KR100680175B1 - 말뚝을 이용한 해안 이안제 - Google Patents
말뚝을 이용한 해안 이안제 Download PDFInfo
- Publication number
- KR100680175B1 KR100680175B1 KR1020060076440A KR20060076440A KR100680175B1 KR 100680175 B1 KR100680175 B1 KR 100680175B1 KR 1020060076440 A KR1020060076440 A KR 1020060076440A KR 20060076440 A KR20060076440 A KR 20060076440A KR 100680175 B1 KR100680175 B1 KR 100680175B1
- Authority
- KR
- South Korea
- Prior art keywords
- coastal
- piles
- steel
- vertical
- sides
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 25
- 239000010959 steel Substances 0.000 claims abstract description 25
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 15
- 230000002787 reinforcement Effects 0.000 claims description 3
- 239000004576 sand Substances 0.000 abstract description 7
- 230000008878 coupling Effects 0.000 abstract 1
- 238000010168 coupling process Methods 0.000 abstract 1
- 238000005859 coupling reaction Methods 0.000 abstract 1
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 239000003795 chemical substances by application Substances 0.000 description 8
- 239000013535 sea water Substances 0.000 description 8
- 206010013647 Drowning Diseases 0.000 description 3
- 230000003628 erosive effect Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000002535 lyotropic effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000009182 swimming Effects 0.000 description 2
- 241001455273 Tetrapoda Species 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000003638 chemical reducing agent Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Abstract
Description
Claims (2)
- 상부를 향해 개방된 체결공이 구비되고 양측면에 승강홀이 형성된 제1수직부, 상기 제1수직부의 양측에 다단의 수평부를 통해 형성되며 상부를 향해 개방된 체결공이 구비되면서 상기 제1수직부보다 작은 높이의 제2수직부 및 상기 제1,2수직부와 수평부의 사이에 형성되는 십자형 보강부로 이루어져 해안가에 해안선의 길이방향을 따라 일정 간격을 두고 배열되면서 수중 바닥에 박혀 고정되는 다수의 강재 말뚝과;수평부, 상기 수평부의 양단부에서 각각 하향 경사지게 절곡되는 경사부 및 상기 수평부와 경사부의 저부에 각각 하부를 향해 돌출 형성되어 상기 강재 말뚝의 제1,2수직부의 체결공에 각각 끼워지면서 볼트로 체결되는 결속돌기가 구비된 강재 보와;양측에 상기 승강홀에 승강 가능하게 결합되어 수위에 따라 상기 승강홀 내에서 승강하는 슬라이드부가 구비된 사각 프레임, 상기 사각 프레임의 내부에 상호 간에 일정 간격을 두고 각각 경사지게 결합되어 그 사이에 통수공을 형성하는 다수의 베인으로 이루어져, 해저로부터 일정 높이 이격되면서 수위에 따라 승강하면서 이안류의 흐름을 완화시키는 이안류 감속판을 포함하여 구성된 것을 특징으로 하는 말뚝을 이용한 해안 이안제.
- 제 1 항에 있어서, 상기 이안류 감속판의 저부에 분리 가능하게 결합되는 고무제 커튼이 포함된 것을 특징으로 하는 말뚝을 이용한 해안 이안제.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060076440A KR100680175B1 (ko) | 2006-08-11 | 2006-08-11 | 말뚝을 이용한 해안 이안제 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060076440A KR100680175B1 (ko) | 2006-08-11 | 2006-08-11 | 말뚝을 이용한 해안 이안제 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100680175B1 true KR100680175B1 (ko) | 2007-02-16 |
Family
ID=38103720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060076440A KR100680175B1 (ko) | 2006-08-11 | 2006-08-11 | 말뚝을 이용한 해안 이안제 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100680175B1 (ko) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100921392B1 (ko) | 2008-12-16 | 2009-10-14 | (주) 금성산업 | 투시형 방파제 안전시설물 |
KR101178274B1 (ko) | 2010-04-15 | 2012-08-29 | 경주대학교 산학협력단 | 철재형 이안제 |
CN109281259A (zh) * | 2018-11-12 | 2019-01-29 | 中铁西北科学研究院有限公司 | 一种滑移式挡沙墙及挡沙墙系统 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000020128A (ko) * | 1998-09-17 | 2000-04-15 | 유근형 | 녹용주의 제조방법 |
KR100450309B1 (ko) * | 2002-02-15 | 2004-09-30 | (주)대우건설 | 말뚝 기초를 이용한 방파제 |
-
2006
- 2006-08-11 KR KR1020060076440A patent/KR100680175B1/ko active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000020128A (ko) * | 1998-09-17 | 2000-04-15 | 유근형 | 녹용주의 제조방법 |
KR100450309B1 (ko) * | 2002-02-15 | 2004-09-30 | (주)대우건설 | 말뚝 기초를 이용한 방파제 |
Non-Patent Citations (2)
Title |
---|
1004503090000 |
2000201280000 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100921392B1 (ko) | 2008-12-16 | 2009-10-14 | (주) 금성산업 | 투시형 방파제 안전시설물 |
KR101178274B1 (ko) | 2010-04-15 | 2012-08-29 | 경주대학교 산학협력단 | 철재형 이안제 |
CN109281259A (zh) * | 2018-11-12 | 2019-01-29 | 中铁西北科学研究院有限公司 | 一种滑移式挡沙墙及挡沙墙系统 |
CN109281259B (zh) * | 2018-11-12 | 2023-10-24 | 中铁西北科学研究院有限公司 | 一种滑移式挡沙墙及挡沙墙系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4367978A (en) | Device for preventing beach erosion | |
KR101207609B1 (ko) | 부유식 방파제 | |
MX2012004204A (es) | Sistema supresor de olas y de recoleccion de sedimentos. | |
KR101104030B1 (ko) | 부유식 방파제 | |
JP2006342653A (ja) | 津波防波堤 | |
KR100680175B1 (ko) | 말뚝을 이용한 해안 이안제 | |
KR101958907B1 (ko) | 해안침식 방지용 파압 및 해빈류 완화 시스템 | |
KR100542331B1 (ko) | 수중 수평판을 구비한 부방파제 | |
CN105155464A (zh) | 一种用于沉排促淤加固的浮板装置 | |
KR100740533B1 (ko) | 부유식 방파제 | |
KR100762375B1 (ko) | 조류발전설비 보호시설 | |
KR100542332B1 (ko) | 동요저감형 부방파제 | |
KR100657180B1 (ko) | 해안의 토사 침식 방지 구조물 | |
KR101522923B1 (ko) | 다목적 해양 인공구조물 | |
JP2006193981A (ja) | 漂砂制御構造物 | |
WO2013024610A1 (ja) | 避難用フロート | |
KR20110069407A (ko) | 부유식 방파제 | |
KR20180062008A (ko) | 파도 소멸용 다기능 부력모듈, 이를 이용한 방파 구조체 및 그 시공방법 | |
KR101557006B1 (ko) | 해안 침식방지용 구조물 및 그 시공방법 | |
JP2005133301A (ja) | 石樋魚道と石積堰堤とからなる治水堰堤、及びその構築工法 | |
CN214656752U (zh) | 一种漂浮式防波堤 | |
KR100764915B1 (ko) | 연장벽체를 포함하는 저중심형 부방파제 | |
CN220666093U (zh) | 一种沙丘侵蚀防治系统 | |
CN104743074B (zh) | 一种用于岛礁的可漂浮建筑结构 | |
KR102035663B1 (ko) | 인접 취수 펌프 시설의 수질 관리를 위한 오탁방지막 시설 및 그 시공방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
N231 | Notification of change of applicant | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130124 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20140128 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20150210 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20160128 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20170124 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20180123 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20190124 Year of fee payment: 13 |