KR102002336B1 - Construction and dismantle method of temporary work table for furnace scaffold - Google Patents

Construction and dismantle method of temporary work table for furnace scaffold Download PDF

Info

Publication number
KR102002336B1
KR102002336B1 KR1020180140527A KR20180140527A KR102002336B1 KR 102002336 B1 KR102002336 B1 KR 102002336B1 KR 1020180140527 A KR1020180140527 A KR 1020180140527A KR 20180140527 A KR20180140527 A KR 20180140527A KR 102002336 B1 KR102002336 B1 KR 102002336B1
Authority
KR
South Korea
Prior art keywords
frame
wing
truss
base
workbench
Prior art date
Application number
KR1020180140527A
Other languages
Korean (ko)
Inventor
박근배
Original Assignee
주식회사 삼신
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 삼신 filed Critical 주식회사 삼신
Priority to KR1020180140527A priority Critical patent/KR102002336B1/en
Application granted granted Critical
Publication of KR102002336B1 publication Critical patent/KR102002336B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • E04G1/362Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes specially adapted for tanks, silos or similar vessels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The present invention relates to a method for installing and disassembling a temporary workbench for a scaffold inside the furnace of a boiler, comprising: a floor workbench installation step of installing a working platform (140) on an upper plane of a bottom frame, and fastening a rail (153) to an upper plane of a working platform (240) before mounting a transport table (150) on the rail (153); a basic workbench installation step of, when the floor workbench installation step is completed, fastening a lower support frame (260) downwards to both sides of a basic frame, and vertically fastening a plurality of jack bases (250) to an upper end of the basic frame, before installing the working platform (140) on an upper plane of the basic frame; a scaffold tower standing step of, when the basic workbench installation step is completed, fastening a support frame (310) to the jack bases (250) of a basic workbench (200) in multi-stages to form a plurality of adjacent scaffold towers with an adequate height; a wing workbench installation step of, when the scaffold tower standing step is completed, coupling a basic wing frame to each upper end of the scaffold tower and installing a working platform (440) at the gap with an upper plane of the basic wing frame while fastening a lower portion support frame (460) downwards to both sides of a wing frame; and a reinforcing workbench installation step of, when the wing workbench installation step is completed, vertically assembling at a lower portion of both sides of the wing frame to support a wing workbench. Therefore, a temporary workbench can be installed in the furnace of a boiler in a solid, rapid, and safe manner. Furthermore, reliability of the temporary workbench can be magnified.

Description

보일러 노내 비계용 가설 작업대 설치 및 해체 방법{CONSTRUCTION AND DISMANTLE METHOD OF TEMPORARY WORK TABLE FOR FURNACE SCAFFOLD}TECHNICAL FIELD [0001] The present invention relates to a method of installing and dismounting a work table for a scaffold in a boiler,

본 발명은 보일러 노내 비계용 가설 작업대 설치 및 해체 방법에 관한 것으로 상세하게는 화력발전소의 대형 보일러 노내에 가설 작업대를 견고하게 설치하여 안정적인 지지력을 지속적으로 확보 유지하여 안전하게 작업할 수있도록 유도 하므로 안전사고를 방지함과 동시에 신속하고 효율적으로 가설 작업대의 설치하거나 해체 하는 작업을 안정적으로 수행할 수 있도록 하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법에 관한 것이다.The present invention relates to a method of installing and dismounting a work station for a scaffold in a boiler furnace, and more particularly, to a method of disassembling a work station by installing a temporary work station in a large boiler furnace of a thermal power plant, And a method for installing and dismounting a temporary work bench for a scaffold in a boiler in which the temporary work bench can be stably installed or disassembled.

일반적으로 화력발전소는 보일러에서 발생하는 고압의 증기로 터빈을 회전시켜 발전시키는 것으로, 이러한, 화력발전소는 정기적으로 점검하고 보수하는 정비작업을 실시하여 최상의 상태에서 운용할 수 있도록 해야 한다.Generally, a thermal power plant generates a high-pressure steam generated from a boiler by rotating the turbine. Such a thermal power plant should be regularly inspected and repaired so that it can be operated in the best condition.

이를 위한 화력발전소 점검 및 정비작업은 먼저 비계를 이용하여 작업대를 설치하고 작업자가 설치된 작업대를 통해 이동하면서 보일러를 점검 및 정비하고, 작업이 끝나면 설치한 작업대를 해체하는 과정으로 이루어지는 것으로, 특히 보일러 내부의 노(Furnace)는 하부 및 측면이 튜브(Tube)로 둘러싸인 형태로 구성되며 매우 높고 크다.For this purpose, the inspection and maintenance work for the thermal power plant is performed by first installing a workbench by using a scaffold, inspecting and maintaining the boiler while moving through the workbench installed by the worker, and disassembling the workbench installed when the work is finished. The furnace of the present invention is formed in a shape in which a lower portion and a side portion are surrounded by a tube and is very high and large.

따라서, 노내의 버티칼 튜브(Vertical Tube)에 손상이 발생하면 작업위치까지의 접근이 매우 어려워 노내에 조립식 비계를 설치하게 것으로, 이러한 노내의 비계 구조는 구조 안전성을 확보하기 위해 하중이 가장 많이 집중되는 기초트러스와, 각 코너별 집중하중을 담당하는 윙트러스와, 비계의 기능을 담당하는 스냅아웃과, 비계간 결합력을 증가시켜 비계 견고성을 높혀주는 브레이싱, 스팬덱 및 기타 보조부재 등으로 구성된다.Therefore, when the vertical tube in the furnace is damaged, the access to the working position is very difficult, so that the prefabricated scaffold is installed in the furnace. In order to secure structural safety, It consists of a foundation truss, a wing truss that is responsible for the concentrated load at each corner, a snapout that takes charge of the scaffolding function, and a bracing, span deck,

그러나 이와 같이 보일러 노내에 설치되는 종래의 비계는 기초트러스에 발생한 휨 변형은 중간에서 처짐 현상이 발생하며 이로 인해 각 부재 조립시 연결핀을 체결하는 데 불필요한 시간이 소요되거나, 체결하기 곤란해 부분적으로 누락될 확률이 커져 안전성이 떨어질 뿐만 아니라 이로 이하여 트러스에 가해지는 힘을 상쇄시키지 못해 스냅아웃의 수직재에 변형이 생겨 좌굴이 발생하는 등 구조적으로 취약점을 노출할 우려가 높고, 구조적 결함에 의한 트러스의 변형 및 손상이 발생되어 장시간 사용할 수 없음은 물론 안전사고의 우려가 높은 문제점이 있었다.However, in the conventional scaffold installed in the boiler furnace, the bending deformation of the foundation truss causes a sagging phenomenon in the middle, so that it takes a long time to fasten the connecting pin when assembling each member, The possibility of missing is increased, and the safety is deteriorated. Also, since the force applied to the truss is not canceled, the snap-out vertical member is deformed and buckling occurs. Therefore, there is a high possibility that the structural weakness is exposed, So that there is a problem in that it is not possible to use for a long time and there is a high possibility of safety accident.

따라서 본 발명의 주 목적은 보일러 노내에 가설 작업대를 견고하게 신속하며 안전하게 설치할 수 있도록 하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법을 제공하는 데 있다. Accordingly, it is a main object of the present invention to provide a method for installing and dismounting a work station for a scaffold in a boiler in a boiler furnace, which can securely and quickly install the work station in a boiler furnace.

본 발명의 다른 목적은 가설 작업대의 지지력을 향상시켜 지속적으로 확보 유지하도록 함과 동시에 비숙련공도 정확하고 안전하게 작업할 수 있도록 유도하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법을 제공하는 데 있다.It is another object of the present invention to provide a method of installing and dismounting a temporary work bench for a scaffold in a boiler in which the support force of the temporary work bench is improved to continuously maintain and maintain the work, and at the same time,

본 발명의 다른 목적은 가설 작업대의 신뢰성과 효율성을 극대화하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법을 제공하는 데 있다.It is another object of the present invention to provide a method of installing and dismounting a work table for a scaffold in a boiler in order to maximize the reliability and efficiency of the work table.

상기한 목적을 달성하기 위하여 본 발명의 보일러 노내 비계용 가설 작업대 설치 및 해체 방법은 In order to accomplish the above object, the present invention provides a method of installing and dismounting a work station for a scaffold in a boiler,

바닥프레임의 상면에 작업발판을 설치하고 작업발판의 상면에 레일을 체결하고 레일에 이송테이블을 안치시키는 바닥작업대 설치단계와; 상기 바닥작업대 설치단계가 완료되면 기초프레임의 양측에 하향으로 하부지지프레임을 체결함과 동시에 기초프레임의 상단에 수직으로 복수개의 잭베이스를 체결한 다음 기초프레임의 상면에 작업발판을 설치하는 기초작업대 설치단계와; 상기 기초작업대 설치단계가 완료되면 기초작업대의 잭베이스에 지지프레임을 다단으로 체결하여 적정높이의 비계타워를 다수개 인접하여 형성하는 비계타워 입설단계와; 상기 비계타워 입설단계가 완료되면 빅계타워 상단에 기본 윙프레임을 각각 결합하고 기본 윙프레임의 상면과 사이에 작업발판을 설치함과 동시에 윙프레임의 양측에 하향으로 하부지지프레임을 체결하는 윙작업대 설치단계; 및 상기 윙작업대 설치단계가 완료되면 윙프레임의 양측 하부에 수직으로 조립하여 윙작업대를 지지하는 보강작업대 설치단계를 포함하여 구성하되; 상기 보강작업대 체결단계는 보일러 노의 경사면에서 수직으로 사각형상으로 프레임을 상향으로 세워 형성시키는 지지프레임을 구비하되, 지지프레임은 보일러 노의 경사면에 수직봉을 세워 설치하고 수직봉의 중간부분에 수평봉을 순차적으로 연접하여 체결하며, 수직봉의 하단에 체결부재를 구비함과 동시에 체결부재에 윙트러스의 하부지지프레임에 연결하여 체결하는 연결지지봉을 구비하여 구성함을 그 기술적 구성상 기본 특징으로 한다.A step of installing a work platform on an upper surface of a floor frame, fixing a rail on an upper surface of the work platform, and placing a transfer table on the rail; A plurality of jack bases are vertically fastened to the upper ends of the base frames, and a plurality of jack bases are fastened to the upper and lower ends of the base frame, Installation steps; A scaffolding tower forming step of forming a plurality of scaffolding towers of appropriate height adjacent to each other by fastening the support frame to the jack base of the foundation workbench in multiple stages when the foundation workbench installation step is completed; When the step of inserting the scaffold tower is completed, the base wing frame is coupled to the upper end of the big tower, the work footrest is installed between the upper surface of the base wing frame and the wing worktable is fastened to both sides of the wing frame. step; And a reinforcing workbench mounting step of assembling the wing workbench vertically to the lower portions of both sides of the wing frame when the wing workbench installation step is completed, thereby supporting the wing workbench. The supporting frame includes a vertical bar on the inclined surface of the furnace furnace, and a horizontal bar is installed on the middle portion of the vertical bar. And a connecting support bar for connecting and fastening the upper and lower support frames in order, connecting the upper and lower support frames of the wing truss to the fastening members, and connecting support rods for fastening the fastening members to the lower support frame of the wing truss.

따라서 본 발명의 보일러 노내 비계용 가설 작업대 설치 및 해체 방법은 보일러 노내 비계용 가설 작업대는 바닥트러스와 기초트러스 및 윙트러스를 보강트러스로 체결하여 바닥작업대와 기초작업대 및 윙작업대를 형성하므로 비숙련공도 신속하고 견고하게 설치작업을 수행할 수 있도록 하고, 벽면지지구와 경사지지블록을 다양하게 구비하여 안전하게 가설 작업대를 보강지지하므로 안전하게 작업할 수 있도록 함과 동시에 비계타워와 보강작업대 상단에 윙트러스를 체결하여 안전성을 극대화시킬 뿐만 아니라 보강작업대의 하측과 윙트러스의 하부지지프레임을 연결지지봉으로 체결함과 동시에 연결지지봉을 하측으로 연장하여 기초트러스의 하부지지프레임에 연결하거나 바닥트러스에 연결하므로 전체적으로 가설 작업대의 지지력을 극대화시킴으로서 보일러 내의 다양한 작업을 안정적이고 안전하며 효율적으로 수행할 수 있도록 하는 효과가 있다.Therefore, the installation and disassembly method of the boiler in-floor scaffolding system according to the present invention is characterized in that a floor truss, a base truss, and a wing truss are fastened by a reinforcing truss to form a floor work platform and a base work platform and a wing work platform, It is able to perform the installation work quickly and firmly, and it has various wall support and slope support block to support the work station safely, so that it can work safely, and the wing truss is fastened to the top of the scaffold tower and the reinforcement worktable The lower support frame of the wing truss is fastened to the lower support frame of the wing truss by connecting support rods, and at the same time, the connection support rods are extended downwardly to connect to the lower support frame of the foundation truss or to the floor truss, To maximize bearing capacity As a result, it is possible to perform various operations in the boiler in a stable, safe and efficient manner.

도 1 은 본 발명에 따른 보일러 노내 비계용 가설 작업대를 설명하기 위해 나타낸 전체사시도.
도 2 는 본 발명에 따른 보일러 노내 비계용 가설 작업대를 설명하기 위해 나타낸 전체정면도.
도 3 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 바닥트러스 체결상태를 설명하기 위해 나타낸 부분사시도.
도 4 는 본 발명에 따른 보일러 노내 비계용 가설 작업대의 바닥트러스 체결상태를 설명하기 위해 나타낸 전체사시도.
도 5 는 본 발명에 따른 보일러 노내 비계용 가설 작업대의 이송테이블 설치상태를 설명하기 위해 나타낸 사시도.
도 6 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 기초트러스를 설명하기 위해 나타낸 사시도.
도 7 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 기초트러스 체결상태를 설명하기 위해 나타낸 전체사시도.
도 8 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 기초작업대를 설명하기 위해 나타낸 사시도.
도 9 는 본 발명에 따른 보일러 노내 비계용 가설 작업대의 비계타워를 설명하기 위해 나타낸 정면도.
도 10 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 비계타워를 설명하기 위해 나타낸 사시도.
도 11 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 비계타워를 설명하기 위해 나타낸 사시도.
도 12 는 본 발명에 따른 보일러 노내 비계용 가설 작업대의 윙트러스를 설명하기 위해 나타낸 사시도.
도 13 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 윙트러스 체결상태를 설명하기 위해 나타낸 부분사시도.
도 14 는 본 발명에 따른 보일러 노내 비계용 가설 작업대의 기초 윙프레임 체결상태를 설명하기 위해 나타낸 부분사시도
도 15 는 본 발명에 따른 보일러 노내 비계용 가설 작업대의 기초 윙프레임 리프팅상태를 설명하기 위해 나타낸 부분사시도
도 16 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 기초 윙프레임 안착상태를 설명하기 위해 나타낸 부분사시도
도 17 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 윙작업대를 설명하기 위해 나타낸 사시도.
도 18 은 본 발명에 따른 보일러 노내 비계용 가설 작업대의 보강작업대를 설명하기 위해 나타낸 사시도.
도 19 는 본 발명에 따른 보일러 노내 비계용 가설 작업대의 벽면지지구 체결상태를 설명하기 위해 나타낸 부분사시도.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an overall perspective view illustrating a hypothetical workbench for a scaffold in a boiler according to the present invention; FIG.
2 is an overall front view illustrating a hypothetical workbench for a boiler interior scaffold in accordance with the present invention.
FIG. 3 is a partial perspective view for explaining a state of the floor truss engaged state of a temporary work bench for a scaffold in a boiler according to the present invention. FIG.
4 is a whole perspective view for explaining a state of a floor truss engaged state of a work station for a scaffold in a boiler according to the present invention.
5 is a perspective view for explaining a transfer table installation state of a temporary work table for a scaffold in a boiler according to the present invention.
6 is a perspective view for explaining a foundation truss of a hypothetical workbench for a scaffold in a boiler according to the present invention.
FIG. 7 is an overall perspective view for explaining a basic truss engagement state of a temporary work bench for a scaffold in a boiler according to the present invention. FIG.
8 is a perspective view for explaining a foundation workbench of a hypothetical workbench for scaffolding in a boiler according to the present invention.
9 is a front view for explaining a scaffolding tower of a hypothetical workbench for a scaffold in a boiler according to the present invention.
10 is a perspective view illustrating a scaffolding tower of a hypothetical workbench for scaffolding in a boiler according to the present invention.
11 is a perspective view illustrating a scaffolding tower of a hypothetical workbench for scaffolding in a boiler according to the present invention.
12 is a perspective view for explaining a wing truss of a temporary work bench for a scaffold in a boiler according to the present invention.
13 is a partial perspective view for explaining a wing truss fastening state of a work station for a scaffold in a boiler according to the present invention.
FIG. 14 is a partial perspective view for explaining the state of the foundation wing frame fastening of the temporary work bench for scaffolding in the boiler interior according to the present invention. FIG.
15 is a partial perspective view for explaining a basic wing frame lifting state of a temporary work bench for scaffolding in a boiler in accordance with the present invention;
16 is a partial perspective view for explaining a basic wing frame seating state of a temporary work bench for scaffolding in a boiler according to the present invention;
17 is a perspective view for explaining a wing workbench of a hypothetical workbench for a scaffold in a boiler according to the present invention.
18 is a perspective view for explaining a reinforcing workbench of a hypothetical workbench for scaffolding in a boiler according to the present invention.
19 is a partial perspective view for explaining a state of fastening a wall surface of a temporary work bench for a scaffold in a boiler according to the present invention.

이하, 첨부한 도면을 참조하면서 본 발명의 실시 예를 상세하게 설명하면 다음과 같다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 19 에 나타낸 바와 같이, 본 발명은 보일러 노내 비계용 가설 작업대 설치 및 해체 방법은 바닥프레임의 상면에 작업발판(140)을 설치하고 작업발판(240)의 상면에 레일(153)을 체결하고 레일(153)에 이송테이블(150)을 안치시키는 바닥작업대 설치단계와; 상기 바닥작업대 설치단계가 완료되면 기초프레임의 양측에 하향으로 하부지지프레임(260)을 체결함과 동시에 기초프레임의 상단에 수직으로 복수개의 잭베이스(250)를 체결한 다음 기초프레임의 상면에 작업발판(140)을 설치하는 기초작업대 설치단계와; 상기 기초작업대 설치단계가 완료되면 기초작업대(200)의 잭베이스(250)에 지지프레임(310)을 다단으로 체결하여 적정높이의 비계타워를 다수개 인접하여 형성하는 비계타워 입설단계와; 상기 비계타워 입설단계가 완료되면 빅계타워 상단에 기본 윙프레임을 각각 결합하고 기본 윙프레임의 상면과 사이에 작업발판(440)을 설치함과 동시에 윙프레임의 양측에 하향으로 하부지지프레임(460)을 체결하는 윙작업대 설치단계; 및 상기 윙작업대 설치단계가 완료되면 윙프레임의 양측 하부에 수직으로 조립하여 윙작업대를 지지하는 보강작업대 설치단계를 포함하여 구성한다.As shown in FIGS. 1 to 19, the present invention provides a method of installing and dismounting a work station for a scaffold in a boiler cab, comprising the steps of installing a work platform 140 on an upper surface of a floor frame, A floor table mounting step for fixing the transfer table 150 to the rail 153; When the bottom stage mounting step is completed, the lower support frame 260 is downwardly mounted on both sides of the base frame, and a plurality of jack bases 250 are vertically fastened to the top of the base frame. Then, A base workbench installing step of installing a footstool 140; A step of installing a scaffolding tower in which a plurality of scaffolding towers of appropriate height are formed adjacent to each other by fastening the support frame 310 to the jack base 250 of the foundation work platform 200 when the foundation work station installation step is completed; When the step of inserting the scaffold tower is completed, the base wing frame is coupled to the upper end of the big tower, the operation pedestal 440 is installed between the upper surface of the base wing frame and the lower supporting frame 460 is installed downward on both sides of the wing frame. A step of installing a wing workbench for fastening the wing workbench; And a reinforcing workbench mounting step of assembling the wing workbench vertically on both lower sides of the wing frame when the wing workbench installation step is completed.

상기 바닥작업대 설치단계는 바닥트러스(110)를 평행하게 세워 바닥트러스(110)와 바닥트러스(110) 사이에 보강트러스(130)를 직각으로 체결하되 이를 반복하여 순차적으로 설치하는 바닥프레임 형성단계와; 상기 바닥프레임 형성단계가 완료되면 바닥트러스(110)의 상단에 작업발판(140)을 연접하여 형성하는 바닥작업발판 설치단계; 및 상기 바닥작업발판 설치단계가 완료되면 작업발판(240)의 상면에 레일(153)을 체결하고 레일(153)에 이송테이블(150)을 안치시키는 이송테이블 설치단계를 포함하여 구성한다.The floor assembly step includes a floor frame forming step of installing the floor truss 110 in parallel and fixing the reinforcing truss 130 perpendicularly between the floor truss 110 and the floor truss 110, ; A floor operation stool installation step of connecting the operation pedestal 140 to an upper end of the floor truss 110 when the floor frame forming step is completed; And a transfer table installation step of fastening the rail 153 to the upper surface of the operation pedestal 240 and placing the transfer table 150 on the rail 153 when the floor operation pedestal installation step is completed.

여기서 바닥프레임 형성단계는 바닥트러스(110)의 양단에 경사프레임을 형성하여 보일러 노의 하측 경사면에 평행도록 형성하고, 경사지지블록(120)을 바닥트러스(110)의 양단 경사프레임에 각각에 결합하므로 경사지지블록(120)의 밀착패드(122)가 보일러 노의 경사면을 보호함과 동시에 견고하게 밀착할 수 있도록 한다.In the bottom frame forming step, an inclined frame is formed at both ends of the floor truss 110 so as to be parallel to the lower inclined surface of the boiler furnace. The inclined supporting block 120 is coupled to the inclined frame at both ends of the floor truss 110 So that the abutting pad 122 of the inclined support block 120 protects the inclined surface of the boiler furnace and firmly adheres thereto.

나아가, 이송테이블 설치단계는 연접 설치한 작업발판(140)의 상면에 길게 레일(153)을 설치하여 이송테이블(150)을 안착시키되 원활한 이동을 위해 하부에 롤러(152)를 형성함과 동시에 테두리에 다수개의 지지대(151)를 세워 운반물품을 안전하고 용이하게 이송할 수 있도록 함과 동시에 바닥트러스(110)에는 후술하는 기초작업대(200)에 연결시키는 사다리(160)를 구비함이 바람직하다.Further, in the step of installing the transfer table, the rails 153 are installed on the upper surface of the operation pedestal 140, and the transfer table 150 is mounted thereon. In order to smoothly move the transfer table 150, The floor truss 110 may be provided with a ladder 160 to be connected to a base work table 200 to be described later.

상기 기초작업대 설치단계는 상기 이송테이블 설치단계가 완료되면 기초트러스(210)를 평행하게 세워 기초트러스(210)와 기초트러스(210) 사이에 보강트러스(230)를 직각으로 체결하되 이를 반복하여 순차적으로 설치하는 기초프레임 형성단계와; 상기 기초프레임 형성단계가 완료되면 기초프레임의 양측에 하향으로 하부지지프레임(260)을 체결하여 보일러 노의 경사면에 밀착 가압시키는 기초프레임 지지단계와; 상기 기초프레임 지지단계가 완료되면 기초프레임의 상단에 수직으로 복수개의 잭베이스(250)를 체결하는 잭베이스 결합단계; 및 상기 잭베이스 결합단계 가 완료되면 기초트러스(210)의 상단에 작업발판(240)을 연접하여 형성하는 기초작업발판 설치단계를 포함하여 구성한다.In the step of installing the base table, when the transfer table setting step is completed, the base truss 210 is set up in parallel and the reinforcing truss 230 is tightened between the base truss 210 and the base truss 210 at right angles, A base frame forming step of forming a base frame; When the base frame forming step is completed, a base frame supporting step of tightening the lower support frame 260 downward on both sides of the base frame and pressing the lower support frame 260 against the slope of the boiler furnace; A jack base coupling step of coupling the plurality of jack bases 250 vertically to the top of the base frame when the base frame supporting step is completed; And a step of installing a foot pedestal in which the footrest 240 is connected to the upper end of the base truss 210 when the jack base engaging step is completed.

여기서 기초프레임 형성단계는 기초트러스(210)의 양단에 경사프레임을 형성하여 보일러 노의 하측 경사면에 평행하도록 형성하고 경사지지블록(220)을 기초트러스(210)의 양단 경사프레임에 결합하므로 경사지지블록(220)의 밀착패드(222)가 보일러 노의 경사면을 보호함과 동시에 견고하게 밀착할 수 있도록 한다.Here, the base frame forming step may include forming a slanting frame at both ends of the base truss 210 so as to be parallel to the lower slanting plane of the boiler furnace and coupling the slanting supporting block 220 to the slanting frame at both ends of the base truss 210, The adhesion pad 222 of the block 220 protects the inclined surface of the furnace furnace and firmly adheres thereto.

더불어, 기초프레임 지지단계는 기초트러스(210)의 양측 하부에 하부지지프레임(260)을 설치하되 기초트러스(210)의 양단 경사프레임에 하부지지프레임(260)의 지지봉(265)를 핀결합하여 절곡하도록 하고 기초트러스(210)의 하부에 하부지지프레임(260)의 조절봉(261)을 핀결합하여 절곡하도록 설치한 다음 지지봉(265)와 조절봉(261)의 하단을 체결부재에 각각 핀결합하여 지지봉(265)와 조절봉(261)을 역삼각형상으로 형성한 것으로, 조절봉(261)의 양단에 너트(263)를 부착하고 너트(263)에 전산볼트(262)를 나사결합하되 전산볼트(262)를 기초트러스(210)와 체결부재에 핀결합하고, 조절봉(261) 양단의 너트(263)와 전산볼트(262)는 나사방향으로 왼나사와 오른나사로 다르게 하여 조절봉(261)의 회전으로 신축할 수 있도록 하므로, 체결부재에 하측에 핀결합시킨 경사지지블록(270)의 밀착면에 밀착패드(272)가 부착하여 보일러 노의 경사면을 보호함과 동시에 견고하게 밀착할 수 있도록 한다.In addition, in the base frame supporting step, the lower supporting frame 260 is installed on both lower sides of the base truss 210, and the supporting bar 265 of the lower supporting frame 260 is connected to the both ends of the base truss 210 by pin- The lower end of the support rods 261 and the control rods 261 are fastened to the fastening members by fastening the lower ends of the support rods 261 and 261 to the fastening members, A nut 263 is attached to both ends of the control rod 261 and a bolt 262 is screwed to the nut 263, The nut 263 and the bolt 262 at both ends of the adjusting rod 261 are screwed to the left and right screws in the screw direction so that the adjusting rods 261 So that the slant supporting block, which is pin-coupled to the lower side of the fastening member, (272) is attached to the contact surface of the boiler furnace (270) so that the inclined surface of the boiler furnace can be protected and firmly adhered.

아울러, 잭베이스 결합단계는 지지플레이트(255)의 저면에 체결브래킷(254)을 형성하여 기초트러스(210)의 상단에 일정간격으로 한 쌍을 결합하고 지지플레이트(255)의 상면에 체결하는 결합플레이트(253)를 구비하되 결합플레이트(253)의 상향으로 조절나사(252)를 나사결합한 전산볼트(251)를 세워 잭베이스(250)를 형성한다. In the jack base coupling step, a fastening bracket 254 is formed on the bottom surface of the support plate 255, and a pair of the fastening brackets 254 are coupled to the upper end of the base truss 210 at regular intervals and fastened to the upper surface of the support plate 255. A jack base 250 is formed by raising a bolt 251 having a plate 253 and screwing an adjusting screw 252 upward in the coupling plate 253.

상기 비계타워 입설단계는 상기 기초작업발판 설치단계가 완료되면 잭베이스(250)에 지지프레임(310)을 다단으로 체결하여 비계타워(300)를 형성하되 비계타워(300)를 순차적으로 인접하게 다수개 설치하는 비계타워 체결단계로 구성한다.The scaffold tower 300 is formed by fastening the support frame 310 to the jack base 250 in a multistage manner when the scaffold tower installation step is completed, And a scaffolding tower to be installed.

여기서 비계타워(300)는 기초작업대(200)의 잭베이스(250)에 사각형상으로 프레임을 상향으로 세워 다단으로 형성시키는 지지프레임(310)을 형성하되 지지프레임(310)의 수직봉(311)을 기초작업대(200)의 잭베이스(250)에 세워 설치하고 수직봉(311)의 상부와 중간부분에 수평봉(312)을 순차적으로 연접하여 체결하며 경사봉(313)을 수직봉(311) 사이마다 동일 방향의 경사각으로 체결하여 지지력을 향상시키도록 함과 동시에 작업발판(320)을 수평봉(312) 사이에 선택적으로 설치하고 상부연결지지구(330)를 구비하여 후술하는 윙트러스(410)의 하단에 용이하고 견고하게 체결할 수 있도록 하는 것으로, 상부연결지지구(330)는 수직봉(331)과 수평봉(332)로 결합하여 'T'자 형상으로 형성하되 수직봉(331)을 다단으로 형성시킨 지지프레임(310)의 최상단 수직봉(311)에 결합하고 수평봉(332)의 좌우에 클램프(333)을 부착하여 형성한 것이다.Here, the scaffolding tower 300 includes a support frame 310 which is formed in the jack base 250 of the foundation work platform 200 in a rectangular shape with the frame upward, And a horizontal bar 312 is successively connected and fastened to the upper and middle portions of the vertical bar 311 so that the angled bar 313 is inserted between the vertical bars 311 The operation pedestal 320 is selectively installed between the horizontal bars 312 and the upper connection support part 330 is provided to connect the wing truss 410 The upper connection support part 330 is connected to the vertical bar 331 by a horizontal bar 332 so as to be formed into a T shape and the vertical bar 331 is formed in a multi- And is coupled to the uppermost vertical rod 311 of the formed support frame 310, And a clamp 333 is attached to the left and right of the flat rod 332. [

상기 윙작업대 설치단계는 상기 비계타워 체결단계가 완료되면 윙트러스(410)를 평행하게 세워 윙트러스(410)와 윙트러스(410) 사이에 보강트러스(430)를 직각으로 체결하여 기본 윙프레임을 형성한 다음 기본 윙프레임을 각각의 비계타워(300)의 상단에 순차적으로 체결하는 기본 윙프레임 체결단계와; 상기 기본 윙프레임 체결단계가 완료되면 기본 윙프레임의 윙트러스(410)와 윙트러스(410) 사이에 작업발판(440)을 연접하여 체결함과 동시에 인접하는 윙프레임과 윙프레임 사이에 작업발판(440)으로 연접하는 윙작업발판 설치단계; 및 상기 윙작업발판 설치단계가 완료되면 윙프레임의 양측에 하향으로 하부지지프레임(460)을 체결하여 보일러 노의 경사면에 밀착 가압시키는 윙프레임 지지단계를 포함하여 구성한다. The wing worktable is installed in a state where the wing truss 410 is parallel to the wing truss 410 and the reinforcing truss 430 is inserted between the wing truss 410 and the wing truss 410 at a right angle, A basic wing frame fastening step of sequentially fastening the formed base wing frame to the upper end of each scaffold tower 300; When the basic wing frame fastening step is completed, the operation footrest 440 is connected and fastened between the wing truss 410 and the wing truss 410 of the basic wing frame, 440); And a wing frame supporting step of tightly pressing the lower supporting frame 460 downward on both sides of the wing frame and pressing the upper supporting frame 460 against the slope of the boiler furnace when the wing working foot mounting step is completed.

여기서 기본 윙프레임 체결단계는 기초작업대(200)에서 센터트러스(411)의 좌우에 사이드트러스(412)를 일직선상으로 체결하여 윙트러스(410)를 형성하되 사이드트러스(412)의 외향측에 경사프레임을 형성하여 보일러 노의 하측 경사면에 평행할 수 있도록 하고, 경사지지블록(420)을 윙트러스(210)의 양단 경사프레임에 결합하므로 경사지지블록(420)의 밀착패드(422)가 보일러 노의 경사면을 보호함과 동시에 견고하게 밀착할 수 있도록 한다.In the basic wing frame fastening step, the wing trusses 410 are formed by fastening the side trusses 412 to the left and right sides of the center truss 411 in the base work platform 200, And the slant supporting block 420 is coupled to the both end inclined frame of the wing truss 210 so that the contact pad 422 of the slant supporting block 420 is connected to the bottom of the boiler furnace 420, So as to be firmly adhered to each other.

더욱이, 이러한 기본 윙프레임은 길이가 비교적 길어 보일러 노내에서 리프팅하여 비계타워(300)에 안착시킬 때 기본 윙프레임의 일측을 내리거나 올려 기울인 상태로 회전시켜 서서히 안착시키도록 함이 바람직하다.In addition, when the base wing frame is relatively long in length and is lifted in the boiler furnace and is mounted on the scaffold tower 300, it is preferable that one side of the basic wing frame is rotated or lowered in an inclined state so as to be seated gradually.

나아가, 윙작업발판 설치단계는 작업발판(440)을 연접하여 체결하되 개폐문을 형성한 개폐발판(450)을 구비하여 비계타워(300)의 사다리(340)의 상측에 개폐문이 위치하도록 체결하여 출입을 용이하게 한다.In addition, the step of installing the wing operation footsteps includes an opening / closing door 450 formed by connecting the operation footstep 440 and forming an opening / closing door so that the opening / closing door is placed on the upper side of the ladder 340 of the scaffolding tower 300, .

더불어, 윙프레임 지지단계는 윙트러스(410)의 양측 하부에 하부지지프레임(460)을 설치하되 윙트러스(410)의 양단 경사프레임에 하부지지프레임(460)의 지지봉(465)를 핀결합하여 절곡하도록 하고 윙트러스(410)의 하부에 하부지지프레임(460)의 조절봉(461)을 핀결합하여 절곡하도록 설치한 다음 지지봉(465)와 조절봉(461)의 하단을 체결부재에 각각 핀결합하여 지지봉(465)와 조절봉(461)을 역삼각형상으로 형성한 것으로, 조절봉(461)의 양단에 너트(463)를 부착하고 너트(463)에 전산볼트(462)를 나사결합하되 전산볼트(462)를 윙트러스(410)와 체결부재에 핀결합하고, 조절봉(461) 양단의 너트(463)와 전산볼트(462)는 나사방향으로 왼나사와 오른나사로 다르게 하여 조절봉(261)의 회전으로 신축할 수 있도록 하므로, 체결부재에 하측에 핀결합시킨 경사지지블록(470)의 밀착면에 밀착패드(472)가 부착하여 보일러 노의 경사면을 보호함과 동시에 견고하게 밀착할 수 있도록 한다.In addition, in the supporting step of the wing frame, the lower supporting frame 460 is installed at both lower sides of the wing truss 410, and the supporting rods 465 of the lower supporting frame 460 are connected to the both ends of the wing truss 410 by pin- The upper end of the control rod 461 and the lower end of the control rod 461 are fixed to the lower end of the wing truss 410 by means of pins A nut 463 is attached to both ends of the adjusting rod 461 and a bolt 462 is screwed to the nut 463, The nut 463 and the bolt 462 at both ends of the adjusting rod 461 are screwed to the left and right threads in the screw direction so that the adjusting rods 261 So that it can be stretched and contracted by the rotation of the slant supporting block 470 which is pin- The adhesion pad 472 is attached to the surface of the furnace so that the inclined surface of the furnace furnace can be protected and firmly adhered.

아울러, 윙프레임 지지단계는 윙트러스(410)에 벽면지지구(480)를 형성하여 보일러 노의 수직벽면에 지지플레이트(483)를 밀착하여 가압하여 견고한 지지력을 얻을 수 있도록 하되, 상기 벽면지지구(480)는 지지봉(481)을 윙트러스(410)에 직각으로 교차하도록 체결하되 전후단의 윙트러스(410)에 체결하고 지지봉(481)의 상측에 이동지지봉(482)을 클램프(484)로 결합하여 일체화하며 이동지지봉(482)의 전단에 지지플레이트(483)를 부착하여 보일러 노 내벽에 밀착시킬 수 있도록 하는 것이다.In addition, in the step of supporting the wing frame, a wall supporting member 480 is formed on the wing truss 410 to press the support plate 483 against the vertical wall surface of the boiler furnace so as to obtain a strong supporting force, The support rods 480 are fastened to the wing trusses 410 at the front and rear ends so that the support rods 481 intersect at right angles to the wing trusses 410 and the movement support rods 482 are fastened to the clamps 484 And the support plate 483 is attached to the front end of the movable support bar 482 so as to be brought into close contact with the inner wall of the boiler furnace.

상기 보강작업대 설치단계는 상기 윙프레임 지지단계가 완료되면 윙프레임의 양측 하부에 수직으로 조립하여 윙프레임을 지지하는 보강작업대 체결단계를 포함하여 구성한다.The reinforcing workbench attaching step includes a reinforcing workbench fastening step of supporting the wing frame by assembling vertically to both lower sides of the wing frame when the wing frame supporting step is completed.

여기서 보강작업대 체결단계는 보일러 노의 경사면에서 수직으로 사각형상으로 프레임을 상향으로 세워 형성시키는 지지프레임(510)를 구비하되, 지지프레임(510)은 보일러 노의 경사면에 4개의 수직봉(511)를 세워 설치하고 수직봉(511)의 중간부분에 수평봉(512)을 순차적으로 연접하여 체결하며, 수직봉(511)의 하단에 체결부재(516)를 구비한 것으로, 체결부재(516)에 윙트러스(410)의 하부지지프레임(460)에 연결하여 체결하는 연결지지봉(514)을 구비하여 일체화 시킬 수 있도록 한다.The supporting frame 510 includes four vertical rods 511 on the inclined surface of the furnace furnace. The supporting frame 510 includes a vertical frame 511, And a horizontal rod 512 is successively joined to the intermediate portion of the vertical bar 511 and fastened to the vertical bar 511. A fastening member 516 is provided at the lower end of the vertical bar 511. The fastening member 516 is provided with a wing And a connection support rod 514 connected to the lower support frame 460 of the truss 410 to be fastened together to be integrated.

더욱이, 연결지지봉(514)은 체결부재(516)의 하측으로 연장하여 기초트러스(210)의 하부지지프레임(260)에 연결하거나 바닥트러스(110)에 연결하여 전체적으로 연결하여 구조적 안전성을 확보할 수 있도록 한다.The connection support rod 514 may extend to the lower side of the fastening member 516 and may be connected to the lower support frame 260 of the base truss 210 or may be connected to the floor truss 110 to secure the structural safety. .

아울러 상부연결지지구(530)를 구비하여 윙트러스(410)의 하단에 용이하고 견고하게 체결할 수 있도록 하는 것으로, 상부연결지지구(530)는 수직봉(531)과 수평봉(532)로 결합하여 'T'자 형상으로 형성하되 수직봉(531)을 지지프레임(510)의 수직봉(511)에 결합하고 수평봉(532)의 좌우에 클램프(533)를 부착하여 윙트러스(410)의 하단에 용이하고 견고하게 체결할 수 있도록 한다.The upper connection support unit 530 is provided with a vertical bar 531 and a horizontal bar 532. The upper connection support unit 530 is provided at the lower end of the wing truss 410, And the vertical bar 531 is coupled to the vertical bar 511 of the support frame 510 and the clamp 533 is attached to the left and right of the horizontal bar 532 so that the lower end of the wing truss 410 So that it can be easily and firmly fastened.

더불어, 체결부재(516)의 하측에는 경사지지블록(540)을 핀결합하여 각도조절이 원활하도록 하되, 경사지지블록(540)의 밀착면에 밀착패드(542)를 부착하여 보일러 노의 경사면을 보호함과 동시에 견고하게 밀착할 수 있도록 한다.In addition, the slope supporting block 540 is pin-coupled to the lower side of the fastening member 516 so that the angle adjustment can be smoothly performed. In this case, the slope of the slope supporting block 540 Protect it and make it firmly in close contact with it.

한편 본 발명의 보일러 노내 비계용 가설 작업대의 해체는 상기의 역순으로 진행한다. In the meantime, disassembly of the temporary work bench for scaffolding in the boiler in the present invention proceeds in the reverse order.

이러한 본 발명의 보일러 노내 비계용 가설 작업대 설치 및 해체 방법은 바닥트러스(110)를 평행하게 세워 바닥트러스(110)와 바닥트러스(110) 사이에 보강트러스(130)를 직각으로 체결하여 바닥작업대(100)를 형성하고, 기초트러스(210)를 평행하게 세워 기초트러스(210)와 기초트러스(210) 사이에 보강트러스(230)를 직각으로 체결하여 기초작업대(200)를 형성하며, 윙트러스(410)를 평행하게 세워 윙트러스(410)와 윙트러스(410) 사이에 보강트러스(430)를 직각으로 체결하여 윙작업대(400)를 형성하므로 설치작업을 신속하게 수행할 수 있을 뿐만 아니라 견고한 지지력을 확보할 수 있으며 비계 순련공이 아니더라도 설치작업을 수행할 수 있는 것이다.The method of installing and dismounting a work table for a boiler in a boiler according to the present invention includes installing a floor truss 110 in parallel and fixing a reinforcing truss 130 at a right angle between a floor truss 110 and a floor truss 110, The foundation truss 210 is formed in parallel and the reinforcing truss 230 is tightened at a right angle between the foundation truss 210 and the foundation truss 210 to form the foundation work platform 200, 410 are parallel to each other and the reinforcing truss 430 is inserted at right angles between the wing trusses 410 and the wing trusses 410 to form the wing workstations 400. In addition, And it is possible to perform installation work even if it is not a scaffold.

아울러, 윙작업대(400)의 윙트러스(410)에는 벽면지지구(480)를 형성하여 보일러 노의 수직벽면에 지지플레이트(483)를 밀착하여 가압하고, 바닥트러스(210)와 기초트러스(210) 및 윙트러스(410)의 경사지지블록(120,220,420)을 보일러 노의 경사면에 안정적으로 밀착하여 가압하며, 기초트러스(210) 및 윙트러스(410)의 하부지지프레임(260,460)에 형성시킨 경사지지블록(270,470)을 조절봉(261,461)으로 조절하여 가압함과 동시에 보강작업대(500)의 경사지지블록(540)으로 지지하여 안전하게 가설 작업대(10)를 보강지지하므로 안전하고 원활하게 작업할 수 있도록 하는 것이다.A wall support member 480 is formed on the wing truss 410 of the wing work station 400 so that the support plate 483 is pressed against the vertical wall surface of the boiler furnace to press the floor truss 210 and the foundation truss 210 The slant support blocks 120, 220 and 420 of the wing truss 410 stably contact and press the slant support blocks 120, 220 and 420 of the wing truss 410 on the inclined surfaces of the boiler furnace and are supported on the lower support frames 260 and 460 of the base truss 210 and the wing trusses 410, The blocks 270 and 470 are adjusted by the adjustment rods 261 and 461 and pressed and supported by the inclined support block 540 of the reinforcement work table 500 to securely support the work station 10 so that it can be safely and smoothly operated .

더욱이, 기초작업대(100)의 상면에서 비계타워(300)을 설치하고 비계타워(300) 상단에 윙작업대(400)를 체결함과 동시에 비계타워(300)의 양측에 보강작업대(500)를 형성하여 보일러노의 경사부분 점검 보수하는 정비작업을 안전하고 효율적으로 수행할 수 있도록 할 뿐만 아니라 비계타워(300)와 보강작업대(500)의 상단에 윙작업대(400)를 체결하므로 견고한 지지력을 확보하여 가설 작업대(10)의 안전하게 안정적으로 지지하여 안전사고를 방지할 수 있도록 하는 것이다.The scaffolding tower 300 is installed on the upper surface of the foundation workbench 100 and the wing workbench 400 is fastened to the upper end of the scaffolding tower 300 and the reinforcing workbench 500 is formed on both sides of the scaffolding tower 300 The maintenance work for inspecting and repairing the inclined portion of the boiler furnace can be performed safely and efficiently, and the wing work table 400 is fastened to the upper ends of the scaffolding tower 300 and the reinforcing work platform 500, So that it is possible to securely and stably support the hypothetical workbench 10 to prevent a safety accident.

특히 보강작업대(500)에는 윙트러스(410)의 하부지지프레임(460)을 연결지지봉(514)으로 체결함과 동시에 연결지지봉(514)을 하측으로 연장하여 기초트러스(210)의 하부지지프레임(260)에 연결하거나 바닥트러스(110)에 연결하므로 전체적으로 가설 작업대(10)의 지지력을 극대화시키므로 보일러 내의 다양한 작업을 효율적으로 수행할 수 있도록 하는 것이다.Particularly, the lower supporting frame 460 of the wing truss 410 is fastened to the reinforcing table 500 by the connecting supporting bar 514 and the connecting supporting bar 514 is extended downward, 260 or the floor truss 110, thereby maximizing the supporting force of the temporary work table 10, so that various operations in the boiler can be efficiently performed.

이상의 설명에서 본 발명은 특정의 실시 예와 관련하여 도시 및 설명하였지만, 특허청구범위에 의해 나타난 발명의 사상 및 영역으로부터 벗어나지 않는 한도 내에서 다양한 개조 및 변화가 가능하다는 것을 이 기술분야에서 통상의 지식을 가진 자라면 누구나 쉽게 알 수 있을 것이다.While the invention has been shown and described with respect to the specific embodiments thereof, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention as defined by the appended claims. Anyone who has it will know it easily.

10 : 가설작업대 100 : 바닥작업대 110: 바닥트러스
120 : 경사지지블록 121 : 체결부재 122 : 밀착패드
130 : 보강트러스 131 : 체결부재 140 : 작업발판
141 : 체결부재 150 : 이송테이블 151 : 지지대
152 : 롤러 153 : 레일 160 : 사다리
200 : 기초작업대 210 : 기초트러스 220 : 경사지지블록
221 : 체결부재 222 : 밀착패드 230 : 보강트러스
231 : 체결부재 240 : 작업발판 241 : 체결부재
250 : 잭베이스 251 : 전산볼트 252 : 조절나사
253 : 결합플레이트 254 : 체결브래킷 255 : 지지플레이트
260 : 하부지지프레임 261 : 조절봉 262 : 손잡이
263 :너트 264 : 전산볼트 265 : 지지봉
270 : 경사지지블록 272 : 밀착패드 300 : 비계타워
310 : 지지프레임 311 : 수직봉 312 : 수평봉
313 : 경사봉 314 : 체결부재 320 : 작업발판
330 : 상부연결지지구 331 : 수직봉 332 : 수평봉
333 : 클램프 340 : 사다리 400 : 윙 작업대
410 : 윙트러스 411 : 센터트러스 412 : 사이드트러스
413 : 트러스연결구 420 : 경사지지블록 421 : 체결부재
422 : 밀착패드 430 : 보강트러스 431 : 체결부재
440 : 작업발판 441 : 체결부재 450 : 개폐발판
451 : 체결부재 460 : 하부지지프레임 461 : 조절봉
462 : 손잡이 463 :너트 464 : 전산볼트
465 : 지지봉 466 : 연결지지봉 470 : 경사지지블록
472 : 밀착패드 480 : 벽면지지구 481 : 지지봉
482 : 이동지지봉 483 : 지지플레이트 484 : 클램프
500 : 보강작업대 510 : 지지프레임 511 : 수직봉
512 : 수평봉 513 : 경사지지봉 514 : 연결지지봉
515 : 보조지지봉 516 : 체결부재 520 : 작업발판
530 : 상부연결지지구 531 : 수직봉 532 : 수평봉
533 : 클램프 540 : 경사지지블록 541 : 체결브래킷
542 : 밀착패드 550 : 잭베이스
10: hypothetical workbench 100: floor workbench 110: floor truss
120: slant supporting block 121: fastening member 122:
130: reinforcing truss 131: fastening member 140: work footrest
141: fastening member 150: transfer table 151: support
152: roller 153: rail 160: ladder
200: foundation work platform 210: foundation truss 220: inclined support block
221: fastening member 222: tight contact pad 230: reinforced truss
231: fastening member 240: work footrest 241: fastening member
250: Jack base 251: Numerical bolt 252: Adjusting screw
253: coupling plate 254: fastening bracket 255:
260: lower supporting frame 261: adjusting rod 262: handle
263: Nuts 264: Numerical bolts 265:
270: slant supporting block 272: adhesion pad 300: scaffold tower
310: support frame 311: vertical bar 312: horizontal bar
313: slanting rod 314: fastening member 320: work footrest
330: Upper connecting portion 331: Vertical rod 332: Horizontal rod
333: clamp 340: ladder 400: wing workbench
410: Wing truss 411: Center truss 412: Side truss
413: truss connection port 420: inclined support block 421: fastening member
422: adhesion pad 430: reinforcing truss 431: fastening member
440: operation footrest 441: fastening member 450: opening / closing step
451: fastening member 460: lower support frame 461:
462: Handle 463: Nut 464:
465: support rod 466: connection support rod 470: inclined support block
472: Adhesive pad 480: Wall support area 481: Support rod
482: moving support rod 483: support plate 484: clamp
500: reinforcement workbench 510: support frame 511: vertical bar
512: horizontal rod 513: inclined jig 514: connecting rod
515: auxiliary support rod 516: fastening member 520: work footrest
530: Upper connection area 531: Vertical rod 532: Horizontal rod
533: clamp 540: inclined support block 541: fastening bracket
542: Adhesive pad 550: Jack base

Claims (6)

바닥프레임의 상면에 작업발판(140)을 설치하고 작업발판(240)의 상면에 레일(153)을 체결하고 레일(153)에 이송테이블(150)을 안치시키는 바닥작업대 설치단계와;
상기 바닥작업대 설치단계가 완료되면 기초프레임의 양측에 하향으로 하부지지프레임(260)을 체결함과 동시에 기초프레임의 상단에 수직으로 복수개의 잭베이스(250)를 체결한 다음 기초프레임의 상면에 작업발판(140)을 설치하는 기초작업대 설치단계와;
상기 기초작업대 설치단계가 완료되면 기초작업대(200)의 잭베이스(250)에 지지프레임(310)을 다단으로 체결하여 적정높이의 비계타워를 다수개 인접하여 형성하는 비계타워 입설단계와;
상기 비계타워 입설단계가 완료되면 빅계타워 상단에 기본 윙프레임을 각각 결합하고 기본 윙프레임의 상면과 사이에 작업발판(440)을 설치함과 동시에 윙프레임의 양측에 하향으로 하부지지프레임(460)을 체결하는 윙작업대 설치단계; 및
상기 윙작업대 설치단계가 완료되면 윙프레임의 양측 하부에 수직으로 조립하여 윙작업대를 지지하는 보강작업대 설치단계를 포함하여 구성하되,
상기 보강작업대 설치단계는 보일러 노의 경사면에서 수직으로 사각형상으로 프레임을 상향으로 세워 형성시키는 지지프레임(510)을 구비하되, 지지프레임(510)은 보일러 노의 경사면에 4개의 수직봉(511)를 세워 설치하고 수직봉(511)의 중간부분에 수평봉(512)을 순차적으로 연접하여 체결하며, 수직봉(511)의 하단에 체결부재(516)를 구비하여 체결부재(516)에 윙트러스(410)의 하부지지프레임(460)에 체결하는 연결지지봉(514)을 구비함과 동시에 체결부재(516)의 하측의 기초트러스(210)의 하부지지프레임(260)에 연결하거나 바닥트러스(110)에 연결하는 연결지지봉(514)을 구비하도록 하는 구성한 것을 특징으로 하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법.
Installing a work platform (140) on an upper surface of the floor frame, fixing a rail (153) to an upper surface of the work platform (240) and placing the transfer table (150) on the rail (153);
When the bottom stage mounting step is completed, the lower support frame 260 is downwardly mounted on both sides of the base frame, and a plurality of jack bases 250 are vertically fastened to the top of the base frame. Then, A base workbench installing step of installing a footstool 140;
A step of installing a scaffolding tower in which a plurality of scaffolding towers of appropriate height are formed adjacent to each other by fastening the support frame 310 to the jack base 250 of the foundation work platform 200 when the foundation work station installation step is completed;
When the step of inserting the scaffold tower is completed, the base wing frame is coupled to the upper end of the big tower, the operation pedestal 440 is installed between the upper surface of the base wing frame and the lower supporting frame 460 is installed downward on both sides of the wing frame. A step of installing a wing workbench for fastening the wing workbench; And
And a reinforcing workbench mounting step of assembling the wing workbench vertically to the lower portions of both sides of the wing frame when the wing workbench installation step is completed,
The supporting frame 510 includes four vertical rods 511 on the inclined surface of the boiler furnace, and the vertical frame 511 is formed on the upper surface of the supporting frame 510, And a horizontal rod 512 is successively joined to an intermediate portion of the vertical bar 511 to fasten the vertical bar 511. A fastening member 516 is provided at the lower end of the vertical bar 511 to fasten the fastening member 516 to the wing truss The lower truss 210 is connected to the lower supporting frame 260 of the lower truss 210 and the lower truss 110 is connected to the lower supporting frame 460 of the lower truss 210, And a connection support rod (514) for connecting the boiler to the boiler.
제 1 항에 있어서,
상기 바닥작업대 설치단계는 바닥트러스(110)를 평행하게 세워 바닥트러스(110)와 바닥트러스(110) 사이에 보강트러스(130)를 직각으로 체결하되 이를 반복하여 순차적으로 설치하는 바닥프레임 형성단계와; 상기 바닥프레임 형성단계가 완료되면 바닥트러스(110)의 상단에 작업발판(140)을 연접하여 형성하는 바닥작업발판 설치단계; 및 상기 바닥작업발판 설치단계가 완료되면 작업발판(240)의 상면에 레일(153)을 체결하고 레일(153)에 이송테이블(150)을 안치시키는 이송테이블 설치단계를 포함하여 구성하되;
상기 바닥프레임 형성단계는 바닥트러스(110)의 양단에 경사프레임을 형성하여 보일러 노의 하측 경사면에 평행도록 형성하고, 경사지지블록(120)을 바닥트러스(110)의 양단 경사프레임에 각각에 결합하여 구성한 것을 특징으로 하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법.
The method according to claim 1,
The floor assembly step includes a floor frame forming step of installing the floor truss 110 in parallel and fixing the reinforcing truss 130 perpendicularly between the floor truss 110 and the floor truss 110, ; A floor operation stool installation step of connecting the operation pedestal 140 to an upper end of the floor truss 110 when the floor frame forming step is completed; And a transfer table installation step of fastening the rail 153 to the upper surface of the operation pedestal 240 and placing the transfer table 150 on the rail 153 when the floor installation step is completed.
The bottom frame forming step may include forming an inclined frame at both ends of the bottom truss 110 so as to be parallel to a lower inclined surface of the boiler furnace and inserting the inclined supporting block 120 into the inclined frame at both ends of the floor truss 110 And a method for installing and dismounting a work table for a scaffold in a boiler.
제 1 항에 있어서,
상기 기초작업대 설치단계는 기초트러스(210)를 평행하게 세워 기초트러스(210)와 기초트러스(210) 사이에 보강트러스(230)를 직각으로 체결하되 이를 반복하여 순차적으로 설치하는 기초프레임 형성단계와; 상기 기초프레임 형성단계가 완료되면 기초프레임의 양측에 하향으로 하부지지프레임(260)을 체결하여 보일러 노의 경사면에 밀착 가압시키는 기초프레임 지지단계와; 상기 기초프레임 지지단계가 완료되면 기초프레임의 상단에 수직으로 복수개의 잭베이스(250)를 체결하는 잭베이스 결합단계; 및 상기 잭베이스 결합단계 가 완료되면 기초트러스(210)의 상단에 작업발판(240)을 연접하여 형성하는 기초작업발판 설치단계를 포함하여 구성하되,
상기 기초프레임 형성단계는 기초트러스(210)의 양단에 경사프레임을 형성하여 보일러 노의 하측 경사면에 평행하도록 형성하고 경사지지블록(220)을 기초트러스(210)의 양단 경사프레임에 결합하여 구성한 것을 특징으로 하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법.
The method according to claim 1,
In the step of installing the base workbench, a base frame forming step of setting the base truss 210 in parallel and fixing the reinforcing truss 230 at a right angle between the base truss 210 and the base truss 210, ; When the base frame forming step is completed, a base frame supporting step of tightening the lower support frame 260 downward on both sides of the base frame and pressing the lower support frame 260 against the slope of the boiler furnace; A jack base coupling step of coupling the plurality of jack bases 250 vertically to the top of the base frame when the base frame supporting step is completed; And a step of connecting the footrest 240 to the upper end of the base truss 210 when the jack base combining step is completed,
The base frame forming step may include forming an inclined frame at both ends of the base truss 210 so as to be parallel to the lower inclined plane of the boiler furnace and coupling the inclined support block 220 to the inclined frame at both ends of the base truss 210 A method of installation and dismantling of a temporary workbench for a scaffold in a boiler.
제 1 항 또는 제 3 항에 있어서,
상기 비계타워 입설단계는 잭베이스(250)에 지지프레임(310)을 다단으로 체결하여 비계타워(300)를 형성하되 비계타워(300)를 순차적으로 인접하게 다수개 설치하되 기초작업대(200)의 잭베이스(250)에 사각형상으로 프레임을 상향으로 세워 다단으로 형성시키는 지지프레임(310)을 형성하되 지지프레임(310)의 수직봉(311)을 기초작업대(200)의 잭베이스(250)에 세워 설치하고 수직봉(311)의 상부와 중간부분에 수평봉(312)을 순차적으로 연접하여 체결하며 경사봉(313)을 수직봉(311) 사이마다 동일 방향의 경사각으로 체결하여 구성한 것을 특징으로 하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법.
The method according to claim 1 or 3,
The scaffold tower 300 is formed by joining the support frame 310 to the jack base 250 in a plurality of stages so that a plurality of scaffolding towers 300 are disposed adjacent to each other in a sequential manner. A support frame 310 is formed on the jack base 250 so that the frame is formed upward in a rectangular shape and the support frame 310 is vertically formed in the jack base 250. The vertical frame 311 of the support frame 310 is connected to the jack base 250 of the foundation work platform 200 And a horizontal bar (312) is successively joined to the upper and middle portions of the vertical bar (311), and the oblique bar (313) is fastened between the vertical bars (311) at an inclination angle of the same direction Installation and disassembly of a temporary work bench for scaffolding in a boiler.
제 1 항에 있어서
상기 윙작업대 설치단계는 윙트러스(410)를 평행하게 세워 윙트러스(410)와 윙트러스(410) 사이에 보강트러스(430)를 직각으로 체결하여 기본 윙프레임을 형성한 다음 기본 윙프레임을 각각의 비계타워(300)의 상단에 순차적으로 체결하는 기본 윙프레임 체결단계와; 상기 기본 윙프레임 체결단계가 완료되면 기본 윙프레임의 윙트러스(410)와 윙트러스(410) 사이에 작업발판(440)을 연접하여 체결함과 동시에 인접하는 윙프레임과 윙프레임 사이에 작업발판(440)으로 연접하는 윙작업발판 설치단계; 및 상기 윙작업발판 설치단계가 완료되면 윙프레임의 양측에 하향으로 하부지지프레임(460)을 체결하여 보일러 노의 경사면에 밀착 가압시키는 윙프레임 지지단계를 포함하여 구성하되;
상기 기본 윙프레임 체결단계는 기초작업대(200)에서 센터트러스(411)의 좌우에 사이드트러스(412)를 일직선상으로 체결하여 윙트러스(410)를 형성하되 사이드트러스(412)의 외향측에 경사프레임을 형성하여 보일러 노의 하측 경사면에 평행할 수 있도록 하고, 경사지지블록(420)을 윙트러스(210)의 양단 경사프레임에 결합하여 구성하며,
상기 윙프레임 지지단계는 윙트러스(410)에 벽면지지구(480)를 형성하여 보일러 노의 수직벽면에 지지플레이트(483)를 밀착하여 가압하도록 구성한 것을 특징으로 하는 보일러 노내 비계용 가설 작업대 설치 및 해체 방법.
The method of claim 1, wherein
In the step of installing the wing workbench, the wing truss 410 is installed in parallel to form a basic wing frame by tightening the reinforcing truss 430 between the wing truss 410 and the wing truss 410, A base wing frame fastening step of fastening the base wing frame to an upper end of the scaffold tower 300; When the basic wing frame fastening step is completed, the operation footrest 440 is connected and fastened between the wing truss 410 and the wing truss 410 of the basic wing frame, 440); And a wing frame supporting step of tightening the lower support frame (460) downward on both sides of the wing frame and pressing the lower support frame (460) against the slope of the boiler furnace when the wing operation footrest installation step is completed.
The base wing frame fastening step is performed by fastening the side truss 412 to the left and right of the center truss 411 in the base work table 200 to form a wing truss 410, The slope supporting block 420 may be coupled to the both-end inclined frame of the wing truss 210,
Wherein the wing frame supporting step comprises forming a wall surface support member 480 on the wing truss 410 so as to press the support plate 483 against the vertical wall surface of the boiler furnace, Dismantling method.
삭제delete
KR1020180140527A 2018-11-15 2018-11-15 Construction and dismantle method of temporary work table for furnace scaffold KR102002336B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180140527A KR102002336B1 (en) 2018-11-15 2018-11-15 Construction and dismantle method of temporary work table for furnace scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180140527A KR102002336B1 (en) 2018-11-15 2018-11-15 Construction and dismantle method of temporary work table for furnace scaffold

Publications (1)

Publication Number Publication Date
KR102002336B1 true KR102002336B1 (en) 2019-07-23

Family

ID=67439917

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180140527A KR102002336B1 (en) 2018-11-15 2018-11-15 Construction and dismantle method of temporary work table for furnace scaffold

Country Status (1)

Country Link
KR (1) KR102002336B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210071163A (en) * 2019-12-05 2021-06-16 한국남부발전 주식회사 Open space minimized cylindrical tank maintenance scaffold tower

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101734445B1 (en) * 2016-01-13 2017-05-11 한국남동발전 주식회사 Bench and its installation method using the trusses
KR20170127278A (en) * 2016-05-11 2017-11-21 대우조선해양 주식회사 Scaffold apparatus for offshore plant
KR101913668B1 (en) * 2018-04-12 2018-10-31 호리코리아(주) A prefabricated scaffolding device which can work aheat power plant

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101734445B1 (en) * 2016-01-13 2017-05-11 한국남동발전 주식회사 Bench and its installation method using the trusses
KR20170127278A (en) * 2016-05-11 2017-11-21 대우조선해양 주식회사 Scaffold apparatus for offshore plant
KR101913668B1 (en) * 2018-04-12 2018-10-31 호리코리아(주) A prefabricated scaffolding device which can work aheat power plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210071163A (en) * 2019-12-05 2021-06-16 한국남부발전 주식회사 Open space minimized cylindrical tank maintenance scaffold tower
KR102303509B1 (en) * 2019-12-05 2021-09-23 한국남부발전 주식회사 Open space minimized cylindrical tank maintenance scaffold tower

Similar Documents

Publication Publication Date Title
JP4966977B2 (en) Improved construction system, method and apparatus
CA2106030C (en) Form panel
US10253513B2 (en) Doorway lintel lift apparatus and method
KR101991397B1 (en) Temporary work table for furnace scaffold
KR102002336B1 (en) Construction and dismantle method of temporary work table for furnace scaffold
KR100760435B1 (en) Adjustable temporary support
KR101266282B1 (en) Construction and dismantle method of scaffolding device for heat power plant
WO2024077880A1 (en) Inclining jacking-type steel platform construction apparatus and method for inclining walls having large inclination angle
US9841140B2 (en) Door lintel lift apparatus and method
KR20220022256A (en) Non-welding prefabricated deck stairs
CN109465576B (en) Defect correction device and correction method for steel structure joint
CN214652865U (en) Concatenation formula installs old building elevator steel construction derrick additional
CN209907886U (en) Adjustable assembled stair construction platform
JP6630087B2 (en) Soundproof, dustproof, windproof and rainproof panels and work platforms with panels
KR20020028984A (en) Worktable assembly and method for constructing of it
CN113323447A (en) Temporary supporting device for steel structure hoisting construction
JP2022083546A (en) Fitting method of outer wall panel loading rack and gasket
CN113356595B (en) Steel structure integral installation process
CN219138304U (en) Cantilever scaffold
CN220451464U (en) Steel bar truss floor carrier plate positioning device
CN219261693U (en) Adjustable platform of elevator shaft
CN219840201U (en) Steel structure frame suitable for quick assembly
CN218175602U (en) Plate girder jacking supporting structure for bridge
KR20230001209U (en) Safety foothold for Multipurpose work
JP2009162044A (en) Temporary hut structure

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant