JPWO2023187925A5 - - Google Patents
Download PDFInfo
- Publication number
- JPWO2023187925A5 JPWO2023187925A5 JP2024510739A JP2024510739A JPWO2023187925A5 JP WO2023187925 A5 JPWO2023187925 A5 JP WO2023187925A5 JP 2024510739 A JP2024510739 A JP 2024510739A JP 2024510739 A JP2024510739 A JP 2024510739A JP WO2023187925 A5 JPWO2023187925 A5 JP WO2023187925A5
- Authority
- JP
- Japan
- Prior art keywords
- delivery
- conditions
- request
- requests
- plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2022/015126 WO2023187925A1 (ja) | 2022-03-28 | 2022-03-28 | 配送計画作成システム、方法およびプログラム |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JPWO2023187925A1 JPWO2023187925A1 (https=) | 2023-10-05 |
| JPWO2023187925A5 true JPWO2023187925A5 (https=) | 2024-11-26 |
| JP7848864B2 JP7848864B2 (ja) | 2026-04-21 |
Family
ID=88199954
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2024510739A Active JP7848864B2 (ja) | 2022-03-28 | 2022-03-28 | 配送計画作成システム、方法およびプログラム |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US20250173634A1 (https=) |
| JP (1) | JP7848864B2 (https=) |
| WO (1) | WO2023187925A1 (https=) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7477001B1 (ja) * | 2023-02-27 | 2024-05-01 | いすゞ自動車株式会社 | 情報処理装置、情報処理方法及び走行制御システム |
| WO2025134213A1 (ja) * | 2023-12-19 | 2025-06-26 | 日本電気株式会社 | 配置算出装置、配置算出方法及び記憶媒体 |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3416635B2 (ja) * | 2000-10-13 | 2003-06-16 | イー・トラック株式会社 | 配車計画サービス提供システムおよび配車計画システム |
| JP2003002444A (ja) * | 2001-06-22 | 2003-01-08 | Nissan Motor Co Ltd | 配送計画支援装置 |
| JP5269531B2 (ja) * | 2008-09-20 | 2013-08-21 | 生活協同組合コープさっぽろ | 配送用マップ作成装置、配送用マップ作成方法、及び配送用マップ作成プログラム |
| JP5338305B2 (ja) * | 2008-12-26 | 2013-11-13 | Jfeスチール株式会社 | 車両運行計画作成方法及び装置 |
| US20140330738A1 (en) * | 2013-05-01 | 2014-11-06 | Gruppo Due Mondi, Inc. | Optimizing Customer Delivery Services |
| JP6941974B2 (ja) * | 2017-05-30 | 2021-09-29 | 株式会社日立製作所 | 輸送計画生成方法および輸送計画生成システム |
| JP7122216B2 (ja) * | 2018-10-16 | 2022-08-19 | 株式会社日立製作所 | 配送計画立案システム、および配送計画立案方法 |
| JP7332243B2 (ja) * | 2019-07-04 | 2023-08-23 | 株式会社ゼンリンデータコム | 経路生成装置、経路生成方法及びプログラム |
| WO2022004833A1 (ja) * | 2020-06-30 | 2022-01-06 | 旭化成株式会社 | 装置、方法、およびプログラム |
| US11425751B2 (en) * | 2020-07-09 | 2022-08-23 | Samsung Electronics Co., Ltd. | System and method for collision handling with cross carrier scheduling |
-
2022
- 2022-03-28 US US18/842,074 patent/US20250173634A1/en active Pending
- 2022-03-28 JP JP2024510739A patent/JP7848864B2/ja active Active
- 2022-03-28 WO PCT/JP2022/015126 patent/WO2023187925A1/ja not_active Ceased
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| McManus et al. | The changing nature of life cycle assessment | |
| CN109891438B (zh) | 数值量子实验方法和系统 | |
| Groër et al. | A parallel algorithm for the vehicle routing problem | |
| Zhang et al. | Bottleneck machine identification method based on constraint transformation for job shop scheduling with genetic algorithm | |
| CN103530702B (zh) | 一种基于瓶颈设备分解的大规模作业车间调度方法 | |
| US20200042659A1 (en) | Autonomous surrogate model creation platform | |
| JPWO2023187925A5 (https=) | ||
| Dehghan et al. | Optimization of overlapping activities in the design phase of construction projects | |
| Liu et al. | A novel MILP model based on the topology of a network graph for process planning in an intelligent manufacturing system | |
| Rahman et al. | Multiple-order permutation flow shop scheduling under process interruptions | |
| CN104199820A (zh) | 云平台MapReduce工作流调度优化方法 | |
| JP2024166404A5 (ja) | プロジェクトの進捗予測方法、進捗予測装置、進捗予測プログラム、及び影響評価モデルの作成方法 | |
| Leenders et al. | Integrating quantum and classical computing for multi-energy system optimization using Benders decomposition | |
| Azimzadeh et al. | Multi-objective job scheduling algorithm in cloud computing based on reliability and time | |
| JP2023012060A5 (https=) | ||
| CN114860398B (zh) | 一种智能的云平台的任务调度方法、装置及设备 | |
| JPWO2022038785A5 (https=) | ||
| JP5839662B2 (ja) | 納期達成条件自動検証システム | |
| Song et al. | Solving satellite range scheduling problem with learning-based artificial bee colony algorithm | |
| Singla et al. | No idle flow shop scheduling models for optimization of machine rental costs with processing and separated setup times | |
| Chouchen et al. | Predicting code review completion time in modern code review | |
| CN116258287A (zh) | 钢筋下料组合优化方法 | |
| KR20150019491A (ko) | 사용자 주도 사례기반 추론엔진을 이용한 웹기반 공정 애로사항 예측 및 대응방안 도출 시스템의 룰엔진 및 구현 방법 | |
| CN115271031A (zh) | 智能电网中大数据平台参数自适应调整方法及装置 | |
| CN113298292A (zh) | 基于电力物联网的配电线路电力杆塔巡视管控方法及系统 |