CN208347370U - A kind of large pool of Fast Installation - Google Patents

A kind of large pool of Fast Installation Download PDF

Info

Publication number
CN208347370U
CN208347370U CN201820782658.6U CN201820782658U CN208347370U CN 208347370 U CN208347370 U CN 208347370U CN 201820782658 U CN201820782658 U CN 201820782658U CN 208347370 U CN208347370 U CN 208347370U
Authority
CN
China
Prior art keywords
pool
pool wall
fast installation
pond
large pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820782658.6U
Other languages
Chinese (zh)
Inventor
任崇峰
李小涛
王继飞
张晓刚
李进军
李茜
高得力
朱俊杰
李成羽
陈小明
姜华
张欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Three Gorges Construction Engineering Co Ltd filed Critical China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority to CN201820782658.6U priority Critical patent/CN208347370U/en
Application granted granted Critical
Publication of CN208347370U publication Critical patent/CN208347370U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of large pool of Fast Installation, the pond includes pool wall, pond baseboard, the pool wall includes multiple ripple type metal plates, carries out overlap joint by double anchor bolt between each ripple type metal plate and is fixed into cylindrical sidewalls, is arranged inside and outside barrier rubber band in overlap joint coincidence part;The pond baseboard is armoured concrete slab, and pond baseboard and pool wall pour integrally.A kind of large pool of Fast Installation of the utility model, portable construction, installation, disassembly are quick, securely and reliably, low in cost.

Description

A kind of large pool of Fast Installation
Technical field
The utility model relates to pond, especially a kind of large pool of Fast Installation.
Background technique
Currently, generally use rubber bucket quickly to solve production, domestic water needed for engineering construction, but its capacity compared with It is small, it is difficult to meet production water supply requirement, multiple buckets is needed to use parallel, and generally require and set up bent-frame bracing and fix, cause Pond arranges that difficulty is big, and risk is larger, and management cost is high;And large-scale head-tank then uses armored concrete leakage preventing structure, Concrete impervious higher ranked, construction process requirement is stringent, at high cost, and the construction period is long.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of large pools of Fast Installation, solve large-scale water The difficulty that pond rapid shaping comes into operation, portable construction, installation, disassembly are quick, securely and reliably, low in cost, and can facilitate Dismounting transfer is carried out, is particularly suitable for installing and using in backwoodsman large water conservancy hydroelectric engineering construction site
In order to solve the above technical problems, the technical scheme adopted by the utility model is:
A kind of large pool of Fast Installation, including pool wall, pond baseboard, the pool wall are assembled by multi-disc steel plate It forms, the pond baseboard is armoured concrete slab, and the hardened conjunction of the steel of pond baseboard and pool wall bottom pours integral.
The pool wall overall structure is cylindrical, is conducive to the circumferential whole stability under loading of pool wall ripple type metal plate.
The pool wall is assembled by multi-disc steel material ripple template.Ripple template is relative to general smooth plate face pond Wall can bear bigger water lateral pressure and indeformable.
Overlap joint is carried out by double anchor bolt between the steel material ripple template and is fixed into cylindrical sidewalls.By double Anchor bolt splicing is arranged, it is easy to operate relative to welding manner, environmentally friendly, repetition benefit can be repeatedly mounted and dismounted convenient for pool wall With.
Barrier rubber band is arranged in overlap joint coincidence part between the steel material ripple template, and this composite structure plays very Good antiseepage effect.
The pond baseboard bottom is provided with blow-down pipe, and when easy access empties the water in pond.
The utility model provides a kind of large pool of Fast Installation, by using the basin side wall of ripple type steel, energy It bears compared with flood lateral pressure, and by reserving double anchor bolt hole at adjacent ripple type metal plate wave crest, trough, uses Mutually overlapped that mode is connected with each other, and barrier rubber band is arranged in lap-joint, in this way can Fast Installation molding, and have preferably Antiseepage function, and the basin side wall of ripple type steel can be then connected as by concreting with reinforced concrete floor it is whole Body, since the production of ripple type metal plate is got up, precision is high and simple and quick, and for relatively complete concrete structure, construction technology is wanted Ask relatively low, the construction period is short, and construction and maintenance cost are low, and safety is preferable, and pool wall can be according to project situation needs Disassembly is reused, flexible to operation, further increases stock utilization, reduces engineering cost.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the front view of the utility model.
Fig. 2 is the top view of the utility model.
Fig. 3 is the side view of pool wall in the utility model.
Fig. 4 is the partial enlarged view in Fig. 3 at A.
Fig. 5 is pool wall connection schematic diagram in the utility model.
Fig. 6 is that pool wall connects enlarged drawing in the utility model.
In figure: pool wall 1, anchor bolt 2, barrier rubber band 3, pond baseboard 4, blow-down pipe 5, pool wall evagination ripple Line 6, pool wall indent wave molding 7 overlap coincidence part 8, pool wall bottom cripple 9.
Specific embodiment
As shown in Figs. 1-5, a kind of large pool of Fast Installation, including pool wall 1, pond baseboard 4, the pool wall 1 Including multiple steel material ripple templates, each steel material ripple template longitudinal section be corrugated, and cross section be it is arc-shaped, it is each It partially overlaps between steel material ripple template, overlap joint is carried out by double anchor bolt 2 and is fixed into cylindrical sidewalls, in overlap joint weight Conjunction portion is arranged inside and outside barrier rubber band 3;The pond baseboard 4 is armoured concrete slab, and pond baseboard 4 is poured with pool wall 1 and built up One.In addition blow-down pipe 5 is reserved in pond baseboard 4, is facilitated and is drained into using.
A kind of large pool construction method, implementation steps are as follows:
1) it, is needed according to production, plans large pool capacity, determine pool diameter, and it is true to measure setting-out at the scene Determine pond installation site.
2) every piece of splice plate of ripple type steel pool wall, is uniformly processed in processing factory by radian, and in every piece of splice plate Edge bores double anchor bolt hole, and anchor bolt 2 connects every piece of splice plate when for subsequent pond assembly.This example pond capacity is 460m3, pool diameter are about 15 meters, and monolithic ripple type steel pool wall splice plate is about 1 meter wide, about 3 meters high.
3) concrete basin bottom plate 4 is built in, row pond baseboard concrete construction on smooth place.Water is carried out first 4 reinforcement construction of bottom of pond plate, 5 accommodation space of blow-down pipe is reserved in reinforcing bar process of binding, and the installation of blow-down pipe 5 passes through 4 steel of pond baseboard Muscle is fixed, and blow-down pipe 5 extends radially to outside pond along pond baseboard;
4), pool edge binds 1 reinforcement foundation of pool wall, and bottom plate vertical reinforcement bends horizontal extension in 90 °, is formed reserved Ripple type metal plate resettlement groove plays the role of ripple type metal plate and simply erects platform.
5), 90 degree of cripple's structures 9 are processed into ripple type metal plate bottom, will be processed by the method for crane and human assistance Molding each ripple type metal plate is erected to be reserved in resettlement groove in pool wall reinforcement foundation, 90 degree of cripple's structures of ripple type metal plate Lower part extends among baseplate reinforcing bar layer, can effectively reinforce being fixedly connected for pool wall and underplate concrete structure, play simultaneously Sealing effect.
6) simple bidirectional steel pipe Auxiliary support, fixed each ripple type gold, are used during each ripple type metal plate erects Belong to plate, avoids being made its positional shift by strong wind or other disturbances.
7), every two panels ripple type metal plate is overlapped according to reserved anchor bolt hole, using each ripple of artificial intense adjustment Type metal plate lap position, and barrier rubber band 3 is installed in lap-joint;Barrier rubber band 3 is clipped in every 2 ripple types in lap-joint Between metal plate, using anchor bolt 2 by the preformed hole anchor connection on ripple type metal plate, ring tank wall 1 is formed.? When overlap joint installation ripple type metal plate, reserves last block and form door opening as underplate concrete pouring construction personnel disengaging pond Channel.
8) it, by the impervious rank of design requirement and match ratio mixing water-tight concrete, is poured by the way of pump concrete Pond baseboard 4 and pool wall basis are built, manually is finely vibrated when concreting using the progress of hose vibrating spear, avoids touching water Pool wall, pool wall bottom cripple's structure are sealedly and fixedly connected with underplate concrete, play the role of efficient water seepage prevention.And the bottom of at Board concrete installs last block ripple type metal plate when pouring completion, form ring seal pool wall 1.
9), pond baseboard 4 is poured be installed with pool wall after, carry out filling water test, leak hunting test and deformation monitoring close It comes into operation after lattice.

Claims (6)

1. a kind of large pool of Fast Installation, including pool wall (1), pond baseboard (4), it is characterised in that: the pool wall (1) assembled by multi-disc steel plate, the pond baseboard (4) is armoured concrete slab, pond baseboard (4) and pool wall (1) The hardened conjunction of the steel of bottom pours integral.
2. a kind of large pool of Fast Installation according to claim 1, it is characterised in that: the pool wall (1) is whole Structure is cylindrical.
3. a kind of large pool of Fast Installation according to claim 1, it is characterised in that: the pool wall (1) is by more Piece steel material ripple template is assembled.
4. a kind of large pool of Fast Installation according to claim 3, it is characterised in that: the steel material ripple template Between by double anchor bolt (2) carry out overlap joint be fixed into cylindrical sidewalls.
5. a kind of large pool of Fast Installation according to claim 4, it is characterised in that: the steel material ripple template Between overlap joint coincidence part be arranged barrier rubber band (3).
6. a kind of large pool of Fast Installation according to claim 1, it is characterised in that: pond baseboard (4) bottom Portion is provided with blow-down pipe (5).
CN201820782658.6U 2018-05-24 2018-05-24 A kind of large pool of Fast Installation Active CN208347370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820782658.6U CN208347370U (en) 2018-05-24 2018-05-24 A kind of large pool of Fast Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820782658.6U CN208347370U (en) 2018-05-24 2018-05-24 A kind of large pool of Fast Installation

Publications (1)

Publication Number Publication Date
CN208347370U true CN208347370U (en) 2019-01-08

Family

ID=64890847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820782658.6U Active CN208347370U (en) 2018-05-24 2018-05-24 A kind of large pool of Fast Installation

Country Status (1)

Country Link
CN (1) CN208347370U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560958A (en) * 2018-05-24 2018-09-21 中国葛洲坝集团三峡建设工程有限公司 A kind of large pool and construction method of Fast Installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560958A (en) * 2018-05-24 2018-09-21 中国葛洲坝集团三峡建设工程有限公司 A kind of large pool and construction method of Fast Installation

Similar Documents

Publication Publication Date Title
CN101832049B (en) Concrete-structured conjoined cylindrical shell construction device and method therefor
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN206189455U (en) Piping lane
CN205742265U (en) Complete prefabricated overlapping assembled underground pipe gallery and connection node thereof
CN107642252B (en) Old building free removal is double to increase rebuilding construction technique
CN204899204U (en) Mouthful structure concrete structure's of department a template system fetches earth among reverse construction method
CN104131704A (en) Steel pipe column concrete lateral pouring method and steel pipe column structure used in method
CN208347370U (en) A kind of large pool of Fast Installation
CN105019645B (en) Fetch earth in contrary sequence method and the template system and construction method of xoncrete structure are built at mouth
CN111305627B (en) Concrete tank room construction method
CN108560958A (en) A kind of large pool and construction method of Fast Installation
CN210013708U (en) Corrugated steel plate connecting structure for reinforcing inner wall of existing tunnel
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN209082558U (en) A kind of overlapping fabricated construction pipe gallery
CN205557538U (en) Assembled underground structure system based on prefabricated component
CN214464166U (en) Deep underground tunnel ventilation shaft supporting construction
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN206189968U (en) Prefabricated assembled underground granary of inside lining plastics echelonment
CN212582739U (en) Prefabricated grout of concrete seals assembled inspection shaft
CN209620300U (en) Overlapped shear wall plate and overlapped shear wall
CN210127630U (en) Bathroom stagnant water plastic formwork
CN210163936U (en) Pile culvert integrally-assembled steel bone concrete comprehensive pipe gallery
CN211948320U (en) Structure of steel pipe square and round transition section
CN204238244U (en) Deep foundation pit construction structure
CN220113574U (en) Prefabricated mould structure of building block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant