JPWO2023187925A5 - - Google Patents

Download PDF

Info

Publication number
JPWO2023187925A5
JPWO2023187925A5 JP2024510739A JP2024510739A JPWO2023187925A5 JP WO2023187925 A5 JPWO2023187925 A5 JP WO2023187925A5 JP 2024510739 A JP2024510739 A JP 2024510739A JP 2024510739 A JP2024510739 A JP 2024510739A JP WO2023187925 A5 JPWO2023187925 A5 JP WO2023187925A5
Authority
JP
Japan
Prior art keywords
delivery
conditions
request
requests
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2024510739A
Other languages
English (en)
Japanese (ja)
Other versions
JPWO2023187925A1 (https=
JP7848864B2 (ja
Filing date
Publication date
Application filed filed Critical
Priority claimed from PCT/JP2022/015126 external-priority patent/WO2023187925A1/ja
Publication of JPWO2023187925A1 publication Critical patent/JPWO2023187925A1/ja
Publication of JPWO2023187925A5 publication Critical patent/JPWO2023187925A5/ja
Application granted granted Critical
Publication of JP7848864B2 publication Critical patent/JP7848864B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2024510739A 2022-03-28 2022-03-28 配送計画作成システム、方法およびプログラム Active JP7848864B2 (ja)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/015126 WO2023187925A1 (ja) 2022-03-28 2022-03-28 配送計画作成システム、方法およびプログラム

Publications (3)

Publication Number Publication Date
JPWO2023187925A1 JPWO2023187925A1 (https=) 2023-10-05
JPWO2023187925A5 true JPWO2023187925A5 (https=) 2024-11-26
JP7848864B2 JP7848864B2 (ja) 2026-04-21

Family

ID=88199954

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2024510739A Active JP7848864B2 (ja) 2022-03-28 2022-03-28 配送計画作成システム、方法およびプログラム

Country Status (3)

Country Link
US (1) US20250173634A1 (https=)
JP (1) JP7848864B2 (https=)
WO (1) WO2023187925A1 (https=)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7477001B1 (ja) * 2023-02-27 2024-05-01 いすゞ自動車株式会社 情報処理装置、情報処理方法及び走行制御システム
WO2025134213A1 (ja) * 2023-12-19 2025-06-26 日本電気株式会社 配置算出装置、配置算出方法及び記憶媒体

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3416635B2 (ja) * 2000-10-13 2003-06-16 イー・トラック株式会社 配車計画サービス提供システムおよび配車計画システム
JP2003002444A (ja) * 2001-06-22 2003-01-08 Nissan Motor Co Ltd 配送計画支援装置
JP5269531B2 (ja) * 2008-09-20 2013-08-21 生活協同組合コープさっぽろ 配送用マップ作成装置、配送用マップ作成方法、及び配送用マップ作成プログラム
JP5338305B2 (ja) * 2008-12-26 2013-11-13 Jfeスチール株式会社 車両運行計画作成方法及び装置
US20140330738A1 (en) * 2013-05-01 2014-11-06 Gruppo Due Mondi, Inc. Optimizing Customer Delivery Services
JP6941974B2 (ja) * 2017-05-30 2021-09-29 株式会社日立製作所 輸送計画生成方法および輸送計画生成システム
JP7122216B2 (ja) * 2018-10-16 2022-08-19 株式会社日立製作所 配送計画立案システム、および配送計画立案方法
JP7332243B2 (ja) * 2019-07-04 2023-08-23 株式会社ゼンリンデータコム 経路生成装置、経路生成方法及びプログラム
WO2022004833A1 (ja) * 2020-06-30 2022-01-06 旭化成株式会社 装置、方法、およびプログラム
US11425751B2 (en) * 2020-07-09 2022-08-23 Samsung Electronics Co., Ltd. System and method for collision handling with cross carrier scheduling

Similar Documents

Publication Publication Date Title
McManus et al. The changing nature of life cycle assessment
CN109891438B (zh) 数值量子实验方法和系统
Groër et al. A parallel algorithm for the vehicle routing problem
Zhang et al. Bottleneck machine identification method based on constraint transformation for job shop scheduling with genetic algorithm
CN103530702B (zh) 一种基于瓶颈设备分解的大规模作业车间调度方法
US20200042659A1 (en) Autonomous surrogate model creation platform
JPWO2023187925A5 (https=)
Dehghan et al. Optimization of overlapping activities in the design phase of construction projects
Liu et al. A novel MILP model based on the topology of a network graph for process planning in an intelligent manufacturing system
Rahman et al. Multiple-order permutation flow shop scheduling under process interruptions
CN104199820A (zh) 云平台MapReduce工作流调度优化方法
JP2024166404A5 (ja) プロジェクトの進捗予測方法、進捗予測装置、進捗予測プログラム、及び影響評価モデルの作成方法
Leenders et al. Integrating quantum and classical computing for multi-energy system optimization using Benders decomposition
Azimzadeh et al. Multi-objective job scheduling algorithm in cloud computing based on reliability and time
JP2023012060A5 (https=)
CN114860398B (zh) 一种智能的云平台的任务调度方法、装置及设备
JPWO2022038785A5 (https=)
JP5839662B2 (ja) 納期達成条件自動検証システム
Song et al. Solving satellite range scheduling problem with learning-based artificial bee colony algorithm
Singla et al. No idle flow shop scheduling models for optimization of machine rental costs with processing and separated setup times
Chouchen et al. Predicting code review completion time in modern code review
CN116258287A (zh) 钢筋下料组合优化方法
KR20150019491A (ko) 사용자 주도 사례기반 추론엔진을 이용한 웹기반 공정 애로사항 예측 및 대응방안 도출 시스템의 룰엔진 및 구현 방법
CN115271031A (zh) 智能电网中大数据平台参数自适应调整方法及装置
CN113298292A (zh) 基于电力物联网的配电线路电力杆塔巡视管控方法及系统