KR100476659B1 - Worktable assembly constructing method - Google Patents
Worktable assembly constructing method Download PDFInfo
- Publication number
- KR100476659B1 KR100476659B1 KR10-2002-0013005A KR20020013005A KR100476659B1 KR 100476659 B1 KR100476659 B1 KR 100476659B1 KR 20020013005 A KR20020013005 A KR 20020013005A KR 100476659 B1 KR100476659 B1 KR 100476659B1
- Authority
- KR
- South Korea
- Prior art keywords
- frame
- fixing
- lifting
- safety
- bridge
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 8
- 238000010276 construction Methods 0.000 claims abstract description 28
- 239000002184 metal Substances 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 9
- 238000004904 shortening Methods 0.000 abstract description 6
- 230000009467 reduction Effects 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 230000032683 aging Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011120 plywood Substances 0.000 description 1
- 230000002040 relaxant effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
공사기간 단축 및 비용절감에 유리하도록 개선된 구조를 가지는 안전작업대 조립체의 시공방법에 대해 개시한다. 안전작업대 조립체는 격자상의 프레임(20)과, 이 프레임(20) 상면에 안착고정되는 금속그물망(30)을 가지는 안전작업대(50)를 구비한다. 또한, 조립체는 교각(61)(62)상단에 안착지지되어 교량상판(80)을 지지하는 복수의 빔부재(71)에 안전작업대(50)를 연결고정시키기 위한 고정와이어(51)(52)를 구비한다. 고정와이어의 일단은 프레임(20)상에 용접고정된 고정용러그(23)에 연결되고, 타단에는 빔부재에 고정시키기 위한 클램프부재(90)가 마련되어 있다. 이러한 안전작업대는 크레인등의 중장비에 의해 인양되어진 상태에서 교량의 빔부재에 고정된다.Disclosed is a method for constructing a safety workbench assembly having an improved structure in order to shorten the construction period and reduce costs. The safety workbench assembly includes a safety workbench 50 having a lattice-shaped frame 20 and a metal mesh net 30 fixed to the upper surface of the frame 20. In addition, the assembly is fixed on the top of the bridge (61) 62, the fixing wire (51) (52) for connecting and fixing the safety bench 50 to a plurality of beam members 71 for supporting the bridge upper plate (80) It is provided. One end of the fixing wire is connected to the fixing lug 23 welded and fixed on the frame 20, and the other end is provided with a clamp member 90 for fixing to the beam member. This workbench is fixed to the beam member of the bridge in a lifted state by heavy equipment such as a crane.
이와 같은 안전작업대 및 시공방법은 프레임(20) 및 금속그물망(30)등으로 구성되는 안전작업대 조립체를 지상에서 제작함으로써 안전작업에 유리하고, 또한 안전작업대 조립체를 크레인등의 중장비를 이용하여 교량에 설치함으로써 설치작업이 간편하여 공기단축 및 비용절감에 유리하다.Such a safety workbench and a construction method are advantageous for safety work by manufacturing a safety workbench assembly composed of a frame 20 and a metal mesh net 30 on the ground, and the safety workbench assembly is installed on a bridge using heavy equipment such as a crane. Installation is easy by installation, which is advantageous for air shortening and cost reduction.
Description
본 발명은 고소(高所) 또는 교량작업시 추락을 방지하기 위해 설치되는 안전작업대 조립체의 시공방법에 관한 것으로, 특히 안전작업대의 안전성 및 공기(工期) 단축에 유리하도록 된 고소 또는 교량작업 추락방지용 안전작업대 조립체의 시공방법에 관한 것이다.The present invention relates to a construction method of a safety platform assembly installed in order to prevent a fall during a high place or bridge work, and particularly for preventing the fall of a height or bridge work that is advantageous to the safety of the safety platform and shortening the air. It relates to a construction method of the safety bench assembly.
일반적으로, 교량은 설계 시공 당시와는 다른 외적 요인, 즉 교량 빔의 단면 부족 현상에 의하여 발생되는 빔의 처짐 변형과, 통과 차량의 대형화, 통행량의 급증과 같은 외적 요인 및 교량 빔 자체의 노후화 등으로 인하여 빔의 강성이 크게 저하된 상태에 있을 뿐아니라 이들 빔을 비롯한 교량 구조물에 균열 및 부분 파손 등이 발생함으로서 대부분의 노후교량에 있어서는 예기치 못한 사고의 위험이 상존하고 있는 현실이다. 이에 따라서 지속적인 관리 및 보수가 필수적이며 이를 위한 안전작업대의 설치가 요구된다.In general, bridges have different external factors from the time of design construction, that is, deflection deformation of beams caused by lack of cross-section of bridge beams, external factors such as larger passing vehicles, and increased traffic volume, and aging of bridge beams itself. Due to this, not only the beam rigidity is greatly reduced, but also cracks and partial breakages occur in bridge structures including these beams, and thus, the risk of unexpected accidents exists in most old bridges. Accordingly, continuous management and maintenance is essential and a safety workbench is required for this.
또한, 교량 건설에 있어서 교각건립중 교각 상단 교좌지점 작업 또는 교량 저부를 따라 설치되는 배관 파이프 및 전선파이프등의 설치 및 보수 또는 작업자의 추락 방지 및 작업공구의 낙하를 방지하기 위해 안전작업대를 설치하게 된다.In addition, in the construction of bridges, safety benches should be installed in order to prevent the fall of workers and the fall of work tools. do.
일반적으로 교량은 도 1에 도시된 바와 같이, 교각(1)의 상단부에 복수의 빔부재(2)가 마련되고, 이들 빔부재(2)의 상부에 교량상판(3)이 안착되는 구조를 가진다.Generally, as shown in FIG. 1, a bridge has a structure in which a plurality of beam members 2 are provided at an upper end of the bridge 1, and a bridge top plate 3 is seated on the beam members 2. .
교량하부 작업시 설치되는 안전작업대(10)는 도 2 및 도 3에 도시된 바와 같이, 빔부재(2) 사이에 상부수평파이프(11)를 거치시키고 이 상부수평파이프(11)에 수직파이프(13)들을 클램프(미도시)로 고정설치하며, 수직파이프(13)의 하단부에 하부수평파이프(12)들을 클램프로 고정시킨 후, 합판과 같은 작업판(14)을 하부수평파이프(12)에 안착고정시킨 구조로 되어 있다.2 and 3, the safety platform 10 installed at the bottom of the bridge is mounted with the upper horizontal pipe 11 between the beam members 2 and the vertical pipe (11) to the upper horizontal pipe (11). 13 are fixed by clamps (not shown), and the lower horizontal pipes 12 are clamped to the lower end of the vertical pipe 13, and then a work plate 14 such as plywood is attached to the lower horizontal pipe 12. It has a structure that is fixed and fixed.
그러나 이와 같은 안전작업대 및 이의 시공방법은 다음과 같은 문제점이 있다.However, such a safety workbench and its construction method has the following problems.
첫째, 파이프(11)(12)(13)들 및 작업판(14)의 설치작업을 교량하부에서 작업자들이 직접함으로써 위험할 뿐만 아니라, 설치에 따른 숙련작업자들이 요구되고 작업시간이 과다 소요되는 등 공기단축에 불리하다.First, the installation work of the pipes (11) (12) (13) and the working plate (14) is not only dangerous by the workers directly in the lower part of the bridge, but also requires skilled workers according to the installation and takes too much time. It is disadvantageous for air shortening.
둘째, 안전작업대(10)의 설치를 위하여는 또 다른 설치작업대가 요구되므로 비용절감 및 공기단축에 불리하다.Second, because the installation of another workbench is required for the installation of the safety workbench 10, it is disadvantageous in cost reduction and air shortening.
세째, 각 파이프(11)(12)(13)들을 작업자가 고소(高所)에서 클램핑하게 되므로 안전작업에 불리하다.Third, each of the pipes 11, 12, 13 is clamped at the height of the worker (high place), which is disadvantageous for safety work.
네째, 작업판(14)의 안정된 설치를 위해서는 다수의 수직 및 수평파이프들이 요구되므로 작업공간이 협소해지며, 또한 해체가 번거롭다.Fourth, since a plurality of vertical and horizontal pipes are required for the stable installation of the working plate 14, the working space becomes narrow, and disassembly is cumbersome.
본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로서, 지상에서 작업대의 제작작업이 가능하여 안전작업에 유리하고 또한 이의 설치작업이 간편하여 공기단축 및 비용절감에 유리한 안전작업대 조립체의 시공방법을 제공하는 데 그 목적이 있다.The present invention was created in order to solve the above problems, it is possible to manufacture the workbench on the ground is advantageous to the safety work and also easy to install the construction work method of the safety workbench assembly which is advantageous for shortening the air and cost reduction The purpose is to provide.
본 발명의 다른 목적은 작업공간이 여유롭고 교량에의 안정한 고정작업이 가능한 안전작업대 조립체의 시공방법을 제공하는 데 있다.It is another object of the present invention to provide a method for constructing a safety workbench assembly which allows a work space to be free and a stable fixing work to a bridge.
본 발명의 또 다른 목적은 해체작업이 간편한 안전작업대 조립체의 시공방법을 제공하는 데 있다.Still another object of the present invention is to provide a method for constructing a safety bench assembly, which is easy to dismantle.
상기 목적을 달성하는 본 발명 안전작업대 조립체의 시공방법은,Construction method of the present invention workbench assembly to achieve the above object,
삭제delete
삭제delete
삭제delete
삭제delete
a) 복수의 강부재들로 격자상으로 프레임을 형성하는 단계,a) forming a frame in a grid with a plurality of steel members,
b) 상기 프레임 상면에 금속그물망을 안착고정시키는 단계,b) fixing the metal net to the upper surface of the frame,
c) 크레인으로 상기 프레임을 고소(高所)에 일정간격으로 위치된 복수의 빔부재 하부로 인양시키는 단계,c) lifting the frame under a plurality of beam members positioned at regular intervals on a height with a crane,
d) 인양된 프레임을 상기 빔부재에 고정시키는 단계를 포함하며,d) securing the lifted frame to the beam member,
상기 c)단계에서는 상기 프레임에 상기 크레인으로 인양시키기 위한 적어도 2개의 인양용러그와 인양시 상기 프레임의 기울기를 조정하기 위한 적어도 1개의 경사조절용러그를 용접고정하고, In step c), welding fixing at least two lifting lugs for lifting the frame to the crane and at least one tilt adjusting lug for adjusting the inclination of the frame when lifting the frame;
상기 크레인의 인양용와이어와 경사조절용와이어를 각각 상기 인양용러그와 경사조절용러그에 걸어서 상기 프레임의 기울기를 조절하면서 인양하는 것을 특징으로 한다.The lifting wire and the inclination adjustment wire of the crane are respectively lifted while adjusting the inclination of the frame by hanging on the lifting lug and the inclination adjustment lug.
또한, 상기 프레임에 일정간격으로 고정용러그를 용접고정하고, 상기 d) 단계에서 상기 고정용러그와 상기 빔부재의 플랜지에 고정와이어로 연결하여 고정하되,In addition, the fixing lug is welded to the frame at a predetermined interval, and in step d), the fixing lug and the flange of the beam member are connected and fixed by fixing wires,
상기 고정와이어의 일단에는 상기 빔부재의 플랜지에 결합되는 결합홈이 형성된 클립부와, 상기 클립부에 나사결합되어 상기 플랜지에 나사고정되는 고정나사를 구비하는 클램프부재가 구비된다.One end of the fixing wire is provided with a clamp member having a clip portion formed with a coupling groove coupled to the flange of the beam member, and a fixing screw screwed to the flange by screwing to the clip portion.
한편, 상기 프레임에 일정간격으로 고정용러그를 용접고정하고, 상기 d)단계에서 상기 상호 인접된 빔부재 사이에 수평지지빔을 지지시키고, 상기 수평지지빔에 상기 프레임의 고정용러그를 복수의 고정와이어로 고정시키되,Meanwhile, welding fixing fixing lugs are fixed to the frame at a predetermined interval, and in step d), horizontal supporting beams are supported between the beam members adjacent to each other, and a plurality of fixing lugs for fixing the frame are attached to the horizontal supporting beams. Fasten with a fixed wire,
상기 각 고정와이어의 일단에는 상기 수평지지빔에 걸어지지되는 고정용채널부재와, 상기 고정용채널부재를 관통하여 결합되어 상기 수평지지빔으로부터 이탈을 방지시키는 체결볼트가 구비된다.One end of each of the fixing wires is provided with a fixing channel member which is held by the horizontal support beam, and a fastening bolt which is coupled through the fixing channel member to prevent deviation from the horizontal support beam.
상기 d)단계에서 상기 상호 인접하는 빔부재에 가이드레일을 설치하고,In step d), the guide rails are installed on the mutually adjacent beam members.
상기 가이드레일에 구름이동되는 롤러부재를 상기 프레임에 설치하여서,By installing a roller member which is rolled on the guide rail to the frame,
상기 프레임을 상기 가이드레일에 지지시킨다.The frame is supported on the guide rail.
상기 목적을 달성하는 본 발명은 일정간격으로 시공된 교각 상단에 복수의 빔부재들이 안착되고, 상기 빔부재들의 상단에 교량상판이 안착된 교량에 안전작업대를 설치하기 위한 시공방법에 있어서,In the present invention to achieve the above object is a construction method for installing a safety workbench on the bridge is a plurality of beam members are seated on the top of the bridge constructed at a predetermined interval, the bridge top plate is seated on the top of the beam members,
a) 복수의 강부재들로 격자상으로 복수의 프레임을 형성하는 단계,a) forming a plurality of frames in a grid with a plurality of steel members,
b) 상기 프레임들을 회동가능하게 힌지연결하는 단계,b) pivotally hinged said frames,
c) 상기 교량상판의 일부분을 천공하고 이를 통하여 교량상판에서 크레인을 이용하여 인양와이어를 내려서 상기 프레임들을 인양하고 힌지부분을 상기 빔부재에 고정시키는 단계,c) drilling a portion of the bridge deck and lifting the lifting wires by using a crane from the bridge deck to lift the frames and fix the hinge to the beam member;
d) 상기 인양된 프레임들중 일측 프레임 단부에 제1와이어로 연결하고 이 프레임을 인양하여 상기 빔부재에 고정시키는 단계,d) connecting a first wire to one frame end of the lifted frames and lifting the frame to fix it to the beam member;
e) 상기 타측 프레임 단부에 제2와이어로 연결하고 이 프레임을 인양하여 상기 빔부재에 고정시키는 단계를 포함하여 된 것을 특징으로 한다.e) connecting to the other frame end with a second wire and lifting the frame to fix it to the beam member.
이하 첨부된 도면을 참조하면서 본 발명에 따른 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
본 발명에 따른 안전작업대 조립체는 고소(高所)지역 예컨대, 교량공사시에 교량하부에 설치되어 작업자들이 안전하게 작업할 수 있도록 된 구조를 가지며, 설치가 간편하고 안정된 구조를 가진다.Safety workbench assembly according to the present invention has a structure that is installed in the lower part of the bridge at the height of the height (for example, bridge construction) so that workers can work safely, has a simple and stable structure.
일 실시예의 안전작업대 조립체는 도 4a 및 도 4b에 도시된 바와 같이, 복수의 강부재(21)(22)들에 의해 격자상으로 형성되는 프레임(20)과, 이 프레임(20) 상면에 안착고정되는 도 5에 도시된 바와 같은 금속그물망(30)을 가지는 안전작업대(50)를 구비한다.4A and 4B, the safety bench assembly of one embodiment includes a frame 20 formed in a lattice form by a plurality of steel members 21 and 22 and seated on an upper surface of the frame 20. As shown in FIG. It is provided with a safety platform 50 having a metal net 30 as shown in FIG.
또한, 조립체는 도 8 및 도 9에 도시된 바와 같이, 교각(61)(62)상단에 안착지지되어 교량상판(80)을 지지하는 복수의 빔부재(71)에 안전작업대(50)를 연결고정시키기 위한 고정와이어(51)(52)를 구비한다.In addition, as shown in FIGS. 8 and 9, the safety platform 50 is connected to a plurality of beam members 71 that are supported by being seated on the upper ends of the piers 61 and 62 to support the bridge top plate 80. Fixing wires 51 and 52 for fixing.
상기 프레임(20)에는 도 4a 및 도 7에 도시된 바와 같이, 상기 고정와이어(51)(52)의 일단이 고정되는 복수의 고정용러그(23)가 일정간격으로 용접고정되어 있다. 또한, 상기 고정와이어(51)(52)의 타단에는 도 7 내지 도 9에 도시된 바와같이 상기 빔부재(71)의 플랜지(72)에 결합되는 결합홈(91a)이 형성된 클립부(91)와, 이 클립부(91)에 나사결합되어 상기 플랜지(72)에 클립부(91)를 나사고정시키는 고정나사(92)를 가지는 클램프부재(90)를 구비한다.As shown in FIGS. 4A and 7, a plurality of fixing lugs 23 to which one end of the fixing wires 51 and 52 are fixed are welded to the frame 20 at regular intervals. In addition, the other end of the fixing wire 51, 52, the clip portion 91 is formed with a coupling groove 91a is coupled to the flange 72 of the beam member 71, as shown in Figs. And a clamp member 90 which is screwed to the clip portion 91 and has a fixing screw 92 for screwing the clip portion 91 to the flange 72.
상기와 같은 안전작업대(50)는 교각(61)(62) 상단에 일정간격으로 배설된 빔부재(71)들의 플랜지(72)에 고정와이어(51)(52) 및 클램프부재(90)들에 의해서 안정적으로 고정된다. The safety work bench 50 as described above is fixed to the wires 51 and 52 and the clamp members 90 on the flanges 72 of the beam members 71 disposed at regular intervals on the tops of the piers 61 and 62. Is fixed stably.
한편, 빔부재(71)들에 설치된 안전작업대(50)에는 도 4b에 도시된 바와 같이, 금속그물망(30)의 상면에 작업공구 또는 콘크리트 조각등 이물질들의 낙하 방지를 위한 천막지(35)가 도포될 수 있으며, 또한 작업시 안전작업을 위한 난간대(55)가 세워질 수 있다.Meanwhile, as illustrated in FIG. 4B, the safety work bench 50 installed at the beam members 71 has a tent 35 for preventing falling of foreign objects such as a work tool or a piece of concrete on the upper surface of the metal mesh net 30. It can be applied, and also the handrail 55 for safety work at work can be erected.
상기와 같은 안전작업대 조립체는 안전작업대(50)가 강부재(21)(22)들로 형성되는 프레임(20)에 금속그물망(30)이 안착지지되는 구조를 가짐으로써, 작업자들이 심리적으로 안정된 상태에서 또한 구조적으로 안정한 상태에서 작업을 가능하게 한다.The safety workbench assembly as described above has a structure in which the metal net 30 is seated and supported on the frame 20 in which the safety workbench 50 is formed of steel members 21 and 22, so that workers are psychologically stable. It also enables working in a structurally stable state.
또한, 클램프부재(90)의 고정나사(92)에 의해서 빔부재(71)에 간편하게 고정시킬 수 있어 공사기간 단축에도 유리해진다.In addition, it can be easily fixed to the beam member 71 by the fixing screw 92 of the clamp member 90, which is advantageous to shorten the construction period.
상기와 같은 안전작업대 조립체를 교량의 빔부재(71)에 설치하기 위한 시공방법은 다음과 같다.The construction method for installing the safety bench assembly as described above to the beam member 71 of the bridge is as follows.
먼저, 도 4a에 도시된 바와 같이 복수의 강부재(21)(22)들로 격자상으로 프레임(20)을 형성하고, 이 프레임(20)의 상단에 도 4b에 도시된 바와 같이 도 5에 도시된 바와 같은 금속그물망(30)을 안착고정시킨다.First, as shown in FIG. 4A, a frame 20 is formed in a lattice form with a plurality of steel members 21 and 22, and as shown in FIG. 4B on the top of the frame 20, as shown in FIG. Secure the metal net 30 as shown.
이와 같은 안전작업대(50)의 프레임(20)의 가장자리를 따라 일정간격으로 도 4a 및 도 7에 도시된 바와 같이 고정용러그(23)들을 용접고정하고 이 고정용러그(23)에는 상기 클램프부재(90)가 연결된 고정와이어(51)(52)를 연결시킨 후, 도 4a 및 도 6에 도시된 바와 같이 인양용러그(111)(112)와 경사조절용러그(113)(114)를 프레임(20)에 결합시킨다. The fixing lugs 23 are welded and fixed as shown in FIGS. 4A and 7 at regular intervals along the edge of the frame 20 of the safety work bench 50, and the clamp members are attached to the fixing lugs 23. After connecting the fixing wires 51 and 52 to which the 90 is connected, the lifting lugs 111 and 112 and the inclination adjustment lugs 113 and 114 are framed as shown in FIGS. 4A and 6. 20).
이때 인양용러그(111)(112)와 경사조절용러그(113)(114)는 도 6a에 도시된 바와 같이 동일한 구조를 가지며, 체결볼트(115)에 의해서 프레임(20)에 해체가능하게 결합된다.At this time, the lifting lugs 111 and 112 and the inclination adjustment lugs 113 and 114 have the same structure as shown in FIG. 6A, and are detachably coupled to the frame 20 by the fastening bolts 115. .
이어서 인양용러그(111)(112)와 경사조절용러그(113)(114)에 도 8에 도시된 바와 같이, 각각 인양용와이어(116)(117)외 경사조절용와이어(118)(119)를 연결시키고, 크레인(미도시)을 이용하여 상기 안전작업대(50)를 고소(高所)에 위치된 복수의 빔부재(71) 하부로 인양시킨다.Subsequently, as shown in FIG. 8, the lifting lugs 111 and 112 and the inclination adjustment lugs 113 and 114, respectively, the inclination adjustment wires 118 and 119 besides the lifting wires 116 and 117, respectively. The safety work platform 50 is lifted to a lower portion of the plurality of beam members 71 located at a height by using a crane (not shown).
이때 인양위치의 공간적 형태에 따라서 안전작업대(50)를 기울이고자 할 경우에는 크레인으로 경사조절용와이어(118)(119)를 이완 또는 수축시키면서 안전작업대(50)의 기울기를 조절시킨다.At this time, if you want to tilt the safety workbench 50 according to the spatial shape of the lifting position to adjust the inclination of the safety workbench 50 while relaxing or contracting the inclined adjustment wire 118, 119 with a crane.
원하는 위치로 안전작업대(50)가 인양되면, 인양을 멈추고 고정와이어(51)(52)의 단부에 연결된 클램프부재(90)를 빔부재(71)의 플랜지(71)에 고정시킨다. 이때 작업자가 안전작업대(50)에서 클램프부재(90)의 고정나사(92)를 조임하여 플랜지(72)에 견고하게 결속시킨다.When the safety platform 50 is lifted to a desired position, the lifting stops and the clamp member 90 connected to the ends of the fixing wires 51 and 52 is fixed to the flange 71 of the beam member 71. At this time, the operator tightens the fixing screw 92 of the clamp member 90 in the safety workbench 50 to firmly bind to the flange 72.
상기 클램프부재(90)는 도 7에 도시된 바와 같은 구조를 가지며, 구조설명은 상술한 바와 같으므로 생략한다.The clamp member 90 has a structure as shown in FIG. 7, and the structure description is the same as described above, and thus will be omitted.
도 10 및 도 11은 본 발명 시공방법의 다른 실시예를 나타낸다. 이는 교량상판(80)을 지지하는 빔부재가 콘크리트빔부재(130)인 경우, 이 콘크리트빔부재(130)에 안전작업대 조립체를 지지시키기 위한 시공방법을 나타낸다.10 and 11 show another embodiment of the construction method of the present invention. This indicates a construction method for supporting the safety workbench assembly on the concrete beam member 130 when the beam member supporting the bridge deck 80 is the concrete beam member 130.
통상 콘크리트빔부재(130)는 플랜지(131)부분이 상향경사진구조를 가짐으로써, 도 7에 도시된 바와 같은 클램프부재(90)의 사용시 미끄럼발생등 부적합하다.In general, the concrete beam member 130 has an upwardly inclined structure of the flange 131, so that the use of the clamp member 90 as shown in FIG.
따라서, 상호 인접된 콘크리트빔부재(130) 사이에 수평지지빔(120)을 지지시키고, 상기 수평지지빔(120)에 상기 프레임(20)의 고정용러그(23)를 복수의 고정와이어(51)로 고정시키되, 상기 각 고정와이어(51)의 일단에는 도 11에 도시된 바와 같이 고정용채널부재(140)를 연결하여서 상기 수평지지빔(120)에 걸어서 지지시킨다.Accordingly, the horizontal support beams 120 are supported between the adjacent concrete beam members 130, and the fixing lugs 23 of the frame 20 are attached to the horizontal support beams 120. Fixed to, but one end of each of the fixing wire 51 is connected to the fixing channel member 140, as shown in Figure 11 and supported by walking on the horizontal support beam (120).
이와 같이 수평지지빔(120)에 걸어지지된 고정용채널부재(140)에는 이탈방지를 위해서 체결볼트(150)를 이용하여 고정시킨다.As such, the fixing channel member 140 held on the horizontal support beam 120 is fixed by using the fastening bolt 150 to prevent separation.
본 발명 안전작업대 조립체의 또 다른 시공방법을 나타낸 도 12를 참조하면, 이는 브라켓트(150)에 의해서 가이드레일(26)을 빔부재(171)의 플랜지(72)에 고정시키고 상기 안전작업대(20)에 롤러부재(26)를 설치하여서, 상술한 바와 같이 크레인을 사용하여 안전작업대(20)를 빔부재(71) 하부로 인양시킨 후, 안전작업대(20)의 롤러부재(26)를 가이드레일(151)에 슬라이딩 결합하여 지지시킨다. 이 경우 크레인을 이동시키지 아니하고도 복수의 안전작업대(20)를 빔부재(71)에 설치가능하게 한다.Referring to Figure 12 showing another construction method of the safety bench assembly of the present invention, which is fixed to the flange 72 of the beam member 171 to the guide rail 26 by the bracket 150 and the safety platform 20 Install the roller member 26 in the above, and lift the safety bench 20 below the beam member 71 by using a crane as described above, and then, the roller member 26 of the safety bench 20 is guide rail ( Sliding coupled to the 151 to support. In this case, it is possible to install a plurality of safety platform 20 to the beam member 71 without moving the crane.
도 13은 브라켓트(160)에 가이드레일(161)(162)를 한쌍으로 구성하고 이에 대응하여 안전작업대(20)에 롤러부재(27)를 한쌍으로 마련하여 구조적으로 안정된 지지를 위한 것으로서 이의 시공방법은 상기와 동일하므로 생략한다. 13 is a pair of guide rails (161, 162) to the bracket 160 and a pair of roller members (27) on the safety bench 20 in response to the structural support for the stable construction Are the same as above, and thus will be omitted.
본 발명의 또 다른 시공방법을 나타낸 도 14 내지 도 16을 참조하면, 이는 먼저 도 4a에 도시된 바와 같이 복수의 강부재(21)(22)들로 격자상으로 복수의 프레임(20)(20a)을 형성한다. 이들 프레임(20)(20a)에는 도 7에 도시된 바와 같은 고정용러그(23)를 용접고정하고 이에 고정와이어(51)로 클램프부재(90)를 연결고정시킨다. Referring to Figures 14 to 16 showing yet another construction method of the present invention, which is first shown in Figure 4a a plurality of frames (20, 20a) in a grid of a plurality of steel members (21, 22) ). The fixing lugs 23 as shown in FIG. 7 are welded to these frames 20 and 20a, and the clamping members 90 are connected and fixed to the fixing wires 51.
이어서 상기 프레임(20)(20a)들을 회동가능하게 힌지(28)연결시키고, 교량상판(80)에 천공된 구멍(81)을 통하여 크레인의 인양와이어(200)를 내려서 상기 프레임(20)(20a)들을 인양하고 힌지(28)부분을 상기 빔부재(71)에 고정시킨다. 이때 고정작업은 상술한 고정와이어(51) 및 클램프부재(90)를 사용하며 이에 대한 설명은 상술한 바와 동일하므로 생략한다.The hinges 28 are rotatably connected to the frames 20 and 20a, and the lifting wires 200 of the crane are lowered through the holes 81 drilled in the bridge top plate 80 so that the frames 20 and 20a are connected. ) And lifts the hinge 28 to the beam member 71. At this time, the fixing operation uses the fixing wire 51 and the clamp member 90 described above, and the description thereof is the same as described above, and thus will be omitted.
이어서 도 15에 도시된 바와 같이, 상기 인양된 프레임(20)(20a)들중 일측 프레임(20) 단부에 제1와이어(210)로 연결하여 이 프레임(20)을 인장하여 수평상태로 위치시킨 상태에서 빔부재(71)에 고정와이어(71) 및 클램프부재(90)로 고정시킨다.Subsequently, as shown in FIG. 15, one of the lifted frames 20 and 20a is connected to the end of one of the frames 20 by a first wire 210 to tension the frames 20 and position them in a horizontal state. The fixed wire 71 and the clamp member 90 to the beam member 71 in the state is fixed.
마찬가지로, 도 16에 도시된 바와 같이 타측 프레임(20a) 단부에 제2와이어(220)로 연결하여 이 프레임(20a)을 수평상태로 위치시킨 상태에서 상기 빔부재(71)에 고정와이어(71) 및 클램프부재(90)로 고정시킨다.Similarly, as shown in FIG. 16, the second wire 220 is connected to an end of the other frame 20a to fix the wire 71 to the beam member 71 in a state where the frame 20a is horizontally positioned. And clamp member 90.
이와 같은 시공방법은 다수의 프레임(20)(20a)을 힌지연결하여 한번에 인양함으로써 공기를 더욱 단축시킬 수 있다.Such a construction method can further shorten the air by hinge-connecting a plurality of frames 20, 20a at one time.
상술한 바와 같은 본 발명은 상기 실시예에 한정되지 아니하고 본원의 정신과 범위를 이탈함이 없이 많은 변형을 가하여 실시될 수 있음은 두 말 할 것도 없다.Needless to say, the present invention as described above is not limited to the above embodiment and can be practiced with many modifications without departing from the spirit and scope of the present application.
상술한 바와 같은 본 발명은 다음과 같은 이점을 가진다.The present invention as described above has the following advantages.
첫째, 프레임(20) 및 금속그물망(30)등으로 구성되는 안전작업대 조립체를 지상에서 제작함으로써 안전작업에 유리하고, 또한 안전작업대 조립체를 크레인등의 중장비를 이용하여 교량에 설치함으로써 설치작업이 간편하여 공기단축 및 비용절감에 유리하다.First, the safety workbench assembly consisting of the frame 20 and the metal mesh net 30 is manufactured on the ground, which is advantageous for safety work, and the installation of the safety workbench assembly on the bridge using heavy equipment such as a crane is easy to install. It is advantageous to shorten the air and reduce the cost.
둘째, 종래 다수의 파이프들로 하여금 작업판(14)을 지지시킴으로써 작업공간이 협소하였던 것과는 달리, 본 발명은 프레임(20)의 가장자리를 따라 고정와이어(51) 및 클램프부재(90)로 고정시킴으로써 작업공간이 여유롭고 교량에의 안정한 고정작업이 가능하다.Second, unlike the prior art, where the workspace is narrowed by supporting a plurality of pipes to support the working plate 14, the present invention is fixed by the fixing wire 51 and the clamp member 90 along the edge of the frame 20. The working space is free and stable fixing work to the bridge is possible.
세째, 클램프부재(90)의 고정나사(92)를 해지시킴으로써 해체작업이 간편하다.Third, the dismantling operation is easy by releasing the fixing screw 92 of the clamp member 90.
네째, 교량상판을 지지하는 빔부재에 가이드레일을 설치하고, 안전작업대에 가이드레일을 따라 구름이동되는 롤러부재를 설치함으로써, 복수의 안전작업대의 설치작업이 간편하다.Fourth, by installing a guide rail on the beam member for supporting the bridge top plate, and by installing a roller member to move the cloud along the guide rail to the safety platform, the installation work of a plurality of safety platform is easy.
다섯째, 프레임(20)을 구비하는 복수의 안전작업대를 회동가능하게 힌지연결하여서, 1회의 인양작업으로 보다 넓은 구간에 안전작업대의 설치가 가능하므로 공사기간 단축 및 비용절감에 유리하다.Fifth, by hinge-connecting a plurality of safety workbench having a frame 20 to be rotatable, it is possible to install the safety workbench in a wider section by one lifting operation, which is advantageous in shortening construction period and reducing costs.
도 1은 통상의 교량을 나타낸 개략 단면도,1 is a schematic cross-sectional view showing a conventional bridge,
도 2는 종래 교량에 작업대 설치를 위한 가시설를 설치한 상태를 나타낸 개략 사시도,Figure 2 is a schematic perspective view showing a state in which a temporary facility for installing a workbench in a conventional bridge,
도 3은 도 2에 작업판이 설치된 상태를 나타낸 개략도,3 is a schematic view showing a state in which the working plate is installed in FIG.
도 4a는 본 발명 안전작업대에 채용되는 프레임을 나타낸 평면도,Figure 4a is a plan view showing a frame employed in the safety workbench of the present invention,
도 4b는 본 발명 안전작업대를 나타낸 개략 측면도,Figure 4b is a schematic side view showing the safety workbench of the present invention,
도 5는 본 발명 안전작업대의 프레임에 용접고정되는 금속그물망을 나타낸 평면도,5 is a plan view showing a metal mesh welded to the frame of the present invention workbench,
도 6a는 프레임을 인양하기 위한 인양용러그의 조립상태를 나타낸 사시도,Figure 6a is a perspective view showing the assembled state of the lifting lug for lifting the frame,
도 6b는 도 6a의 조립상태 단면도,Figure 6b is a cross-sectional view of the assembled state of Figure 6a,
도 7은 프레임을 고정시키기 위한 고정용러그 및 클램프부재를 나타낸 요부 발췌 사시도,Figure 7 is a perspective view of the main portion showing the fixing lug and clamp member for fixing the frame,
도 8은 안전작업대의 시공방법을 설명하기 위한 개략사시도,8 is a schematic perspective view for explaining the construction method of the safety bench;
도 9는 안전작업대가 교량에 설치된 상태를 나타낸 개략도,9 is a schematic view showing a state where the work bench is installed on the bridge,
도 10은 본 발명의 다른 실시예를 나타낸 개략도,10 is a schematic view showing another embodiment of the present invention;
도 11은 도 10의 요부 단면도,11 is a sectional view of the main part of FIG. 10;
도 12 및 도 13은 본 발명의 또 다른 시공방법을 나타낸 개략도,12 and 13 is a schematic view showing another construction method of the present invention,
도 14 내지 도 16은 발명의 또 다른 시공방법을 나타낸 개략도이다.14 to 16 is a schematic view showing another construction method of the invention.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
20...프레임 21,22...강부재20 Frame 21, 22 Steel member
23...고정용러그 26,27...롤러부재23 Fixing lugs 26, 27 Roller elements
30...금속그물망 35...천막지30.Metal Net 35 ... Temper
50...안전작업대 51...고정와이어50.Safety platform 51 ... Fixed wire
61,62...교각 71...빔부재 61,62 piers 71 beam members
72...(빔부재의)플랜지 80...교량상판72 ... flange 80 (bridge member)
90...클램프부재 91...클립부90 Clamp member 91 Clip section
92...고정나사 111,112...인양용러그92 fixing screw 111,112 lifting lug
113,114...경사조절용러그 151,161,162...가이드레일113,114 ... Tilt adjustment lugs 151,161,162 ... Guide rail
200...인양와이어 210...제1와이어200 ... Salvage Wire 210 ... First Wire
220...제2와이어220 ... 2nd wire
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0013005A KR100476659B1 (en) | 2002-03-11 | 2002-03-11 | Worktable assembly constructing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0013005A KR100476659B1 (en) | 2002-03-11 | 2002-03-11 | Worktable assembly constructing method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020028984A KR20020028984A (en) | 2002-04-17 |
KR100476659B1 true KR100476659B1 (en) | 2005-03-17 |
Family
ID=19719747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2002-0013005A KR100476659B1 (en) | 2002-03-11 | 2002-03-11 | Worktable assembly constructing method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100476659B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102341325B1 (en) | 2021-07-28 | 2021-12-21 | 주식회사 신흥기공 | Safety workbench |
KR20230009720A (en) * | 2021-07-09 | 2023-01-17 | (주)인테크 디자인 | Equipment for controlling sky-walk |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100737126B1 (en) * | 2006-09-22 | 2007-07-06 | 김진곤 | Fish Beam Edge Safety Net Mounting |
KR100764418B1 (en) * | 2007-07-11 | 2007-10-05 | (주) 케이 이엔씨 | Concrete beam damage prevention exterior installation structure of bridge |
KR101645469B1 (en) * | 2015-12-31 | 2016-08-08 | 브릿지테크놀러지(주) | Molding system for through bridge and through bridge construction method therewith |
CN111119044B (en) * | 2020-01-08 | 2024-09-24 | 无锡太湖学院 | Bridge suspension walking equipment and bridge working system applying same |
CN113356069B (en) * | 2021-06-25 | 2024-09-20 | 中国五冶集团有限公司 | Construction platform for installing steel structure bridge |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63134702A (en) * | 1986-11-27 | 1988-06-07 | 新日本製鐵株式会社 | Aerial assembly and suspension method of mobile suspended scaffolding |
JPH01102208U (en) * | 1987-12-28 | 1989-07-10 | ||
JPH02128749U (en) * | 1989-03-31 | 1990-10-24 | ||
JPH05295712A (en) * | 1992-04-15 | 1993-11-09 | Mitsui Eng & Shipbuild Co Ltd | Mobile protecting construction for bridge |
JP2000303682A (en) * | 1999-04-20 | 2000-10-31 | Koyo Kikai Sangyo Kk | Suspended scaffold and its constructing method |
KR200233184Y1 (en) * | 2001-02-14 | 2001-09-29 | (주)신성엔지니어링 | Bridge Inspection Stand |
KR200254668Y1 (en) * | 2001-08-10 | 2001-12-01 | 주식회사 한국종합기술개발공사 | Move types bridge safety passway apparatus |
-
2002
- 2002-03-11 KR KR10-2002-0013005A patent/KR100476659B1/en not_active IP Right Cessation
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63134702A (en) * | 1986-11-27 | 1988-06-07 | 新日本製鐵株式会社 | Aerial assembly and suspension method of mobile suspended scaffolding |
JPH01102208U (en) * | 1987-12-28 | 1989-07-10 | ||
JPH02128749U (en) * | 1989-03-31 | 1990-10-24 | ||
JPH05295712A (en) * | 1992-04-15 | 1993-11-09 | Mitsui Eng & Shipbuild Co Ltd | Mobile protecting construction for bridge |
JP2000303682A (en) * | 1999-04-20 | 2000-10-31 | Koyo Kikai Sangyo Kk | Suspended scaffold and its constructing method |
KR200233184Y1 (en) * | 2001-02-14 | 2001-09-29 | (주)신성엔지니어링 | Bridge Inspection Stand |
KR200254668Y1 (en) * | 2001-08-10 | 2001-12-01 | 주식회사 한국종합기술개발공사 | Move types bridge safety passway apparatus |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20230009720A (en) * | 2021-07-09 | 2023-01-17 | (주)인테크 디자인 | Equipment for controlling sky-walk |
KR102497454B1 (en) * | 2021-07-09 | 2023-02-09 | (주)인테크 디자인 | Equipment for controlling sky-walk |
KR102341325B1 (en) | 2021-07-28 | 2021-12-21 | 주식회사 신흥기공 | Safety workbench |
Also Published As
Publication number | Publication date |
---|---|
KR20020028984A (en) | 2002-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5394334B2 (en) | Construction method of work floor for work at height | |
KR101547824B1 (en) | Furnace scaffolding and hoisting system platform support system | |
KR100760435B1 (en) | Adjustable Temporary Shores | |
KR100476659B1 (en) | Worktable assembly constructing method | |
JP3181041U (en) | Mounting member for scaffolding for bridge | |
JP6498075B2 (en) | Overhang passage of steel structure | |
JP5589183B2 (en) | Cylindrical structure scaffolding apparatus and moving method thereof | |
CN212452315U (en) | Assembly module and modular construction platform | |
JP2012102468A (en) | Movable scaffold for repairing bridge lower face and installation method for the same | |
KR101266282B1 (en) | Construction and dismantle method of scaffolding device for heat power plant | |
JP5773469B1 (en) | Suspended scaffolding | |
KR102002336B1 (en) | Construction and dismantle method of temporary work table for furnace scaffold | |
JP5356091B2 (en) | Crane girder exchanging method and crane girder exchanging apparatus | |
KR20130116225A (en) | Operating method of scaffolding device of corner part | |
JP3950800B2 (en) | Suspension scaffold | |
JP2023078610A (en) | Temporary reinforcement member for replacing web member of steel tower, and web member replacement method | |
KR100278830B1 (en) | Safety Work Platform for Pier Head Facility | |
KR20230064122A (en) | Fixing clamp for plate grass of handrail | |
CN209907886U (en) | Adjustable assembled stair construction platform | |
JPH1088786A (en) | Scaffold for columnar structure | |
CN219684325U (en) | Steel column side column welding platform | |
KR101757279B1 (en) | Building scaffolding equipment by way of wire rope in the boiler system | |
CN220364873U (en) | Prefabricated bed-jig of bent cap steel reinforcement cage | |
KR20130116054A (en) | Operating method of scaffolding device of corner part | |
CN217352125U (en) | Bailey bridge builds with channel-section steel assembled steel landing stage railing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20020311 |
|
PA0201 | Request for examination | ||
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20040528 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20041216 |
|
N231 | Notification of change of applicant | ||
PN2301 | Change of applicant |
Patent event date: 20050203 Comment text: Notification of Change of Applicant Patent event code: PN23011R01D |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20050304 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20050307 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
PR1001 | Payment of annual fee |
Payment date: 20080115 Start annual number: 4 End annual number: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20090212 Start annual number: 5 End annual number: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20100223 Start annual number: 6 End annual number: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20110224 Start annual number: 7 End annual number: 7 |
|
PR1001 | Payment of annual fee |
Payment date: 20120302 Start annual number: 8 End annual number: 8 |
|
FPAY | Annual fee payment |
Payment date: 20130227 Year of fee payment: 9 |
|
PR1001 | Payment of annual fee |
Payment date: 20130227 Start annual number: 9 End annual number: 9 |
|
FPAY | Annual fee payment |
Payment date: 20140221 Year of fee payment: 10 |
|
PR1001 | Payment of annual fee |
Payment date: 20140221 Start annual number: 10 End annual number: 10 |
|
FPAY | Annual fee payment |
Payment date: 20150304 Year of fee payment: 11 |
|
PR1001 | Payment of annual fee |
Payment date: 20150304 Start annual number: 11 End annual number: 11 |
|
FPAY | Annual fee payment |
Payment date: 20160304 Year of fee payment: 12 |
|
PR1001 | Payment of annual fee |
Payment date: 20160304 Start annual number: 12 End annual number: 12 |
|
FPAY | Annual fee payment |
Payment date: 20170306 Year of fee payment: 13 |
|
PR1001 | Payment of annual fee |
Payment date: 20170306 Start annual number: 13 End annual number: 13 |
|
FPAY | Annual fee payment |
Payment date: 20171227 Year of fee payment: 14 |
|
PR1001 | Payment of annual fee |
Payment date: 20171227 Start annual number: 14 End annual number: 14 |
|
LAPS | Lapse due to unpaid annual fee | ||
PC1903 | Unpaid annual fee |
Termination category: Default of registration fee Termination date: 20191215 |