JPH07324330A - Pile driving construction method - Google Patents

Pile driving construction method

Info

Publication number
JPH07324330A
JPH07324330A JP11808194A JP11808194A JPH07324330A JP H07324330 A JPH07324330 A JP H07324330A JP 11808194 A JP11808194 A JP 11808194A JP 11808194 A JP11808194 A JP 11808194A JP H07324330 A JPH07324330 A JP H07324330A
Authority
JP
Japan
Prior art keywords
pile
pile body
hole
tension material
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11808194A
Other languages
Japanese (ja)
Inventor
Noriaki Isemoto
昇昭 伊勢本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP11808194A priority Critical patent/JPH07324330A/en
Publication of JPH07324330A publication Critical patent/JPH07324330A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To allow a ready-made pile with little settlement to be driven in without generating the obstruction of vibration and noise even in a place with a severe outskirt environmental condition such as an urban area and enable sufficient examination of soundness at the time of pile construction even in an on-site driven pile. CONSTITUTION:Tension material 4 bent in U-turn shape is inserted into a pile driving drilled hole 2 drilled in the ground 1. The tip part of the tension material 4 is fixed to a supporting layer at the lower part of the hole bottom, and the upper end part is led out of a hole port 2a. In this state, concrete 11 is placed in the drilled hole 2 to form a pile body 12. After the pile body 12 is sunk by previously applying a specified load to the pile body 12 by the tension material 4, the tension material 4 is pulled out and eliminated.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は杭の打設工法に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile driving method.

【0002】[0002]

【従来の技術】従来、建物を構築する場合、杭を含めた
基礎の設計は支持力と沈下の検討が義務付けられてい
る。
2. Description of the Related Art Conventionally, when constructing a building, the foundation design including piles must obey bearing capacity and settlement.

【0003】そのために直接基礎の場合は両者の検討が
必ず行なわれるが、杭基礎の場合は支持力のみの検討で
沈下の検討がおざなりに扱われることが多かった。これ
は杭で支持すれば沈下しないと考えられていたためであ
り、実際は建物荷重により沈下を生じていた。
For this reason, in the case of a direct foundation, both are inevitably examined, but in the case of a pile foundation, the examination of settlement is often handled roughly by the consideration of bearing capacity alone. This was because it was thought that the pile would not support settlement if it was supported, and in fact the settlement caused by the building load.

【0004】特に埋め込み杭工法における既製杭におい
ては、杭の沈下を考慮せずに建物を建てると不同沈下が
生じるため、一般的には杭を打設した後に、杭頭部を軽
打してある程度沈下させることが行なわれている。
Particularly in the case of ready-made piles in the embedded pile method, if a building is built without considering the settlement of the piles, uneven settlement will occur. Therefore, after the piles have been laid, generally, the pile head is tapped. Some subsidence is being done.

【0005】また埋め込み杭工法による場所打ち杭にお
いては、スライム処理等の打設上留意すべき点がいくつ
もあり、杭の健全性に対する確認も重要なものとなって
いるが実際にはほとんど何も行なわれておらず、まれに
非破壊検査等が行なわれることもある。
[0005] In addition, there are several points to be noted in the cast-in-place pile by the embedded pile method, such as slime treatment, and confirmation of the soundness of the pile is important, but in reality, it is almost nothing. However, non-destructive inspections are sometimes performed.

【0006】[0006]

【発明が解決しようとする課題】しかし上記のように埋
め込み杭工法により既製杭を構築した後に杭頭部を軽打
する方法は、市街地などの周辺環境条件が厳しいところ
においては振動や騒音障害が発生するという問題があっ
た。また場所打ち杭においては杭施工時における健全性
を検討するための非破壊検査等は必ずしも信頼性が高い
とはいえなかった。
However, the method of tapping the pile head after constructing the prefabricated pile by the embedded pile method as described above causes a vibration or noise obstacle in a place where the surrounding environmental conditions such as an urban area are severe. There was a problem that it occurred. For cast-in-place piles, non-destructive inspections to examine the soundness during pile construction were not always reliable.

【0007】本発明は上記のような問題に鑑みてなされ
たものであり、その目的は、市街地などの周辺環境条件
が厳しいところにおいても振動や騒音障害を発生させず
に既製杭を打設することができるとともに、場所打ち杭
においても杭施工時の健全性を十分に検討できる杭の打
設工法を提供することである。
The present invention has been made in view of the above problems, and an object thereof is to drive ready-made piles without generating vibrations or noise obstacles even in places with severe environmental conditions such as urban areas. It is also possible to provide a method for driving a pile, which is capable of sufficiently examining the soundness at the time of constructing a pile even for cast-in-place piles.

【0008】[0008]

【課題を解決するための手段】以上の課題を達成するた
めの本発明の杭の打設工法は、地盤に掘削した杭打設用
の掘削孔に緊張材を挿入してその下端部を孔底下部の支
持層に固定すると共に、その上端部を孔口から導出させ
た状態で前記掘削孔にコンクリートを打設して杭体を形
成し、該杭体に前記緊張材で予め所定の荷重を付加する
ことにより杭体を沈下させた後、前記緊張材を除去した
ことを特徴とする構成とすることであり、前記杭体に予
め付加される荷重は設計荷重より大きいことを特徴とす
る構成にすることである。
[Means for Solving the Problems] In order to achieve the above-mentioned object, a pile driving method of the present invention is such that a tension material is inserted into a drilling hole for driving a pile, which is excavated in the ground, and a lower end portion thereof is bored. While fixing to the support layer at the bottom bottom, concrete is placed in the excavation hole in a state where the upper end of the pile is led out from the hole mouth to form a pile body, and a predetermined load is previously applied to the pile body by the tension member. The tension member is removed after the pile body is submerged by adding the load to the pile body, and the load applied in advance to the pile body is larger than the design load. It is to make a structure.

【0009】[0009]

【作用】上記構成によれば、杭体に緊張材で予め荷重を
付加させることにより、市街地などの周辺環境条件が厳
しいところにおいても振動や騒音障害を発生させずに埋
め込み杭工法による既製杭を予め沈下させることができ
るとともに、場所打ち杭においては個々の杭について載
荷試験をすることと同じになるので、上記の作用の他に
杭の健全性を十分にチェックすることができる。また予
め付加する荷重を設計荷重よりも大きな荷重とすること
により、緊張材を除去した後に付加される建設物の再荷
重による杭の再沈下量を小さくすることができる。
[Advantage] According to the above construction, by pre-loading the pile body with the tension material, the ready-made pile by the embedded pile method can be generated without generating vibration or noise even in a place where the surrounding environmental conditions such as an urban area are severe. In addition to the above-mentioned effects, the soundness of the pile can be sufficiently checked because it can be subsided in advance and in the case of cast-in-place pile, it is the same as performing a load test for each pile. Further, by making the load to be applied in advance larger than the design load, it is possible to reduce the amount of subsidence of the pile due to the re-loading of the construction that is added after the tendon is removed.

【0010】[0010]

【実施例】以下、本発明の場所打ち杭の打設工法の一実
施例を図面に基づいて詳細に説明する。図1〜図6は場
所打ち杭の打設工法を示す断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the cast-in-place driving method of the present invention will be described in detail below with reference to the drawings. 1 to 6 are cross-sectional views showing a method for driving a cast-in-place pile.

【0011】場所打ち杭の打設工法はまず初めに図1に
示すように、建物が構築される地盤1の所定箇所に杭打
設用の掘削孔2を掘削機により掘削形成する。そして、
この掘削孔2の孔底に緊張材挿入孔3を支持層、或はそ
の近くまで掘削形成する。
In the cast-in-place driving method, first, as shown in FIG. 1, a drilling hole 2 for driving a pile is excavated and formed in a predetermined place of a ground 1 where a building is constructed. And
At the bottom of the excavation hole 2, the tendon insertion hole 3 is excavated to the support layer or near the support layer.

【0012】次に前記掘削孔2にUターン状に折り曲げ
た緊張材4を挿入して、そのUターン部4aを下側にし
て前記緊張材挿入孔3に挿入する。この場合、杭の径に
応じて複数本の緊張材4を挿入するものとするが、掘削
孔3は1本、或は緊張材4の数に応じて掘削することも
できる。この緊張材4は図7及び図8に示すようにPC
鋼より線5を合成樹脂製のシース6で被覆してその間に
グリス等の潤滑材7を充填して形成したものであり、打
設後に引き抜きできるようにUターン状に折り曲げてあ
る。
Next, the tension member 4 bent in a U-turn shape is inserted into the excavation hole 2, and the U-turn portion 4a is inserted downward into the tension member insertion hole 3. In this case, a plurality of tendons 4 are inserted according to the diameter of the pile, but one excavation hole 3 or excavation depending on the number of tendons 4 can be performed. This tension member 4 is a PC as shown in FIGS. 7 and 8.
It is formed by covering the steel stranded wire 5 with a sheath 6 made of synthetic resin and filling a lubricant 7 such as grease between them, and is bent in a U-turn shape so as to be able to be pulled out after driving.

【0013】そしてこの緊張材4の下端部、すなわちU
ターン部4aを前記緊張材挿入孔3に挿入するととも
に、その上端部を掘削孔2の孔口2aから導出した状態
とする。
The lower end of the tension member 4, that is, U
The turn portion 4a is inserted into the tendon insertion hole 3 and the upper end of the turn portion 4a is led out from the hole opening 2a of the excavation hole 2.

【0014】次に、前記緊張材挿入孔3の下端部にグラ
ウト8を充填してアンカー体9を形成すると共に、前記
アンカー体9上部の緊張材挿入孔3に杭と緊張材4との
縁を切るため砂10を充填して緊張材4の下端部を固定
する。
Next, the lower end of the tension member insertion hole 3 is filled with grout 8 to form an anchor body 9, and the edge of the pile and the tension member 4 is formed in the tension member insertion hole 3 above the anchor body 9. In order to cut, the sand 10 is filled and the lower end of the tendon 4 is fixed.

【0015】次に、掘削孔2に鉄筋籠13を挿入すると
共にコンクリート11を打設して杭体12を形成する。
この際前記緊張材4が杭体12のほぼ中央部に設置され
るように緊張材4にスペーサ13aを取り付けておく。
Next, the reinforcing rod cage 13 is inserted into the excavation hole 2 and the concrete 11 is cast to form the pile body 12.
At this time, a spacer 13a is attached to the tension member 4 so that the tension member 4 is installed at the substantially central portion of the pile body 12.

【0016】そして前記コンクリート11が硬化して所
定の強度を発現した後に、緊張材4の上端部を緊張ジャ
ッキで緊張して杭体12に設計荷重よりも大きな荷重を
付加することにより杭体12を沈下させる。
After the concrete 11 is hardened and exhibits a predetermined strength, the upper end portion of the tension member 4 is tensioned with a tension jack to apply a load larger than the designed load to the pile body 12. Subside.

【0017】このように緊張材4に所定の緊張力を付加
した後に、その上端部を定着金具14で固定する。そし
てこの状態で所定期間経過後に前記緊張材4をアンカー
体9から引き抜いて除去する。この除去はUターン状に
折り曲げられた緊張材4の上端部におけるPC鋼より線
5の一方を引っ張ることにより行なう。
After applying a predetermined tension force to the tension member 4 in this manner, the upper end of the tension member 4 is fixed by the fixing metal fitting 14. Then, in this state, after the elapse of a predetermined period, the tendon 4 is pulled out from the anchor body 9 and removed. This removal is performed by pulling one of the PC steel strands 5 at the upper end of the tension member 4 bent in a U-turn shape.

【0018】この緊張材4を引き抜いた場合、杭体12
は地盤のリバウンドが少ないために沈下量は大きく変化
しない(図9参照)。
When the tension member 4 is pulled out, the pile body 12
The subsidence does not change significantly because the ground rebound is small (see Fig. 9).

【0019】このように杭体12を予め沈下させた後、
それに建設物の再荷重を付加すると再沈下量は図9の
に示す幅となる。この再沈下量は地盤によって異なる
が、例えば初期沈下が50mmだとすると10mm以下
となる。
After preliminarily sinking the pile body 12 in this manner,
When the re-loading of the building is added to it, the amount of re-subsidence becomes the width shown in Fig. 9. The re-subsidence amount varies depending on the ground, but if the initial settlement is 50 mm, it will be 10 mm or less.

【0020】そして上記のごとく杭体12を再沈下させ
た後に上部基礎を構築して上部構造物を構築するものと
する。
Then, after the pile body 12 is subsided as described above, the upper foundation is constructed to construct the upper structure.

【0021】また埋め込み杭工法による既製杭も上記と
同様な方法により打設するものとする。
Further, ready-made piles by the embedded pile method are also driven by the same method as described above.

【0022】[0022]

【発明の効果】地盤に掘削形成した杭打設用の掘削孔に
緊張材を挿入してその下端部を孔底下部の支持層に固定
すると共に、その上端部を孔口から導出させた状態で前
記掘削孔にコンクリートを打設して杭体を形成した後、
該杭体に前記緊張材で予め所定の荷重を付加させて杭体
を所定の深さまで沈下させた後、前記緊張材を除去する
ことにより、市街地等の周辺環境条件が厳しい場合にお
いても振動や騒音障害を発生させずに杭に構築時とほぼ
等しい初期沈下を与えることができる。
EFFECTS OF THE INVENTION A state in which a tension member is inserted into an excavation hole for driving a pile formed in the ground to fix the lower end portion to a support layer below the hole bottom and the upper end portion is led out from the hole mouth. After placing concrete in the excavation hole to form a pile body,
A predetermined load is applied to the pile body in advance with the tension material to sink the pile body to a predetermined depth, and then the tension material is removed, so that vibration or vibration can be generated even in a severe environment condition such as an urban area. It is possible to give the pile an initial settlement that is almost the same as when it was built without causing noise interference.

【0023】杭体に緊張材によって荷重を付加するた
め、緊張力を自由に制御することにより任意の荷重を正
確かつ効率よく付加することができる。
Since the load is applied to the pile body by the tension member, an arbitrary load can be applied accurately and efficiently by freely controlling the tension force.

【0024】構築後杭体に予め付加される荷重を設計荷
重よりも大きくすることにより、建物荷重による再荷重
を付加したときに杭体の再沈下量を少なくすることがで
きる。
By making the load pre-applied to the pile body after construction larger than the design load, it is possible to reduce the amount of re-subsidence of the pile body when a re-load is applied by the building load.

【0025】また場所打ち杭においては個々の杭につい
て載荷試験をすることと同じになるので杭の健全性を十
分にチェックすることができる。
Further, in the case of cast-in-place pile, the same as carrying out a load test for each pile, the soundness of the pile can be sufficiently checked.

【図面の簡単な説明】[Brief description of drawings]

【図1】地盤に掘削された掘削孔の断面図である。FIG. 1 is a cross-sectional view of an excavation hole excavated in the ground.

【図2】孔底の下部に緊張材挿入孔を設けた掘削孔の断
面図である。
FIG. 2 is a cross-sectional view of an excavation hole in which a tendon insertion hole is provided at the bottom of the hole bottom.

【図3】緊張材挿入孔に緊張材を固定した掘削孔の断面
図である。
FIG. 3 is a cross-sectional view of an excavation hole in which a tension member is fixed to a tension member insertion hole.

【図4】掘削孔にコンクリートと打設して形成した杭体
の断面図である。
FIG. 4 is a cross-sectional view of a pile body formed by placing concrete in an excavation hole.

【図5】緊張材で荷重を付加された杭体の断面図であ
る。
FIG. 5 is a cross-sectional view of a pile body to which a load is applied by a tension member.

【図6】緊張材を除去した杭体の断面図である。FIG. 6 is a cross-sectional view of the pile body from which the tension material is removed.

【図7】緊張材の横断面図である。FIG. 7 is a cross-sectional view of a tendon.

【図8】緊張材の正面図である。FIG. 8 is a front view of a tension member.

【図9】荷重と沈下量の関係図である。FIG. 9 is a relationship diagram between a load and a subsidence amount.

【符号の説明】[Explanation of symbols]

1 地盤 2 掘削孔 3 緊張材挿入孔 4 緊張材 5 PC鋼より線 6 シース 7 潤滑材 8 グラウト 9 アンカー体 10 砂 11 コンクリート 12 杭体 13 鉄筋籠 14 定着金具 1 Ground 2 Drilling Hole 3 Tensile Material Insertion Hole 4 Tensile Material 5 PC Steel Stranded Wire 6 Sheath 7 Lubricant 8 Grout 9 Anchor 10 Sand 11 Concrete 12 Pile 13 Reinforcing Bar Cage 14 Anchorage

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 地盤に掘削した杭打設用の掘削孔に緊張
材を挿入してその下端部を孔底下部の支持層に固定する
と共に、その上端部を孔口から導出させた状態で前記掘
削孔にコンクリートを打設して杭体を形成し、該杭体に
前記緊張材で予め所定の荷重を付加することにより杭体
を沈下させた後、前記緊張材を除去したことを特徴とす
る杭の打設工法。
1. A state in which a tension material is inserted into an excavation hole for driving a pile excavated in the ground to fix the lower end portion to a support layer at the lower part of the hole bottom and the upper end portion is led out from the hole mouth. It is characterized in that concrete is poured into the excavation hole to form a pile body, and the pile body is sunk by applying a predetermined load to the pile body in advance with the tension material, and then the tension material is removed. Pile driving method.
【請求項2】 前記杭体に予め付加される荷重は設計荷
重より大きいことを特徴とする請求項1に記載の杭の打
設工法。
2. The pile driving method according to claim 1, wherein a load applied in advance to the pile body is larger than a design load.
JP11808194A 1994-05-31 1994-05-31 Pile driving construction method Pending JPH07324330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11808194A JPH07324330A (en) 1994-05-31 1994-05-31 Pile driving construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11808194A JPH07324330A (en) 1994-05-31 1994-05-31 Pile driving construction method

Publications (1)

Publication Number Publication Date
JPH07324330A true JPH07324330A (en) 1995-12-12

Family

ID=14727529

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11808194A Pending JPH07324330A (en) 1994-05-31 1994-05-31 Pile driving construction method

Country Status (1)

Country Link
JP (1) JPH07324330A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008297802A (en) * 2007-05-31 2008-12-11 Shimizu Corp Settlement suppressing structure of structures
CN104805835A (en) * 2015-04-09 2015-07-29 江苏江鸿建设工程有限公司 Construction pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56125528A (en) * 1980-03-06 1981-10-01 Nittoku Kensetsu Kk Construction of in-situ driven pile
JPS61233119A (en) * 1985-04-08 1986-10-17 Takenaka Komuten Co Ltd Horizontal movement preventive work for in-situ concrete pile
JPS6311715A (en) * 1986-06-30 1988-01-19 Kajima Corp Construction of earth anchor-concrete pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56125528A (en) * 1980-03-06 1981-10-01 Nittoku Kensetsu Kk Construction of in-situ driven pile
JPS61233119A (en) * 1985-04-08 1986-10-17 Takenaka Komuten Co Ltd Horizontal movement preventive work for in-situ concrete pile
JPS6311715A (en) * 1986-06-30 1988-01-19 Kajima Corp Construction of earth anchor-concrete pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008297802A (en) * 2007-05-31 2008-12-11 Shimizu Corp Settlement suppressing structure of structures
CN104805835A (en) * 2015-04-09 2015-07-29 江苏江鸿建设工程有限公司 Construction pile

Similar Documents

Publication Publication Date Title
JP7175725B2 (en) Reinforcing structure of masonry building
WO2006094277A2 (en) Torque down pile substructure support system
KR20070004244A (en) Simple pile loading tester usingg double pack-anchor and loading test method thereby
US5320452A (en) Cast-in-place concrete pile and method of constructing the same in the ground
JP4852450B2 (en) Reinforcing method of existing building and reinforcing structure of existing building
JPH07324330A (en) Pile driving construction method
JP3081905B2 (en) Cast-in-place concrete pile and its construction method
JP2001303592A (en) Method for installing and fixing block
JP5484165B2 (en) Pile quality control method
KR20150050012A (en) Retaining Wall and Construction Method thereof
JPH0959973A (en) Cast-in-place concrete pile and execution method thereof
JPS649413B2 (en)
JP3586839B2 (en) In-situ formed concrete pile and its forming method
JP2005083123A (en) Earth retaining combined wall and method for constructing earth retaining combined wall
JPH10121489A (en) Building structure utilizing pile as pillar
JPH10102487A (en) Method of introducing prestress into diaphragam wall
CN218712907U (en) Super high-rise building foundation mud jacking bored concrete pile
JP2003268785A (en) Pile foundation
JP2011047202A (en) Construction method of cast-in-place concrete pile or cylindrical soil improving body
JPH07166544A (en) Precast concrete pile construction method
JP2855156B2 (en) How to build underground structures
JPS62276119A (en) Composite piling work
JPH05171638A (en) Construction method of pile used as drawing yield strength
JP4451555B2 (en) Reverse hammering method
JPH0458853B2 (en)