JPS60230423A - Ground improving method - Google Patents
Ground improving methodInfo
- Publication number
- JPS60230423A JPS60230423A JP8684484A JP8684484A JPS60230423A JP S60230423 A JPS60230423 A JP S60230423A JP 8684484 A JP8684484 A JP 8684484A JP 8684484 A JP8684484 A JP 8684484A JP S60230423 A JPS60230423 A JP S60230423A
- Authority
- JP
- Japan
- Prior art keywords
- poured
- bored
- hole
- soil
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002689 soil Substances 0.000 abstract 4
- 239000004568 cement Substances 0.000 abstract 3
- 238000009412 basement excavation Methods 0.000 abstract 1
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 238000005755 formation reaction Methods 0.000 abstract 1
- 238000011105 stabilization Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
Abstract
PURPOSE:To enable stabilization of surface soil quality of a ground for a building, by a method wherein a hole is bored deep to lower than the under surface of a foundation, expandable cement is poured in the hole up to a level about equal to that of the under surface of the foundation, and the hollow hole part, above the poured part, of the bored hole is backfilled. CONSTITUTION:Holes 3, each bored down to lower than the under surface of a foundation 2, are bored in juxataposition with each other, expandable cement 4 is poured in the bored holes 3, and is placed such that the upper end of a poured part 5 is located in a level about equal to that of the lower end of a pit excavation with a depth H. After the poured part 5 is formed, a hollow hole part 6, above the poured part 5, of the bored hole 2 is backfilled with soil A excavated for formation of the hole. The expansible cement 4 is expanded in a barrel during curing, and soil B between the poured parts 5 is consolidated to form the poured parts integrally with each other. This facilitates improvement of a ground, enables reduction in a cost to improve a ground, and permits to perform an optimum building work according to viscosity and depth of soil.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8684484A JPS60230423A (en) | 1984-04-27 | 1984-04-27 | Ground improving method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8684484A JPS60230423A (en) | 1984-04-27 | 1984-04-27 | Ground improving method |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS60230423A true JPS60230423A (en) | 1985-11-15 |
Family
ID=13898116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8684484A Pending JPS60230423A (en) | 1984-04-27 | 1984-04-27 | Ground improving method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS60230423A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6363816A (en) * | 1986-09-03 | 1988-03-22 | Sekisui House Ltd | Improving work of surface soil of ground for building |
CN114016498A (en) * | 2021-11-15 | 2022-02-08 | 中国建筑第四工程局有限公司 | Construction method for preventing hole string of overlength hollow cast-in-place pile in sea-filling area |
-
1984
- 1984-04-27 JP JP8684484A patent/JPS60230423A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6363816A (en) * | 1986-09-03 | 1988-03-22 | Sekisui House Ltd | Improving work of surface soil of ground for building |
CN114016498A (en) * | 2021-11-15 | 2022-02-08 | 中国建筑第四工程局有限公司 | Construction method for preventing hole string of overlength hollow cast-in-place pile in sea-filling area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH02240321A (en) | Device for forming cast-in-situ pile | |
JPS60230423A (en) | Ground improving method | |
JPS6475715A (en) | Soil cement composite pile | |
JPS6434383A (en) | Construction method for erecting support for backnet and foundation block | |
JPS61151325A (en) | Method of reinforcing pile head part against horizontal force | |
JPS6210323A (en) | Connecting work of continuous underground wall panel and excavator therefor | |
RU2014392C1 (en) | Method for reinforcing foundation base | |
JPS5869923A (en) | Construction of underground continuous wall with drain layer | |
JPS61146910A (en) | Method of preventing liquefaction of sand ground | |
JPH0464618A (en) | Pit excavation work method | |
SU881254A1 (en) | Method of erecting cast-in-place pile in bulging soil | |
JPS58185819A (en) | Crushed stone piling work | |
JPS6088720A (en) | Piling work | |
JPH0381420A (en) | Sinking method for open caisson | |
JPS62160315A (en) | Burying work of pile | |
JPS59177422A (en) | Construction work of underground continuous wall using disposable formwork | |
JPS61254720A (en) | Construction work of embankment | |
JPH04309617A (en) | Method for improving foundation ground and device therefor | |
JPS603317A (en) | Construction work of foundation pile | |
SU1162900A1 (en) | Method of reinforcing pile foundation | |
JPS58218513A (en) | Excavation work for pedestal pile | |
JPS5968433A (en) | Foundation work taking custom-made pile with soil cement | |
JPS5869924A (en) | Construction of sheathing wall having upper part consisting of underground continuous wall and lower part of pillar-row pile | |
JPS60219318A (en) | Soft ground improving method | |
JPS55161118A (en) | Pile driving method and pile |