JPS5850216A - Improving work of soft ground - Google Patents

Improving work of soft ground

Info

Publication number
JPS5850216A
JPS5850216A JP14970881A JP14970881A JPS5850216A JP S5850216 A JPS5850216 A JP S5850216A JP 14970881 A JP14970881 A JP 14970881A JP 14970881 A JP14970881 A JP 14970881A JP S5850216 A JPS5850216 A JP S5850216A
Authority
JP
Japan
Prior art keywords
sand
ground
hollow tube
strength
soft ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14970881A
Other languages
Japanese (ja)
Other versions
JPS6125859B2 (en
Inventor
Masaru Shono
庄野 勝
Takahiro Kawakami
高弘 川上
Toshiyuki Matsumoto
松元 利行
Toru Tamura
徹 田村
Hideki Matsumoto
松本 秀輝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Tetra Corp
Original Assignee
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Construction Co Ltd filed Critical Fudo Construction Co Ltd
Priority to JP14970881A priority Critical patent/JPS5850216A/en
Priority to AU88128/82A priority patent/AU552443B2/en
Priority to DK413282A priority patent/DK413282A/en
Priority to US06/419,313 priority patent/US4487524A/en
Priority to IT49138/82A priority patent/IT1149086B/en
Priority to KR8204233A priority patent/KR860001923B1/en
Priority to SE8205390A priority patent/SE8205390L/en
Priority to MX194467A priority patent/MX154481A/en
Priority to FR8215881A priority patent/FR2513283B1/en
Priority to GB08226827A priority patent/GB2106960B/en
Priority to NO823193A priority patent/NO823193L/en
Priority to DE3234918A priority patent/DE3234918C2/en
Priority to NLAANVRAGE8203652,A priority patent/NL189868C/en
Priority to BR8205533A priority patent/BR8205533A/en
Priority to PH27899A priority patent/PH20304A/en
Publication of JPS5850216A publication Critical patent/JPS5850216A/en
Publication of JPS6125859B2 publication Critical patent/JPS6125859B2/ja
Priority to MY355/87A priority patent/MY8700355A/en
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/106Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by forming sand drains containing only loose aggregates

Abstract

PURPOSE:To obtain uniformly improved ground by forming sand piles while changing any one or both of the diameters and strengths of the sand piles according to the variations in the soil quality of ground to be improved. CONSTITUTION:While injecting water from a jet nozzle 6, a hollow tube 1 is penetrated to a given depth of soft ground by operating a penetration mechanism 5 and a piston cylinder 2. Then, sand is charged into the hollow tube 1 from a hopper 7 and the hollow tube 1 is raised while operating a sand discharging and compacting part 3, whereupon sand discharged from the lower end of the hollow tube 1 is compacted by the part 3 to form a sand pile.

Description

【発明の詳細な説明】 本発明は軟弱地盤中に多数の砂杭を造成して軟弱地盤全
改良する技術に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a technique for completely improving soft ground by constructing a large number of sand piles in the soft ground.

軟弱地盤改良工事の設計にお込ては、改良区域内の複数
地点における土質調査の結果に基いて平決定している。
The design of soft ground improvement work is determined based on the results of soil surveys at multiple locations within the improvement area.

そして、従来はこの設計上与えられた径とピッチで砂杭
を造成すれば自ら所定の改良地盤強度があるため、原地
盤強度の実際上のばらつきが改良地盤強度にそのまま現
われて、均一な地盤改良がなされなhという問題点があ
った。
In the past, if sand piles were built with the diameter and pitch given in the design, they would have a predetermined improved ground strength, so actual variations in the original ground strength would be directly reflected in the improved ground strength, resulting in a uniform ground. There was a problem that no improvements were made.

本発明は、この点に鑑みてなされたものであって、均一
に改良地盤をつるために原地盤の土性の変化に対応して
砂杭径と砂杭強度の何れか二方又は双方を変化させなが
ら各砂杭の造成全行なう点を特徴としている。
The present invention has been made in view of this point, and in order to uniformly suspend improved ground, either or both of the sand pile diameter and sand pile strength can be adjusted in response to changes in the soil properties of the original ground. A distinctive feature is that the construction of each sand pile is carried out while making changes.

第1図は従来技術と本発明の比較を模式図で示したもの
であるが、aは土質調査による原地盤強度、bは設計用
C原地盤強度、Cは目標とする改良地盤強度、dは実際
の改良地盤強度であり、([)の従来技術におりてはd
がaと同様にばらついているのに対して、釦の本発明に
おいてはdがCと一致しており、本発明によれば地盤が
均一に改良されることを示している。
Fig. 1 is a schematic diagram showing a comparison between the conventional technology and the present invention, where a is the original ground strength according to the soil survey, b is the original ground strength for design C, C is the target improved ground strength, and d is the actual improved soil strength, and in the conventional technology ([), d
d varies as well as a, whereas in the present invention of the button, d coincides with C, indicating that the ground is uniformly improved according to the present invention.

第2図は、本発明工法に使用する砂杭造成装置の−例?
示しており、この図において、1は砂杭令成用の中空管
、2は油圧式のピストン・シリンダ装置、3は砂排出兼
締固め部材、4は外管、5は貫入機、6は噴水ノズル、
7はホッパー、8は空気弁、9は圧縮空気供給管である
Figure 2 is an example of sand pile construction equipment used in the construction method of the present invention?
In this figure, 1 is a hollow pipe for sand pile formation, 2 is a hydraulic piston cylinder device, 3 is a sand discharge/compaction member, 4 is an outer pipe, 5 is a penetrating machine, and 6 is a fountain. nozzle,
7 is a hopper, 8 is an air valve, and 9 is a compressed air supply pipe.

この装置音用いて砂杭を造成するには、先ず中空管lを
軟弱地盤中に所定深度まで貫入させるが、この際噴水ノ
ズル6から水噴射させたり、貫入機5の作動に加えてピ
ストン・シリンダ装置2ケも作動させると貫入が容易と
なる。
To create a sand pile using this device's sound, first the hollow tube l is penetrated into the soft ground to a predetermined depth. - Penetration becomes easier if the two cylinder devices are also activated.

次に、ホッパー7から中空管1内に砂を投入し、砂排出
兼締固め部材3を作動させながら中空管lを連続的に上
昇させると、中空管lの下端から排出された砂は砂排出
兼締固め部材3によって突き固められて砂杭が造成され
る。
Next, sand is put into the hollow tube 1 from the hopper 7, and when the hollow tube 1 is raised continuously while operating the sand discharge/compaction member 3, sand is discharged from the lower end of the hollow tube 1. The sand is compacted by a sand discharge/compaction member 3 to create a sand pile.

造成中の砂杭の径は中空管1内の砂面変化を検知する砂
面計と中空管lの下端深度を検知する深度計から得られ
る数値によ2て算出逼れるが、この点は公知なので詳述
は省略する。
The diameter of the sand pile being constructed is calculated based on the values obtained from the sand level gauge that detects changes in the sand surface inside the hollow pipe 1 and the depth gauge that detects the bottom depth of the hollow pipe 1. Since this point is well known, detailed explanation will be omitted.

砂杭造成地点の実際の原地盤強度はピストン・シリンダ
装置2の油圧・によって検知できるが、砂杭造成装置の
適所に応力測定用ゲージ、ロードセル等を設けて検知し
てもより。
The actual strength of the ground at the sand pile construction site can be detected by the hydraulic pressure of the piston/cylinder device 2, but it can also be detected by installing a stress measuring gauge, load cell, etc. at an appropriate location on the sand pile construction device.

原地盤強度のばらつきに対応させて砂杭径を変化させる
場合には、設計用原地盤強度より一実際の原地盤強度が
大きい所では杭径を標準設計上の杭径よりも小さくシ、
又実際の原地盤強度が小さい所では杭径を大きくするの
であるが、この杭径の変化は、中空管1の引抜速11−
変化させることにより行い得るし、又噴水ノズル6より
中空管1の周辺地盤に対して水音噴射し、周辺地盤を一
時的に限定した範囲弱めることにより砂杭径?拡径し易
くする手段全とることもある。
When changing the sand pile diameter in response to variations in the original soil strength, the pile diameter should be made smaller than the standard design pile diameter in areas where the actual soil strength is greater than the design original soil strength.
In addition, the pile diameter is increased in places where the actual ground strength is low, but this change in pile diameter is due to the drawing speed 11- of the hollow tube 1.
This can be done by changing the diameter of the sand pile, or by spraying water sound from the fountain nozzle 6 onto the ground around the hollow pipe 1 and temporarily weakening the surrounding ground in a limited area. All measures to facilitate diameter expansion may be taken.

次に、原地盤強度のばらつきに対応させて砂杭強度を変
化させる場合には、設計用原地盤強度よシ実際の原地盤
強度が大きい所では砂杭強奪km準設計上の砂杭強度よ
りも小名くシ、又実際の原地盤強度が小さい所では砂杭
強度音大[くするのであるが、この砂杭強度の変化は、
第2図の砂杭造成装置音用いる場合には、砂排出兼締固
め部3のストローク長、同じく単位時間当りの昇降回数
、同じく昇降連爆等を変化させることにより行い得 。
Next, when changing the sand pile strength in response to variations in the original ground strength, in places where the actual original ground strength is greater than the design original ground strength, the sand pile robbery km should be Also, in places where the actual ground strength is low, the strength of the sand piles can be quite loud. However, this change in the strength of the sand piles is
When using the sound of the sand pile making device shown in Fig. 2, this can be done by changing the stroke length of the sand discharge/compaction section 3, the number of times of lifting and lowering per unit time, and the repeated lifting and lowering.

る。Ru.

そして、前記の砂排出兼締固め部材3のストローク長の
検出は、該部材と共に昇降するピストンロンドの一部に
設けた作用片により動作する近接スイッチの多数を中空
管1の下端部又は外管4に設けたスイッチを何部に一定
間隔で配設し、この各スイッチと該スイッチ間に接続し
た抵抗器とでポテンショメーター回路を構成し、この回
路の出力電圧変化を検出することにより達成でき、又昇
降速さは油圧流量をもとにして検出可能である。
Detection of the stroke length of the sand discharge/compaction member 3 is accomplished by using a number of proximity switches operated by operating pieces provided on a part of the piston rod that moves up and down together with the sand discharge and compaction member 3 at the lower end or outside of the hollow tube 1. This can be achieved by arranging switches on the tube 4 at regular intervals, configuring a potentiometer circuit with each switch and a resistor connected between the switches, and detecting changes in the output voltage of this circuit. Also, the speed of elevation can be detected based on the hydraulic flow rate.

以上の説明から明らかなように、本発明によれば、強度
にばらつきがある原地盤が均一の状態で所要強度を保有
する地盤に改良されるから、品質が保証嘔れ九改良地盤
を提供することができる。
As is clear from the above explanation, according to the present invention, the original ground with uneven strength is improved to the ground that has the required strength in a uniform state, so that quality is guaranteed and the improved ground is provided without sagging. be able to.

なお、これまでの記載は砂杭による地盤改良についてな
されているが、砂に代えて砂利、砕石。
In addition, although the previous description has been about ground improvement using sand piles, gravel and crushed stone can be used instead of sand.

鉱滓1石灰、その他砂類仰粒状材料を用いることができ
、これら?用いた場合にも本発明は適用される。
Mine slag 1 Lime and other sandy materials can be used, and these? The present invention is also applicable to the case where it is used.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は従来技術と本発明を比較した模式図、第2図は
本発明の実施において用いる砂杭造成装置の一例を示す
概略図である。 なお、図面において、 1 :中空1.2 :ピストン・シリンダ装置、・・・
代理人 弁理士 染 谷 廣 司
FIG. 1 is a schematic diagram comparing the prior art and the present invention, and FIG. 2 is a schematic diagram showing an example of a sand pile building apparatus used in carrying out the present invention. In the drawings, 1: Hollow 1.2: Piston/cylinder device,...
Agent Patent Attorney Hiroshi Sometani

Claims (1)

【特許請求の範囲】[Claims] 軟弱地盤中に多数の砂杭全造成して軟弱地盤全改良する
工法において、均一な改良地@をうるために原地盤の土
性の変化に対応して砂杭径と砂杭強度の倒れか一方又は
枚方を変化させながら各砂杭を造成することt−特徴と
する軟弱地盤改良工法。
In the method of completely improving soft ground by constructing a large number of sand piles in soft ground, in order to obtain a uniform improved ground, the sand pile diameter and sand pile strength should be changed depending on the changes in the soil texture of the original ground. Or, a soft ground improvement method characterized by constructing each sand pile while changing the hirakata.
JP14970881A 1981-09-22 1981-09-22 Improving work of soft ground Granted JPS5850216A (en)

Priority Applications (16)

Application Number Priority Date Filing Date Title
JP14970881A JPS5850216A (en) 1981-09-22 1981-09-22 Improving work of soft ground
AU88128/82A AU552443B2 (en) 1981-09-22 1982-09-08 Compacting soils
DK413282A DK413282A (en) 1981-09-22 1982-09-16 METHOD AND APPARATUS FOR FOUND BASEMENT IMPROVEMENT
US06/419,313 US4487524A (en) 1981-09-22 1982-09-17 Method and apparatus of forming sand piles for improving a soft ground
IT49138/82A IT1149086B (en) 1981-09-22 1982-09-20 PROCEDURE AND APPARATUS TO FORM SAND POLES TO IMPROVE SOFT SOIL IN A CONTROLLED WAY
KR8204233A KR860001923B1 (en) 1981-09-22 1982-09-20 Method and apparatus for making a sand pile in the weak foundation
SE8205390A SE8205390L (en) 1981-09-22 1982-09-20 SET AND DEVICE FOR SHAPING SAND PILLARS FOR AMPLIFYING LOS MARK
GB08226827A GB2106960B (en) 1981-09-22 1982-09-21 Method and apparatus for forming sand piles for improving soft ground
FR8215881A FR2513283B1 (en) 1981-09-22 1982-09-21 METHOD AND APPARATUS FOR FORMING VERTICAL SAND DRAINS FOR SOIL IMPROVEMENT
MX194467A MX154481A (en) 1981-09-22 1982-09-21 IMPROVEMENTS IN METHOD AND APPARATUS TO FORM SAND PILES TO IMPROVE A SOFT SOIL
NO823193A NO823193L (en) 1981-09-22 1982-09-21 PROCEDURE AND APPARATUS FOR ANTIFICATION OF ANGLES FOR AA IMPROVE BLOOD FOUNDATION
DE3234918A DE3234918C2 (en) 1981-09-22 1982-09-21 Method and device for forming sand piles for consolidating soft ground
NLAANVRAGE8203652,A NL189868C (en) 1981-09-22 1982-09-21 DEVICE FOR SOFT-GROUNDING SOIL COLUMNS IMPROVING SOIL.
BR8205533A BR8205533A (en) 1981-09-22 1982-09-21 PROCESS AND APPARATUS FOR FORMING SAND HILLS FOR IMPROVING A SOFT LAND
PH27899A PH20304A (en) 1981-09-22 1982-09-22 Method and apparatus of forming sand piles for improving a soft ground
MY355/87A MY8700355A (en) 1981-09-22 1987-12-30 Method & apparatus for forming sand piles for improving soft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14970881A JPS5850216A (en) 1981-09-22 1981-09-22 Improving work of soft ground

Publications (2)

Publication Number Publication Date
JPS5850216A true JPS5850216A (en) 1983-03-24
JPS6125859B2 JPS6125859B2 (en) 1986-06-18

Family

ID=15481078

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14970881A Granted JPS5850216A (en) 1981-09-22 1981-09-22 Improving work of soft ground

Country Status (1)

Country Link
JP (1) JPS5850216A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61126218A (en) * 1984-11-21 1986-06-13 Fudo Constr Co Ltd Soft ground improving method
US6881013B2 (en) 2003-06-19 2005-04-19 Fudo Construction Co., Ltd. Sand pile driving method
JP2010065525A (en) * 2009-10-29 2010-03-25 Penta Ocean Construction Co Ltd Sand pile preparation method and improved ground in floating-type sand compaction pile construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5598519A (en) * 1979-01-19 1980-07-26 Matsupu Kogyo:Kk Driving method of sand pile and its apparatus

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5598519A (en) * 1979-01-19 1980-07-26 Matsupu Kogyo:Kk Driving method of sand pile and its apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61126218A (en) * 1984-11-21 1986-06-13 Fudo Constr Co Ltd Soft ground improving method
US6881013B2 (en) 2003-06-19 2005-04-19 Fudo Construction Co., Ltd. Sand pile driving method
JP2010065525A (en) * 2009-10-29 2010-03-25 Penta Ocean Construction Co Ltd Sand pile preparation method and improved ground in floating-type sand compaction pile construction method

Also Published As

Publication number Publication date
JPS6125859B2 (en) 1986-06-18

Similar Documents

Publication Publication Date Title
US4487524A (en) Method and apparatus of forming sand piles for improving a soft ground
US4230425A (en) Method and installation for producing cast-in-situ piles
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN108914912A (en) A kind of Foundation Treatment engineering method of column-hammer forced tamping displacement
CN106522191A (en) Transformer substation foundation treatment method and application thereof
CN107255656A (en) The superfilled device of detection concrete that electronics and mechanical detection are integrated in one
JPS5850216A (en) Improving work of soft ground
CN108914911B (en) Stratum pre-stressed advanced excavation stability control method
CN112412340B (en) Sand layer geological soil nailing wall supporting construction method
CN107780407A (en) Secondary precipitation union dynamic consolidation soft base processing method
CN106869153A (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering
CN115652893A (en) Construction method for reinforcing foundation soil body of hydraulic building
JP3584201B2 (en) Sand pile forming equipment
JPS58164814A (en) Sand pile formation work
EP0457813B1 (en) A process for building a concrete structure in loose matter, from ground level, and equipment for carrying out said process
CN110438973A (en) A kind of reinforcement means of soft foundation
CN210660129U (en) Slurry leakage prevention tool for shield construction in high-cold ultra-shallow earthing area
CN109024544A (en) The hydraulic high frequency compaction method of collapsible loess tunnel substrate
SU1599481A1 (en) Method of erecting building foundation in heaving soil
GB2041049A (en) Method and Installation for Producing Cast-in-situ Piles
JPS59173416A (en) Soft ground improvement work by sand pile
CN105887812A (en) Single-pile-casing construction method for static pressure sinking pipe carrier cast-in-place pile
JPS61126218A (en) Soft ground improving method
JPS5842513Y2 (en) Continuous wall forming device
JPS57174530A (en) Penetration of cylinder into ground