JPS6311715A - Construction of earth anchor-concrete pile - Google Patents
Construction of earth anchor-concrete pileInfo
- Publication number
- JPS6311715A JPS6311715A JP15379586A JP15379586A JPS6311715A JP S6311715 A JPS6311715 A JP S6311715A JP 15379586 A JP15379586 A JP 15379586A JP 15379586 A JP15379586 A JP 15379586A JP S6311715 A JPS6311715 A JP S6311715A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- earth anchor
- pile
- steel material
- tremie pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims description 22
- 238000000034 method Methods 0.000 abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 4
- 125000006850 spacer group Chemical group 0.000 description 8
- 210000000078 claw Anatomy 0.000 description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 241000272814 Anser sp. Species 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
【発明の詳細な説明】
(産業上の利用分野)
この発明は構造物の水圧による浮上シ防止を兼ねるコン
クリート杭を形成する、アースアンカー兼用コンクリー
ト杭の施工方法に関するものである0
(発明が解決しようとする問題点)
近年構造物の基礎等底盤の薄肉化に伴い、主て底盤に作
用する水圧に抵抗する必要から構造物下の地中杭に構造
物の浮上りに対する抵抗力を持たせることが要請されて
いる。[Detailed Description of the Invention] (Industrial Application Field) This invention relates to a method of constructing a concrete pile that also serves as an earth anchor, and which also serves to prevent floating of structures due to water pressure. In recent years, as the foundations of structures have become thinner, it is necessary to resist the water pressure that mainly acts on the bottom, so underground piles under the structure have to have resistance to the floating of the structure. This is requested.
この発明はこうした要請に対する一手段として現場打ち
コンクリート杭・て上向きの力に抵抗する機能を与える
目的からなされたもので、杭先端部にアースアンカーを
定着させることによりこれを解決しようとするものであ
る。This invention was made with the aim of providing cast-in-place concrete piles with the ability to resist upward force as a means to meet these demands, and attempts to solve this problem by fixing an earth anchor to the tip of the pile. be.
(問題点を解決するだめの手段)
本発明ではコンクリート杭の先端部にPC鋼材に接続さ
れたアースアンカーを定着させてPC鋼材にプレストレ
スを導入することにより杭に上向きの力に対する抵抗力
を持たせる。(Another means to solve the problem) In the present invention, an earth anchor connected to a prestressing steel material is fixed at the tip of a concrete pile to introduce prestress into the prestressing steel material, thereby increasing resistance to upward force on the pile. Have it.
アースアンカーは掘削孔に鉄筋篭、トレミー管とともに
孔底まで挿入される。そして掘削孔内にトレミー管を通
じてコンクリートを打設してアースアンカーを杭先端部
に定着させた後、PC鋼材を緊張して杭に下向きの力を
支える。The earth anchor is inserted into the borehole along with the rebar cage and tremie pipe to the bottom of the borehole. Concrete is poured into the excavated hole through a tremie pipe to secure the earth anchor to the tip of the pile, and then the prestressing steel is tensed to support the downward force on the pile.
(実施例) 以下本発明を一実施例を示す図面に基づいて説明する。(Example) The present invention will be explained below based on the drawings showing one embodiment.
この発明はPC鋼材1の下端に接続されたアースアンカ
ー2を先端部に定着させて現場打ちコンクリート杭A(
以下杭A)を施工する方法である。This invention fixes the earth anchor 2 connected to the lower end of the PC steel material 1 to the tip part, and cast-in-place concrete pile A (
The following is the method for constructing pile A).
初めに第1図知より施工手順を説明する。First, the construction procedure will be explained from Figure 1.
まず所定の位置にケーシング3を建込み、支持層Bまで
掘削して掘削孔Cを形成する(I)。続いてこの掘削孔
Cに鉄筋篭4を挿入しく■)、更にトレミー管5及びP
C鋼材1を挿入する(III)。First, the casing 3 is built in a predetermined position and excavated to the support layer B to form the excavated hole C (I). Next, insert the reinforcing bar cage 4 into this excavated hole C), and then insert the tremie pipe 5 and P.
Insert C steel material 1 (III).
PC鋼材1の下端にはアースアンカー2が接続されてお
り、アースアンカー2は孔底まで吊り下げられる。An earth anchor 2 is connected to the lower end of the PC steel material 1, and the earth anchor 2 is suspended to the bottom of the hole.
次にアースアンカー2を孔底に位置させた状態でトレミ
ー管5上部のホッパー6よりコンクリート7を流し込み
(IV) 、 )レミー管5を引き上げながら掘削孔
C内にコンクリート7を打設し、杭Aを形成する(V)
0
コンクリート7の打設完了後、アースアンカー2を杭A
先端部に定着させてPC鋼材1を緊張する0
第2図は掘削孔C内に鉄筋篭4.トレミー管5及びPC
鋼材1を挿入した状態を示したもので、第3図、第4図
、第5図はその上端部、中央部、下端部の詳細を示して
いる。Next, with the earth anchor 2 positioned at the bottom of the hole, concrete 7 is poured from the hopper 6 above the tremie pipe 5 (IV), and concrete 7 is poured into the excavated hole C while pulling up the tremie pipe 5, and the pile form A (V)
0 After completing the pouring of concrete 7, attach earth anchor 2 to pile A.
The PC steel material 1 is fixed at the tip and tensioned.0 Figure 2 shows a reinforcing bar cage 4. Tremy tube 5 and PC
This shows the state in which the steel material 1 is inserted, and FIGS. 3, 4, and 5 show details of its upper end, center, and lower end.
第3図に示すようにグーソング3上には主としてトレミ
ー管5及びPC鋼材1の位置決めのだめの架台8が設置
される。この架台8はPC鋼材1が打設コンク!J −
) 7 !77″よって押し下げられるのを防止する役
目も兼ねる。PC鋼材1は第4図のようにトレミー管5
の周囲に配置されるが、架台8上のトレミー管5周囲に
はPC鋼材1を吊るだめの喫9が取り付けられる。As shown in FIG. 3, a frame 8 for mainly positioning the tremie tube 5 and the PC steel material 1 is installed on the goose song 3. This frame 8 is made of concrete made of PC steel material 1! J-
) 7! 77'', it also serves to prevent it from being pushed down.The PC steel material 1 is attached to the tremie tube 5 as shown in Figure 4.
However, around the tremie tube 5 on the pedestal 8, a drawer 9 for suspending the PC steel material 1 is attached.
トレミー管5の周囲には第4図に示すようにPC鋼材1
の位置決めのだめの位置決め用スペーサ10が取り付け
られており、Hのよう知そのPCC鋼材1置置設けた凹
みに外側からPC鋼材1を差し込むようにしである。■
は3本のPC鋼材1を入れる場合の実施例であるが、I
II、IVはそれぞれ2本の場合、4本の場合の実施例
である。A PC steel material 1 is placed around the tremie tube 5 as shown in FIG.
A positioning spacer 10 for the positioning pot is attached so that the PC steel material 1 can be inserted from the outside into the recess provided in which the PCC steel material 1 is placed. ■
is an example in which three pieces of PC steel material 1 are inserted, but I
II and IV are examples in which there are two and four wires, respectively.
トレミー管5及びPC鋼材1の下端部には第5図に示す
ようにPC鋼材1を固定する固定用金物11が取シ付け
られる。この固定用金物11の内側にはツメllaが突
設されており、このツメ11aにより固定用金物11は
トレミー管5に仮固定されている。そして固定用金物1
1はコンクリート7の打設開始後、トレミー管5を引き
上げる際これを回転させてツメllaを解くことにより
トレミー管5から切り離される。A fixing hardware 11 for fixing the PC steel material 1 is attached to the lower ends of the tremie tube 5 and the PC steel material 1, as shown in FIG. A claw lla is provided on the inside of the fixing hardware 11, and the fixing hardware 11 is temporarily fixed to the tremie tube 5 by this claw 11a. And fixing hardware 1
1 is separated from the tremie pipe 5 by rotating the tremie pipe 5 and loosening the claws lla when pulling up the tremie pipe 5 after starting pouring of the concrete 7.
PC鋼材1は■のように固定用金物11にパイプ状の固
定端金物11b及びU型ポル)llcによって固定され
ておシ、またPC鋼材1下端には固定用金物11と支持
層Bとの距離を確保するためのスペーサ12が取り付け
られている。この実施例では固定用金物11とスペーサ
12とから杭A先端部に定着されるアースアンカー2を
形成している。The PC steel material 1 is fixed to the fixing hardware 11 by a pipe-shaped fixed end hardware 11b and a U-shaped pole (llc), as shown in (). A spacer 12 is attached to ensure distance. In this embodiment, a fixing hardware 11 and a spacer 12 form an earth anchor 2 that is fixed to the tip of a pile A.
スペーサ12にはストッパー12aが設けられ、ストッ
パー12aの下方のスペーサ12が支持層B内に埋め込
まれる。スペーサ12を支持層B内に埋め込むことによ
ってトレミー管5の固定用金物11からの解除を容易に
している。The spacer 12 is provided with a stopper 12a, and the spacer 12 below the stopper 12a is embedded in the support layer B. By embedding the spacer 12 in the support layer B, the tremie tube 5 can be easily released from the fixing hardware 11.
(発明の効果)
この発明は以上の通υであり、アースアンカーを杭先端
部に定着させてPC鋼材にプレストレスを導入すること
によって杭に下向きの力が与えられるため構造物の水圧
等による浮上りを有効に防止することが可能となる。(Effects of the Invention) This invention has the above-mentioned principle, and by fixing the earth anchor to the tip of the pile and introducing prestress to the PC steel material, downward force is applied to the pile, which is caused by the water pressure of the structure etc. It becomes possible to effectively prevent floating.
第1図は本発明の施工手順を示した概要図、第2図はコ
ンクリート打設前の様子を示した断面図第3図−I、[
は架台部分を示したそれぞれ正面図、平面図、第4図−
■はトレミー管中央部を示した正面図、m、m、■はそ
の平面図、第5図−I、[はトレミー管下端部を示した
それぞれ正面図、平面図である。
A:現場打ちコンクリート杭
B:支持層、C:、掘削孔
1:PC鋼材、2:アースアンカー
3:ケーシング、4:鉄筋篭
5:トレミー管、6:ホッパー
7:コンクリート、8:架台、9:楔
10:位置決め用スペーサ、11:固定用金物11a:
ツメ、11b:固定端金物
1tc:U型ボルト、12ニスペーサ
12a:ストッパー。
第3図
第1
1 II II[IV
VFig. 1 is a schematic diagram showing the construction procedure of the present invention, Fig. 2 is a sectional view showing the state before concrete pouring Fig. 3-I, [
are a front view, a plan view, and Fig. 4 showing the pedestal part, respectively.
(2) is a front view showing the central part of the tremie tube; m, m, and (2) are a plan view thereof; FIGS. A: Cast-in-place concrete pile B: Support layer, C:, Drill hole 1: PC steel material, 2: Earth anchor 3: Casing, 4: Rebar cage 5: Tremy pipe, 6: Hopper 7: Concrete, 8: Frame, 9 : Wedge 10: Positioning spacer, 11: Fixing hardware 11a:
Claw, 11b: Fixed end hardware 1tc: U-shaped bolt, 12 spacer 12a: Stopper. Figure 3 1 1 II II [IV
V
Claims (1)
篭、トレミー管及び下端にアースアンカーが接続された
PC鋼材を孔底まで挿入し、トレミー管を引き上げなが
らこれを通じて掘削孔内にコンクリートを打設した後、
アースアンカーをコンクリート杭先端部に定着させてP
C鋼材を緊張するアースアンカー兼用コンクリート杭の
施工方法。(1) Insert a reinforcing bar basket, a tremie pipe, and a PC steel material with an earth anchor connected to the bottom end into the hole formed by excavating to a specified support layer, and insert the tremie pipe through it into the hole while pulling up the tremie pipe. After pouring concrete,
Fix the earth anchor to the tip of the concrete pile and
Construction method for concrete piles that also serve as earth anchors to tension C steel materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15379586A JPS6311715A (en) | 1986-06-30 | 1986-06-30 | Construction of earth anchor-concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15379586A JPS6311715A (en) | 1986-06-30 | 1986-06-30 | Construction of earth anchor-concrete pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6311715A true JPS6311715A (en) | 1988-01-19 |
JPH0420443B2 JPH0420443B2 (en) | 1992-04-02 |
Family
ID=15570296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15379586A Granted JPS6311715A (en) | 1986-06-30 | 1986-06-30 | Construction of earth anchor-concrete pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6311715A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0369033U (en) * | 1989-11-13 | 1991-07-09 | ||
JPH07324330A (en) * | 1994-05-31 | 1995-12-12 | Toda Constr Co Ltd | Pile driving construction method |
CN102242546A (en) * | 2010-05-12 | 2011-11-16 | 梁闽 | Method and device for regulating and controlling deformation of foundation by utilizing pullout resistance of reinforcing elements |
CN104947671A (en) * | 2014-03-25 | 2015-09-30 | 上海外高桥造船有限公司 | Wharf pile pulling analytical method for self-elevating drilling platform |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60173215A (en) * | 1984-02-20 | 1985-09-06 | Nittoku Kensetsu Kk | Construction work of cast-in-place pile |
JPS6110622A (en) * | 1984-06-26 | 1986-01-18 | Hasegawa Komuten Co Ltd | Method of constructing cast-in-place concrete pile |
-
1986
- 1986-06-30 JP JP15379586A patent/JPS6311715A/en active Granted
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60173215A (en) * | 1984-02-20 | 1985-09-06 | Nittoku Kensetsu Kk | Construction work of cast-in-place pile |
JPS6110622A (en) * | 1984-06-26 | 1986-01-18 | Hasegawa Komuten Co Ltd | Method of constructing cast-in-place concrete pile |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0369033U (en) * | 1989-11-13 | 1991-07-09 | ||
JPH07324330A (en) * | 1994-05-31 | 1995-12-12 | Toda Constr Co Ltd | Pile driving construction method |
CN102242546A (en) * | 2010-05-12 | 2011-11-16 | 梁闽 | Method and device for regulating and controlling deformation of foundation by utilizing pullout resistance of reinforcing elements |
CN104947671A (en) * | 2014-03-25 | 2015-09-30 | 上海外高桥造船有限公司 | Wharf pile pulling analytical method for self-elevating drilling platform |
CN104947671B (en) * | 2014-03-25 | 2017-01-11 | 上海外高桥造船有限公司 | Wharf pile pulling analytical method for self-elevating drilling platform |
Also Published As
Publication number | Publication date |
---|---|
JPH0420443B2 (en) | 1992-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6299386B1 (en) | Method and apparatus for a shoring wall | |
US9683347B2 (en) | Systems and methods to reinforce excavation walls | |
CN110629671A (en) | Suspension bridge anchorage and construction method thereof | |
US3087308A (en) | Method of installing piles for resisting upward soil movements | |
CN114483081A (en) | Construction method of deflection-preventing structure of curved middle wall of multi-arch tunnel under terrain bias pressure | |
JPS6311715A (en) | Construction of earth anchor-concrete pile | |
KR102277470B1 (en) | Basement Composite Wall Using Retaing Wall And Method for Constructing the Same | |
CN108005086A (en) | A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure | |
RU2303103C1 (en) | Pile | |
JPH10317371A (en) | Method for erecting pile-column in building using pile as column, and pile-column support band for use therein | |
JPH0367168B2 (en) | ||
JP2787806B2 (en) | Earth retaining wall | |
CN206902721U (en) | A kind of foundation pit supporting system | |
JP2697558B2 (en) | Independent mountain retaining wall method | |
JP2011047202A (en) | Construction method of cast-in-place concrete pile or cylindrical soil improving body | |
JPH0355612B2 (en) | ||
JPH02164930A (en) | Foundation structure for building | |
JPH1082057A (en) | Method of earthquake-resisting pile foundation construction | |
JPS6332019A (en) | Construction of hollow pile serving also as earth anchor | |
JPH1082056A (en) | Method of earthquake-resisting pile foundation construction | |
CN220225382U (en) | Light side slope reinforcing retaining structure | |
JPH05171638A (en) | Construction method of pile used as drawing yield strength | |
CN217629949U (en) | Firm supporting construction of deep basal pit | |
KR200255715Y1 (en) | Anchorage of earth anchor in steel pipe pile for pull-out resistance in the water | |
JPH11247203A (en) | Reinforcing method of existing building foundation by inclined shaft |