JPS6125859B2 - - Google Patents

Info

Publication number
JPS6125859B2
JPS6125859B2 JP56149708A JP14970881A JPS6125859B2 JP S6125859 B2 JPS6125859 B2 JP S6125859B2 JP 56149708 A JP56149708 A JP 56149708A JP 14970881 A JP14970881 A JP 14970881A JP S6125859 B2 JPS6125859 B2 JP S6125859B2
Authority
JP
Japan
Prior art keywords
sand
ground
strength
design
sand pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP56149708A
Other languages
Japanese (ja)
Other versions
JPS5850216A (en
Inventor
Masaru Shono
Takahiro Kawakami
Toshuki Matsumoto
Tooru Tamura
Hideki Matsumoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Tetra Corp
Original Assignee
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Construction Co Ltd filed Critical Fudo Construction Co Ltd
Priority to JP14970881A priority Critical patent/JPS5850216A/en
Priority to AU88128/82A priority patent/AU552443B2/en
Priority to DK413282A priority patent/DK413282A/en
Priority to US06/419,313 priority patent/US4487524A/en
Priority to IT49138/82A priority patent/IT1149086B/en
Priority to KR8204233A priority patent/KR860001923B1/en
Priority to SE8205390A priority patent/SE8205390L/en
Priority to MX194467A priority patent/MX154481A/en
Priority to FR8215881A priority patent/FR2513283B1/en
Priority to GB08226827A priority patent/GB2106960B/en
Priority to NO823193A priority patent/NO823193L/en
Priority to DE3234918A priority patent/DE3234918C2/en
Priority to NLAANVRAGE8203652,A priority patent/NL189868C/en
Priority to BR8205533A priority patent/BR8205533A/en
Priority to PH27899A priority patent/PH20304A/en
Publication of JPS5850216A publication Critical patent/JPS5850216A/en
Publication of JPS6125859B2 publication Critical patent/JPS6125859B2/ja
Priority to MY355/87A priority patent/MY8700355A/en
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/106Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by forming sand drains containing only loose aggregates

Description

【発明の詳細な説明】 (発明が属する技術分野) 本発明は軟弱地盤中に多数の砂杭を造成して軟
弱地盤を改良する技術に関するものである。
DETAILED DESCRIPTION OF THE INVENTION (Technical field to which the invention pertains) The present invention relates to a technique for improving soft ground by constructing a large number of sand piles in the ground.

(発明の課題とその特徴点) 軟弱地盤の改良目的は、該軟弱地盤上に将来構
築される各種構築物の重量、形状等を考え、それ
に見合う安全な地盤とすることにある。しかし、
実際の難弱地盤は土性にばらつきがあり、特に埋
立地のような人工地盤ではこれが著しいが、この
ような軟弱地盤に砂杭施工を行う際に、従来は、
地盤強度に着目した場合を例にとると、設計段階
で、改良区域内の数少ない複数地点における土質
調査の結果に基いて平均的(平均値に限らない)
な設計用原地盤強度を設定し、この設計用原地盤
強度を基準にして目標とする改良地盤強度が得ら
れるように砂杭の径とピツチを決定し、実際の施
工をこの設計どおりに行つているが、設計の基礎
となつている設計用原地盤強度が平均的なもので
あるため、実際の原地盤強度のばらつきが実際の
改良地盤強度にそのまま現われて、均一な地盤改
良がなされないという問題点があつた。
(Problems to be solved by the invention and its characteristics) The purpose of improving soft ground is to consider the weight, shape, etc. of various structures that will be built on the soft ground in the future, and to create a safe ground that is commensurate with that. but,
Actual weak ground has variations in soil properties, and this is especially noticeable in artificial ground such as reclaimed land.When constructing sand piles on such soft ground, conventionally,
Taking the case of focusing on ground strength as an example, at the design stage, an average value (not limited to the average value) is
Set the design original ground strength, determine the diameter and pitch of the sand piles so as to obtain the target improved ground strength based on this design original ground strength, and carry out the actual construction according to this design. However, because the design base ground strength, which is the basis of the design, is an average, variations in the actual ground strength are directly reflected in the actual improved ground strength, resulting in uneven ground improvement. There was a problem.

本発明は、この点に鑑みてなされたものであつ
て、その特徴とする構成は特許請求の範囲に記載
したとおりである。
The present invention has been made in view of this point, and its characteristic configuration is as described in the claims.

すなわち、本発明は、その特徴とする構成から
明らかなように、各砂杭の造成に先立つて各造成
地点の原地盤土性を検知し、この検知結果を反映
させて各砂杭の造成を行うことにより、設計と実
際との調和を図り、確実に均一な改良地盤をうる
ようにしたものである。
That is, as is clear from its characteristic configuration, the present invention detects the soil properties of the original ground at each construction point prior to constructing each sand pile, and reflects this detection result in constructing each sand pile. By doing so, we were able to harmonize the design with reality and ensure that the improved ground was uniform.

(図面による発明の具体的説明) 第1図は従来技術と本発明の比較を模式図で示
したものであるが、aは実際の原地盤強度、bは
設計用原地盤強度、cは目標とする改良地盤強
度、dは実際の改良地盤強度であり、()の従
来技術においてはdがaと同様にばらついている
のに対して、()の本発明においてはdがcと
一致しており、本発明によれば地盤が均一に改良
されることを示している。
(Specific explanation of the invention with drawings) Figure 1 is a schematic diagram showing a comparison between the conventional technology and the present invention, where a is the actual ground strength, b is the design ground strength, and c is the target ground strength. The improved soil strength, d, is the actual improved soil strength. In the conventional technology shown in (), d varies in the same way as a, whereas in the present invention shown in (), d coincides with c. This shows that the ground can be uniformly improved according to the present invention.

第2図は、本発明工法に使用する砂杭造成装置
の一例を示しており、この図において、1は中空
管、2は油圧式のピストン・シリンダ装置、3は
砂排出兼締固め部材、4は外管、5は貫入機、6
は噴水ノズル、7はホツパ、8は空気弁、9は圧
縮空気供給管である。
Figure 2 shows an example of a sand pile construction device used in the construction method of the present invention. In this figure, 1 is a hollow pipe, 2 is a hydraulic piston cylinder device, and 3 is a sand discharge/compaction member. , 4 is the outer tube, 5 is the penetrating machine, 6
7 is a fountain nozzle, 7 is a hopper, 8 is an air valve, and 9 is a compressed air supply pipe.

この装置を用いて砂杭を造成するには、先ず中
空管1を軟弱地盤中に所定深度まで貫入するが、
このとき、噴水ノズル6から圧力水を噴射した
り、貫入機5の作動に加えてピストン・シリンダ
装置2をも作動させたりすると、貫入が容易にな
る。
To construct a sand pile using this device, first, the hollow pipe 1 is penetrated into soft ground to a predetermined depth.
At this time, injecting pressurized water from the fountain nozzle 6 or operating the piston/cylinder device 2 in addition to operating the penetrator 5 facilitates penetration.

次に、ホツパ7から中空管1内に砂を投入し、
砂排出兼締固め部材3を作動させながら中空管1
を連続的に引抜くと、中空管1の下端から砂が排
出され砂排出兼締固め部材3により突固められて
砂杭が造成される。
Next, sand is poured into the hollow tube 1 from the hopper 7,
Hollow tube 1 while operating sand discharge and compaction member 3
When the hollow tube 1 is continuously pulled out, sand is discharged from the lower end of the hollow tube 1 and compacted by the sand discharge/compaction member 3 to form a sand pile.

造成中の砂杭の径は中空管1内の砂面変化を検
知する砂面計と中空管1の下端深度を検知する深
度計から得られる数値に基いて算出されるが、こ
の点は公知なので詳述は省略する。
The diameter of the sand pile being constructed is calculated based on the values obtained from the sand level gauge that detects changes in the sand surface inside the hollow pipe 1 and the depth gauge that detects the bottom depth of the hollow pipe 1. Since this is well known, detailed description thereof will be omitted.

本発明では各砂杭の造成に先立つて各造成地点
の原地盤土性を検知するが、原地盤強度を検知す
る場合を例にとると、前述の中空管1の貫入時に
砂排出兼締固め部材3の先端に作用する貫入抵抗
をピストン・シリンダ装置2の油圧から検出し、
この検出値に基いて検知してもよいし、また、中
空管1の適所に専用の検知手段(応力測定用ゲー
ジ、ロードセル等)を設けて検知してもよい。
In the present invention, the soil properties of the original soil at each construction point are detected prior to the construction of each sand pile. Taking the case of detecting the strength of the original soil as an example, sand is discharged and tightened when the hollow pipe 1 is penetrated. Detecting the penetration resistance acting on the tip of the hardening member 3 from the oil pressure of the piston cylinder device 2,
Detection may be carried out based on this detected value, or detection may be carried out by providing a dedicated detection means (stress measuring gauge, load cell, etc.) at an appropriate location in the hollow tube 1.

本発明では前述の検知結果を砂杭造成時に反映
させるが、それは具体的には次のようにする。
In the present invention, the above-mentioned detection results are reflected at the time of sand pile construction, and specifically, this is done as follows.

検知された原地盤強度の設計用原地盤強度に対
するばらつきに対応させて砂杭径を変化させる場
合は、設計用原地盤強度より検知された原地盤強
度が大きい所では杭径を設計上の標準杭径よりも
小さくし、反対に検知された原地盤強度が小さい
所では杭径を大きくするのであるが、この杭径の
変化は、中空管1の引抜き速度を変化させて行う
ことができ、又噴水ノズル6から中空管1の周辺
地盤に対して圧力水を噴射し、周辺地盤を一時的
に限定した範囲弱めて砂杭径を拡大し易くする手
段をとることもある。
When changing the sand pile diameter in response to variations in the detected original ground strength with respect to the design original ground strength, in places where the detected original ground strength is greater than the design original ground strength, the pile diameter should be changed to the design standard. The pile diameter is made smaller than the pile diameter, and conversely, the pile diameter is increased in places where the detected original ground strength is low. This change in the pile diameter can be done by changing the drawing speed of the hollow pipe 1. Alternatively, pressure water may be injected from the fountain nozzle 6 onto the ground around the hollow pipe 1 to temporarily weaken the surrounding ground in a limited area to facilitate expansion of the sand pile diameter.

検知された原地盤強度の設計用原地盤強度に対
するばらつきに対応させて砂杭強度を変化させる
場合は、前述の場合に準じて造成砂杭の強度を設
計上の標準砂杭強度より大きくしたり小さくした
りするが、この砂杭強度の変化は、例えば、前述
の砂排出兼締固め部材3に振動を与え、この振動
の振動数と振巾の何れか一方若しくは双方を変化
させて行うことができる。
When changing the sand pile strength in response to variations in the detected original ground strength with respect to the design original ground strength, the strength of the prepared sand pile should be made larger than the standard design sand pile strength in accordance with the above case. However, this change in the strength of the sand pile can be achieved, for example, by applying vibration to the sand discharge/compaction member 3 mentioned above and changing either or both the frequency and amplitude of this vibration. I can do it.

前述の2つの場合に準じて造成砂杭の型と強度
の双方を変化させる場合は、砂排出兼締固め部材
3のストローク長、単位時間当りの昇降回数等を
変化させて行うことができる。
When changing both the type and strength of the sand pile for construction in accordance with the above two cases, this can be done by changing the stroke length of the sand discharge/compaction member 3, the number of times it moves up and down per unit time, etc.

なお、以上の記載は砂杭による地盤改良につい
てなされているが、砂に代えて砂利、砕石、鉱
滓、その他類似材料を用いることができ、これら
を用いた場合にも本発明は適用される。
Note that although the above description is about ground improvement using sand piles, gravel, crushed stone, slag, and other similar materials can be used instead of sand, and the present invention is also applicable when these are used.

(発明の効果) 以上の説明から明らかなように、本発明によれ
ば、土性にばらつきがある原地盤を確実に均一な
改良地盤にすることができ、改良地盤の品質が保
証される。
(Effects of the Invention) As is clear from the above description, according to the present invention, it is possible to reliably transform original ground with uneven soil texture into uniform improved ground, and the quality of the improved ground is guaranteed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来技術と本発明を比較した模式図、
第2図は本発明実施用装置の一例を示す概略図で
ある。 1……中空管、2……ピストン・シリンダ装
置、3……砂排出兼締固め部材、…。
FIG. 1 is a schematic diagram comparing the conventional technology and the present invention.
FIG. 2 is a schematic diagram showing an example of an apparatus for implementing the present invention. 1...Hollow tube, 2...Piston/cylinder device, 3...Sand discharge/compaction member,...

Claims (1)

【特許請求の範囲】[Claims] 1 軟弱地盤中に多数の砂杭を造成して軟弱地盤
を改良する工法において、均一な改良地盤をうる
ために、各砂杭の造成に先立つて各造成地点の原
地盤土性を検知し、この検知された原地盤土性と
設計時に平均的に定めた設計用原地盤土性との差
に対応させて砂杭径と砂杭強度の一方又は双方を
変化させながら各砂杭の造成を行うことを特徴と
する軟弱地盤改良工法。
1. In a method of improving soft ground by constructing a large number of sand piles in soft ground, in order to obtain a uniform improved ground, the soil properties of the original soil at each construction point are detected prior to constructing each sand pile, Each sand pile is created while changing one or both of the sand pile diameter and sand pile strength in response to the difference between the detected original soil properties and the design original soil properties determined as an average at the time of design. A soft ground improvement method characterized by:
JP14970881A 1981-09-22 1981-09-22 Improving work of soft ground Granted JPS5850216A (en)

Priority Applications (16)

Application Number Priority Date Filing Date Title
JP14970881A JPS5850216A (en) 1981-09-22 1981-09-22 Improving work of soft ground
AU88128/82A AU552443B2 (en) 1981-09-22 1982-09-08 Compacting soils
DK413282A DK413282A (en) 1981-09-22 1982-09-16 METHOD AND APPARATUS FOR FOUND BASEMENT IMPROVEMENT
US06/419,313 US4487524A (en) 1981-09-22 1982-09-17 Method and apparatus of forming sand piles for improving a soft ground
IT49138/82A IT1149086B (en) 1981-09-22 1982-09-20 PROCEDURE AND APPARATUS TO FORM SAND POLES TO IMPROVE SOFT SOIL IN A CONTROLLED WAY
KR8204233A KR860001923B1 (en) 1981-09-22 1982-09-20 Method and apparatus for making a sand pile in the weak foundation
SE8205390A SE8205390L (en) 1981-09-22 1982-09-20 SET AND DEVICE FOR SHAPING SAND PILLARS FOR AMPLIFYING LOS MARK
GB08226827A GB2106960B (en) 1981-09-22 1982-09-21 Method and apparatus for forming sand piles for improving soft ground
FR8215881A FR2513283B1 (en) 1981-09-22 1982-09-21 METHOD AND APPARATUS FOR FORMING VERTICAL SAND DRAINS FOR SOIL IMPROVEMENT
MX194467A MX154481A (en) 1981-09-22 1982-09-21 IMPROVEMENTS IN METHOD AND APPARATUS TO FORM SAND PILES TO IMPROVE A SOFT SOIL
NO823193A NO823193L (en) 1981-09-22 1982-09-21 PROCEDURE AND APPARATUS FOR ANTIFICATION OF ANGLES FOR AA IMPROVE BLOOD FOUNDATION
DE3234918A DE3234918C2 (en) 1981-09-22 1982-09-21 Method and device for forming sand piles for consolidating soft ground
NLAANVRAGE8203652,A NL189868C (en) 1981-09-22 1982-09-21 DEVICE FOR SOFT-GROUNDING SOIL COLUMNS IMPROVING SOIL.
BR8205533A BR8205533A (en) 1981-09-22 1982-09-21 PROCESS AND APPARATUS FOR FORMING SAND HILLS FOR IMPROVING A SOFT LAND
PH27899A PH20304A (en) 1981-09-22 1982-09-22 Method and apparatus of forming sand piles for improving a soft ground
MY355/87A MY8700355A (en) 1981-09-22 1987-12-30 Method & apparatus for forming sand piles for improving soft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14970881A JPS5850216A (en) 1981-09-22 1981-09-22 Improving work of soft ground

Publications (2)

Publication Number Publication Date
JPS5850216A JPS5850216A (en) 1983-03-24
JPS6125859B2 true JPS6125859B2 (en) 1986-06-18

Family

ID=15481078

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14970881A Granted JPS5850216A (en) 1981-09-22 1981-09-22 Improving work of soft ground

Country Status (1)

Country Link
JP (1) JPS5850216A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61126218A (en) * 1984-11-21 1986-06-13 Fudo Constr Co Ltd Soft ground improving method
US6881013B2 (en) 2003-06-19 2005-04-19 Fudo Construction Co., Ltd. Sand pile driving method
JP5426321B2 (en) * 2009-10-29 2014-02-26 五洋建設株式会社 Sand pile construction method and improved ground in floating sand compaction pile method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5598519A (en) * 1979-01-19 1980-07-26 Matsupu Kogyo:Kk Driving method of sand pile and its apparatus

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5598519A (en) * 1979-01-19 1980-07-26 Matsupu Kogyo:Kk Driving method of sand pile and its apparatus

Also Published As

Publication number Publication date
JPS5850216A (en) 1983-03-24

Similar Documents

Publication Publication Date Title
Meyerhof Compaction of sands and bearing capacity of piles
JPS6248009B2 (en)
CN107905212B (en) A kind of construction method of water filling element earth pile composite foundation in situ
US4487524A (en) Method and apparatus of forming sand piles for improving a soft ground
CN104264655A (en) Preformed hole deep-layer underwater tamping method
US3751931A (en) Piling
CN109736289A (en) A kind of construction method of hydraulic quick compacting foundation
JPS6125859B2 (en)
US4199277A (en) Piling
CN207314340U (en) Hidden pipe pile machine for water filling element earth pile Composite foundation construction in situ
JPH04506553A (en) Pile forming process and tooling assembly to carry it out
CN205712060U (en) Preexisting hole sidewise restraint stake
Mansur et al. Pile-Loading Tests, Morganza Floodway Control Structure
JPS642725B2 (en)
KR960003748B1 (en) Working method of concrete pile or sand pile for a soft-soil foundation
RU2135690C1 (en) Method for deep vibration compacting of sandy ground
JP2927612B2 (en) Foundation method
US3901041A (en) Method of grouting a pile in a hole involving the optimized vibration of the grouting material
JPS59173416A (en) Soft ground improvement work by sand pile
CN1098156A (en) Strong-ramming method by pressing additional macadam
JPS5826109A (en) Compaction work for soft ground
JPS60230423A (en) Ground improving method
RU2602524C1 (en) Method for making a combined built-in-place pile
JPS59173415A (en) Improvement work of soft ground
Pakhomov Method of investigating the compatibility of cohesive soils