JPS61155511A - Removal of negative frictional force of in-situ pile - Google Patents

Removal of negative frictional force of in-situ pile

Info

Publication number
JPS61155511A
JPS61155511A JP27676584A JP27676584A JPS61155511A JP S61155511 A JPS61155511 A JP S61155511A JP 27676584 A JP27676584 A JP 27676584A JP 27676584 A JP27676584 A JP 27676584A JP S61155511 A JPS61155511 A JP S61155511A
Authority
JP
Japan
Prior art keywords
bags
concrete
bag
hollow ring
frictional force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP27676584A
Other languages
Japanese (ja)
Other versions
JPH029124B2 (en
Inventor
Eiji Matsui
松井 英治
Masaaki Kakurai
正昭 加倉井
Tadanori Date
伊達 忠則
Junro Aida
合田 潤朗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP27676584A priority Critical patent/JPS61155511A/en
Publication of JPS61155511A publication Critical patent/JPS61155511A/en
Publication of JPH029124B2 publication Critical patent/JPH029124B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To remove negative frictional forces from in-situ piles by a method in which steel plates with frictional force-cutters and bags are alternately set, a reinforcing bar cage having a cylinder with a hollow ring on its lower end is built in the hole, the bag and the hollow ring are expanded, and concrete is placed. CONSTITUTION:Steel plates 17 and bags 18 made of water-stopping nylon sheets are alternately set circularly and a life-bouy shaped hollow ring 19 is provided to the lowest end portion to form a cylinder 16. A frictional force cutter 20 of asphalt, etc., is bonded to the outer surfaces of the steel plates 17 and the inner walls 18 of the bags 18, and a reinforcing bag cage 22 surrounded by the cylinder 16 is built in the excavated hole 23. When water is injected through the opening of the bags 18 to fill them with water, the bags 18 and the rings 19 are expanded and pressingly contacted with the wall of the hole 23. Concrete 24 is then placed and a filling material 25, e.g., sand, etc., is packed into the aperture between the hole 23 and the steel plates 17.

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は場所打ち杭の負の摩擦力除去方法に関する。[Detailed description of the invention] "Industrial application field" This invention relates to a method for removing negative frictional force from cast-in-place piles.

「従来の技術」 埋立地等の軟弱地盤に構築される基礎杭には地盤の圧密
作用によって地盤が沈下するのに伴なって基礎杭を共に
引き込もうとする負の摩擦力が作用し建築物等の基礎に
不測の沈下を生じ建築物等に傾斜やひび割れ等を生じ、
あるいは杭を破壊する原因となっている。
``Conventional technology'' Foundation piles constructed on soft ground such as reclaimed land are subject to negative frictional force that tries to pull the foundation piles together as the ground sinks due to the consolidation action of the ground, causing damage to buildings, etc. Unexpected subsidence in the foundations of buildings, etc., resulting in tilting, cracking, etc.
Or it may cause the pile to break.

よって、このような地盤沈下地帯では、基礎杭と地層と
の間に何んらかの縁切り措置を施こすことが必要であり
、既製杭の場合では外套鋼管を付けるか、杭にアスファ
ルト等の摩擦力切断材を塗布しておいて打込むかされて
いる。
Therefore, in such areas of ground subsidence, it is necessary to take some kind of edge cutting measures between the foundation piles and the strata, and in the case of ready-made piles, either attach a mantle steel pipe or cover the piles with asphalt, etc. It is applied with a friction cutting material and then hammered in.

しかし、場所打ち杭の場合には上述のように地上で縁切
り措置を施こすことは出来ないので、全(相異なる手段
がとられる。
However, in the case of cast-in-place piles, it is not possible to perform edge cutting measures on the ground as described above, so different measures are taken.

例えば、特公昭58−58495号にあっては第2図に
示される如く、アスファルト11等を付着した複数の板
12を鉄筋かご13の外周にワイヤ14で取付けて掘削
孔15に建込み、打設したコンクリートの圧力によって
複数の板12を掘削孔15の壁面に押しつけるようにし
てコンクリート杭を形成するとし、特願昭59−102
736号にあっては、コンクリ−ト杭の施工手順および
地盤沈下状態を示す説明図の第3図fa)〜(d)並び
に潤滑材を塗布した鋼管を嵌入したコンクリート杭の拡
大切断平面図である第4図に示される如く、地il中に
コンクリート杭2を打設しコンクリートが固結した後、
コンクリート杭2より大径で外周壁4に潤滑材5を付着
させた鋼管3を打設されたコンクリート杭2に嵌入する
ようにし、さらに、特願昭59−108544号にあっ
ては、コンクリート杭の施工手順および地盤沈下状態を
示す説明図の第5図a〜e並びに注入管付き鋼管を嵌入
したコンクリート杭の拡大切断平面図である第6図に示
される如く、地盤1°中にコンクリート杭2°を打設し
コンクリートが固結した後、コンクリート杭2”より大
径の注入管4′付き鋼管3”をコンクリート杭2゛に嵌
入し、つぎに注入管4″の先端6°から潤滑材7°を地
盤1°中に注入しながら注入管4′付き鋼管3′を引き
上げてコンクリート杭2”の周囲に/I21滑材7゛の
浸透層8°を形成するようにしている。
For example, in Japanese Patent Publication No. 58-58495, as shown in FIG. A concrete pile is formed by pressing a plurality of plates 12 against the wall surface of the excavation hole 15 by the pressure of the concrete placed in the concrete.
In No. 736, Figures 3 fa) to (d) are explanatory diagrams showing the construction procedure of concrete piles and the state of ground subsidence, as well as an enlarged cutaway plan view of a concrete pile fitted with a steel pipe coated with a lubricant. As shown in Figure 4, after concrete piles 2 are driven into the ground and the concrete hardens,
A steel pipe 3 having a diameter larger than that of the concrete pile 2 and having a lubricant 5 attached to the outer peripheral wall 4 is fitted into the concrete pile 2 that has been cast. As shown in Figures 5a to 5e, which are explanatory diagrams showing the construction procedure and ground subsidence state, and Figure 6, which is an enlarged cutaway plan view of a concrete pile into which a steel pipe with an injection pipe is inserted, the concrete pile is placed in the ground at 1°. After pouring 2° and solidifying the concrete, insert the steel pipe 3" with injection pipe 4', which has a larger diameter than the concrete pile 2", into the concrete pile 2", and then lubricate the 6° tip of the injection pipe 4". The steel pipe 3' with the injection pipe 4' is pulled up while injecting the lubricant 7° into the ground to form an 8° permeable layer of /I21 lubricant 7' around the concrete pile 2''.

「発明が解決しようとする問題点」 しかるに第1の方法は摩擦力切断材を付着させた板体を
鉄筋かごに移動可能に取付けるという複雑な作業が必要
であり、また当該板材を杭とともに埋殺すので多数の板
体が必要であり、さらに板体を鉄筋かとに取付けるので
鉄筋かごの直径を従来のものより小さくする必要があり
そのため曲げやせん断に対して強度が不足するばかりで
なく、最も重要なことは板体と掘削孔の壁面との間にコ
ンクリートが侵入し摩擦力の切断を妨げるおそれがある
``Problems to be solved by the invention'' However, the first method requires the complicated work of movably attaching the plate to which the frictional cutting material is attached to the reinforcing bar cage, and the plate is buried together with the pile. In addition, since the plates are attached to reinforcing bars, the diameter of the reinforcing bar cage must be smaller than conventional ones, which not only lacks strength against bending and shearing, but also The important thing is that concrete may enter between the plate and the wall of the excavation hole, which may prevent the frictional force from being cut.

また第2の方法は外套管としての鋼管3をドロップハン
マーまたはバイブロハンマー等を用いて所定の深さまで
嵌入させるようにするというのであるから、この使い捨
ての鋼管3は所定の強度を有した高価なものを供さねば
ならない。
In the second method, the steel pipe 3 serving as the jacket pipe is inserted to a predetermined depth using a drop hammer or a vibrohammer, so this disposable steel pipe 3 is an expensive one with a predetermined strength. I have to give something.

さらに第3の方法は、鋼管3゛に注入管4゛の付設とい
う加工を要するという不利ばかりか、当該注入管4°が
ウォータージェットまたはバイブロハンマー等を用いて
所定の深さまで嵌入させる際に大なる嵌入抵抗になると
いう難点がある。
Furthermore, the third method not only has the disadvantage of requiring processing to attach the injection pipe 4 to the steel pipe 3, but also requires a large amount of work when inserting the injection pipe 4 to a predetermined depth using a water jet or vibro hammer. However, there is a problem in that it results in resistance to insertion.

尚、第2.第3の方法はいずれも場所打ち机面化をまっ
てからの施工であるので、工事工程の長期化をもたらし
、好ましくない。
In addition, the second. The third method is undesirable because it requires construction after waiting for the casting-in-place table surface, which prolongs the construction process.

「問題点を解決するための手段」、「作用」本発明は値
上の事情に鑑みなされたもので、その要旨とするところ
は、鉄板と止水性シート材よりなる袋と・を交互に円周
上に配し、最下端部に咳袋の連続体として浮き輪状の中
空リング部を設けてなる筒体を構成し、当該鉄板の外表
面並びに当該袋の内壁外表面にアスファルト等の摩擦力
切断材を付着し、これを鉄筋かごの所定位置に紐止め等
にてあらかじめttt着し、かかる鉄筋かごを掘削孔に
建込んだ後、該袋並びに中空リング部に掘削用泥水等を
注入充満させて膨脹状態に保持させ、この状態下にてコ
ンクリート打設をとり行うと共に掘削孔壁と鉄板との空
隙部には砂等の充填材を詰めるとして、圧密沈下層に於
いて外周面に摩擦力切断材付着層を同時繞囲形成したと
ころの場所打ち杭を提供するとして、既述した従来手段
の諸難点を全く解消した点にある。
``Means for solving problems'' and ``effects'' The present invention was made in view of cost considerations, and its gist is that iron plates and bags made of water-stopping sheet material are alternately arranged in circles. It is arranged on the circumference and constitutes a cylinder with a hollow ring part in the form of a floating ring as a continuous body of the cough bag at the lowest end, and the frictional force of asphalt etc. is applied to the outer surface of the iron plate and the outer surface of the inner wall of the bag. After attaching the cut material and attaching it to the predetermined position of the reinforcing bar cage with strings, etc., and erecting the reinforcing bar cage in the excavation hole, the bag and hollow ring part are filled with drilling mud, etc. Under this condition, concrete is poured and the gap between the excavation hole wall and the steel plate is filled with filler such as sand, and friction is applied to the outer circumferential surface in the consolidation settlement layer. By providing a cast-in-place pile in which a force-cutting material adhesion layer is simultaneously formed, the problems of the conventional means described above are completely eliminated.

「実施例」 以下、これを図に基づいて詳細に説明する。"Example" This will be explained in detail below based on the drawings.

第1図a、bは本発明の特徴である筒体16の説明図で
、これは鉄板17とナイロン等の止水性シート材よりな
る袋18とを交互に円周上に配し、最下端部に該袋18
の連続体として浮き輪状の中空リング部19が設けられ
ている。
Figures 1a and 1b are explanatory diagrams of a cylindrical body 16, which is a feature of the present invention, in which iron plates 17 and bags 18 made of water-stopping sheet material such as nylon are arranged alternately on the circumference, and the lowermost end The bag 18 in the section
A floating ring-like hollow ring portion 19 is provided as a continuous body.

筒体16に供される鉄板17は別設ケーシング鋼管の如
く土中に打ち込み貫入させる訳ではないので、コンクリ
ート側圧に耐え得る強度を有している安価なもので良い
Since the iron plate 17 provided to the cylinder 16 is not driven into the soil like a separate casing steel pipe, it may be an inexpensive one that has the strength to withstand concrete side pressure.

さらに、鉄板17の外表面並びに袋18の内壁18a外
表面にはアスファルト等の摩擦力切断材20を付着する
Further, a friction cutting material 20 such as asphalt is attached to the outer surface of the iron plate 17 and the outer surface of the inner wall 18a of the bag 18.

しかして、該袋18の開口より水を注入充満させると袋
18並びに中空リング部19は膨張し、剛性が付与され
て径大化し、柱状並びにリング状に安定し、掘削孔内に
あっては孔壁に強く押し付き(袋18にあってはb図左
図態様より右図態様に変化する)、一種の縦並びに横方
向の堰となり、中空リング部の上方には摩擦力切断材の
輪状層が立上ることとなる。
When water is injected and filled from the opening of the bag 18, the bag 18 and the hollow ring part 19 expand, are given rigidity, enlarge in diameter, and become stable in columnar and ring shapes, so that they do not fit inside the borehole. It strongly presses against the hole wall (in the case of bag 18, the mode changes from the mode shown on the left in figure b to the mode shown on the right), and becomes a kind of vertical and horizontal weir, and above the hollow ring part there is a ring-shaped friction cutting material. A layer will rise.

本発明はこれを建込み鉄筋かごの所定位置っまり圧密沈
下層に該当する部位にあらかじめ配し、しかる後にコン
クリート打設を行うことによって、縁切り措置を同時に
形成する場所打ち杭とせんとするものである。
The present invention is a cast-in-place pile that simultaneously forms edge cutting measures by placing the pile in advance at a predetermined position of a rebar cage, which corresponds to the consolidation settlement layer, and then pouring concrete. It is.

すなわち、第7図a〜Cは本発明方法の施工手順を縁切
り措置部の平断面を付図して示した図で、紐止め21等
の止め手段で筒体16を1巻着させた鉄筋かご22を掘
削孔23内に建込む(a)。
That is, FIGS. 7a to 7C are diagrams showing the construction procedure of the method of the present invention with a plan cross-section of the edge-cutting section, and show a reinforcing bar cage in which the cylinder 16 is wrapped once with a fastening means such as a string fastener 21. 22 is built into the excavated hole 23 (a).

次いで、注水用パイプPを袋18の開口に差し込んで袋
18並びに中空リング部19内へ注水(掘削用泥水でよ
い)充満させて膨張させると、阿り性が付与されて既述
の如く大径化する袋18並びに中空リング部19は掘削
孔23の壁面に押し付けられ、へばり付く形態となる(
b)。
Next, when the water injection pipe P is inserted into the opening of the bag 18 and the inside of the bag 18 and the hollow ring portion 19 are filled with water (mud from drilling may be used) and expanded, the water is imparted with aqueous properties and becomes large as described above. The bag 18 and the hollow ring part 19, which are increasing in diameter, are pressed against the wall surface of the excavation hole 23 and become stuck (
b).

しかして、後述のコンクリート打設によっても鉄板17
と掘削孔23壁面との間にコンクリートが侵入すること
はない。
However, due to the concrete pouring described later, the iron plate 17
Concrete will not enter between the hole 23 and the wall surface of the excavation hole 23.

袋18の開口に栓をする等の措置にて、袋18並びに中
空リング部19の膨張保持をしておいてからコンクリ−
、ト24の打設をすると共に掘削孔23と鉄板I7との
空隙部に砂等の充填材25を詰める(C)。
The bag 18 and the hollow ring part 19 are kept inflated by taking measures such as plugging the opening of the bag 18, and then the concrete is poured.
, and at the same time, the gap between the excavated hole 23 and the iron plate I7 is filled with a filler 25 such as sand (C).

結局、コンクリート24の固化による場所打ち杭の完成
と同時に圧密沈下層に該当する部位のコンクリート24
外周にFlkM力切断材20を有した縁切りtS置も完
成する。
Eventually, the concrete 24 in the area corresponding to the consolidation settlement layer was completed at the same time as the cast-in-place pile was completed due to the solidification of the concrete 24.
The edge cutting tS position having the FlkM force cutting material 20 on the outer periphery is also completed.

尚、本発明方法では、鉄板17の部では、コンクリート
側圧を受けた展張状態の平滑面(鉄板故に)と摩擦力切
断材20の層形筋とが全く一致することとなるので、掘
削孔23の壁面状態の如何にかかわらず最も望ましい平
滑な縁切り層形成が自動的になされるが、袋18の部で
は掘削孔23壁面への押し付き態様に摩擦力切断材20
が従かうこととなるので、最良の形態である平滑面な縁
切り層形成のためには掘削孔23壁面がさほど粗面では
ない地盤に通用されるを良しとする。
In addition, in the method of the present invention, in the part of the steel plate 17, the smooth surface in the expanded state (because of the steel plate) subjected to concrete side pressure completely coincides with the layered reinforcement of the friction force cutting material 20, so that the excavation hole 23 The most desirable smooth edge cutting layer is automatically formed regardless of the wall surface condition, but in the bag 18 section, the friction cutting material 20 is pressed against the wall surface of the excavation hole 23.
Therefore, in order to form a cutting layer with a smooth surface, which is the best form, it is preferable that the wall surface of the excavation hole 23 is used in ground that is not very rough.

また、袋18は既述より明らかな如く、場所打ち杭の固
化までの期間保もたれてくれればよく、摩擦力除去層が
形成されたならば不要であり、耐久性もその範囲内でよ
いものである。
Furthermore, as is clear from the above description, the bag 18 only needs to be able to hold the cast-in-place pile for a period of time until it solidifies, and is unnecessary if a frictional force removing layer is formed, and the durability is good within that range. It is.

「発明の効果」 以上より明らかなる如く、本発明によるならば、多数の
分割体を鉄筋かごに取り付けねばならぬ煩られしさかな
く、また、摩擦力切断を妨げることとなるコンクリート
の摩擦力除去層外側への侵入もない。
``Effects of the Invention'' As is clear from the above, according to the present invention, there is no need to attach a large number of divided bodies to the reinforcing bar cage, and there is no need to attach a large number of divided bodies to the reinforcing bar cage.Furthermore, the frictional force of the concrete, which hinders frictional force cutting, is eliminated. There is no invasion to the outside of the layer.

また、捨て材として高価なものを供することなく、且つ
、その設置に困難を伴なうこともない。
Further, there is no need to provide expensive materials as waste materials, and there is no difficulty in installing them.

さらには、コンクリート固化と同時に、つまり、従来の
場所打ち杭の完成と同時に摩擦力除去層も出来るもので
あって、何んら工期の遅延をもたらすこともなく、実際
上、極めて有意義である。
Furthermore, the friction force removal layer can be formed at the same time as the concrete solidifies, that is, at the same time as the conventional cast-in-place pile is completed, and it does not cause any delay in the construction period, which is extremely meaningful in practice.

【図面の簡単な説明】[Brief explanation of drawings]

第1図a、bは本発明が用いる袋の説明としての全体俯
藏図、a図中b−b矢視平断面図、第2図〜第4図並び
に第5〜6図は夫々従来手段の説明図、第7図a −c
は本発明方法の施工手順図である。 1.1”・・・地盤、2.2°・・・コンクリート杭、
3.3′・・・鋼管、4・・・外周壁、4”・・・注入
管、5・・・潤滑材、6”・・・先端、7゛・・・潤滑
材、8°・・・浸透層、11・・・アスファルト、12
・・・板、13・・・鉄筋かご、14・・・ワイヤ、1
5・・・掘削孔、16・・・筒体、17・・・鉄板、1
8・・・袋、19・・・中空リング部、20・・・摩擦
力切断材、21・・・紐止め、22・・・鉄筋かご、2
3・・・掘削孔、24・・・コンクリート、25・・・
充填材。 ズ免シθ
Figures 1a and 1b are overall overhead views for explaining the bag used in the present invention, a plane sectional view taken along line bb in figure a, and Figures 2 to 4 and 5 to 6 are conventional means, respectively. 7a-c
1 is a construction procedure diagram of the method of the present invention. 1.1"...ground, 2.2°...concrete pile,
3.3'...Steel pipe, 4...Outer peripheral wall, 4"...Injection pipe, 5...Lubricant, 6"...Tip, 7゛...Lubricant, 8°...・Permeation layer, 11... Asphalt, 12
...Plate, 13...Rebar cage, 14...Wire, 1
5...Drilling hole, 16...Cylinder, 17...Iron plate, 1
8... Bag, 19... Hollow ring part, 20... Friction force cutting material, 21... Strap stopper, 22... Rebar basket, 2
3...Drilling hole, 24...Concrete, 25...
Filling material. Zunshi θ

Claims (1)

【特許請求の範囲】[Claims] 鉄板と止水性シート材よりなる袋とを交互に円周上に配
し、最下端部に該袋の連続体として浮き輪状の中空リン
グ部を設けてなる筒体を構成し、当該鉄板の外表面並び
に当該袋の内壁外表面にアスファルト等の摩擦力切断材
を付着し、これを鉄筋かごの所定位置に紐止め等にてあ
らかじめ捲着し、かかる鉄筋かごを掘削孔に建込んだ後
、該袋並びに中空リング部に掘削用泥水等を注入充満さ
せて膨脹状態に保持させ、この状態下にてコンクリート
打設をとり行うと共に掘削孔壁と鉄板との空隙部には砂
等の充填材を詰めるとして、圧密沈下層に於いて外周面
に摩擦力切断材付着層を同時繞囲形成するとしたことを
特徴とする場所打ち杭の負の摩擦力除去方法。
Iron plates and bags made of water-stopping sheet material are arranged alternately on the circumference, and a hollow ring in the form of a floating ring is provided at the lowest end as a continuation of the bags, forming a cylinder. A friction cutting material such as asphalt is attached to the surface and the outer surface of the inner wall of the bag, and this is wrapped in advance with a string or the like at a predetermined position of the reinforcing bar cage, and after the reinforcing bar cage is erected in the excavation hole, The bag and the hollow ring are filled with drilling mud, etc., and held in an expanded state. Concrete is poured under this condition, and a filler such as sand is filled into the gap between the borehole wall and the steel plate. A method for removing negative frictional force from a cast-in-place pile, characterized in that a layer of frictional cutting material attached to the outer circumferential surface is simultaneously formed surrounding the consolidation settlement layer.
JP27676584A 1984-12-27 1984-12-27 Removal of negative frictional force of in-situ pile Granted JPS61155511A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27676584A JPS61155511A (en) 1984-12-27 1984-12-27 Removal of negative frictional force of in-situ pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27676584A JPS61155511A (en) 1984-12-27 1984-12-27 Removal of negative frictional force of in-situ pile

Publications (2)

Publication Number Publication Date
JPS61155511A true JPS61155511A (en) 1986-07-15
JPH029124B2 JPH029124B2 (en) 1990-02-28

Family

ID=17574041

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27676584A Granted JPS61155511A (en) 1984-12-27 1984-12-27 Removal of negative frictional force of in-situ pile

Country Status (1)

Country Link
JP (1) JPS61155511A (en)

Also Published As

Publication number Publication date
JPH029124B2 (en) 1990-02-28

Similar Documents

Publication Publication Date Title
CN110042844B (en) Construction method of cast-in-situ large-diameter foundation pit supporting tubular pile
JP4463140B2 (en) Seismic reinforcement method for masonry walls
EP0565816A1 (en) Cast-in-place concrete pile and method of construction the same in the ground
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
KR20190137432A (en) Soil retaining wall for phc pile
JP2001098542A (en) Soil cement composite taper pile
KR102070912B1 (en) Phc pile for soil retaining wall, mold assembly and manufacturing method thereof
JPS61155511A (en) Removal of negative frictional force of in-situ pile
JPS61151318A (en) Method of elimianting negative friction force of cast-in-place pile
KR101047257B1 (en) Construction method of earth wall using composite sheet pile
JPS63277319A (en) Setting of friction pile
JP6616180B2 (en) Construction method of foundation pile with reinforced pile head
JPH0472928B2 (en)
JPS61155512A (en) Removal of negative frictional force of in-site pile
JPH10219683A (en) Underground pile molding method and device therefor
JP4146250B2 (en) Open caisson bottom plate construction method
JP2905129B2 (en) Ground improvement method
JPS61151317A (en) Method of eliminating negative friction force of cast-in-place pile
JPS60246918A (en) Method of removing negative friction force of cast-in-place concrete pile
JP2764482B2 (en) Construction method of large depth human hole
JPS5869924A (en) Construction of sheathing wall having upper part consisting of underground continuous wall and lower part of pillar-row pile
JP2540561Y2 (en) A recess forming tool for fitting a reinforcing bar into the top of a cast-in-place concrete pile
JPS64530B2 (en)
JPS6221929A (en) Reinforcing work for pile head
JPH04182509A (en) Land slide protection structure