US3087308A - Method of installing piles for resisting upward soil movements - Google Patents

Method of installing piles for resisting upward soil movements Download PDF

Info

Publication number
US3087308A
US3087308A US680156A US68015657A US3087308A US 3087308 A US3087308 A US 3087308A US 680156 A US680156 A US 680156A US 68015657 A US68015657 A US 68015657A US 3087308 A US3087308 A US 3087308A
Authority
US
United States
Prior art keywords
pile
bedrock
shell
soil
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US680156A
Inventor
Hart Linton
Harry W D Hunter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Raymond International Inc
Original Assignee
Raymond International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raymond International Inc filed Critical Raymond International Inc
Priority to US680156A priority Critical patent/US3087308A/en
Application granted granted Critical
Publication of US3087308A publication Critical patent/US3087308A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations

Definitions

  • This invention relates to pile and foundation constructions and methods for installing same in such form that same will provide effective means not only for the usual purpose of supporting buildings or other structures, but also the additional purpose of preventing undesired displacement and upward movements of the soil through which the piles are driven.
  • uplift piles that is, piles or the like which are so constructed and installed as effectively to resist the upward movement of the surrounding soil by anchoring the lower ends of the piles or pile groups in bedrock, while the upper ends are anchored in the concrete footing for the structure being built thereon.
  • post-tensioned reinforcing means is provided, such means being anchored with respect to the bedrock and extending up through the pile to the region of the tops of the piles and there anchored with respect to the concrete footing.
  • the pile since the pile is securely anchored against rising, it will resist rising of the surrounding soil by reason of frictional resistance of the soil against the sides of the pile and by reason of the pressure of the soil against the boot on the lower end of the pile shell. Danger to any surrounding buildings or structures, due to the tend- "ice ency of the soil to shift into the area or pit for the new construction, will thus be prevented, because such soil 'will be held against upheaval and thus retained against release of its pressure which holds in place the soil adjacent the surrounding building foundations.
  • the invention makes possible pile constructions which can carry out the above-indicated purposes while making possible increased speeds of foundation construction with reduced costs and without interfering with the usual purpose of normal piles of providing reliable load-bearing supports firmly resistant against the heavy downward pressures of buildings or other structures when completed and resting thereon.
  • FIG. 1 is a vertical sectional view of a typical pile and foundation installation embodying the invention
  • FIG. 2 is a View showing the lower end portion of one of the piles partially in section, and a preferred means for anchoring same in bedrocks;
  • FIG. 3 is an enlarged view of one typical and possible form of anchorage means for the lower end of the pile, this view being shown in section taken substantially along line 3--3 of FIG. 5;
  • FIG. 4 is an elevational view of the lower end portion of said anchorage means
  • FIG. 4a illustrates in perspective certain of the separate portions of the assembly of FIG. 4. 4
  • FIG. 5 is a horizontal sectional view taken substantially along line 55 of FIG. 4;
  • FIG. 6 is a horizontal sectional view taken substantially along line 6-6 of FIG. 3;
  • FIG. 7 is a vertical sectional view of a portion of the concrete footing for a building and also showing in vertical section the upper portion of the pile cast there: in, together with the upper end anchorage means and tension-applying means for the post-tensionable reinforcement-s extending up through the pile;
  • FIG. 8 is a top plan view of such upper anchorage and post-tensioning means.
  • FIG. 9 shows an alternative construction for the upper portion of the pile and with the reinforcement-anchoring and tension-applying and adjusting means located above the concrete footing and resting thereon.
  • pile shells are indicated at 10. As shown, these comprise helically corrugated sectional step-tapered pile shells of a wellknown type, but it will be understood that pile shells or pipe of various other forms may be used.
  • the earth is excavated, as indicated at 11, down to a point just below where the tops of the piles are to be cut off or terminated, and to the full depth of the required foundation footing, care being taken that the sides of the excavation are suitably supported or braced to protect the surrounding building foundations or utilities from damage due to shifting of the soil.
  • the pile shells 10 may be installed at the desired locations by the procedure of wet rotary pre-excavation, followed by the installation of the shells into the wet rotary pre-excavation holes, and then driving the shells to refusal through the clay or other soil indicated at 12, and into the hardpan below, as indicated at 13.
  • methods may be followed like or similar to those disclosed in the US. patent to Linton Hart, No. 2,663,152, granted December 22, 1953.
  • an inner sleeve as shown at 14 in FIG. 2 is installed in each pile shell 10, such sleeve being provided on its exterior with suitable guide fins at various points, two of which are indicated at 15, to insure that it will remain approximately concentric with the shell 10.
  • the shells when driven are, in accord with usual practice, provided at their lower ends with suitable closure plates or socalled boots.
  • the boots may comprise circular discs as at 16 secured in place as by a plow ring or the like 17, welded thereto and to the lower edge of the pile shell.
  • this boot plate When being installed, it will be understood that this boot plate has no central aperture, but acts to close off the end of the shell.
  • an addiitonal tube as at 20, which may be formed of telescoping sections, may be introduced and lowered or driven down through the hardpan or other soil and eventually lowered, if desired, for a short distance into the bore hole to be formed in the bedrock 21.
  • the tube 20 acts as a connecting tube between the lower end of the pile per se and the bore hole which is to be formed in the bedrock, but in some cases the character of the hardpan or soil may be such that the tube 20 may be dispensed with.
  • the bore hole is carried down through the hardpan or the refusal soil below the lower end of the pile shell, and thence, for example by using a milling bit or other suitable bit, the hole is drilled into the bedrock 21 for a suitable distance to provide for adequate engagement of the lower anchorage assembly (hereinafter described) with the rock in the bore hole, and to assure that uplifting forces on the pile will be effectively resisted.
  • FIGS. 46 inclusive Such assembly comprises one or preferably a plurality of elements 23 in the form of steel rods or preferably cables, as shown in the drawings, these elements being securely attached at their lower ends in nose portions 24 by any suitable known form of anchorage means or material, indicated at 25.
  • a plurality of wedge bars as at 26 respectively are slipped over each cable or rod so that they will extend down at their lower ends into contact with the nose portions, these wedge bars being formed with side surface portions as at 27 which will come into contact with each other as shown in FIG. 5.
  • a pipe or tremie 28 is now slid down centrally within the assembly to provide a withdrawable conduit for introducing grout.
  • gripper bars as at 29 are placed in the spaces of sector-shaped cross-section between each pair of the wedge bars 26.
  • the assembly of parts may then be tied together in any suitable manner as by surrounding same at various points by strands of soft iron wire or rope, or any other simple securing means, to retain the parts together until the assembly is lowered into place.
  • the nose portions 24 if desired may be made in separable sections, one of which is indicated at 24a in FIG. 4a.
  • the anchorage assembly is now lowered into the pile through the inner sleeve 14 (and through the connecting tube 20 if one is used) down into the bore hole in the bedrock, preferably until the lower tip of the nose portions 24 engage the bottom of the bore hole.
  • the cables or rods 23 at their upper ends may then be cut off at proper length for attachment to the upper anchorage assembly hereinafter described.
  • Such upper anchorage assembly one typical and suitable form of which among other possibilities is shown in FIGS. 7 and 8, may now be installed.
  • This assembly as shown comprises suitable screw anchor means as indicated at 30, one being applied to the upper end of each of the cables or rods 23.
  • Such screw anchors may be of a suitable known type, acting to secure the upper ends of the cables or rods 23 to screw elements as at 31.
  • a supporting plate 32 may be slipped over the upper ends of the cables in position to rest upon surface 33 of the concrete within the upper end of the pile shell 10.
  • the screw anchors may be surrounded by a casing 34, welded, if desired, at its lower edge to the supporitng plate 32 and having welded to the top thereof a cover-plate 35.
  • lock washers 36 are placed over the upwardly protruding threaded portions of the screw elements 31 and nuts 37 are screwed down in place thereon.
  • Each of the cables or rods 23 is then tensioned by screwing down the nuts 37.
  • the cables or rods may be tensioned singly or in pairs, or all simultaneously as preferred, and until they are subjected to a tension at least substantially equal to the force of the required uplift which the pile is designed to resist.
  • the tensioning of the rods or cables 23 will cause the nose portions on the lower end of the lower anchorage assemblies to be pulled up against the lower ends of the wedge bars 26.
  • series of upwardly and inwardly inclined surface areas thereon as indicated at 26' will engage respectively corresponding downwardly and outwardly inclined surface areas 29' on the gripper bars 29,.
  • cement grout may be introduced down through the pipe 28- under pressure and by the use of suitable known grouting procedure, so that as said pipe is raised, grout will penetrate and become set in the cavities between the various parts of the lower anchorage means for permanently securing these parts against movement with respect to each other and with respect to the bedrock.
  • the cables will become surrounded and permanently protected by the grout, which, if desired, may be extended up into the upper anchorage sleeve 34, although if this latter is not desired, the anchorage sleeve 34 may contain a concentric tube 43 for preventing grout from surrounding the screw anchor means 30.
  • the ground and footing forms are then prepared for forming the final concrete foundation or footing as indicated at 41.
  • Suitable reinforcing means may then be placed in such forms, including load-spreading means, if desired, of suitable known design to meet the requirements, whereupon the concrete for the footing may be poured to surround the upper anchorage assemblies.
  • the upper anchorage assemblies will then serve to anchor the upper end portions in the pile structures to the footing by reason of being encased in the concrete of the footing.
  • pile shell as at may extend up to the level of the top surface of the footing and with a top anchorage assembly as indicated at 51 positioned to rest upon the top surface of the concrete in the pile shell, and also on the surrounding top surface of the footing, if desired.
  • the assembly 51 may be otherwise similar to that shown in FIG. 7. With this arrangement it will be possible to adjust and readjust the degree of post-tensioning as may he required from time to time as conditions change durmg the construction work and as the construction of the building on the footing proceeds.
  • Method of installing a pile construction adapted to support a structure and also to resist upheaval of the soil surrounding the pile comprises: introducing a pile shell down to a firm bearing in the earth; introducing a filling of concrete in said shell, but leaving a hole extending down therethrough; introducing drilling means through said hole and boring therewith a hole down for a substantial distance into bedrock as well as through any earth intervening between the lower end of the pile and such bedrock; withdrawing the drilling means; introducing an assembly including anchorage means for engaging the bedrock in the hole bored therein and for resisting upward displacement of said assembly, said assembly including a post tensionable element or elements extending from such anchorage means up to the top of the pile shell; providing anchoring means at the upper end of said element or elements and applying and maintaining tension in said element or elements at least substantially equal to the upheaval forces which the pile construction is to resist, such tension being maintained between said lower anchorage means and the upper portion of the pile which becomes post-stressed thereby under compression.
  • Method of installing a pile construction adapted to support a structure and also to resist adjacent soil upheaval comprises: driving a booted pile shell to a firm bearing in the earth; introducing a pipe into said shell and extending down to the boot therein; introducing a filling of concrete into the space between said pipe and shell; using boring means extending down through said pipe for boring therewith a hole through the boot and down for a substantial distance into bedrock as well as through earth intervening between the boot and such bedrock, a connecting tube being introduced effectively to connect said pipe with the hole bored in the bedrock; introducing through said pipe, tube and hole an assembly including anchorage means for engaging the bedrock in the hole bored therein and for resisting upward displacement of said assembly, said assembly including a post-tensionable element or elements extending from such anchorage means up to the top of the pile shell; providing anchoring means at the upper end of said element or elements and applying and maintaining heavy tension in said element or elements between said lower anchorage means and the upper portion of the pile which becomes thereby post-stress
  • Method of installing a pile and concrete footing construction adapted to support a structure and also to resist upheaval of the soil surrounding the pile comprises; driving a pile shell into the earth; and introducing a filling of concrete in said shell, leaving a hole therethrough, such concrete being allowed to set in the shell to provide a rigid pile; using drilling means extending down through said shell and boring therewith a hole down for a substantial distance into bedrock as well as through any earth intervening between the lower end of the pile and such bedrock; casting in engagement with the upper end of the shell and the filling of concrete, a concrete footing for supporting said structure and hearing against a substantial area of the surrounding soil, such footing and filling being affixed to one another; introducing an assembly including anchorage means for engaging the bedrock in the hole bored therein, said assembly including a post-tensionable element or elements extending from such anchorage means up to the top of the pile shell; applying anchoring means to the upper end of said element or elements and applying and maintaining a heavy tension in said element or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

April 30, 1963 L. HART ETAL METHOD OF INSTALLING PILES FOR RESISTING UPWARD SOIL MOVEMENTS Filed Aug. 26, 1957 3 Sheets-Sheet 1 .R. 5. mm H W W MWHW M NWM m N R R LAB H April 30, 1963 L. HART ETAL 3,087,308
METHOD OF INSTALLING PILES FOR RESISTING UPWARD SOIL MOVEMENTS 5 Sheets-Sheet 2 Filed Aug. 26, 1957 '27 INVENTORS.
L //\1 TO N HA IP77 V 3 1% lP/PY WDHL/N TEE.
| HART ETAL 3,087,308
TALLING FILES FOR RESISTING UPW RD son MOVEM ENTS April 30, 1963 METHOD OF INSA 3 Sheets-Sheet 5 Filed Aug. 26, 1957 l ENTORS. Luvro %A FP7T HARRYWD.HUNTEI.
ATTORNEYS.
United States Patent 3,087,308 METHOD OF INSTALLING PILES FOR RESISTING UPWARD SOIL MOVEMENTS Linton Hart and Harry W. D. Hunter, Birmingham,
Mich., assignors to Raymond International Inc, New
York, N.Y., a corporation of New Jersey Filed Aug. 26, 1957, Ser. No. 680,156 3 Claims. (Cl. 61-5352) This invention relates to pile and foundation constructions and methods for installing same in such form that same will provide effective means not only for the usual purpose of supporting buildings or other structures, but also the additional purpose of preventing undesired displacement and upward movements of the soil through which the piles are driven.
In the construction of foundations for large buildings and other purposes, under certain design conditions, deep pits must be excavated to provide space for sub-basement foundations. Where the soil in which such foundations are to be constructed is of an unstable nature such that it will move objectionably under differences in pressure and where structures exist near or adjacent to the construction site so as to be endangered by the consequent relief of soil pressures in the vicinity, it may be necessary to make provision against upheavals of the soil in the areas where deep foundations are being constructed.
Heretofore when such problems have arisen, it has oftentimes been the practice to install a caisson such that it will be provided at its lower portion with a bell formation at the level of the hardpan layer in the earth, such caisson being reinforced down into the bell formation and arranged in such a way that the uplift forces in the surrounding earth are transferred to and resisted by the caisson shaft when the uplift pressure of the earth is applied to the base slab of the foundation at the top of the caisson, the uplift pressure thence being transferred down to the bell formation, and upward movement of the latter being in turn resisted by the load of clay or other earth thereabove. However, the installation of such caissons is often not practicable because of inconveniences and expense factor or because of the soil conditions at the hardpan level, which may be of of a granular or permeable character, not suited for constructing the bell formation particularly in the presence of water.
In accordance with the present invention, the aboveindicated problem is overcome by controlling the upheaval of the surrounding earth by the use of piles or the like of a type which will herein be referred to as uplift piles, that is, piles or the like which are so constructed and installed as effectively to resist the upward movement of the surrounding soil by anchoring the lower ends of the piles or pile groups in bedrock, while the upper ends are anchored in the concrete footing for the structure being built thereon. In accordance with preferred forms of the invention, with the lower ends of the piles anchored in bedrock, post-tensioned reinforcing means is provided, such means being anchored with respect to the bedrock and extending up through the pile to the region of the tops of the piles and there anchored with respect to the concrete footing. Thus any upward pressures which tend to be applied by the soil surrounding the piles and against the underside of the concrete footing, will be effectively resisted, because the concrete footing will be effectively anchored by the post-tensioned pile structures to the bedrock below the soil. Also to some degree, since the pile is securely anchored against rising, it will resist rising of the surrounding soil by reason of frictional resistance of the soil against the sides of the pile and by reason of the pressure of the soil against the boot on the lower end of the pile shell. Danger to any surrounding buildings or structures, due to the tend- "ice ency of the soil to shift into the area or pit for the new construction, will thus be prevented, because such soil 'will be held against upheaval and thus retained against release of its pressure which holds in place the soil adjacent the surrounding building foundations.
The invention makes possible pile constructions which can carry out the above-indicated purposes while making possible increased speeds of foundation construction with reduced costs and without interfering with the usual purpose of normal piles of providing reliable load-bearing supports firmly resistant against the heavy downward pressures of buildings or other structures when completed and resting thereon.
Various further and more specific objects, features and advantages of the invention will appear from the description given below, taken in connection with the accompanying drawings, illustrating by way of example preferred forms of the invention.
In the drawings:
FIG. 1 is a vertical sectional view of a typical pile and foundation installation embodying the invention;
FIG. 2 is a View showing the lower end portion of one of the piles partially in section, and a preferred means for anchoring same in bedrocks;
FIG. 3 is an enlarged view of one typical and possible form of anchorage means for the lower end of the pile, this view being shown in section taken substantially along line 3--3 of FIG. 5;
FIG. 4 is an elevational view of the lower end portion of said anchorage means;
FIG. 4a illustrates in perspective certain of the separate portions of the assembly of FIG. 4. 4
FIG. 5 is a horizontal sectional view taken substantially along line 55 of FIG. 4;
FIG. 6 is a horizontal sectional view taken substantially along line 6-6 of FIG. 3;
FIG. 7 is a vertical sectional view of a portion of the concrete footing for a building and also showing in vertical section the upper portion of the pile cast there: in, together with the upper end anchorage means and tension-applying means for the post-tensionable reinforcement-s extending up through the pile;
FIG. 8 is a top plan view of such upper anchorage and post-tensioning means; and
FIG. 9 shows an alternative construction for the upper portion of the pile and with the reinforcement-anchoring and tension-applying and adjusting means located above the concrete footing and resting thereon.
Referring now to FIG. 1, a plurality of pile shells are indicated at 10. As shown, these comprise helically corrugated sectional step-tapered pile shells of a wellknown type, but it will be understood that pile shells or pipe of various other forms may be used. When necessary, and before the installation is completed, the earth is excavated, as indicated at 11, down to a point just below where the tops of the piles are to be cut off or terminated, and to the full depth of the required foundation footing, care being taken that the sides of the excavation are suitably supported or braced to protect the surrounding building foundations or utilities from damage due to shifting of the soil.
The pile shells 10 may be installed at the desired locations by the procedure of wet rotary pre-excavation, followed by the installation of the shells into the wet rotary pre-excavation holes, and then driving the shells to refusal through the clay or other soil indicated at 12, and into the hardpan below, as indicated at 13. In installing such shells, methods may be followed like or similar to those disclosed in the US. patent to Linton Hart, No. 2,663,152, granted December 22, 1953. As the next step, an inner sleeve as shown at 14 in FIG. 2, is installed in each pile shell 10, such sleeve being provided on its exterior with suitable guide fins at various points, two of which are indicated at 15, to insure that it will remain approximately concentric with the shell 10. The shells when driven are, in accord with usual practice, provided at their lower ends with suitable closure plates or socalled boots. In the particular form shown in FIG. 2 (although other forms may be used) the boots may comprise circular discs as at 16 secured in place as by a plow ring or the like 17, welded thereto and to the lower edge of the pile shell. When being installed, it will be understood that this boot plate has no central aperture, but acts to close off the end of the shell.
After installation of the inner sleeve 14, concrete as at 18 is introduced into the shell around the outside of the sleeve 14 until the space between the two is solidly filled, thus forming a solidly filled pile shell, except for the center core, through which subsequent ope-rations hereinafter described are accomplished. Suitable drilling means is now introduced down into the sleeve 14 for drilling a central aperture as at 19 through the boot plate 16. Then an addiitonal tube as at 20, which may be formed of telescoping sections, may be introduced and lowered or driven down through the hardpan or other soil and eventually lowered, if desired, for a short distance into the bore hole to be formed in the bedrock 21. The tube 20 acts as a connecting tube between the lower end of the pile per se and the bore hole which is to be formed in the bedrock, but in some cases the character of the hardpan or soil may be such that the tube 20 may be dispensed with.
After the hole 19 has been drilled through the boot 16,. and the tube 20, if used, has been lowered down through this hole, then by drilling or chopping, the bore hole is carried down through the hardpan or the refusal soil below the lower end of the pile shell, and thence, for example by using a milling bit or other suitable bit, the hole is drilled into the bedrock 21 for a suitable distance to provide for adequate engagement of the lower anchorage assembly (hereinafter described) with the rock in the bore hole, and to assure that uplifting forces on the pile will be effectively resisted.
, The uplift pile assembly is now ready to receive the lower anchorage assembly, the details of one suitable example of which, among other possibilities, are shown in FIGS. 46 inclusive. Such assembly comprises one or preferably a plurality of elements 23 in the form of steel rods or preferably cables, as shown in the drawings, these elements being securely attached at their lower ends in nose portions 24 by any suitable known form of anchorage means or material, indicated at 25. A plurality of wedge bars as at 26 respectively are slipped over each cable or rod so that they will extend down at their lower ends into contact with the nose portions, these wedge bars being formed with side surface portions as at 27 which will come into contact with each other as shown in FIG. 5. A pipe or tremie 28 is now slid down centrally within the assembly to provide a withdrawable conduit for introducing grout. Finally, in making up the anchorage assembly, gripper bars as at 29 are placed in the spaces of sector-shaped cross-section between each pair of the wedge bars 26. The assembly of parts may then be tied together in any suitable manner as by surrounding same at various points by strands of soft iron wire or rope, or any other simple securing means, to retain the parts together until the assembly is lowered into place. The nose portions 24 if desired may be made in separable sections, one of which is indicated at 24a in FIG. 4a.
The anchorage assembly is now lowered into the pile through the inner sleeve 14 (and through the connecting tube 20 if one is used) down into the bore hole in the bedrock, preferably until the lower tip of the nose portions 24 engage the bottom of the bore hole. The cables or rods 23 at their upper ends may then be cut off at proper length for attachment to the upper anchorage assembly hereinafter described.
Such upper anchorage assembly, one typical and suitable form of which among other possibilities is shown in FIGS. 7 and 8, may now be installed. This assembly as shown comprises suitable screw anchor means as indicated at 30, one being applied to the upper end of each of the cables or rods 23. Such screw anchors may be of a suitable known type, acting to secure the upper ends of the cables or rods 23 to screw elements as at 31. If desired, before the screw anchors 30 are put in place, a supporting plate 32 may be slipped over the upper ends of the cables in position to rest upon surface 33 of the concrete within the upper end of the pile shell 10. Then, after the screw anchors are secured in place on the cables, they may be surrounded by a casing 34, welded, if desired, at its lower edge to the supporitng plate 32 and having welded to the top thereof a cover-plate 35. Then lock washers 36 are placed over the upwardly protruding threaded portions of the screw elements 31 and nuts 37 are screwed down in place thereon.
Each of the cables or rods 23 is then tensioned by screwing down the nuts 37. The cables or rods may be tensioned singly or in pairs, or all simultaneously as preferred, and until they are subjected to a tension at least substantially equal to the force of the required uplift which the pile is designed to resist. The tensioning of the rods or cables 23 will cause the nose portions on the lower end of the lower anchorage assemblies to be pulled up against the lower ends of the wedge bars 26. As the wedge bars are forced upwardly, series of upwardly and inwardly inclined surface areas thereon as indicated at 26' will engage respectively corresponding downwardly and outwardly inclined surface areas 29' on the gripper bars 29,. thereby causing the latter to be forced outwardly and upwardly so that a series of external gripper teeth as at 40 on the gripper bars 29 will engage the rock in the interior of the bore hole in the bedrock formation. Thus further upward movement of the wedge bars 26 and of the nose portions 24, as well as of the rods or cables 23, will be prevented and the latter will all become fixed and anchored at their lower ends and thus heavily post-tensioned by reason of the fact that the upper ends thereof are secured under heavy tension in the upper anchorage means above described.
At this stage, cement grout may be introduced down through the pipe 28- under pressure and by the use of suitable known grouting procedure, so that as said pipe is raised, grout will penetrate and become set in the cavities between the various parts of the lower anchorage means for permanently securing these parts against movement with respect to each other and with respect to the bedrock. As the grouting proceeds upwardly, the cables will become surrounded and permanently protected by the grout, which, if desired, may be extended up into the upper anchorage sleeve 34, although if this latter is not desired, the anchorage sleeve 34 may contain a concentric tube 43 for preventing grout from surrounding the screw anchor means 30.
When the uplift piles have thus been post-tensioned to the required degree, and also preferably after the cables have been grouted in place, the ground and footing forms are then prepared for forming the final concrete foundation or footing as indicated at 41. Suitable reinforcing means may then be placed in such forms, including load-spreading means, if desired, of suitable known design to meet the requirements, whereupon the concrete for the footing may be poured to surround the upper anchorage assemblies. As indicated in FIG. 7, the upper anchorage assemblies will then serve to anchor the upper end portions in the pile structures to the footing by reason of being encased in the concrete of the footing.
In some cases, it may be preferable to pour the concrete footing as shown at 50 in FIG. 9 before the posttensioning of the piles is carried out. In this case, the
pile shell as at may extend up to the level of the top surface of the footing and with a top anchorage assembly as indicated at 51 positioned to rest upon the top surface of the concrete in the pile shell, and also on the surrounding top surface of the footing, if desired. The assembly 51 may be otherwise similar to that shown in FIG. 7. With this arrangement it will be possible to adjust and readjust the degree of post-tensioning as may he required from time to time as conditions change durmg the construction work and as the construction of the building on the footing proceeds.
Although certain particular embodiments of the invention are herein disclosed for purposes of explanation, further modifications thereof, after study of this specification, Will be apparent to those skilled in the art to which the invention pertains. Reference should accordingly be had to the appended claims in determining the scope of the invention.
What is claimed and desired to be secured by Letters Patent is:
1. Method of installing a pile construction adapted to support a structure and also to resist upheaval of the soil surrounding the pile, which method comprises: introducing a pile shell down to a firm bearing in the earth; introducing a filling of concrete in said shell, but leaving a hole extending down therethrough; introducing drilling means through said hole and boring therewith a hole down for a substantial distance into bedrock as well as through any earth intervening between the lower end of the pile and such bedrock; withdrawing the drilling means; introducing an assembly including anchorage means for engaging the bedrock in the hole bored therein and for resisting upward displacement of said assembly, said assembly including a post tensionable element or elements extending from such anchorage means up to the top of the pile shell; providing anchoring means at the upper end of said element or elements and applying and maintaining tension in said element or elements at least substantially equal to the upheaval forces which the pile construction is to resist, such tension being maintained between said lower anchorage means and the upper portion of the pile which becomes post-stressed thereby under compression.
2. Method of installing a pile construction adapted to support a structure and also to resist adjacent soil upheaval, which method comprises: driving a booted pile shell to a firm bearing in the earth; introducing a pipe into said shell and extending down to the boot therein; introducing a filling of concrete into the space between said pipe and shell; using boring means extending down through said pipe for boring therewith a hole through the boot and down for a substantial distance into bedrock as well as through earth intervening between the boot and such bedrock, a connecting tube being introduced effectively to connect said pipe with the hole bored in the bedrock; introducing through said pipe, tube and hole an assembly including anchorage means for engaging the bedrock in the hole bored therein and for resisting upward displacement of said assembly, said assembly including a post-tensionable element or elements extending from such anchorage means up to the top of the pile shell; providing anchoring means at the upper end of said element or elements and applying and maintaining heavy tension in said element or elements between said lower anchorage means and the upper portion of the pile which becomes thereby post-stressed under compression.
3. Method of installing a pile and concrete footing construction adapted to support a structure and also to resist upheaval of the soil surrounding the pile, which method comprises; driving a pile shell into the earth; and introducing a filling of concrete in said shell, leaving a hole therethrough, such concrete being allowed to set in the shell to provide a rigid pile; using drilling means extending down through said shell and boring therewith a hole down for a substantial distance into bedrock as well as through any earth intervening between the lower end of the pile and such bedrock; casting in engagement with the upper end of the shell and the filling of concrete, a concrete footing for supporting said structure and hearing against a substantial area of the surrounding soil, such footing and filling being affixed to one another; introducing an assembly including anchorage means for engaging the bedrock in the hole bored therein, said assembly including a post-tensionable element or elements extending from such anchorage means up to the top of the pile shell; applying anchoring means to the upper end of said element or elements and applying and maintaining a heavy tension in said element or elements between said lower anchorage means and the upper portion of the pile, the upper end of the anchoring means being exposed to permit adjustment of said forces; and the pile becoming poststressed under compression upon tensioning said element or elements.
References Cited in the file of this patent UNITED STATES PATENTS 1,164,085 Golds borough Dec. 14, 1915 1,558,127 Upson Oct. 20, 1925 2,428,070 Frenkil Sept. 30, 1947 2,435,345 Freyssinet Feb. 3, 1948 2,570,003 Palmer Oct. 2, 1951 2,589,484 Ecuer Mar. 18, 1952 2,706,498 Upson Apr. '19, 1955 2,741,910 Thornley Apr. 17, 1956 2,863,292 Coyne et al. Dec. 9, 1958 2,917,901 Lackner Dec. 22, 1959 FOREIGN PATENTS 699,615 Great Britain Nov. 11, 1953 763,899 Great Britain Dec. 19, 1956

Claims (1)

1. METHOD OF INSTALLING A PILE CONSTRUCTION ADAPTED TO SUPPORT A STRUCTURE AND ALSO TO RESIST UPHEAVAL OF THE SOIL SURROUNDING THE PILE, WHICH METHOD COMPRISES: INTRODUCING A PILE SHELL DOWN TO A FIRM BEARING IN THE EARTH; INTRODUCING A FILLING OF CONCRETE IN SAID SHELL, BUT LEAVING A HOLE EXTENDING DOWN THERETHROUGH; INTRODUCING DRILLING MEANS THROUGH SAID HOLE AND BORING THEREWITH A HOLE DOWN FOR A SUBSTANTIAL DISTANCE INTO BEDROCK AS WELL AS THROUGH ANY EARTH INTERVENING BETWEEN THE LOWER END OF THE PILE AND SUCH BEDROCK; WITHDRAWING THE DRILLING MEANS; INTRODUCING AN ASSEMBLY INCLUDING ANCHORAGE MEANS FOR ENGAGING THE BEDROCK IN THE HOLE BORED THEREIN AND FOR
US680156A 1957-08-26 1957-08-26 Method of installing piles for resisting upward soil movements Expired - Lifetime US3087308A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US680156A US3087308A (en) 1957-08-26 1957-08-26 Method of installing piles for resisting upward soil movements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US680156A US3087308A (en) 1957-08-26 1957-08-26 Method of installing piles for resisting upward soil movements

Publications (1)

Publication Number Publication Date
US3087308A true US3087308A (en) 1963-04-30

Family

ID=24729914

Family Applications (1)

Application Number Title Priority Date Filing Date
US680156A Expired - Lifetime US3087308A (en) 1957-08-26 1957-08-26 Method of installing piles for resisting upward soil movements

Country Status (1)

Country Link
US (1) US3087308A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3256694A (en) * 1962-10-29 1966-06-21 Bremische Spannbetonwerke Hill Structural piles and methods of preparing pipe foundations
US3299644A (en) * 1965-08-27 1967-01-24 Spencer White And Prentis Inc Underpinning system and method of constructing same
US3490185A (en) * 1967-06-26 1970-01-20 Robert Fred Moore Pile-and-concrete connecting device
US3503213A (en) * 1967-08-14 1970-03-31 Rotary Oil Tool Co Method of and apparatus for installing reinforcing members in boreholes
DE2523988A1 (en) * 1974-05-31 1975-12-18 Pietro Meardi ANCHORING DEVICE FOR ANCHORING WALLS SUCH AS SCHOTTWAENDE, SCHUTZWAENDE O.DGL.
US4043133A (en) * 1976-07-21 1977-08-23 Yegge Lawrence R Structure and method of constructing and test-loading pile anchored foundations
US4293242A (en) * 1977-04-29 1981-10-06 Stanley Merjan Piles
US4417831A (en) * 1980-04-30 1983-11-29 Brown & Root, Inc. Mooring and supporting apparatus and methods for a guyed marine structure
USRE32119E (en) * 1980-04-30 1986-04-22 Brown & Root, Inc. Mooring and supporting apparatus and methods for a guyed marine structure
DE3835109A1 (en) * 1988-10-14 1990-04-19 Bpi Buero Fuer Planung Und Ing DEVICE AND METHOD FOR FOUNDING CONSTRUCTIONS AND THE LIKE
US5026213A (en) * 1987-11-09 1991-06-25 Technologie Speciales Ingenierie -T.S.I. Method and apparatus for making a foundation by creating a block constituted by the ground itself
US6256954B1 (en) 1998-06-11 2001-07-10 N.V. Bekaert S.A. Combination reinforcement for floor on piles
US6269602B1 (en) * 1997-02-12 2001-08-07 N.V. Bekaert S.A. Combination reinforcement for floor on piles
US6672015B2 (en) * 1999-02-25 2004-01-06 Menard Soltraitement Concrete pile made of such a concrete and method for drilling a hole adapted for receiving the improved concrete pile in a weak ground
US9328474B2 (en) * 2012-12-07 2016-05-03 Anoop Kumar Arya Soil anchor footing
US10161096B2 (en) * 2016-05-31 2018-12-25 Soletanche Freyssinet Ground reinforcing device

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1164085A (en) * 1913-11-11 1915-12-14 John Byron Goldsborough Method or process of anchoring steel piles.
US1558127A (en) * 1923-05-31 1925-10-20 Maxwell M Upson Setting composite piles
US2428070A (en) * 1945-11-29 1947-09-30 Frenkil Victor Foundation pile
US2435345A (en) * 1944-07-19 1948-02-03 Freyssinet Eugene Piles and method of making the same
US2570003A (en) * 1950-04-06 1951-10-02 Palmer Welloct Tool Corp Expansible sleeve anchoring device
US2589484A (en) * 1951-01-29 1952-03-18 Ecuer Raymond Multiple stage anchoring device
GB699615A (en) * 1952-08-20 1953-11-11 Guy Anson Maunsell Improved two part foundation pile
US2706498A (en) * 1950-11-13 1955-04-19 Raymond Concrete Pile Co Prestressed tubular concrete structures
US2741910A (en) * 1954-07-26 1956-04-17 Joseph H Thornley Building foundation
GB763899A (en) * 1955-01-07 1956-12-19 Erich Lackner Improvements relating to trough-shaped structures having prestressed bottoms
US2863292A (en) * 1953-01-27 1958-12-09 Coyne Andre Reinforced and stabilized dam structure
US2917901A (en) * 1955-04-07 1959-12-22 Lackner Erich Load carrying structure

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1164085A (en) * 1913-11-11 1915-12-14 John Byron Goldsborough Method or process of anchoring steel piles.
US1558127A (en) * 1923-05-31 1925-10-20 Maxwell M Upson Setting composite piles
US2435345A (en) * 1944-07-19 1948-02-03 Freyssinet Eugene Piles and method of making the same
US2428070A (en) * 1945-11-29 1947-09-30 Frenkil Victor Foundation pile
US2570003A (en) * 1950-04-06 1951-10-02 Palmer Welloct Tool Corp Expansible sleeve anchoring device
US2706498A (en) * 1950-11-13 1955-04-19 Raymond Concrete Pile Co Prestressed tubular concrete structures
US2589484A (en) * 1951-01-29 1952-03-18 Ecuer Raymond Multiple stage anchoring device
GB699615A (en) * 1952-08-20 1953-11-11 Guy Anson Maunsell Improved two part foundation pile
US2863292A (en) * 1953-01-27 1958-12-09 Coyne Andre Reinforced and stabilized dam structure
US2741910A (en) * 1954-07-26 1956-04-17 Joseph H Thornley Building foundation
GB763899A (en) * 1955-01-07 1956-12-19 Erich Lackner Improvements relating to trough-shaped structures having prestressed bottoms
US2917901A (en) * 1955-04-07 1959-12-22 Lackner Erich Load carrying structure

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3256694A (en) * 1962-10-29 1966-06-21 Bremische Spannbetonwerke Hill Structural piles and methods of preparing pipe foundations
US3299644A (en) * 1965-08-27 1967-01-24 Spencer White And Prentis Inc Underpinning system and method of constructing same
US3490185A (en) * 1967-06-26 1970-01-20 Robert Fred Moore Pile-and-concrete connecting device
US3503213A (en) * 1967-08-14 1970-03-31 Rotary Oil Tool Co Method of and apparatus for installing reinforcing members in boreholes
DE2523988A1 (en) * 1974-05-31 1975-12-18 Pietro Meardi ANCHORING DEVICE FOR ANCHORING WALLS SUCH AS SCHOTTWAENDE, SCHUTZWAENDE O.DGL.
US4043133A (en) * 1976-07-21 1977-08-23 Yegge Lawrence R Structure and method of constructing and test-loading pile anchored foundations
US4293242A (en) * 1977-04-29 1981-10-06 Stanley Merjan Piles
USRE32119E (en) * 1980-04-30 1986-04-22 Brown & Root, Inc. Mooring and supporting apparatus and methods for a guyed marine structure
US4417831A (en) * 1980-04-30 1983-11-29 Brown & Root, Inc. Mooring and supporting apparatus and methods for a guyed marine structure
US5026213A (en) * 1987-11-09 1991-06-25 Technologie Speciales Ingenierie -T.S.I. Method and apparatus for making a foundation by creating a block constituted by the ground itself
DE3835109A1 (en) * 1988-10-14 1990-04-19 Bpi Buero Fuer Planung Und Ing DEVICE AND METHOD FOR FOUNDING CONSTRUCTIONS AND THE LIKE
US6269602B1 (en) * 1997-02-12 2001-08-07 N.V. Bekaert S.A. Combination reinforcement for floor on piles
US6256954B1 (en) 1998-06-11 2001-07-10 N.V. Bekaert S.A. Combination reinforcement for floor on piles
US6672015B2 (en) * 1999-02-25 2004-01-06 Menard Soltraitement Concrete pile made of such a concrete and method for drilling a hole adapted for receiving the improved concrete pile in a weak ground
US9783949B2 (en) 2012-01-31 2017-10-10 Anoop Kumar Arya Soil anchor footing
US9328474B2 (en) * 2012-12-07 2016-05-03 Anoop Kumar Arya Soil anchor footing
US10161096B2 (en) * 2016-05-31 2018-12-25 Soletanche Freyssinet Ground reinforcing device

Similar Documents

Publication Publication Date Title
US3087308A (en) Method of installing piles for resisting upward soil movements
US4043133A (en) Structure and method of constructing and test-loading pile anchored foundations
US3226933A (en) Sheeting wall system and method of constructing same
US2741910A (en) Building foundation
CN108842798B (en) Static pressure sinking construction method of prefabricated pouring type open caisson
US10738436B1 (en) Tubular foundation for onshore wind turbine generators
US5050356A (en) Immured foundation
US4293242A (en) Piles
WO2020165815A1 (en) Augmented foundations using structural grips used for improving pile/anchor properties
US3992890A (en) Method of forming foundations
CA2551712C (en) Void form for constructing post-tensioned foundation piles
US20080008539A1 (en) Void form for constructing post-tensioned foundation piles
JPH11280067A (en) Method for embedding existing concrete pile and structure of foundation pile and existing concrete pile
US4999966A (en) Method of forming an-before "immured"
US3299644A (en) Underpinning system and method of constructing same
KR19990078994A (en) Method to construct a structure on soft soil and the structure thereof
GB2047303A (en) Under-pinning
CN114032932A (en) Construction method of mixed retaining structure
CN111794224A (en) Construction method of anchor rod implanted uplift pile
US20200208612A1 (en) Bionic Root Foundation for Onshore Wind Turbine Generators
GB2085950A (en) Driven composite piles
CN220377311U (en) Triangular lattice support row pile foundation pit supporting structure
CN219175271U (en) Novel foundation pit supporting structure close to existing building
JPS62268423A (en) Construction work of underground pile used in common for earth anchor
CN220565238U (en) Pile anchor and inner support combined supporting system suitable for large-height-difference deep foundation pit