4 is a schematic view showing a connection structure of a generation slab partial embedding type oill and drain pipe to which the present invention is applied
FIG. 5 is a schematic view showing a plan view of a connection structure of an open /
6 is an exploded view showing the structure of a piping assembly to which the present invention is applied.
FIG. 7 is a plan view, front view, and cross-sectional view showing a piping assembly fixed to a piping fixture to which the present invention is applied and supported by each pipe piping fixing bar;
Fig. 8 is an exploded view showing a pipe pipe fixing bar and a pipe pipe fixing band to which the present invention is applied.
9 is a schematic view showing a cross-sectional structure of a folded six-
FIG. 10 is a schematic view showing a connection state between a sextile, a water inlet connector and a granular pipe to which the present invention is applied.
11 is a flowchart showing a construction method using an oi and drain pipe connection structure to which the present invention is applied

Hereinafter, the present invention will be described in detail with reference to preferred embodiments. It is to be understood, however, that the embodiments are illustrative of the invention in order that the invention may be better understood, and that the terms or words used should not be construed in a conventional or dictionary sense, It should be understood that the present invention should not be construed as being limited to the meanings and concepts consistent with the technical idea of the present invention based on the principle that the concept of the term can be appropriately defined in order to explain it by a method.

First, the generation slab partial embedding type o / water pipe connecting structure including the pipe pipe 21 and the pipe connecting member 26 having the sound insulation air layer of the dual pipe structure of the present invention and the plurality of sliding index joint parts is connected to the pipe pipe 21 ), A variety of pipe coupling parts 26, a partially open type pipe connection socket 23, a wall penetration sleeve 25, a landfill housing 22 for a toilet / bathtub / washbowl elbow, a soundproof air layer 21a, Wherein a plurality of pipe assemblies 20 are assembled from a plurality of mutually different pipe assemblies 20 in the manufacturing company, including a plurality of pipe fixing bands 36, pipe fixing bands 362, pipe pipe fixing bands 37, a gradient bases 33, And it is semi-assembled with piping pipe of the length used for each section according to the construction drawing, so that the construction can be completed quickly and precisely through the minimum work process with the minimum number of people in the field. I can do it Characterized in that for preventing the non-uniform construction and assembly state occurs according to the change and the foundation according to the circumstances in the field.

In addition, the present invention differs from the various embedding housings provided with the housing lid of the applicant's patent No. 2013-144331, which is openable and closable, the piping pipe and various pipe fittings, the wall through sleeve 25, It is only possible to make precise and precise parts in the area of interlocking with the landfill housing for toilet / tub / washbowl elbow, drainage landfill housing, partially open type pipe connection socket, which is extruded or injection molded into opaque structure and capable of correcting the position and correcting the construction structure deviation length. And a partially open type structure having a partially open upper portion and a protective cover for position adjustment is provided.

8, in order to absorb and block the direct transmission of noise and vibration through the piping assembly of the drain pipe, a soundproof air layer 21a is formed inside the center of the thickness of the pipe pipe 21 and the pipe coupling member 26 ) Is integrated with a double pipe structure to prevent noise from being transmitted to another generation.

As shown in FIG. 7, the piping assembly 20, which is buried in the pipe-pipe fixing bars 36 during the concrete installation and curing, is installed from the field installation of the pipe assembly 20 to the pipe- The pipe assembly 20 fixedly supported on the pipe 36 is prevented from buckling like concrete in the concrete when the concrete is poured and is fixed to the pipe pipe fitting 21 And a supporting rod 37c is supported between the lower side supporting rod insertion groove 37b of the wall penetration sleeve 25 and the upper end of the formwork so as to be installed in the slab concrete It is possible to prevent breakage of the piping assembly 20 by the operator by preventing the piping assembly 20 from sagging and supporting and fixing the piping assembly 20 in the vertical direction and to prevent the breakage of the piping assembly due to the load of the concrete Enabling a stable buried by preventing the warpage and is characterized in that the protective damage each pipe plumbing fixture bar 36 of pipe assembly 20 is caused to fall upon dismantling the ceiling formwork mold.

7 (b), when the pipe assembly 20 is fixed by the pipe pipe fixing bars 36 and the pipe pipe fixing bands 37, the pipe fixing bands 36 of the pipe pipe fixing bars 36 362 and a through hole 37a of the pipe pipe fixing bar 36 to form a flow gradient by a pipe gradient according to the standard specification by inserting a gradient base 33 having a different height from the through hole 37a of the pipe pipe fixing bar 36 .

7 (b), the outer side of the wall through sleeve 25, the partially open type pipe connection socket 23, the flush toilet / bathtub / toilet bowl embedding housing 22, and the drainage landfill housing 24 The vertical exponential protrusions 291 are additionally provided in addition to the plurality of horizontal exponential protrusions 291 to block water leaks generated not only in the vertical direction but also in the horizontal direction by the plurality of exponential projections 291 formed in cross- .

The piping pipe 21 and various pipe coupling parts 26 and the wall penetration sleeve 25 are made of a transparent material such that the tile layer and the foamed concrete are poured on the slab concrete layer on the upper part thereof, The upper surface of the pipe joint member 26 is exposed and the upper surface of the portion where the water leakage needs to be repaired is cut through the upper part of the pipeline assembly 20 so that the gap is filled with the adhesive, (Not shown), which is open at the top and is in close contact with the inner circumferential surface of the pipe, is sanded with sandpaper to remove the foreign material at the joint portion, and after repairing the pipe, the pipe pipe 21 and various pipe coupling parts 26, It is characterized in that it is easy to repair the damper plate 38, which is cut larger than the incision portion on the upper surface of the sleeve 25, by attaching the silicone to the damper plate 38 and attaching it with the fixing means.

Since the wall penetration sleeve 25 is buried, it can be manufactured irrespective of the length of the concrete retaining wall or the waterproofing jaw, so that the wall penetration sleeve 25, which has a length enough to accommodate the construction finish deviation, So that it is possible to carry out the piping without cutting off the additional piping or piping by accommodating the unavoidable deviation.

(Example 1): Manufacture of piping pipe of the present invention, various pipe fittings, wall penetration sleeves, landfill housing for elbows, and partially open type pipe connection sockets

First, the quantity of the components of the present invention is determined according to the shop drawing where the toilet sanitary apparatuses are installed on the spot and the piping length dimensions are specified in the field, and the order is submitted to the manufacturer along with the construction drawing.

6, a pipe pipe fixing band 37 for slidingly assembling and fixing the pipe pipe 21, various pipe coupling parts 26, a partially open pipe connection socket 23, a toilet / bathtub / washbowl elbow Two or more pairs of flange portions 222 are formed so as to extend outward from left and right upper ends to fix the landfill housing 22, the drainage landfill housing 24, and the wall penetration sleeve 25 away from the upper surface of the slab formwork, The piping pipe 21 is connected to the piping fixing band 30 and the supporting rod 30 by sliding the piping pipe fixing band 37 sliding along the exponential projection 291 of the piping pipe 21 before bonding with the various piping coupling parts 26 37c are combined in the required quantity. A plurality of exponential projections 291 are formed on the outer circumferential surface in such a manner that the plurality of exponential protrusions 291 are slidably engaged with the plurality of exponential protrusions 291 when the pipe pipe 21 and the various pipe coupling parts 26 are coupled to each other, And the grooves 292 are made to correspond to each other and are slidably inserted. The piping pipe 21 and the pipe fitting part 26 are manufactured on the basis of a closed, transparent structure as a whole.

The piping pipe 21, the piping coupling part 26, and the wall penetration sleeve 25 are preferably made of a transparent material in order to confirm the occurrence of a fault in the piping assembly 20 or to check whether the piping coupling part is abnormal.

The partially open type pipe connection socket 23 is provided with a protective lid 231 which is opened and closed only at one side to facilitate fine positioning when the lid is connected to a toilet / bathtub / washbowl elbow and a drainage main body 241 The sliding pocket connecting port 50 disclosed in the applicant's patent application No. 2013-137574 of the present applicant is inserted into the inside of the protective cover 231 by inserting the PVC pipe 233 into the hollow. A water pressure sensor 232 can be installed inside the sliding pocket connection port 50 easily by using a compression o-ring and a tightening member so that the water pressure can be inspected without any additional equipment after the installation of the pipe. The separator 232 is very easy to separate.

Since the sliding pocket connector 50 has already been described in detail in the foregoing, a detailed description thereof will be omitted.

The open-pipe connecting socket 23 is a part of the open-type pipe connecting socket 23, which is partially opened to the part where the sliding pocket connecting port is coupled. The pipe connecting pipe 23 is a straight pipe having a predetermined length, And an elbow 234, which is coupled with the landfill housing 22 for the toilet / bathtub elbow, so that the piping is bent upward, is inserted into the interior of the toilet pipe / / Washstand or the like, and the pipe coupling part 26 is used for piping that pipes are bent at 45 degrees or 90 degrees, and the wall penetration sleeve 25 has a waterproof jaw and a concrete toilet partition wall Slabs to be installed Upper wall molds Concrete retaining walls of bathrooms and P / S or P / D spaces, not installed on the floor of the inner bottom Watertight jaws, A length of a through-wall sleeve which is installed to penetrate inside the floor slab of a household toilet, and is made to be longer than the waterproof jaw and the thickness of the concrete wall in consideration of margin deviation, thereby being joined with the pipe 21 at the waterproof jaw and outside the concrete wall It is preferable to make such a position adjustment.

The piping pipe 21, various pipe coupling parts 26, and the wall penetration sleeve 25 are all provided with a sound insulation air layer 21a at an inner center of the thickness to minimize transmission of noise and vibration. The pipe 21 integrated with the soundproofing air layer 21a is formed by forming a plurality of exponents and soundproofing air layers 21a in the extruder pipe discharging portion extruded by using a PVC raw material and various plastic raw materials during extrusion production in a pipe extruder And is provided with various pipe coupling parts 26 and wall through sleeves 25, partially open type pipe connecting socket 23, buried housing 22 for toilet / tub / washbowl elbow, drainage In manufacturing the land buried housing 24, the soundproofing air layer 21a is firstly injection-molded using the injection material, and then the various pipe fitting parts 26 are injection-molded according to the insert injection method.

The sliding plural number of exponential coupling portions 29 are horizontally arranged on the outer circumferential surface of the pipe pipe 21 so that sliding lengths can be adjusted at regular intervals when the pipe pipe 21 and the various pipe coupling parts 26 are coupled with each other. And a plurality of index grooves 292 corresponding to the plurality of index joints 26 are formed on the inner circumferential surface of the various pipe coupling parts 26 to form a plurality of index projections 291 extending in a direction The protrusion 291 and the exponential groove 292 are slidably joined to each other, and the length of the joint portion of the joint insertion portion is adjusted to allow the length adjustment during bonding. When the slope concrete is embedded in the slab concrete, And the bottom slab concrete and the pipe assembly 20 are connected to each other through the gap between the bottom slab concrete and the pipe assembly 20, By to prevent the water leakage is obtained a complete leak-proof effect. However, there is a risk of occurrence of leakage in a portion where the plurality of exponential coupling portions 29 are not formed. In the present invention, a plurality of exponential projections 291 of the piping assembly 20 are connected to each other, ) Cross-structure, it is manufactured by the manufacturer using a bond when assembled and sealed and bonded to the inside and the outside at the time of bonding.

The flange portion 222 is formed so as to protrude outward in the horizontal direction from left and right upper ends at predetermined intervals so that when the piping assembly 20 is fixed to the upper end of the slab formwork 2, For example, a piping fixture 30 disclosed in Japanese Patent Application Laid-Open No. 2001-348999. However, it should be understood that the present invention is not limited thereto and may be used for other components that are replaced with the same technical idea as that of the pipe fixture 30.

The piping pipe, various pipe fittings, wall penetration sleeves, the embedding housing for the elbow, and the partially open type pipe connection socket can be formed in a circular or U-shaped cross section, but as shown in the drawing, The exposed upper surface is flat and incised, and can be sealed by the damper plate 38, which makes it easy to maintain maintenance.

(Example 2): Manufacture of pipe pipe fixing bars and pipe pipe fixing bands

As shown in FIGS. 7 to 8, a rectangular pipe 361 having an appropriate length corresponding to the length of the pipe assembly 20 to be supported is prepared, And a plurality of angled pipe fixing bands 362 extending by a predetermined length to form the engaging holes 362a.

The upper end of the pipe is extended to the left and right to form a through hole 37a and the lower end of the pipe is inserted into a support bar insertion groove 37b are formed.

(Example 3): Fabrication of the piping assembly of the present invention

As shown in FIGS. 6 to 7, the piping pipe 21, the various pipe coupling parts 26, and the various landfill housings 22, 27, and 28 manufactured in the first embodiment are transferred to the field, And the sliding index joint portion 29 is used to assemble the pipe assembly according to the construction drawing to produce a pipe assembly.

First, in order to fix the installation position of the pipe according to the construction drawing, a pipe fixing stand 30 disclosed in Korean Patent Application No. 2012-141652 is installed for each installation position.

A process of manufacturing the pipe assembly 20 using the pipe fixing table 30 at the installation position of the toilet, the washstand, and the bathtub will be described with reference to the construction drawing.

6, when the flange portion 222 of the embedding housing 22 for the toilet flap elbow is integrally joined to the pipe pipe fixing bar 36 at the position of the toilet seat and inserted into the pipe fixing base 30, Is fixed.

Next, one end of the embedding housing 22, the partially open type pipe connection socket 23 and the pipe pipe 21, which are fixed in position, is slidably inserted and bonded by using a plurality of sliding index joint parts 29 The index joint portion 29 at one end of the pipe joint fitting part 26 is slidably inserted and bonded to the other end of the pipe pipe 21 using an adhesive and the flange part 222 of the pipe joint fitting part 26 Is inserted into the pipe fixing table 30 previously installed after being integrally joined with the respective pipe pipe fixing bars 36 and fastened, the position is fixed.

Next, one end of another pipe pipe 21 is coupled to the other end of the pipe coupling part 26 by using a plurality of sliding index joint parts 29. At this time, the pipe pipe fixing band 37 manufactured in the second embodiment is slidably inserted into the pipe pipe 21 by a required number of supporting positions during the coupling process.

Next, one end of the wall through sleeve 25 is coupled to the other end of the pipe pipe 21 by using a plurality of sliding index connecting parts 29.

When the piping pipe fixing band 37 is inserted into the piping pipe 21 as described above, the piping pipe is inserted and coupled without using an adhesive, By means of which they are fixed.

Next, the length of the pipe pipe 21 connected in the middle as the position of the embedding housing 22, the partially open type pipe connecting socket 23, and the pipe coupling fitting 26 is fixed by the pipe fixture 30, Is also determined naturally according to the construction drawing.

Next, the plurality of index joint portions 29 of the pipe pipe 21, the pipe coupling member 26 and the wall penetration sleeve 25 are slidably inserted and bonded using an adhesive.

Since the wall penetration sleeve 25 is buried, the length is not limited as before and its length is made longer than the thickness of the concrete retaining wall or the masonry wall, So that the entire length of the pipe pipe can be adjusted.

The same assembling method is used to complete the piping assembly 20 from the bathtub to the drainage land and from the drainage land to the wall through sleeve, and the process is the same as that described above.

Although the process of manufacturing the pipe assembly 20 in the field has been described in the above description of the third embodiment, it is not limited thereto, and the pipe assembly 20 may be transported to the site while being assembled by the manufacturer depending on the circumstances, Of course.

(Construction Example 1): The assembly produced in Example 3 was buried in slab concrete

Referring to FIG. 7, the following description will be made with reference to a toilet pipe side assembly as an example.

As shown in FIG. 6, the piping assembly 20 manufactured in the third embodiment is first installed on the upper surface of the slab formwork 2 by using the fastening means 70 at the bottom. (Installation step of the pipe fixture)

Next, as shown in FIG. 7 (b), a pre-fabricated pipe pipe fixing bar 36 is placed at the center of the upper surface of the pipe assembly 20, and a plurality of angular pipe fixing bands 362 are used. The pipe-pipe fixing bands 37 are coupled to each other by the fixing means. At this time, a plurality of gradient bases 33 having different heights are prepared so as to form a gradient according to a standard specification applied to the site, inserted between the respective pipe fixing bands 362 and the pipe pipe fixing band 37, So that the assembly 20 forms a gradient. (Pipe fixing bar and pipe pipe fixing band joining and draft pipe insertion step)

Next, the flange portion 27 of the embedding housing 22 for the toilet seat elbow is inserted into the pipe pipe fixing bar (not shown) at the position of the upper fixing bolt 31 where the embedding housing 22 for the toilet- 36, and the gradient height is adjusted to the gradient height by the gradient base 33, and then fixed and secured by the respective pipe fixing bands 362. (Inserting the landfill housing for the toilet seat elbow)

Next, an adhesive is applied to a plurality of exponential projections 291 of the embedding housing 22 for the toilet-bowl elbow and a plurality of exponential grooves 292 of the partially open type pipe connection socket 23, and the piping stand 30 is installed at the slab form And then the housing cover 221 is cut in accordance with the length of the open portion and then covered with a partially open type pipe connection 31 to the upper fixing bolt 31 on which the partially open type pipe connection socket 23 of the pipe fixing base 30 is to be positioned. The flange portion 222 of the socket 23 is hooked on the pipe pipe fixing bar 36 and the gradient height is adjusted by the gradient holder 33 and fixed with the respective pipe fixing bands 362. Seating step) At this time, the seating state of the embedding housing for the toilet seat elbows is set to a dimension length that sufficiently accommodates the length of the construction structure deviation.

Next, after cutting the pipe pipe 21 to a length corresponding to the intermediate engaging dimension of the sliding-engaging portion of the partial open-type pipe connecting socket 23 of the construction drawing and the pipe fitting portion 26, A plurality of exponential projections 291 on the other side of the piping pipe 21 after sliding insertion and bonding with adhesive to a plurality of exponential grooves 292 of a partially open type pipe connection socket 23 to be inserted into a plurality of exponential projections 291, And the flange portion 222 is fitted to the slab die of the insertion and bonding pipe fitting part 26 with an adhesive to a plurality of index grooves 292 of the pipe fitting member 26 to be inserted and fixed The pipe is fixed to the pipe pipe fixing bar 36 and fixed to the pipe fixing band 362 by fitting the pipe pipe 33 with the gradient height.

Then, the wall-insertion sleeve 25 is aligned with the mounting position on the slab form of the pipe fixing base 30 of the wall-through sleeve 25 of the construction drawing, After cutting the pipe pipe 21 to a length corresponding to the size of the coupling part intermediate connection, the pipe pipe fixing band 37 is inserted into the exponential protrusion 291 of the pipe pipe 21 by the required number of supporting parts, A plurality of exponential projections 291 on the other side of the pipe pipe 21 after sliding insertion and bonding with a plurality of exponential grooves 292 of the pipe coupling part 26 to be inserted into the plurality of exponential projections 291 on one side of the pipe pipe 21 And the pipe fixture 30 is fixed to the position of the slab die of the wall penetration sleeve 25 which is bonded by being slidably inserted into the plurality of index grooves 292 of the wall penetration sleeve 25 to be inserted and joined by an adhesive, (222) to the pipe pipe fixing bars (36) And then fixed with the pipe fixing band 362. After fitting the piping pipe and the wall through sleeve 25 to each pipe, the pipe fixing bar 36 is seated. The sewerage water drain connector embedding housing 28, which is manufactured in the length of the sleeve 25 to accommodate the watertight jaw mounting location structure construction deviation and the generated construction structure deviation deviation is P / D or P / S The inserted length of the side wall of the straight pipe embedding housing 27 coupled to the wall penetration sleeve 25 is adjusted by pulling or pushing in the insertion portion slides in accordance with the length of the construction structure deviation.

Next, as shown in FIG. 10, after fitting the sextile, the water inlet connector embedding housing 28 to the slab form in the P / D or P / S to the installation position of the pipe fixture 30, the wall through sleeve 25, O, the drainage connector embedding housing 28 is inserted, and if the construction finishing deviation is long, the straight buried housing 27 is inserted less, and if it is short, the protrusion cover 231 is slidably engaged with the drainage connector housing 28, (P / D or P / S inner wall penetration sleeve, sex tiao, combination of water inlet housing with embedded housing) P / D or P / S is a space that does not use water It is easy to adjust the deviation length of the construction structure because there is no exponential part and adhesive bonding is not needed.

Next, the support rod 37c is connected to the slab form bottom and the pipe pipe fixing band 37, various pipe coupling parts 26, the embankment housing 22 for the toilet water elbow, the partial open pipe connection socket 23, A support rod 37c is provided in the support rod insertion groove 37b under the water inlet connector housing housing 28 so that the support rod 37c is dimensioned to a drainage gradient of each section position Settlement phase)

Next, as shown in FIG. 5 (3), various piping pipes 21, various pipe coupling parts 26, wall penetration sleeves 25, and embedding housing 22 for the elbows are fastened with fastening bolts 32 (Fixing bolt fastening step)

This completes the preparation for slab concrete pouring.

Then, the slab concrete is laid and cured to lay the pipe assembly 20 (concrete pouring and curing step). In order to prevent sagging of the pipe assembly 20 due to the heavy concrete, the pipe pipe fixing bars 36 are arranged on the upper side The supporting rod 37c is mutually supported on the lower side to prevent sagging and warping.

Next, the slab formwork 2 is disassembled. (Form disassembly step) Formwork 2 (Fig. 2) The pipe assemblies 20, which are exposed by the form 2 falling down upon disassembly, The diaphragm 361 of the diaphragm 36 absorbs the impact of the die dropped during the form disassembly and protects the pipe assembly 20.

Next, the nut of the fastening means of each of the pipe pipe fixing bars 36 and 30 and the nut of each of the pipe fixing bands 362 fastening the pipe assembly 20 and the pipe pipe fixing bars 36 And the pipe pipe fixing bars 36 are dismounted from the pipe assembly 20 (disassembly step of each pipe pipe fixing bar). The dismounted pipe pipe fixing bars 36 are repeatedly used repeatedly.

Next, the embedding housing 22, the partially open type pipe connecting socket 23, the sextia, the water inlet connector embedding housing 28, the housing lid 221 of the straight embedding housing 27 and the protective lid 231 for the toilet- (Lid removal step)

Next, the rubber packing is inserted into the inserting portion into the partially open type pipe connecting socket 23 coupled with the embedding housing 22 for the toilet-bowl elbow and the wall penetrating sleeve 25 on the side of the sextethe water inlet connector housing 28 Screw in the sliding pocket connector (50) using a separate tool. (Sliding Pocket Connector Assembly Step) Wall Through Sleeve Sliding Pocket Connector Open the compression o-ring and fastening element, insert the water pressure plug, Tighten the foreign material in the pipe and prepare the water pressure.

Next, a suitable length of the PVC pipe (not shown) accommodating the construction finish deviation length received from the manufacturer based on the construction drawing is inserted into the toilet flap elbow 234 in the embedding housing 22 for the simultaneous installation of the sliding pocket connection port 50 233 are bonded with an adhesive, the compression o-ring and the tightening member of the sliding pocket connection port 50 screwed to the partially open type pipe connection socket 23 are loosely loosened and the PVC pipe 233 is inserted into the pocket portion of the sliding pocket connection port 50 The toilet paper flange elbow 234 is aligned with the toilet seat installation position, and the compression o-ring of the sliding pocket connection opening 50 is tightened with the tightening member.

9, the opening protection cover 231 of the housing protection lid 231 and the partial open type pipe connection socket 23 of the drainage land buried housing 24 is opened and the drainage main body 241 And the PVC piping 233 to be connected to the water discharging landfalling main body 241 is passed through the piping inlet of the drainage landfill housing 24. [

Next, the compression o-ring and tightening member of the sliding pocket connection port 50 screwed to the partially open type pipe connection socket 23 are loosely loosened, and the PVC pipe having an appropriate length accommodating the construction finish deviation length supplied by the manufacturer based on the construction drawing The pipe 233 is pushed into the pocket portion of the sliding pocket connection port 50 and slidably inserted into the pocket 233 and then the adhesive is applied to the main body connection socket portion 24a of the drainage main body 241 and the PVC pipe 233, The PVC pipe 233 slides out of the pocket portion of the sliding pocket connection port 50 and slides out of the pocket portion of the sliding pocket connection port 50 to connect the main body coupling socket portion 24a of the drainage main body 241 to the main body coupling socket portion 24a of the drainage main body 241 And then the piping is fixed by tightening the compression o-ring and the tightening member of the sliding pocket connection port 50. (Step of joining the drainage main body)

At this time, the pipe on the washstand side is connected to the sink pipe drainage position inside the toilet partition wall after the PVC pipe 233 and the elbow are bonded to the main body connection socket portion 24a of the drainage hexagonal main body 241, This is the same as the method for joining the toilet side.

Then, a waterproofing test is performed simultaneously with the toilet water piping after the piping is connected to the water discharging landfalling main body 241, and the protective lid 231 is covered with the upper part of the water discharge landing main body 241 after the completion of water pressure inspection.

Next, the piping assembly 20 made of a transparent material is visually inspected to confirm the abnormality of the piping assembly buried in the slab concrete immediately after the coupling of the toilet filament flange elbow 234, and various connecting parts, which are hard to be visually inspected, The water pressure is inspected after filling the water through the elbow 234 and if there is no abnormality, the compression o-ring and the tightening member of the sliding pocket connection port 50 on the side of the wall penetration sleeve 25 are released to dismantle the water pressure plug 232, And then the waterproof plug is connected again to cover the protective cover 231 of the toilet flange elbow 234 and cover the partially open type pipe connection socket 23 and the upper protective cover 231 of the embedding housing 22 for the toilet seat elbow, Protecting foreign matter from entering and completing the water pressure inspection of the piping assembly 20. (Combined with the inspection of the hydraulic pressure of the piping assembly buried in the slab concrete and the protective cover)

Next, when leakage occurs due to poor connection of the pipe assembly 20 during the water pressure inspection, the upper surface of the leaked portion of the piping pipe 21, the various pipe coupling parts 26, and the wall penetration sleeve 25 is cut to fill the gap with an adhesive The surface of the damaged portion is sandwiched with sandpaper to remove foreign matter from the damaged joint portion, the surface is flattened, the upper portion is opened, and the inner overlapping pipe (not shown) is closely contacted with the inner circumferential surface. The repair of the pipe assembly 20 is completed by attaching the silicone rubber to the overhang plate 38 cut larger than the incision and attaching the silicone to the fixation unit so that the leakage gap adhesion and the dam plate 38 are completely After hardening, check the water pressure after completion of the bonding. (Piping assembly repair step)

Next, when the sextia and drain connector 60 are installed, the housing cover 221 of the sextier and the water inlet connector housing 28 is removed, and the ozone is inserted into the lower o-ring insertion portion of the sextia, A sextia, a drain connector 60 integrated with a sliding pocket connector for receiving and inserting the drain pipe 10 after being inserted into the sextia, the water connector 28, A water drain pipe 10 having a length that accommodates a predetermined slid is inserted into the inlet sliding pocket connection port 50 and a sextio water drain connection device 60 is connected to the wall through sleeve 25 side And the upper part of the sewage pipe 60 connected to the upper part of the slab is exposed to the upper part of the U-band 40. Then, Drainage connector installation step)

Next, the hydraulic pocket 232 is removed by unscrewing the sliding pocket connecting hole 50, which is screwed with the wall penetration sleeve 25, and the tightening member. After inserting the compression o-ring, the sliding pocket connecting hole 50 The drain pipe 10 inserted into the sliding pocket connection port 50 of the sextetool and drainage connector 60 integrally formed with the fastening member loosely and the sliding pocket connection port formed integrally with the sliding pocket connection port 50 of the wall through sleeve 25, A PVC pipe 233 having an appropriate length accommodating the construction finish deviation length supplied from the manufacturer is inserted and then joined to the housing 20 by tightening and tightening using the compression o- Oh, fix the drainage branch pipe (Generation O, drainage branch pipe fixing step)

Next, the sliding pocket connecting port 50 is coupled to the upper side of the upper and lower seats, and the sliding pocket connecting port 50 is coupled to the upper side of the upper and lower seats. When the position of the upper and lower seats, In the installation, by using the eccentric sliding pocket connection port (50) having a misaligned top and bottom connection centers, the eccentric sliding pocket connection port (50) is turned to the correct position by turning it to the left and right, And the granular pipe 3 is joined using the PVC pipe 233 of an appropriate length accommodating the construction finish deviation length supplied from the manufacturer.

However, when the center position of the sextetool and the water inlet connector housing 28 is matched, a sextia water drain connector (not shown) having a sliding pocket connector integral with the sextia granular pipe connection part can be used.

Then, while the granular pipe 3 is inserted into the sliding pocket connecting port 50 of the granular pipe connecting portion of the sextier and drain connector 60, the lower granular pipe connecting portion 50 of the upper- (3) is inserted using a PVC pipe (233) having an appropriate length accommodating the construction finish deviation length supplied by the manufacturer based on the construction drawing, and the sliding pocket connection port 50) and the tightening member are used to fix the granular pipe 3. At this time, it is possible to prevent sagging of the granular pipe 3, which may occur due to a rise in the pipe load at the time of using the drainage, and to prevent the granular pipe 3 from falling from the lower granular pipe connecting portion of the upper- It is preferable that the granular pipe 3 is tightened by using the stainless steel hose band 63 in close contact with the upper side of the fastening member of the sliding pocket connection port 50. [

In order to easily separate the main-layer integrated ozone water discharge pipe 3 from the sextia water drain connector 60 integrated with the sliding pocket connection port for receiving and slidingly inserting the drain pipe 10 at the time of use, Even when the water pipe 10 is separated from the wall penetration sleeve 25, the fastening members of the sliding pocket connection ports 50 on both sides are loosened to disassemble the water pipe 10, It can be repaired without causing harm to other generations within the main layer generation requiring repair, by minimizing the damage of the finish material, , It is very easy to replace maintenance, old and broken pipes because it does not damage the lower layer.

In the case of installing the sextetool and drain connector 60 in a state where the sliding pocket connector is not integrated, the compression o-ring and the fastening member of the sliding pocket connector 50 integrally assembled with the wall through sleeve 25 are loosened, O, it is easy to disassemble and reassemble by disassembling the pipe connected to the drain connector 60, replacing the pipe after the replacement, and then sequentially piping the drain pipe into the drain pipe.

Next, the toilet partition wall is stacked. (Step of stacking the toilet partition wall)

Then, after the installation and connection of the toilet flap elbow 234 is completed, water is supplied to the partially opened pipe connection socket 23, which is connected to the toilet flap elbow 234 when the position of the toilet and the toilet is installed, The compression o-ring and the tightening member of the screw-coupled sliding pocket connection port 50 are loosened and the PVC pipe 233 bonded with the toilet flap elbow 234 is inserted / pulled in order to align the compression ring o- And fix the pipe by tightening the tightening member (piping position correction step)

Next, the upper surface of the toilet and the partition wall of the cured slab concrete 1 are waterproofed (the upper surface of the toilet concrete and the partition wall waterproofing step).

Next, as shown in FIG. 9, after dismantling the upper protective lid of the drainage landing main body 241, the tubular side drainage main body 241, the main body coupling socket portion 24a, the bath side pipe fitting side, (The step of installing the tub seal trap part).

At this time, the sewing water is always filled in the bottom surface of the drainage main body 241 in the shape that the elbow is locked by the bottom surface of the drain pipe flowing into the drainage main body 241 from the bathtub side on the bottom surface of the drainage main body 241, Thereby preventing the odor in the drain pipe from being contaminated into the room.

Next, using an extension member 243 inserted and coupled to the inside of the upper portion of the inside of the drainage main body 241 in accordance with the height of the floor of the drainage main body 241, the height of the floor of the toilet floor is adjusted to the height of the toilet floor, And the drainage top end finishing portion 244 is closed with a protective film in order to prevent foreign matter from penetrating into the inside of the drainage toppling main body 241 through the screwdriver. The step of joining the extension member and the drainage upper surface finishing portion in accordance with the height of the thickness)

Next, remove the tub side elbow protection cover plug, assemble the bathtub, insert the bathtub drain hole bellows hose, attach the bath apron, and close the bathtub installation.

Next, the tiles of the wall are to be constructed (wall tile construction stage).

Next, the bottom foam concrete is laid. (Foamed concrete step)

Next, install the heating coils. (Step to install the heating coil coils in the toilet floor)

Next, check the water pressure of the heating coil of the bathroom. (Heating coil piping water pressure test)

Next, the floor of the bathroom floor is drafted with mortar, and the floor tile is constructed. (Toilet floor tile construction stage)

Next, install a toilet and a toilet. (Sanitary installation stage)

As described above, in the construction example 1, various piping pipes 21, piping coupling parts 26, piping connection sockets 23, and the embedding housing 22 for the elbows are delivered to the site as assembled or semi-assembled assemblies in the manufacturer It is possible to provide a piping assembly 20 capable of accommodating a finish deviation of a building structure when assembling in the field, and each household can be provided with a piping assembly 20. Accordingly, The construction work is very easy and the construction quality of the constant quality can be obtained irrespective of the skill of the worker and the construction quality is improved.

Reference numeral 101 denotes slab concrete, 103 denotes a granular pipe, 104 denotes a waterproof layer, 105 denotes a waterproof jaw, 106 denotes a conventional wall penetration sleeve, 107 denotes a foamed concrete, 108 denotes a mortar layer, 109 denotes a tile, 125 is a wall through sleeve of the prior art patent no. 2013-144331, 128 is a sextia, a drainage connector lower landfill housing, 130 is a watertight housing, A tubular fixture of the prior-art patent No. 2012-141652, a U-band 140, a sliding pocket connection port 150 of the previously filed patent No. 2013-137574, and a sextiao, drainage connector 160.

It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.

Description of the Related Art
1: floor slab concrete 2: slab formwork
3: granular piping 4: waterproof layer 5: waterproof jaw 7: foam concrete 8: mortar layer
9: Tile 10: Oh, drain pipe
20: piping assembly 21: piping pipe
21a: Soundproofing air layer 22: Embedding housing for elbow
221: housing cover 222: flange portion
23: Partially open type piping connection socket 231: Protective cover
232: Water pressure plug 233: PVC pipe
234: elbow 24: drainage landfill housing
24a: main body socket coupling portion 241:
242: tub seal trap part 243: extension member
244: upper finishing portion 25: wall through sleeve
26: Various piping coupling parts 27: straight pipe filling housing
28: Sex tiao, drainage connector embedding housing
29: Exponential coupling part 291: Exponential projection
292: index groove 293: second index projection
30: piping fixing member 31: fixing bolt
32: fastening bolt 33:
36: Angle pipe fixing bar 361: Angle pipe
362: each pipe fixing band 362a: engaging hole
37: piping pipe fixing band 37a: through hole
37b: support rod insertion groove 37c: support rod
38: Overhang plate 40: U-band
50: Sliding pocket connector 51: O ring
52: fastening member 60: sex tiao, drain connector
61: Pocket connector 62: Flame retardant rubber ring
63: Hose band
S100: Manufacturer's order step
S110: Piping pipes and parts manufacturing steps
S130: Piping pipes and fittings
S140: Installation steps of pipe fixture form
S150: Step of making the pipe for fixing each pipe
S160: Piping assembly production step
S170: Step of joining pipe pipe fixing band and each pipe pipe fixing bar
S171: Embedding housing for elbow Fixing of each pipe fixing band Step
S172: Partially open type pipe connection socket Angle of pipe fixing band Step
S173: Piping piping connection socket Pipe fixing band fixing step
S174: Fixing step of wall penetration sleeve piping
S180: Stereo diaphragm, step of installing drainage connector buried housing
S190: Step of installing the supporting bar
S200: Fixing the pipes and fittings
S210: Placing slab concrete and curing step
S220: Slab die disassembly step
S230: Step of removing each pipe pipe fixing bar
S240: Open housing cover and protective cover
S250: Sliding Pocket Connector Screwing Step
S260: Step of joining elbow and PVC pipe
S270: Step of attaching protective cover after water pressure test
S280: Repair steps in case of leakage
S300: Sex tiao, drain connector installation steps
S310: Generation O, drainage branch piping connection step
S320: Stage Piping Installation Phase
S330: Toilet partition wall forming step
S340: Elbow installation step
S360: Elbow position correction step
S370: Concrete top and wall waterproofing step
S380: Steps to install bathtub trap section
S390: Installation and maintenance of upper finishing after installation of extension member
S400: Step of installing bathtub
S410: Wall tile construction step
S420: Placing and curing of foamed concrete
S430: Heating coil installation step
S440: To check the pressure of the heating coil coil pipe
S450: Floor tile construction phase
S460: Installation steps of sanitary appliances

Claims (13)

A slab part of a bottom slab is fixed to the upper surface of the slab before the slab concrete is laid so that part or whole of the slab concrete is embedded in the slab concrete,
A pipe pipe (21) for forming a plurality of exponential protrusions in the horizontal direction on the outer circumferential surface so as to be slidably inserted along the exponential groove upon mutual coupling;
Various pipe coupling parts 26 and wall penetration sleeves 25 formed in a horizontal direction on the inner circumferential surface of the exponential groove corresponding to the exponential protrusions and forming one or more pairs of flanges at upper left and right sides;
In order to adjust the position of the water pipe to be connected to the toilet, the drainage water, and the bathtub, a portion to be connected with the pipe pipe 21 is formed in a closed structure, and the upper side of the portion, which is coupled with the elbow pipe and the PVC pipe, A partially open type pipe connecting socket 23 having a protective cover 231 opened to open;
Further comprising a landfill housing (22) for an elbow having a hollow interior formed therein for receiving an elbow of a toilet, a toilet, a tub, and a housing cover (221) openable on the upper side;
And a slip portion connected to the drain pipe, wherein the drain pipe has a sound insulation air layer having a double pipe structure and a sliding index connection portion, and a pipe connection portion and a partially open pipe connection socket.
2. The method according to claim 1, wherein the piping pipe (21), various pipe coupling parts (26), wall through sleeves (25), partially open type pipe connection sockets (23)
And a sound insulation air layer (21a) is provided at an inner center of the thickness as a double pipe structure in order to minimize noise and vibration transmission. The sound insulation air layer and the sound insulation air layer of the double pipe structure and the pipe joint, Including Generation Slap Part Embedded Type O, Drain Pipe Pipe Connection Structure.
3. The pipe joint according to claim 2, wherein the pipe pipe (21), various pipe fitting parts (26) and the partially open type pipe connecting socket (23)
Wherein the slab is formed in a flat shape so that the cross section is circular or incised so as to be easily repaired, and a slab having a sound insulation air layer and a sliding index joint part, a pipe joint part and a partially open pipe connection socket, Partially embedded type o, drain pipe connection structure.
The method of claim 3,
The piping pipe 21, various pipe coupling parts 26, the wall penetration sleeve 25, the partially open type pipe connection socket 23, and the embedding housing 22 for the elbow,
A slab part-embedded type oven including a piping pipe, a pipe joint part and a partially open type pipe connection socket having a sound insulation air layer and a sliding index joint part of a double pipe structure, which are partially or wholly transparent so as to be visually inspected, Piping connection structure.
5. The method of claim 4,
The one or more piping pipes 21, various pipe fittings 26, wall penetration sleeves 25, partially open piping connection sockets 23 and the embedding housing 22 for the elbow may be either entirely or partly manufactured by the manufacturer And the piping assembly is partially assembled and assembled, and the piping assembly is delivered to the site with the piping assembly bonded with the exponential coupling part (29). Generation Slabs with Socket Embedded Oh, Drain Piping Connection Structure.
6. The method according to any one of claims 1 to 5,
Wherein the piping pipe (21) is produced and supplied to a length corresponding to a building finishing deviation in a manufacturing company according to a construction drawing so that the piping pipe (21) can be installed without cutting in the field. Generation slab part embedded type o, drain pipe connection structure including piping pipe, pipe fitting part and partially open type pipe connection socket.
5. The method according to claim 4, wherein the piping pipe (21), the various pipe coupling parts (26), the partially open type pipe connection socket (23), and the embedding housing (22)
In order to prevent sagging and breakage of the pipe when installed in the slab formwork (2), a square pipe (361) having a predetermined length and a fitting hole (362a) are formed by extending a predetermined length to both sides of the square pipe An angle pipe fixing bar 36 composed of a plurality of angular pipe fixing bands 362;
A through hole 37a is formed so as to be slidably coupled along the outer circumference of the pipe pipe 21 and the upper end thereof is extended to the left and right by a predetermined length so as to correspond to the engagement hole 362a of the pipe fixing band 362, And a pipe pipe fixing band (37) formed with a downwardly projecting support bar insertion groove (37b) for inserting a support bar (37c) of a predetermined length into the bottom surface of the support pipe Generation slab part embedded type o, drain pipe connection structure including piping pipe and pipe fitting part and partially open type pipe connection socket.
6. The apparatus of claim 5, wherein the pipe assembly (20)
(362a) of each of the pipe fixing bands (362) and the through holes (362a) of the pipe pipe fixing band (37) in order to form a gradient according to a standard specification applied to the field for the flow gradient of the pipe assembly And a plurality of slant supports (33) having different heights from each other, the slant supports (33a) being inserted between the slant supporting portions (37a). Including Generation Slap Part Embedded Type O, Drain Pipe Pipe Connection Structure.
5. The apparatus of claim 4, wherein the wall penetration sleeve (25) and the embedding housing (22)
A second exponential protrusion 291 formed in a vertical direction so as to surround the outer circumferential surface in addition to the exponential protrusions 291 in the vertical and horizontal directions on the outer circumferential surface in order to prevent leakage in the vertical direction as well as in the left- And a slip portion connecting the piping pipe with the sliding index connecting portion and the pipe connecting fitting and the partially open type pipe connecting socket.
5. The partially open type pipe connection socket (23) according to claim 4,
The waterproof plug 232 is inserted into the sliding pocket connection port 50 and can be easily attached and detached by using the compression o-ring and the tightening member, so that the elbow or bathtub side elbow after the piping installation or the tub- ) Of a double slit structure including a piping pipe having a sliding index joint portion and a pipe joint portion and a partially open type pipe connection socket, characterized by being capable of easily inspecting and separating the water pressure by filling the inside with water Oh, drain pipe connection structure.
The quantity of the piping pipe 21, the various pipe coupling parts 26, the wall penetration sleeve 25, the embedding housing 22 for the elbow, and the partly open type pipe connection socket 23 is determined according to the construction drawing, Step SlOO;
A pipe pipe 21 for forming a soundproof air layer 21a for preventing noise and vibration transmission of the double pipe structure at the inner center portion of the thickness and forming a plurality of sliding expansions 291 on the outer peripheral surface thereof, A plurality of sliding grooves 292 corresponding to the plurality of exponential protrusions 291 are formed on the inner circumferential surface and one or more flange portions 222 are formed on the upper left and right sides A plurality of pipe connecting members 26 and a wall penetrating sleeve 25 are formed on the inner side of the pipe connecting member 26, , A hollow open-type pipe connection socket (23) having a soundproofing air layer (21a) on the inside of the thickness and a hollow inside to accommodate the elbows of the toilet, the washstand and the bathtub, (S110) of fabricating an embedding housing (22) for an elbow having a possible housing lid (221);
(S130) transferring the manufactured pipe pipe and parts to the site;
A step (S140) of installing a pipe fixing stand (30) protruding from the upper surface of the slab formwork (2) to separate and fix the piping while being connected to various piping pipes and connecting parts in the formwork according to the construction drawing;
A step (S150) of assembling each pipe pipe fixing bar 36 by connecting a plurality of pipe pipe fixing bands 362 to each pipe 361;
The piping pipe 21, the various pipe coupling parts 26 and the wall penetration sleeve 25, the embedding housing 22 for the elbow, and the partially open type pipe connection socket 23 according to the construction drawings are provided with the sliding index protrusions 291 And an index joint 29 including an index groove 292. By inserting a required number of pipe pipe fixing bands 37 into the outer circumferential surface while bonding them to the exponential joining portion 29 by bonding, (S160);
A pipe fixing band 37 previously coupled to the pipe assembly 20 and each pipe fixing band 362 of each pipe pipe fixing bar 36 manufactured in advance are fixed by fixing means, (S170) of inserting another gradient pedestal (33) to form a gradient in the pipe assembly (20);
And the water inlet connector is fitted to the wall through sleeve 25 after the water inlet connector 28 is fitted to the installation position of the pipe fixing block 30 and the straight pipe landing housing 27 connected between the water inlet connector and the water inlet connector is adjusted according to the finishing deviation, And engaging the housing cover 221 (S180);
A step (S190) of installing a support rod (37c) in the support rod insertion groove (37b) of the pipe pipe fixing band (37) so as to have a height corresponding to each drain port;
A step S200 of fixing the piping pipe 21, the various pipe coupling parts 26, the wall through sleeves 25 and the embedding housing 22 for the elbow by tightening the fastening bolts 32 of the pipe fixing table 30, Wow;
A step (S210) of placing and curing the slab concrete by pouring and curing;
Disassembling the slab formwork (S220);
A step (S230) of unscrewing the pipe pipe fixing bars 36 from the pipe assembly 20 by unscrewing the nuts which are fastening means of the pipe pipe fixing bars 36;
The open cover 231 of the open-ended pipe connection socket 23, the housing cover 221 of the straight tube buried housing 27 and the sextia, the water inlet connector embedding housing 28, Step S240;
(S250) screwing the sliding pocket connection port (50) after inserting the rubber packing into the partially open type pipe connection socket (23), the sextia, the wall penetration sleeve (25) of the water inlet connector housing housing (28) side;
After the PVC pipe 233 is bonded to the elbow 234, the elbow 234 is inserted into the sliding pocket connection port 50 coupled to the partially open type pipe connection socket 23 and pulled out to align the elbow installation position. Using the O-ring and the tightening member (S260);
Confirm the abnormality through a pipe assembly made of a transparent material, and then, by pressing the compression o-ring and the tightening member of the sliding pocket connection port (50), insert a hydraulic cylinder, tighten the compression o-ring and tightening member, A step (S270) of removing the filled water in the pipe after the inspection and coupling the protective cover 231;
When the leakage occurs, the upper surface of the relevant part is cut, the gap is filled with adhesive, the damaged part is sanded with sand paper to remove the foreign substance, the damaged part is arranged, the upper part is opened and the overflow pipe which is closely attached to the inner surface of the pipe is attached with the adhesive, A step (S280) of bonding and repairing the larger damper plate 38 with a fixing means after applying silicone;
A step (S300) of opening the housing cover (221) of the sextier, water inlet connector housing (28) to install the granular pipe (3) and the sextia and water connector (60);
Removing the hydraulic plug of the sliding pocket connection port 50 connected to the wall penetration sleeve 25 and connecting the PVC pipe to connect the third and fourth drain pipe;
(S320) connecting the sliding pocket connecting port (50) to the upper granulating pipe connecting side of the water tank connector (60) and installing the granulating pipe;
A toilet partition wall is built up (S330) and an elbow 234 is installed (S340);
When the position is corrected by the construction finish deviation, the compression o-ring and the fastening member of the sliding pocket connection port 50 are released and the PVC pipe 233 bonded with the elbow 234 is inserted / extracted, and then the compression o- A step (S360) of finishing pipe modification by tightening the member;
Waterproofing the upper surface of the cured slab concrete 1 and the partition wall (S370);
A bathtub is installed (S400) and a wall tile is constructed (S410);
Pouring and curing foam concrete (S420);
(S450), the floor heating system is installed (S430), the heating coil pipe water pressure is inspected (S440), the bathroom floor is graded with mortar, the floor tile construction is performed (S450), and the toilet,
A piping pipe having a sound insulation air layer of a double pipe structure and a sliding index joint part which is constructed by embedding the drainage pipe of the main layer in the main floor and various piping as an assembly to facilitate construction in the field, A method of construction using a piping connection structure and a generation slab part embedded type o, drain pipe connection structure including a partial open type pipe connection socket.
12. The method of claim 11,
A pipe fixing band 37 previously coupled to the pipe assembly 20 and each pipe fixing band 362 of each pipe pipe fixing bar 36 manufactured in advance are fixed by fixing means, (S170) of inserting another gradient support (33) to form a gradient in the pipe assembly (20)
The fitting position of the embedding housing 22 for the elbow is adjusted and the flange portion 222 is hooked on the pipe pipe fixing bar 36 to fix the gradient height with the gradient holder 33 and fixed with the pipe fixing band 362 (S171);
An adhesive agent is applied to the exponential protrusion 291 of the embedding housing 22 for the elbow and the exponential groove 292 of the partially open type pipe connection socket 23 and is slidingly engaged with the installation position of the pipe fixing table 30, And fixing the partial open type pipe connection socket 23 to the pipe fixture 30 with the pipe fixation band 362 while fitting the partial open pipe connection socket 23 to the pipe pipe fixture 30 and adjusting the gradient height to the gradient fixture 33 S172);
An adhesive is applied to the exponent groove 292 of the partially open type pipe connection socket 23 and the exponential protrusion 291 of the pipe pipe 21 and is slidingly engaged with the exponent protrusion 291 of the pipe pipe 21, An adhesive is applied to the index groove 292 of the fitting 26 and the flange portion 222 of the pipe coupling fitting is slidably engaged with the pipe pipe fixing bar 36 and the gradient height is adjusted by the gradient plate 33, (S173) fixing the pipe fixing band 30 to the installation position with the pipe fixing band 362;
After the wall penetration sleeve 25 is aligned with the pipe fixing table 30 at the installation position, the exponential protrusion 291 of the wall through sleeve 25 and the other exponential groove 292 of the pipe coupling member 26 are coated with an adhesive (Step S174) of fitting the flange part 222 of the wall through sleeve to the pipe pipe fixing bar 36 and fixing the pipe pipe fixing bar 36 to the piping fixing band 30 by aligning the height of the pipe with the gradient pipe );
And a slip partially embedded type o- and drain pipe connection structure including a pipe joint pipe having a sound insulation air layer of a double pipe structure and a sliding index joint, a pipe joint part and a partially open pipe connection socket.
12. The method of claim 11,
Between the upper surface of the cured slab concrete 1 and the step of waterproofing the partition wall (S370) and the bathtub installation (S400)
(S380) of bonding the elbow toward the bottom surface from the inside of the sixth trunk body (241) to the bottom surface of the body side fitting socket portion (24a) after the disassembly of the protective cover of the drainage main body (241) Wow;
A step (S390) of installing and maintaining a drainage upper end finishing section (244) after adjusting the height of the toilet floor finishing height by using an extension member (243) coupled to the inside of the upper part of the drainage main body (241);
The method of claim 1, further comprising the steps of: (a) forming a slab partially-embedded type o / drain piping connection structure including a piping pipe having a sound insulation air layer and a sliding index joint portion, and a partially open type pipe connection socket.
KR1020140000632A 2014-01-03 2014-01-03 Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby KR101537035B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140000632A KR101537035B1 (en) 2014-01-03 2014-01-03 Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140000632A KR101537035B1 (en) 2014-01-03 2014-01-03 Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby

Publications (2)

Publication Number Publication Date
KR20150081381A true KR20150081381A (en) 2015-07-14
KR101537035B1 KR101537035B1 (en) 2015-07-16

Family

ID=53793123

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140000632A KR101537035B1 (en) 2014-01-03 2014-01-03 Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby

Country Status (1)

Country Link
KR (1) KR101537035B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301466A (en) * 2018-03-29 2018-07-20 广东省建工设计院有限公司 Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
CN115162664A (en) * 2022-07-25 2022-10-11 金螳螂精装科技(苏州)有限公司 Modular sinking type toilet design structure
WO2024082574A1 (en) * 2022-10-19 2024-04-25 中建科工集团有限公司 Pre-embed device for electromechanical pipeline support hanger

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002256602A (en) * 2001-02-28 2002-09-11 Takiron Co Ltd Underfloor drain pipe line, supporter for drain pipe line and drainage basin
KR101185556B1 (en) * 2007-04-24 2012-09-25 삼성전자주식회사 Pipe connecting socket and air conditioner having the same
KR101081970B1 (en) * 2009-02-16 2011-11-09 현대산업개발 주식회사 Construction method for On-floor drainage piping system of bathroom in multistory building
KR101399294B1 (en) * 2011-12-09 2014-05-27 주식회사 미래산업 The sleeve for a building dry-wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301466A (en) * 2018-03-29 2018-07-20 广东省建工设计院有限公司 Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
CN108301466B (en) * 2018-03-29 2023-09-12 广东省建工设计院有限公司 Integral prefabricated bathroom caisson, bathroom caisson structure and construction method thereof
CN115162664A (en) * 2022-07-25 2022-10-11 金螳螂精装科技(苏州)有限公司 Modular sinking type toilet design structure
WO2024082574A1 (en) * 2022-10-19 2024-04-25 中建科工集团有限公司 Pre-embed device for electromechanical pipeline support hanger

Also Published As

Publication number Publication date
KR101537035B1 (en) 2015-07-16

Similar Documents

Publication Publication Date Title
CN104358305B (en) A kind of cyclone, water drainage riser connecting piece of caisson type washroom
KR101485797B1 (en) Improved Connecting Structure of Wastewater and drainwater Vertical Pipes and Constructing Method thereby
KR101537035B1 (en) Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby
CN108301466B (en) Integral prefabricated bathroom caisson, bathroom caisson structure and construction method thereof
KR200417925Y1 (en) piping inspect of a wall reclamation style
CN103410318B (en) Washroom pipe well water-leakage construction method
JP5702633B2 (en) Renovation structure of drainage standpipe for multi-layer building and drainage standpipe repair method for multistory building
KR101716876B1 (en) prefabricated Bathroom Floor Board
KR101566229B1 (en) Manufacturing equipment for Manhole using various connecting pipe, manufacturing method for the same and connecting method for the manhole with a connecting pipe
KR101496881B1 (en) Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes and Constructing Method thereby
KR20160028809A (en) prefabricated Bathroom Floor Board
KR20080017112A (en) Korea ko total toilet sleeve system (kkttss)
RU2645315C1 (en) Engineering module and method of its installation
US20200214507A1 (en) Bathtub Installation Aide
KR101545438B1 (en) Installing drainage pipe structure of building
KR100732938B1 (en) That inspect piping of wall reclamation styleand form of construction work of double pipe
CN107419780B (en) Connecting structure and method between non-pressure pipes on upper floor and lower floor of module
JP4327026B2 (en) Repair method and equipment for concrete
KR100732939B1 (en) That inspect piping of wall reclamation styleand form of construction work of double pipe
KR100780797B1 (en) That inspect piping of wall reclamation styleand form of double pipe
KR101458519B1 (en) Device For Connecting Double Drainpipe Embedded On Slab
KR200424768Y1 (en) The connected socket of the double drain pipe with transfer a fluid
KR20080076279A (en) Box buried in wall having temporary fix member and pipe jointing method using the same
KR200352175Y1 (en) Low noise drainage plumbing in bathroom
KR101050191B1 (en) How to install the faucet

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180709

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190708

Year of fee payment: 5