CN109403506A - The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate - Google Patents
The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate Download PDFInfo
- Publication number
- CN109403506A CN109403506A CN201811513808.4A CN201811513808A CN109403506A CN 109403506 A CN109403506 A CN 109403506A CN 201811513808 A CN201811513808 A CN 201811513808A CN 109403506 A CN109403506 A CN 109403506A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- shear wall
- sleeve
- overlapped shear
- wall plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 22
- 238000012423 maintenance Methods 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 46
- 239000010959 steel Substances 0.000 claims description 46
- 230000002787 reinforcement Effects 0.000 claims description 42
- 210000003205 muscle Anatomy 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims 1
- 239000000463 material Substances 0.000 abstract description 9
- 238000010276 construction Methods 0.000 abstract description 8
- 239000002699 waste material Substances 0.000 abstract description 6
- 238000000605 extraction Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 description 4
- 229920001155 polypropylene Polymers 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/04—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
- E04C2/06—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres reinforced
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/52—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
- E04C2/521—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits serving for locating conduits; for ventilating, heating or cooling
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
The present invention provides a kind of overlapped shear wall plate, overlapped shear wall and overlapped shear wall board fabrication method, is related to construction engineering technical field, and overlapped shear wall plate includes the first wallboard, the second wallboard and first sleeve;First wallboard and the second wallboard relative spacing are arranged, and the first sleeve is mounted between first wallboard and second wallboard, and the end of the first sleeve passes through first wallboard.Wherein, it being capable of roughing-in in first sleeve, when live roughing-in, by pipeline laying into first sleeve, can be prefabricated in the factory stage reserved first sleeve, avoid opening up tube seat when site operation on overlapped shear wall plate, and saving of work and time, saving material simultaneously reduce building waste pollution, construction efficiency is substantially increased, and the convenience of roughing-in is higher;In addition later period maintenance replacement pipeline does not need to destroy existing shear wall metope yet, directly extraction pipeline.
Description
Technical field
The present invention relates to construction engineering technical fields, have this more particularly, to a kind of overlapped shear wall plate, and one kind
The overlapped shear wall of overlapped shear wall plate and a kind of manufacturing method of overlapped shear wall plate.
Background technique
When traditional architecture is constructed, the installation of feedwater piping usually opens up tube seat by scene on wall on wall, then exists
Feedwater piping is laid in tube seat, is blocked again with packing material after fixed, is finally completed the laying of the feedwater piping on wallboard.
With the fast development of building industrialization, more and more construction walls use prefabrication wallboard, on-site consolidation
The mode of prefabricated panel carries out, pipeline laying tube seat be also prefabricated in the factory wallboard when it is reserved complete, greatly facilitate site operation.
The advantages of overlapped shear wall integrates traditional cast-in-place structural and assembled arthitecutral structure due to it, and component matter
Amount is light, is readily transported, lifts and installs, and is more and more applied in assembled architecture.
But since overlapped shear wall is superposed type (hollow shape), be different from integral prefabricated concrete wall (solid shape),
Overlapped shear wall plate only has 50mm thickness, if opening up tube seat (generally wide 30mm, depth 20mm) again, can reduce the strong of local wall
Degree may cause the problem of cracking in transport and hoisting process, and since its special overturning production method is also uncomfortable
It closes and opens up tube seat in factory, therefore be difficult to default tube seat in overlapped shear wall, lead to the effect of the roughing-in in overlapped shear wall
Rate is lower, convenience is poor.
Summary of the invention
The purpose of the present invention is to provide a kind of overlapped shear wall plates, in the prior art in overlapped shear wall to solve
The technical problem that the efficiency of roughing-in is lower, convenience is poor.
Overlapped shear wall plate provided by the invention, including the first wallboard, the second wallboard and first sleeve;
First wallboard and the second wallboard relative spacing are arranged, and the first sleeve is mounted on first wallboard
Between second wallboard, and the end of the first sleeve passes through first wallboard.
Further, the overlapped shear wall plate further includes steel reinforcement cage;
The both ends of the steel reinforcement cage are fixed with first wallboard and second wallboard respectively;
It is fixed in the middle part of the first sleeve on the steel reinforcement cage, and the end of the first sleeve is cast in described
In one wallboard.
Further, the first sleeve and the steel reinforcement cage weld.
Further, the first sleeve is bundled on the steel reinforcement cage.
Further, the first sleeve includes the first tube body and two the second tube bodies;
Two second tube bodies are connect with the both ends of first tube body respectively, and two second tube bodies respectively with
First tube body is vertically arranged;
First tube body is mounted between first wallboard and second wallboard, two the second tube body difference
Across first wallboard.
Further, first tube body is connect with second tube body by elbow.
The object of the invention is also to provide a kind of overlapped shear walls, including overlapped shear wall plate of the present invention.
The object of the invention is also to provide a kind of overlapped shear wall board fabrication methods, comprising the following steps:
Steel reinforcement cage is arranged on the mold of the first wallboard of production, and will be fixed on steel reinforcement cage in the middle part of first sleeve,
It makes the first wallboard and pours the side of the first wallboard and steel reinforcement cage and be integrated, make the first sleeve being fixed on steel reinforcement cage
End is cast in the first wallboard;
First wallboard is overturn, steel reinforcement cage is made to be located at the lower section of the first wallboard, make the second wallboard and make the second wallboard and
The other end of steel reinforcement cage, which pours, to be integrated.
Further, further comprising the steps of: the first wallboard of maintenance and the second wallboard.
Overlapped shear wall plate provided by the invention, including the first wallboard, the second wallboard and first sleeve;First wallboard
It is arranged with the second wallboard relative spacing, the first sleeve is mounted between first wallboard and second wallboard,
And the end of the first sleeve passes through first wallboard.Wherein, in first sleeve can roughing-in, when scene laying pipe
When road, by pipeline laying into first sleeve, the stage that can be prefabricated in the factory reserves first sleeve, when avoiding site operation
Tube seat is opened up on overlapped shear wall plate, saving of work and time saves material and reduces building waste pollution, substantially increases construction
Efficiency, and the convenience of roughing-in is higher;In addition later period maintenance replacement pipeline does not need to destroy existing shear wall metope yet, directly
Connect extraction pipeline.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is that (feed pipe is laid in furred ceiling for the structural schematic diagram of overlapped shear wall plate provided in an embodiment of the present invention
When);
Fig. 2 is that (feed pipe is laid in bed course for the structural schematic diagram of overlapped shear wall plate provided in an embodiment of the present invention
When).
Icon: 1- first sleeve;The first tube body of 11-;The second tube body of 12-;The first wallboard of 2-;The second wallboard of 3-;
4- steel reinforcement cage;The toilet 5- furred ceiling;6- accomodation ground;The toilet 7- bed course.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation
Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill
Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that such as occur term " center ", "upper", "lower", "left", "right",
"vertical", "horizontal", "inner", "outside" etc., indicated by orientation or positional relationship be orientation based on the figure or position
Relationship is merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must have
There is specific orientation, be constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, as occurred
Term " first ", is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance " second ".Wherein, term
" first position " and " second position " is two different positions.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in invention.
The present invention provides a kind of overlapped shear wall plate, overlapped shear wall and overlapped shear wall board fabrication methods, give below
Multiple embodiments carry out overlapped shear wall plate provided by the invention, overlapped shear wall and overlapped shear wall board fabrication method detailed out
Thin description.
Embodiment 1
Overlapped shear wall plate provided in this embodiment, as shown in Figure 1 to Figure 2, including the first wallboard 2, the second wallboard 3 and
Sleeve 1;First wallboard 2 and 3 relative spacing of the second wallboard are arranged, and first sleeve 1 is mounted on the first wallboard 2 and the second wallboard 3
Between, and the end of first sleeve 1 passes through the first wallboard 2.
Since the end of first sleeve 1 passes through the first wallboard 2, pipeline can be extended into or out by the end of first sleeve 1
First sleeve 1, so that being capable of roughing-in in first sleeve 1.
When live roughing-in, by pipeline laying into first sleeve 1, which can be in factory
The overlapped shear wall plate stage reserves first sleeve 1, solves the difficult point that overlapped shear wall is not easy reserved tube seat, avoids site operation
When open up tube seat on overlapped shear wall plate, saving of work and time saves material and simultaneously reduces building waste pollution, substantially increases and applies
Work efficiency rate, and the convenience of roughing-in is higher;In addition later period maintenance replacement pipeline does not need to destroy existing metope yet, directly takes out
Pipeline out.
Wherein, the both ends of first sleeve 1 can be cast in the first wallboard 2, so that first sleeve 1 is mounted on the first wallboard
2 and second between wallboard 3, and first sleeve 1 can also be fixed on the steel reinforcement cage between the first wallboard 2 and the second wallboard 3.
In the present embodiment, overlapped shear wall plate further includes steel reinforcement cage 4;The both ends of steel reinforcement cage 4 respectively with the first wallboard 2 and
Two wallboards 3 are fixed;The middle part of first sleeve 1 is fixed on steel reinforcement cage 4, and the end of first sleeve 1 is cast in the first wallboard 2
It is interior.
Specifically, the both ends of steel reinforcement cage 4 pour together with the first wallboard 2 and the second wallboard 3 respectively, so that the first wallboard
2, the second wallboard 3 and steel reinforcement cage 4 form the overlapped shear wall plate of hollow shape.
When making overlapped shear wall plate, steel reinforcement cage 4 is arranged on the mold of the first wallboard 2 of production, and by first set
The middle part of pipe 1 is fixed on steel reinforcement cage 4, then starts from the first wallboard 2, pours the first wallboard 2 and the side of steel reinforcement cage 4
It is integrated, and is cast in the end of the first sleeve being fixed on steel reinforcement cage 41 in first wallboard 2, to be formed complete
First wallboard 2;Then the first wallboard 2 is overturn, steel reinforcement cage 4 is made to be located at the lower section of the first wallboard 2, then carry out the second wall of production
Plate 3 pours the other end of the second wallboard 3 and steel reinforcement cage 4 and is integrated, and finally carrying out maintenance to overlapped shear wall plate can be completed
Manufacturing process.
Wherein, it when first sleeve 1 is fixed on steel reinforcement cage 4, can be welded on steel reinforcement cage 4, reinforcing bar can also be bundled in
Any suitable mode such as on cage 4.
First sleeve 1 has at least two ends, such as first sleeve 1 is substantially U-shaped, and there are two ends for the tool of first sleeve 1
Portion, first sleeve 1 is generally t-shaped, and first sleeve 1 then has there are three end.The shape of first sleeve 1 and the quantity of end can
To be arranged according to pipeline laying situation.
In the present embodiment, first sleeve 1 includes the first tube body 11 and two the second tube bodies 12;Two the second tube body 12 difference
It is connect with the both ends of the first tube body 11, and two the second tube bodies 12 are vertically arranged with the first tube body 11 respectively;First tube body 11 is solid
It is scheduled on the first wallboard 2, two the second tube bodies 12 are each passed through the first wallboard 2.
Specifically, the axial direction of two the second tube bodies 12 is axially vertical with the first tube body 11 respectively, and two second pipes
Body 12 is connect with the both ends of the first tube body 11 respectively, to form first sleeve 1.
First tube body 11 is fixed on steel reinforcement cage, and two the second tube bodies 12 are cast in respectively in the first wallboard 2, and two
The end of second tube body 12 passes through the first wallboard 2, and the end of two the second tube bodies 12 can be concordant with the first wallboard 2, can also be with
Protrude from the first wallboard 2.
For the smooth transition for realizing the first tube body 11 and the second tube body 12, the first tube body 11 and the second tube body 12 pass through elbow
Connection, to facilitate scene roughing-in in it.
Overlapped shear wall plate provided in this embodiment, first sleeve 1 can be the steel sleeve of caliber DN40, and elbow uses
45 ° of elbows can lay PP-R feedwater piping in first sleeve 1, be used to assemble the shear wall of toilet in overlapped shear wall plate
When, when feed pipe is laid in furred ceiling, as shown in Figure 1,1 top of first sleeve is reserved at 5 top 150mm of toilet furred ceiling,
H2 is sanitary apparatus water supply interface height, and 1 bottom end of first sleeve is reserved to be arranged referring to sanitary apparatus water supply interface requirement for height;Pipe
The flexible feed pipe of PP-R material etc. that diameter is DN15-DN20 can the laying installation in first sleeve 1, it is convenient and efficient;Feed pipe
When laying in toilet bed course 7, as shown in Fig. 2, 1 top of first sleeve is reserved in 6 top of accomodation ground, h2+h3 is to defend
The thickness of bed course 7 between life, 1 bottom end of first sleeve are reserved in toilet bed course 7;Caliber is the PP-R material of DN15-DN20
Deng flexible feed pipe can the laying installation in first sleeve 1, it is convenient and efficient.
Overlapped shear wall plate provided in this embodiment, in first sleeve 1 can roughing-in, when live roughing-in,
By pipeline laying into first sleeve 1, the stage that can be prefabricated in the factory reserves first sleeve 1, when avoiding site operation
Tube seat is opened up on overlapped shear wall plate, saving of work and time saves material and reduces building waste pollution, substantially increases construction effect
Rate, and the convenience of roughing-in is higher;In addition later period maintenance replacement pipeline does not need the prefabricated existing metope of destruction yet, directly takes out
Pipeline out.
Embodiment 2
Overlapped shear wall provided in this embodiment, the overlapped shear wall plate provided including embodiment 1.Wherein, first sleeve 1
In can roughing-in, when live roughing-in, by pipeline laying into first sleeve 1, can be prefabricated in the factory rank
The reserved first sleeve 1 of section, avoids opening up tube seat when site operation on overlapped shear wall plate, and saving of work and time is saved material and subtracted
Few building waste pollution, substantially increases the construction efficiency of overlapped shear wall, and the convenience of roughing-in is higher;In addition the later period
Maintenance replacement pipeline does not need to destroy existing metope yet, directly extraction pipeline.
Embodiment 3
Overlapped shear wall board fabrication method provided in this embodiment, for manufacturing the overlapped shear wall plate of the offer of embodiment 1
The following steps are included:
Steel reinforcement cage 4 is arranged on the mold of the first wallboard 2 of production, and the middle part of first sleeve 1 is fixed on steel reinforcement cage 4
On, the first wallboard 2 is then started from, the side of the first wallboard 2 and steel reinforcement cage 4 is poured and is integrated, and make to be fixed on steel
The end of first sleeve 1 on muscle cage 4 is cast in the first wallboard 2, to form complete first wallboard 2;Then by first
Wallboard 2 is overturn, and steel reinforcement cage 4 is made to be located at the lower section of the first wallboard 2, is then carried out the second wallboard 3 of production, is made the second wallboard 3 and steel
The other end of muscle cage 4, which pours, to be integrated, and finally carrying out maintenance to overlapped shear wall plate can be completed manufacturing process.
Wherein, it when first sleeve 1 is fixed on steel reinforcement cage 4, can be welded on steel reinforcement cage 4, reinforcing bar can also be bundled in
Any suitable mode such as on cage 4.
Overlapped shear wall board fabrication method provided in this embodiment, the stage that can be prefabricated in the factory reserve first sleeve 1, keep away
Tube seat is opened up when exempting from site operation on overlapped shear wall plate, saving of work and time saves material and reduces building waste pollution, greatly
The construction efficiency of overlapped shear wall is improved greatly, and the convenience of roughing-in is higher;In addition later period maintenance replaces pipeline also not
Need to destroy existing metope, directly extraction pipeline.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (9)
1. a kind of overlapped shear wall plate, which is characterized in that including the first wallboard (2), the second wallboard (3) and first sleeve (1);
First wallboard (2) and the second wallboard (3) relative spacing are arranged, and the first sleeve (1) is mounted on described the
Between one wallboard (2) and second wallboard (3), and the end of the first sleeve (1) passes through first wallboard (2).
2. overlapped shear wall plate according to claim 1, which is characterized in that the overlapped shear wall plate further includes steel reinforcement cage
(4);
The both ends of the steel reinforcement cage (4) are fixed with first wallboard (2) and second wallboard (3) respectively;
It is fixed on the steel reinforcement cage (4) in the middle part of the first sleeve (1), and the end of the first sleeve (1) is cast in
In first wallboard (2).
3. the overlapped shear wall plate according to any one of claim 2, which is characterized in that the first sleeve (1) and institute
State steel reinforcement cage (4) welding.
4. the overlapped shear wall plate according to any one of claim 2, which is characterized in that first sleeve (1) binding
On the steel reinforcement cage (4).
5. overlapped shear wall plate described in any one of -4 according to claim 1, which is characterized in that first sleeve (1) packet
Include the first tube body (11) and two the second tube bodies (12);
Two second tube bodies (12) connect with the both ends of first tube body (11) respectively, and two second tube bodies
(12) it is vertically arranged respectively with first tube body (11);
First tube body (11) is mounted between first wallboard (2) and second wallboard (3), two second pipes
Body (12) is each passed through first wallboard (2).
6. overlapped shear wall plate according to claim 5, which is characterized in that first tube body (11) and second pipe
Body (12) is connected by elbow.
7. a kind of overlapped shear wall, which is characterized in that including overlapped shear wall plate of any of claims 1-5.
8. a kind of overlapped shear wall board fabrication method, which comprises the following steps:
By steel reinforcement cage (4) setting on the mold of production the first wallboard (2), and reinforcing bar will be fixed in the middle part of first sleeve (1)
On cage (4), makes the first wallboard (2) and pour the side of the first wallboard (2) and steel reinforcement cage (4) to be integrated, make to be fixed on steel
The end of first sleeve (1) on muscle cage (4) is cast in the first wallboard (2);
First wallboard (2) are overturn, steel reinforcement cage (4) is made to be located at the lower section of the first wallboard (2), production the second wallboard (3) simultaneously makes the
The other end of two wallboards (3) and steel reinforcement cage (4), which pours, to be integrated.
9. overlapped shear wall board fabrication method according to claim 8, which is characterized in that further comprising the steps of: maintenance
First wallboard (2) and the second wallboard (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811513808.4A CN109403506A (en) | 2018-12-11 | 2018-12-11 | The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811513808.4A CN109403506A (en) | 2018-12-11 | 2018-12-11 | The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109403506A true CN109403506A (en) | 2019-03-01 |
Family
ID=65458616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811513808.4A Pending CN109403506A (en) | 2018-12-11 | 2018-12-11 | The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109403506A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200417925Y1 (en) * | 2006-03-21 | 2006-06-02 | (주)남호건업 | piping inspect of a wall reclamation style |
KR100732938B1 (en) * | 2006-03-13 | 2007-06-28 | 주식회사 국민에너지 | That inspect piping of wall reclamation styleand form of construction work of double pipe |
US20080092465A1 (en) * | 2006-10-20 | 2008-04-24 | Pip Co., Ltd. | Bricks for pipe laying and construction work using this |
CN101793045A (en) * | 2010-03-31 | 2010-08-04 | 陈康福 | Concealed laying method of water supply pipeline |
CN103672181A (en) * | 2014-01-03 | 2014-03-26 | 永升建设集团有限公司 | Water supply and drainage pipeline sleeve pre-embedding construction method |
CN103993725A (en) * | 2014-03-19 | 2014-08-20 | 潘兴科 | Residential gas and water pipeline supply technology and construction method thereof |
CN206174185U (en) * | 2016-09-21 | 2017-05-17 | 深圳市极尚建筑装饰设计工程有限公司 | Combined type building wall structure of prevention and cure solid borne noise ripples |
US20180038103A1 (en) * | 2010-10-11 | 2018-02-08 | Michael Neumayr | Modular wall system with integrated channels |
CN108867943A (en) * | 2018-09-18 | 2018-11-23 | 三筑工科技有限公司 | Prefabricated sandwich wall and prefabricated sandwich wall production method |
CN108867934A (en) * | 2018-09-18 | 2018-11-23 | 三筑工科技有限公司 | T shape connecting structure of wall and assembled arthitecutral structure system |
CN209620300U (en) * | 2018-12-11 | 2019-11-12 | 三一筑工科技有限公司 | Overlapped shear wall plate and overlapped shear wall |
-
2018
- 2018-12-11 CN CN201811513808.4A patent/CN109403506A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100732938B1 (en) * | 2006-03-13 | 2007-06-28 | 주식회사 국민에너지 | That inspect piping of wall reclamation styleand form of construction work of double pipe |
KR200417925Y1 (en) * | 2006-03-21 | 2006-06-02 | (주)남호건업 | piping inspect of a wall reclamation style |
US20080092465A1 (en) * | 2006-10-20 | 2008-04-24 | Pip Co., Ltd. | Bricks for pipe laying and construction work using this |
CN101793045A (en) * | 2010-03-31 | 2010-08-04 | 陈康福 | Concealed laying method of water supply pipeline |
US20180038103A1 (en) * | 2010-10-11 | 2018-02-08 | Michael Neumayr | Modular wall system with integrated channels |
CN103672181A (en) * | 2014-01-03 | 2014-03-26 | 永升建设集团有限公司 | Water supply and drainage pipeline sleeve pre-embedding construction method |
CN103993725A (en) * | 2014-03-19 | 2014-08-20 | 潘兴科 | Residential gas and water pipeline supply technology and construction method thereof |
CN206174185U (en) * | 2016-09-21 | 2017-05-17 | 深圳市极尚建筑装饰设计工程有限公司 | Combined type building wall structure of prevention and cure solid borne noise ripples |
CN108867943A (en) * | 2018-09-18 | 2018-11-23 | 三筑工科技有限公司 | Prefabricated sandwich wall and prefabricated sandwich wall production method |
CN108867934A (en) * | 2018-09-18 | 2018-11-23 | 三筑工科技有限公司 | T shape connecting structure of wall and assembled arthitecutral structure system |
CN209620300U (en) * | 2018-12-11 | 2019-11-12 | 三一筑工科技有限公司 | Overlapped shear wall plate and overlapped shear wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105839666A (en) | Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof | |
CN108149706A (en) | A kind of cast-in-place hidden girder and the prefabricated assembled pipe gallery and its construction method of superimposed sheet splicing | |
CN109537851A (en) | A kind of method for prefabricating of assembled pipe well | |
CN205742265U (en) | Complete prefabricated overlapping assembled underground pipe gallery and connection node thereof | |
CN105735532A (en) | Method for assembling prefabricated uperimposed slab shear wall structure | |
CN105952060A (en) | Precast beam reinforcement cage component and assembling method thereof | |
CN108086353A (en) | A kind of hollow wallboard spliced with cast-in-place hidden girder mixes prefabricated assembled pipe gallery and its construction method | |
CN113293802A (en) | Construction method of inspection well | |
CN108049318A (en) | Composite entity assembling overlapping box culvert and construction method | |
CN108457208A (en) | Whole assembly overlapping box culvert and construction method | |
CN209620300U (en) | Overlapped shear wall plate and overlapped shear wall | |
CN111305627B (en) | Concrete tank room construction method | |
CN209620299U (en) | Overlapped shear wall plate and overlapped shear wall | |
CN202117320U (en) | Floating-resistant device for inner circle mold of circulation water pipe trench | |
CN207846241U (en) | Whole assembly overlapping box culvert | |
CN209989847U (en) | Shear force wall post-cast strip prefabricated plate closing device | |
CN109403506A (en) | The manufacturing method of overlapped shear wall plate, overlapped shear wall and overlapped shear wall plate | |
CN208039543U (en) | Thread alternating formula monolithic prefabricated panel | |
CN217713886U (en) | Comprehensive utilization platform in ultra-long distance small-diameter tunnel | |
CN109339286A (en) | Overlapped shear wall plate, overlapped shear wall and overlapped shear wall board manufacturing method | |
CN109137984A (en) | Assembled integral mixes prefabricated pipe gallery | |
CN208347370U (en) | A kind of large pool of Fast Installation | |
CN207846242U (en) | Composite entity assembly overlapping box culvert | |
CN113062236A (en) | Wall protection integrated pipe culvert and construction method thereof | |
CN111560980A (en) | 3D printing underground comprehensive pipe gallery manufacturing and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 102200 1st floor, building 6, No.8 Beiqing Road, Huilongguan town, Changping District, Beijing Applicant after: Sany Construction Technology Co.,Ltd. Address before: 410000 Sany industrial city, Sany Road, Changsha Economic and Technological Development Zone, Hunan Province Applicant before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd. |