KR100692492B1 - 적층관 제조 장치 - Google Patents
적층관 제조 장치 Download PDFInfo
- Publication number
- KR100692492B1 KR100692492B1 KR1020060014523A KR20060014523A KR100692492B1 KR 100692492 B1 KR100692492 B1 KR 100692492B1 KR 1020060014523 A KR1020060014523 A KR 1020060014523A KR 20060014523 A KR20060014523 A KR 20060014523A KR 100692492 B1 KR100692492 B1 KR 100692492B1
- Authority
- KR
- South Korea
- Prior art keywords
- layer
- delete delete
- winder
- extruder
- wound
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L9/00—Rigid pipes
- F16L9/16—Rigid pipes wound from sheets or strips, with or without reinforcement
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Extrusion Moulding Of Plastics Or The Like (AREA)
Abstract
Description
또한 본 발명은, 중간층의 소재를 압출 방식이 아닌, 롤러를 이용한 인출 방식으로 구성하여, 중간층의 소재인 재활용 소재를 보다 원활하게 공급함과 아울러, 소재의 용융 상태 및 두께 조절이 가능한 적층관 제조 장치를 제공하는 데 또 다른 목적이 있다.
다음, 상기한 과제를 실현하기 위한 본 발명에 따른 적층관은, 상기 적층관 제조 장치를 이용하여 제작되는 적층관으로서, 적층관의 내층을 형성하는 일부분 또는 외층을 형성하는 일부분이 중간층을 형성하는 권회 부분 사이에 끼워진 구조로 형성된 것을 특징으로 한다.
여기서 상기 중간층은 관의 길이 방향에 대하여 경사진 방향으로 겹치게 권회시켜, 상기 내층 및 외층의 두께보다 상대적으로 두껍게 형성된 것을 특징으로 한다.
또한 본 발명은, 복수의 롤러를 이용한 인출 방식으로 중간층 소재를 공급하기 때문에 중간층의 소재인 재활용 소재를 보다 원활하게 공급할 수 있고, 또 소재의 용융 상태 및 두께 조절이 가능하여 적층관의 제조가 보다 용이해지는 이점도 있다.
Claims (10)
- 원통 구조를 갖는 와인더(60) 및 이를 회전 구동시키는 구동 수단(63)과, 상기 와인더(60)에 적층관(50)의 내층(51) 및 외층(53)을 형성하기 위해 수지재를 띠 형상으로 압출하는 내층 압출기(71) 및 외층 압출기(73)와, 상기 적층관(50)의 내층(51) 및 외층(53)의 소재와는 다른 폐플라스틱 파지원료를 이용한 재활용재로 중간층(52)을 형성하기 위해 용융 상태의 띠를 인출하는 중간 투입기(72)와, 상기 와인더(60)의 측면에 위치되어 상기 와인더(60)에 다층 구조로 적층된 띠를 눌러서 압착시키는 압착 롤러(65)를 포함하여 구성되되;상기 중간 투입기(72)는 용융 상태의 물질이 저장되는 투입통(72A)과, 상기 투입통(72A)의 하부에 위치되어 구동 수단(72C)에 의해 회전 구동되면서 용융 상태의 물질을 인출하는 동시에 그 내부에 냉각수가 통과할 수 있도록 이루어진 한 쌍의 인출 롤러(72B)와, 상기 한 쌍의 인출 롤러(72B) 사이의 간격을 조절하는 간격 조절 장치(85)로 구성되고,상기 내층 압출기(71), 외층 압출기(73), 중간 투입기(72)는 어느 하나의 층의 일부분이 그 내측에 형성되는 층 또는 그 외측에 형성되는 층과 겹쳐진 상태로 권회될 수 있도록 배치되어 구성된 것을 특징으로 하는 적층관 제조 장치.
- 삭제
- 삭제
- 삭제
- 삭제
- 삭제
- 삭제
- 삭제
- 삭제
- 삭제
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060014523A KR100692492B1 (ko) | 2006-02-15 | 2006-02-15 | 적층관 제조 장치 |
CN2007800000955A CN101310136B (zh) | 2006-02-15 | 2007-02-15 | 积层管制造装置及其方法 |
AU2007215670A AU2007215670B2 (en) | 2006-02-15 | 2007-02-15 | Apparatus and method for manufacturing pipe with multi-layer wall |
MYPI20082949A MY148015A (en) | 2006-02-15 | 2007-02-15 | Apparatus and method for manufacturing pipe with multilayer wall |
PCT/KR2007/000824 WO2007094629A1 (en) | 2006-02-15 | 2007-02-15 | Apparatus and method for manufacturing pipe with multi-layer wall |
JP2008555158A JP4912415B2 (ja) | 2006-02-15 | 2007-02-15 | 積層管製造装置及びその方法 |
NZ571074A NZ571074A (en) | 2006-02-15 | 2007-02-15 | Apparatus for manufacturing a pipe with multiple layers including a middle layer of fused resin which has adjustable thickness |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060014523A KR100692492B1 (ko) | 2006-02-15 | 2006-02-15 | 적층관 제조 장치 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020060004257U Division KR200416519Y1 (ko) | 2006-02-15 | 2006-02-15 | 적층관 및 그것의 제조 장치 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100692492B1 true KR100692492B1 (ko) | 2007-03-13 |
Family
ID=38103033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060014523A KR100692492B1 (ko) | 2006-02-15 | 2006-02-15 | 적층관 제조 장치 |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR100692492B1 (ko) |
CN (1) | CN101310136B (ko) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101634277B1 (ko) * | 2015-01-14 | 2016-06-30 | 그린폴리텍(주) | 충진벽관,그 제조방법 및 장치 |
KR102229406B1 (ko) | 2020-10-08 | 2021-03-18 | 문영진 | 압출 성형관을 이용한 관 제조장치 및 방법 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102848589A (zh) * | 2011-06-29 | 2013-01-02 | 努里技术有限公司 | 合成树脂管成型装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10160231A (ja) * | 1996-11-29 | 1998-06-19 | Kuraray Plast Kk | 送吸気用ダクト |
KR20000039281A (ko) * | 1998-12-12 | 2000-07-05 | 김선홍 | 삼중관과 삼중관 제조장치 및 그 방법 |
KR20020014606A (ko) * | 2000-08-18 | 2002-02-25 | 김선홍 | 삼중관과 그 제조방법 |
US20040196755A1 (en) * | 2003-04-07 | 2004-10-07 | Yuh Cheng | Method and related apparatus for deriving a tracking error signal |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4196755A (en) * | 1977-09-19 | 1980-04-08 | Automation Industries, Inc. | Reinforced flexible duct with integral molded liner |
CN1234761A (zh) * | 1997-07-18 | 1999-11-10 | 师桥洋 | 塑料材料等的成形方法及其装置 |
KR20030029177A (ko) * | 2001-10-05 | 2003-04-14 | 김진호 | 농업용 다중호스 및 그 제조장치 |
-
2006
- 2006-02-15 KR KR1020060014523A patent/KR100692492B1/ko active IP Right Grant
-
2007
- 2007-02-15 CN CN2007800000955A patent/CN101310136B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10160231A (ja) * | 1996-11-29 | 1998-06-19 | Kuraray Plast Kk | 送吸気用ダクト |
KR20000039281A (ko) * | 1998-12-12 | 2000-07-05 | 김선홍 | 삼중관과 삼중관 제조장치 및 그 방법 |
KR20020014606A (ko) * | 2000-08-18 | 2002-02-25 | 김선홍 | 삼중관과 그 제조방법 |
US20040196755A1 (en) * | 2003-04-07 | 2004-10-07 | Yuh Cheng | Method and related apparatus for deriving a tracking error signal |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101634277B1 (ko) * | 2015-01-14 | 2016-06-30 | 그린폴리텍(주) | 충진벽관,그 제조방법 및 장치 |
KR102229406B1 (ko) | 2020-10-08 | 2021-03-18 | 문영진 | 압출 성형관을 이용한 관 제조장치 및 방법 |
Also Published As
Publication number | Publication date |
---|---|
CN101310136A (zh) | 2008-11-19 |
CN101310136B (zh) | 2010-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100692492B1 (ko) | 적층관 제조 장치 | |
CN202125676U (zh) | 内肋增强外波纹型塑料缠绕结构壁管材 | |
KR100909006B1 (ko) | 일체화된 코어 및 커버가 있는 페인트 롤러와, 그것의제조방법 및 장치 | |
US20100000674A1 (en) | Process and device for the internal welding of plastic tubes | |
JP4998464B2 (ja) | 複合溶融樹脂の供給方法とその供給装置 | |
JP6666205B2 (ja) | 波付複合管の製造方法 | |
KR20080085921A (ko) | 플라스틱 백의 제조 장치 및 방법 | |
EP2409066A2 (en) | Composite flexible pipe and method of manufacture | |
KR200416519Y1 (ko) | 적층관 및 그것의 제조 장치 | |
JP6236411B2 (ja) | カップ状容器の製造方法 | |
JP4912415B2 (ja) | 積層管製造装置及びその方法 | |
CN102777710A (zh) | 多层钢塑复合带材缠绕输水管及其制造方法和装置,及钢塑复合带材 | |
KR100808470B1 (ko) | 적층관 제조 장치 및 방법 | |
JP6026366B2 (ja) | 補強方法及び補強装置 | |
KR102614732B1 (ko) | 합성수지관 제조 시스템 및 그 합성수지관 | |
JP4928877B2 (ja) | 気泡シート体の製造方法、気泡シート体 | |
KR101851217B1 (ko) | 창호용 단열패널 제조장치 및 이를 이용하는 단열패널 제조방법 | |
JP7101050B2 (ja) | 遮光性ラミネートチューブ用原反、当該原反を使用した胴部並びに容器及び前記胴部の製造方法 | |
KR20060108930A (ko) | 다중관 제조방법 및 장치 | |
KR20120011703A (ko) | 포장 필름 압출 성형용 다이 어셈블리 및 이를 이용한 포장 필름 제조장치 | |
KR20190040461A (ko) | 블록 삽입형 합성수지 이중벽관 제조장치 | |
KR100280017B1 (ko) | 공압출필름의제조장치 | |
KR102522489B1 (ko) | 다층 필름 제조 장치와 이를 이용한 다층 필름의 제조 방법 및 다층 필름 | |
KR20080012429A (ko) | 진공포장용 비닐용기 및 그 제조장치 | |
JP4171903B2 (ja) | 多層樹脂塊 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
AMND | Amendment | ||
E601 | Decision to refuse application | ||
J201 | Request for trial against refusal decision | ||
AMND | Amendment | ||
B701 | Decision to grant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130305 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20140318 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20150303 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20160303 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20170303 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20180305 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20190221 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20200225 Year of fee payment: 14 |