JPS6312966B2 - - Google Patents

Info

Publication number
JPS6312966B2
JPS6312966B2 JP58079860A JP7986083A JPS6312966B2 JP S6312966 B2 JPS6312966 B2 JP S6312966B2 JP 58079860 A JP58079860 A JP 58079860A JP 7986083 A JP7986083 A JP 7986083A JP S6312966 B2 JPS6312966 B2 JP S6312966B2
Authority
JP
Japan
Prior art keywords
panel
waste
formwork
concrete
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP58079860A
Other languages
Japanese (ja)
Other versions
JPS59206528A (en
Inventor
Shigeyoshi Ogawa
Toshio Nakahara
Hisaaki Kumagai
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP58079860A priority Critical patent/JPS59206528A/en
Publication of JPS59206528A publication Critical patent/JPS59206528A/en
Publication of JPS6312966B2 publication Critical patent/JPS6312966B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】 本発明は防水処理の作業性を向上させた捨型枠
パネル工法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a waste form panel construction method that improves the workability of waterproofing.

最近では、地価の大幅な上昇に伴い、土地の有
効利用を図る見地から地下あるいは半地下構造の
部屋を備えた建物のニーズが高まつてきている。
Recently, with the significant rise in land prices, there has been an increasing need for buildings with rooms that are underground or semi-underground in order to make more effective use of land.

一般に、建物の構築現場では、現場作業が天候
等の自然条件に左右され易いので現場工数をでき
るだけ低減させ、工期の短縮と作業性の向上を図
ることが極めて重要である。
Generally, at building construction sites, on-site work is easily affected by natural conditions such as weather, so it is extremely important to reduce the number of on-site man-hours as much as possible, shorten the construction period, and improve work efficiency.

しかしながら、従来一般的に採用されている鉄
筋コンクリート製側壁の構築方法においては、敷
地を根切りして砕石を敷き並べ、捨コンクリート
を打設した後、その立ち上がり筋を利用して壁配
筋を組上げ、その両側に型枠パネルを配置し、セ
パレータで緊結して壁厚を決め、セパレータにフ
オームタイをジヨイントし、縦パイプと横パイプ
を井桁に組んでフオームタイで固定し、しかる
後、型枠パネル間にコンクリートを打設するよう
にしているため、コンクリート打設までの準備作
業に多くの工数と工期を必要とし、しかもコンク
リート打設後、型枠等の解体や後片付けにもかな
りの手間がかかり、コストダウンを図ることが難
しいという欠点がある。
However, in the conventional method of constructing reinforced concrete side walls, the roots of the site are cut, crushed stones are laid down, concrete is poured, and then the wall reinforcement is assembled using the standing reinforcements. , place formwork panels on both sides, tie them with separators to determine the wall thickness, joint the separators with form ties, assemble the vertical pipes and horizontal pipes in a crossbeam and fix them with form ties, and then connect the formwork panels between the formwork panels. Because the concrete is placed in the concrete, it takes a lot of man-hours and time to prepare for the concrete pouring, and it also takes a lot of time to dismantle the formwork and clean up after the concrete is poured. The disadvantage is that it is difficult to reduce costs.

また、壁配筋と型枠パネルの間隔にむらがある
ため鉄筋コンクリートの品質に問題が生じ易いと
いう欠点もある。
Another drawback is that the quality of the reinforced concrete is likely to be affected due to uneven spacing between the wall reinforcement and the formwork panels.

特に、壁面が地下室または半地下室の側壁の場
合には、外防水処理を十分に施しておく必要があ
るが、従来工法においては、型枠の解体後コンク
リート側壁にモルタル下地を塗布し、これを養生
した後、防水処理を施すことになるので、これに
要する工数が増えて工期も長くなり、一段とコス
トアツプを招来するという欠点があつた。
In particular, if the wall is the side wall of a basement or semi-basement, it is necessary to apply sufficient external waterproofing treatment, but in conventional construction methods, after dismantling the formwork, a mortar base is applied to the concrete side wall, and this is applied. After curing, waterproofing must be applied, which increases the number of man-hours required and the construction period, resulting in a further increase in costs.

本発明はかかる事情に鑑みてなされたものであ
つて、現場での作業性を改善して工期を短縮さ
せ、防水性能に優れたコンクリート壁を安価に構
築し得る捨型枠パネル工法を提供することを目的
とするものである。
The present invention has been made in view of the above circumstances, and provides a waste form panel construction method that improves on-site workability, shortens the construction period, and allows construction of concrete walls with excellent waterproof performance at low cost. The purpose is to

すなわち本発明の捨型枠パネル工法は、外側捨
型枠パネルと内側捨型枠パネルとからなる捨型枠
パネルを仮設材に取付け、内外捨型枠パネル間に
コンクリートを打設するに当り、外側捨型枠パネ
ルの表面にその横幅よりも広幅の防水シートを予
め貼着しておき、隣接する外側捨型枠パネルの防
水シート間を外側捨型枠パネルの側方または裏面
において接続することを特徴とする。
That is, in the waste form panel construction method of the present invention, when a waste form panel consisting of an outer waste form panel and an inner waste form panel is attached to a temporary material, and concrete is poured between the inner and outer waste form panels, A waterproof sheet with a width wider than the width is affixed to the surface of the outer waste form panel in advance, and the waterproof sheets of adjacent outer waste form panels are connected on the side or back side of the outer waste form panel. It is characterized by

以下本発明の詳細をその一実施例を示す図面に
よつて説明する。
The details of the present invention will be explained below with reference to the drawings showing one embodiment thereof.

本発明の施工に際しては、第1図に示すよう
に、遺方により敷地を根切りし、残土処理した
後、根切底1上に砕石2を敷き並べ、ランマーで
突き固め、その上に捨コンクリート3を打設して
基礎面の墨出しを行なう。
In the construction of the present invention, as shown in Fig. 1, after cutting the roots of the site and disposing of the remaining soil, crushed stones 2 are laid out on the root cutting bottom 1, tamped with a rammer, and dumped on top. Place concrete 3 and mark out the foundation surface.

この墨出し線を利用して側壁位置の外周面に沿
つて床型枠4を配置し、これらをコンクリート釘
により捨コンクリート3上に固定する。次に捨コ
ンクリート3上に床防水シート5を敷設し、両者
間を接着させるとともに、床防水シート5の端縁
近傍5aを床型枠4の内面に沿つて立ち上がら
せ、両者5a,4間を接着する。続いて床防水シ
ート5上に予め工場組立を行なつた床配筋パネル
(図示せず)をセツテイングし、これを埋め込む
ようにして床コンクリート6を打設する。
The floor formwork 4 is arranged along the outer circumferential surface of the side wall position using this marking line, and these are fixed onto the waste concrete 3 with concrete nails. Next, the floor waterproof sheet 5 is laid on the waste concrete 3, and the two are bonded together, and the edge 5a of the floor waterproof sheet 5 is raised along the inner surface of the floor form 4, and the space between both 5a and 4 is raised. Glue. Subsequently, a floor reinforcement panel (not shown), which has been assembled in advance at a factory, is set on the floor waterproof sheet 5, and floor concrete 6 is poured so as to embed it.

床コンクリート6を所定期間養生した後、その
周縁近傍の内側に沿つて複数の仮設材7を配置
し、その基部7aをホールインアンカーアンカー
ボルト(図示せず)を用いて床コンクリート6上
に固定する。隣接する仮設材7の上端間に受け金
具8を掛け渡して固定し、これに捨型枠パネル9
を吊り下げる。
After the floor concrete 6 is cured for a predetermined period of time, a plurality of temporary materials 7 are placed along the inner side near its periphery, and its base 7a is fixed onto the floor concrete 6 using hole-in anchor anchor bolts (not shown). do. A receiving metal fitting 8 is stretched across and fixed between the upper ends of adjacent temporary materials 7, and a waste form panel 9 is attached to this.
hang.

捨型枠パネル9は第3図に示すように、縦筋1
0aと横筋10bとを井桁に組合せて壁配筋パネ
ル10とし、これに適当間隔毎に連結材11を溶
接し、各連結材の両端に形成した爪に小パネルを
吊り下げて外側捨型枠パネル9aおよび内側捨型
枠パネル9bとしたもので、外側捨型枠パネル9
aには、その中央よりやや上方から下端にかけて
予め壁防水シート12が貼着されている。壁防水
シート12および床防水シート5は合成ゴム、軟
質塩化ビニル等からなる防水性を有するものであ
る。
As shown in FIG.
0a and the horizontal reinforcements 10b are combined into a grid to form a wall reinforcement panel 10, connecting members 11 are welded to this at appropriate intervals, and small panels are hung from claws formed at both ends of each connecting member to form an outer waste form frame. Panel 9a and inner waste formwork panel 9b, outer waste formwork panel 9
A wall waterproof sheet 12 is pasted in advance from slightly above the center to the bottom end. The wall waterproof sheet 12 and the floor waterproof sheet 5 are made of synthetic rubber, soft vinyl chloride, etc. and have waterproof properties.

この壁防水シート12は、第2図および第3図
から明らかなように、外側捨型枠パネル9aの横
幅よりも広幅であり、従つて、その両側は外側捨
型枠パネルの両側に突出する舌片12a,12b
を形成しており、また下端近傍も外側捨型枠パネ
ル9aから突出する舌片12cを形成している。
As is clear from FIGS. 2 and 3, this wall waterproof sheet 12 is wider than the width of the outer formwork panel 9a, and therefore both sides thereof protrude to both sides of the outer formwork panel. Tongue pieces 12a, 12b
Also, near the lower end, a tongue piece 12c is formed which protrudes from the outer mold frame panel 9a.

このような構成の捨型枠パネル9は、第1図に
示すように、最上段の連結材11にねじ止めされ
た吊り金具13を受け金具8に引掛け固定するこ
とにより、仮設材7に吊り下げられる。この状態
で必要に応じて床コンクリート6から突出する床
立ち上がり筋(図示せず)と壁配筋パネルの縦筋
10aをジヨイントし、床防水シートの立ち上が
り部5aの内面と壁防水シート12の下端近傍お
よび舌片12cの間を両面粘着テープや接着剤等
により接着する。
As shown in FIG. 1, the waste form panel 9 having such a configuration is attached to the temporary material 7 by hooking and fixing the hanging metal fittings 13 screwed to the uppermost connecting member 11 onto the receiving metal fittings 8. Hanged. In this state, if necessary, join the floor rising reinforcements (not shown) protruding from the floor concrete 6 and the vertical reinforcements 10a of the wall reinforcement panel to connect the inner surface of the rising part 5a of the floor waterproof sheet and the lower end of the wall waterproof sheet 12. The vicinity and between the tongue pieces 12c are bonded using double-sided adhesive tape, adhesive, or the like.

また、壁防水シート12の舌片12a,12b
を第3図に示すように、外側パネル9aの裏側に
引込み、そこで舌片12a,12b間を両面接着
テープや接着剤13により接着する。次に捨型枠
パネル9の下端を床型枠4または床コンクリート
6上に固定した後、内外捨型枠パネル9a,9b
間にコンクリートを流し込んで壁コンクリート1
4を打設する。
In addition, the tongue pieces 12a and 12b of the wall waterproof sheet 12
As shown in FIG. 3, the tongue pieces 12a and 12b are drawn into the back side of the outer panel 9a, and the tongue pieces 12a and 12b are bonded together using double-sided adhesive tape or an adhesive 13. Next, after fixing the lower end of the waste formwork panel 9 on the floor formwork 4 or the floor concrete 6, the inner and outer waste formwork panels 9a, 9b are
Wall concrete 1 by pouring concrete in between
4.

壁コンクリート14の養生後、吊り金具13、
受け金具8、仮設材7および床型枠4を取外せ
ば、内外面を捨型枠パネル9で補強され、かつ十
分な防水処理を施された鉄筋入り壁コンクリート
が得られる。
After curing the wall concrete 14, the hanging fittings 13,
By removing the receiving fittings 8, the temporary material 7, and the floor formwork 4, a reinforced wall concrete whose inner and outer surfaces are reinforced with waste formwork panels 9 and which has been sufficiently waterproofed is obtained.

以上の説明では、隣接する外側捨型枠パネル9
aの側方に張り出す舌片12aと12bの間を直
接接着剤13で接着する例につき述べたが、本発
明はこれに限定されるものでなく、第4図や第5
図に示すように、壁防水シートの舌片12a,1
2bをそれぞれ外側捨型枠パネル9aの側面に嵌
めたガスケツト14a,14b内に収納し、これ
らのガスケツト間をコーキング材15や接着テー
プ16によつて防水接続するようにしてもよい。
In the above explanation, the adjacent outer formwork panel 9
Although an example has been described in which the tongue pieces 12a and 12b that protrude to the side of a are directly bonded with the adhesive 13, the present invention is not limited to this, and FIGS.
As shown in the figure, the tongue pieces 12a, 1 of the wall waterproof sheet
2b may be housed in gaskets 14a and 14b fitted to the side surfaces of the outer waste formwork panel 9a, respectively, and a waterproof connection may be made between these gaskets using caulking material 15 or adhesive tape 16.

なお第2図ないし第5図では、説明の便宜上隣
接する捨型枠パネル9の間隙を拡大して示した
が、実際にはこれらの間隙を極狭くなし得るもの
であることは容易に理解されよう。
Note that in FIGS. 2 to 5, the gaps between adjacent waste form panels 9 are shown enlarged for convenience of explanation, but it is easy to understand that in reality, these gaps can be made extremely narrow. Good morning.

上述の如く本発明の捨型枠パネル工法において
は、外側捨型枠パネルの外面に広幅の防水シート
を予め接着したものを仮設材に取付け、隣接する
防水シートをその舌片間を接続したものであるか
ら、外側捨型枠パネル間に多少の間隙があつて
も、そこから打設コンクリートが流出することは
なく、また壁面構築後、外部からの水分が壁面内
に侵入することを阻止できるので、水分の侵入を
嫌う地下室や半地下室の側壁用として有用であ
る。
As mentioned above, in the waste form panel construction method of the present invention, a wide waterproof sheet is pre-glued to the outer surface of the outer waste form panel and is attached to the temporary material, and adjacent waterproof sheets are connected between their tongues. Therefore, even if there is some gap between the outer waste formwork panels, the poured concrete will not flow out from there, and after the wall is constructed, moisture from the outside can be prevented from entering the wall. Therefore, it is useful for side walls of basements and semi-basements where moisture infiltration is averse.

また型枠解体やモルタル下地養生を省略でき、
外防水処理を施した壁コンクリートを短い工期で
作業性よく施工できるので、大幅なコストダウン
を図ることが可能である。しかも吊り下げ式の捨
型枠パネルを用いれば、捨型枠パネルの現場据付
けはより簡単となり、品質のよいコンクリート壁
を得ることができる。
In addition, dismantling the formwork and curing the mortar base can be omitted.
Wall concrete that has been externally waterproofed can be constructed with good workability in a short construction period, making it possible to significantly reduce costs. Moreover, by using hanging type waste formwork panels, the on-site installation of the waste formwork panels is easier, and a high quality concrete wall can be obtained.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明工法の適用例を示す縦断面図、
第2図はその拡大正面図、第3図は第2図の−
線に沿う横断面図、第4図および第5図はそれ
ぞれ本発明工法の変形例を示す縦断面図である。 4……床型枠、5……床防水シート、6……床
コンクリート、7……仮設材、8……受け金具、
9……捨型枠パネル、10……壁配筋パネル、1
1……連結材、12……壁防水シート、13……
接着剤、14……壁コンクリート、15……コー
キング材、16……接着テープ。
Figure 1 is a vertical cross-sectional view showing an example of application of the construction method of the present invention;
Figure 2 is an enlarged front view, and Figure 3 is the − of Figure 2.
A cross-sectional view taken along the line, and FIGS. 4 and 5 are vertical cross-sectional views showing modified examples of the construction method of the present invention, respectively. 4... Floor formwork, 5... Floor waterproof sheet, 6... Floor concrete, 7... Temporary construction material, 8... Receiving metal fittings,
9...Discarded formwork panel, 10...Wall reinforcement panel, 1
1... Connecting material, 12... Wall waterproof sheet, 13...
Adhesive, 14...Wall concrete, 15...Caulking material, 16...Adhesive tape.

Claims (1)

【特許請求の範囲】 1 外側捨型枠パネルと内側捨型枠パネルとから
なる捨型枠パネルを仮設材に取付け、内外捨型枠
パネル間にコンクリートを打設するに当り、外側
捨型枠パネルの表面にその横幅よりも広幅の防水
シートを予め貼着しておき、隣接する外側捨型枠
パネルの防水シート間を外側捨型枠パネルの側方
または裏面において接続することを特徴とする捨
型枠パネル工法。 2 隣接する外側捨型枠パネルの防水シートの舌
片どうしを外側捨型枠パネルの側方または裏面に
おいて、接着剤により接続する特許請求の範囲第
1項記載の捨型枠パネル工法。 3 外側捨型枠パネルの防水シートの舌片をこの
外側捨型枠パネルの側面に嵌めたガスケツト内に
収容し、隣接するガスケツト間をコーキングまた
は接着剤により接続する特許請求の範囲第1項記
載の捨型枠パネル工法。
[Scope of Claims] 1. When attaching a waste formwork panel consisting of an outer waste formwork panel and an inner waste formwork panel to a temporary material and pouring concrete between the inner and outer waste formwork panels, the outer waste formwork A waterproof sheet with a width wider than the width is pasted on the surface of the panel in advance, and the waterproof sheets of adjacent outer waste form panels are connected on the side or back side of the outer waste form panel. Discarded form panel construction method. 2. The waste form panel construction method according to claim 1, wherein the tongues of the waterproof sheets of adjacent outer waste form panels are connected to each other by adhesive on the side or back surface of the outer waste form panel. 3. According to claim 1, the tongue piece of the waterproof sheet of the outer waste form panel is housed in a gasket fitted to the side surface of the outer waste form panel, and adjacent gaskets are connected by caulking or adhesive. This is the waste formwork panel construction method.
JP58079860A 1983-05-06 1983-05-06 Disposable form panel work Granted JPS59206528A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP58079860A JPS59206528A (en) 1983-05-06 1983-05-06 Disposable form panel work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP58079860A JPS59206528A (en) 1983-05-06 1983-05-06 Disposable form panel work

Publications (2)

Publication Number Publication Date
JPS59206528A JPS59206528A (en) 1984-11-22
JPS6312966B2 true JPS6312966B2 (en) 1988-03-23

Family

ID=13701950

Family Applications (1)

Application Number Title Priority Date Filing Date
JP58079860A Granted JPS59206528A (en) 1983-05-06 1983-05-06 Disposable form panel work

Country Status (1)

Country Link
JP (1) JPS59206528A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62185923A (en) * 1986-02-13 1987-08-14 Ohbayashigumi Ltd Water-proofing work for outer wall

Also Published As

Publication number Publication date
JPS59206528A (en) 1984-11-22

Similar Documents

Publication Publication Date Title
US2920475A (en) Building panel
US5803669A (en) Thermal-insulated concrete forming system
SK19395A3 (en) Element based foam and concrete modular wall construction and method and apparatus thereof
US20210017755A1 (en) Composite wall and methods of constructing a composite wall
US20030033773A1 (en) Foundation construction
JP6137394B1 (en) Anchor holder for low-rise buildings and foundation work
US20030056460A1 (en) Engineered wall system
JPS6312966B2 (en)
JPH0130976B2 (en)
US3955332A (en) Method of building a structure from bricks and mortar
JPS6160210B2 (en)
JPH032422A (en) Construction of foundation sill
JPS601458B2 (en) Precast concrete basement construction method
WO2014165913A1 (en) Slab construction
JPH0348273Y2 (en)
JP2803539B2 (en) Construction method of double wall underground outer wall
RU2132429C1 (en) Method for erection of walls with warmth-conserving panels
JP3776254B2 (en) Water-stop structure at the bottom end of sweeping sash in structure and its construction method
JPH1121916A (en) Basement made of steel and construction method thereof
JPS59199935A (en) Disposable mold frame panel construction method
JPS5934615Y2 (en) Wall construction panels for small basements
JPH0112889B2 (en)
JPH0426527Y2 (en)
JPS6239248Y2 (en)
JPH02308014A (en) Constructing cellar and cellar-constructing panel therefor