JPS63268569A - 配管溶接方法 - Google Patents
配管溶接方法Info
- Publication number
- JPS63268569A JPS63268569A JP9994187A JP9994187A JPS63268569A JP S63268569 A JPS63268569 A JP S63268569A JP 9994187 A JP9994187 A JP 9994187A JP 9994187 A JP9994187 A JP 9994187A JP S63268569 A JPS63268569 A JP S63268569A
- Authority
- JP
- Japan
- Prior art keywords
- welding
- joint
- welded
- type automatic
- welding machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9994187A JPS63268569A (ja) | 1987-04-24 | 1987-04-24 | 配管溶接方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9994187A JPS63268569A (ja) | 1987-04-24 | 1987-04-24 | 配管溶接方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63268569A true JPS63268569A (ja) | 1988-11-07 |
| JPH0257469B2 JPH0257469B2 (enExample) | 1990-12-05 |
Family
ID=14260741
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP9994187A Granted JPS63268569A (ja) | 1987-04-24 | 1987-04-24 | 配管溶接方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63268569A (enExample) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012037401A (ja) * | 2010-08-09 | 2012-02-23 | Sankei Engineering:Kk | 検査用プローブの製造方法 |
| WO2012096333A1 (ja) * | 2011-01-13 | 2012-07-19 | 株式会社サンケイエンジニアリング | 検査用プローブの製造方法 |
| JP2012230129A (ja) * | 2012-08-14 | 2012-11-22 | Sankei Engineering:Kk | 検査用プローブの製造方法 |
| CN103056485A (zh) * | 2013-01-17 | 2013-04-24 | 上海英汇科技发展有限公司 | 一种金属零件两面全满焊接方法 |
-
1987
- 1987-04-24 JP JP9994187A patent/JPS63268569A/ja active Granted
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012037401A (ja) * | 2010-08-09 | 2012-02-23 | Sankei Engineering:Kk | 検査用プローブの製造方法 |
| WO2012096333A1 (ja) * | 2011-01-13 | 2012-07-19 | 株式会社サンケイエンジニアリング | 検査用プローブの製造方法 |
| JP2012145490A (ja) * | 2011-01-13 | 2012-08-02 | Sankei Engineering:Kk | 検査用プローブの製造方法 |
| JP2012230129A (ja) * | 2012-08-14 | 2012-11-22 | Sankei Engineering:Kk | 検査用プローブの製造方法 |
| CN103056485A (zh) * | 2013-01-17 | 2013-04-24 | 上海英汇科技发展有限公司 | 一种金属零件两面全满焊接方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0257469B2 (enExample) | 1990-12-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102639274B (zh) | 通过内部焊接和外部焊接将管段焊接在一起的用于铺设管道的方法和焊接站 | |
| US4575611A (en) | Method of joining pipes | |
| CN106270933A (zh) | 一种大孔径管端堆焊耐蚀合金复合钢管的复合焊接方法 | |
| CN103624376A (zh) | 端部带转接环的两根双金属复合管端部对焊方法 | |
| CN103769744A (zh) | 大直径金属筒体上斜插接管的精确组对方法 | |
| CA3131446A1 (en) | System and method for maunufacturing pipes | |
| JPS63268569A (ja) | 配管溶接方法 | |
| JP5467711B2 (ja) | 原子炉の容器の底部ヘッド貫通部を修理する方法 | |
| KR20120029650A (ko) | 배관 부재의 용접 방법 | |
| KR101002628B1 (ko) | 원자력발전소 가압기의 이종금속으로 이루어진 노즐부의 자동 오버레이 용접, 검사 및 가공장치와 그의 방법 | |
| KR20230116536A (ko) | 용접 그루브 형성 방법 및 중공형 물품 | |
| WO2006069414A1 (en) | Pipeline welding | |
| JPS5911384B2 (ja) | ヒ−トパイプの接続方法 | |
| JP2013212530A (ja) | 管材の溶接治具 | |
| CN113656867A (zh) | 一种成品管路的安装方法 | |
| KR100509196B1 (ko) | 고급재질(티타늄, 지르코늄)의 화공유체용 탱크의용접선의 라이닝방법 | |
| Shams et al. | PERFORMANCE ANALYSIS OF SMAW WELDING AND GMAW-FCAW COMBINED WELDING FOR PIPELINE CONSTRUCTION JOBS AT SSGC. | |
| JP6122517B1 (ja) | 配管のアンカプレートおよびその設置方法 | |
| JPS63252679A (ja) | 二重構造管の溶接方法 | |
| JP2870034B2 (ja) | Scc入りパイプサンプルの製作方法 | |
| JPS59169679A (ja) | 片面溶接工法 | |
| AU2005100993A4 (en) | Pipeline Welding | |
| Bowers et al. | A New Approach to the Girth Welding of Clad Pipelines | |
| CN107662060A (zh) | 堆芯测量系统中热电偶导管泄漏的处理方法和焊接托架 | |
| JPS63119985A (ja) | 鉄骨仕口部の溶接工法 |