JPS61151318A - Method of elimianting negative friction force of cast-in-place pile - Google Patents
Method of elimianting negative friction force of cast-in-place pileInfo
- Publication number
- JPS61151318A JPS61151318A JP27512084A JP27512084A JPS61151318A JP S61151318 A JPS61151318 A JP S61151318A JP 27512084 A JP27512084 A JP 27512084A JP 27512084 A JP27512084 A JP 27512084A JP S61151318 A JPS61151318 A JP S61151318A
- Authority
- JP
- Japan
- Prior art keywords
- bag body
- concrete
- friction force
- wall
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/60—Piles with protecting cases
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
【発明の詳細な説明】 「産業上の利用分野」 この発明は場所打ち杭の負の摩擦力除去方法に関する。[Detailed description of the invention] "Industrial application field" This invention relates to a method for removing negative frictional force from cast-in-place piles.
「従来の技術」
埋立地等の軟弱地盤に構築される基礎杭には地盤の圧密
作用によって地盤が沈下するのに伴なって基礎杭を共に
引き込もうとする負の摩擦力が作用し建築物等の基礎に
不測の沈下を生じ建築物等に傾斜やひび割れ等を生じ、
あるいは杭を破壊する原因となっている。``Conventional technology'' Foundation piles constructed on soft ground such as reclaimed land are subject to negative frictional force that tries to pull the foundation piles together as the ground sinks due to the consolidation action of the ground, causing damage to buildings, etc. Unexpected subsidence in the foundations of buildings, etc., resulting in tilting, cracking, etc.
Or it may cause the pile to break.
よって、このような地盤沈下地帯では、基礎杭と地層と
の間に何んらかの縁切り措置を施こすことが必要であり
、既製杭の場合では外套鋼管を付けるか、杭にアスファ
ルト等の摩擦力切断材を塗布しておいて打込むかされて
いる。Therefore, in such areas of ground subsidence, it is necessary to take some kind of edge cutting measures between the foundation piles and the strata, and in the case of ready-made piles, either attach a mantle steel pipe or cover the piles with asphalt, etc. It is applied with a friction cutting material and then hammered in.
しかし、場所打ち杭の場合には上述のように地上で縁切
り措置を施こすことは出来ないので、全く相異なる手段
がとられる。However, in the case of cast-in-place piles, it is not possible to carry out edge cutting measures on the ground as described above, so a completely different method is taken.
例えば、特公昭5 B−58495号にあっては第2図
に示される如く、アスファルト11等を付着した複数の
板12を鉄筋かご13の外周にワイヤ14で取付けて掘
削孔15に建込み、打設したコンクリートの圧力によっ
て複数の板12を掘削孔15の壁面に押しつけるように
してコンクリート杭を形成するとし、特願昭59−10
2736号にあっては、コンクリート杭の施工手順およ
び地盤沈下状態を示す説明図の第3図(a)〜(dl並
びに潤滑材を塗布した鋼管を嵌入したコンクリート杭の
拡大切断平面図である第4図に示される如く、地盤1中
にコンクリート杭2を打設しコンクリートが固結した後
、コンクリート杭2より大径で外周壁4に潤滑材5を付
着させた鋼管3を打設されたコンクリート杭2に嵌入す
るようにし、さらに、特願昭59−108544号にあ
っては、コンクリート杭の施工手順および地盤沈下状態
を示す説明図の第5図a〜e並びに注入管付き鋼管を嵌
入したコンクリート杭の拡大切断平面図である第6図に
示される如く、地盤1゛中にコンクリート杭2′を打設
しコンクリートが固結した後、コンクリート杭2”より
大径の注入管4°付き鋼管3°をコンクリート杭2′に
嵌入し、つぎに注入管4°の先端6”から潤滑材7”を
地盤1°中に注入しながら注入舎4”付き鋼管3゛を引
き上げてコンクリート杭2゛の周囲に潤滑材7゛の浸透
層8゛を形成するようにしている。For example, in Japanese Patent Publication No. 5 B-58495, as shown in FIG. 2, a plurality of plates 12 to which asphalt 11 or the like is adhered are attached to the outer periphery of a reinforcing bar cage 13 with wires 14 and built into an excavated hole 15. It is assumed that a concrete pile is formed by pressing a plurality of plates 12 against the wall surface of the excavation hole 15 by the pressure of the poured concrete.
In No. 2736, Figures 3 (a) to (dl) are explanatory diagrams showing the construction procedure of concrete piles and the state of ground subsidence, and Figure 3 (dl) is an enlarged cutaway plan view of a concrete pile fitted with a steel pipe coated with a lubricant. As shown in Figure 4, after concrete piles 2 were driven into the ground 1 and the concrete solidified, a steel pipe 3 with a diameter larger than the concrete piles 2 and having a lubricant 5 attached to the outer peripheral wall 4 was driven. In addition, in Japanese Patent Application No. 59-108544, a steel pipe with an injection pipe is inserted as shown in Figs. As shown in Fig. 6, which is an enlarged cutaway plan view of the concrete pile, after the concrete pile 2' is driven into the ground 1'' and the concrete hardens, a 4° injection pipe with a diameter larger than the concrete pile 2'' is inserted. Insert the steel pipe 3° with the injection pipe 4° into the concrete pile 2', then inject 7" of lubricant into the ground 1° from the tip 6" of the injection pipe 4°, and pull up the steel pipe 3' with the injection shaft 4", and attach it to the concrete pile. A permeation layer 8' of lubricant 7' is formed around the lubricant 2'.
「発明が解決しようとする問題点」
しかるに第1の方法は摩擦力切断材を付着させた板体を
鉄筋かごに移動可能に取付けるという複雑な作業が必要
であり、また当該板材を杭とともに埋殺すので多数の板
体が必要であり、さらに板体を鉄筋かごに取付けるので
鉄筋かごの直径を従来のものより小さくする必要があり
そのため曲げやせん断に対して強度が不足するばかりで
なく、最も重要なことは板体と掘削孔の壁面との間にコ
ンクリートが侵入し摩擦力の切断を妨げるおそれがある
。``Problems to be solved by the invention'' However, the first method requires the complicated work of movably attaching the plate to which the frictional cutting material is attached to the reinforcing bar cage, and the plate is buried together with the pile. In addition, since the plates are attached to reinforcing bar cages, the diameter of the reinforcing bar cages must be smaller than conventional ones, which not only lacks strength against bending and shearing, but also The important thing is that concrete may enter between the plate and the wall of the excavation hole, which may prevent the frictional force from being cut.
また第2の方法は外套管としての鋼管3をドロップハン
マーまたはバイブロハンマー等を用いて所定の深さまで
嵌入させるようにするというのであるから、この使い捨
ての鋼管3は所定の強度を有した高価なものを供さねば
ならない。In the second method, the steel pipe 3 serving as the jacket pipe is inserted to a predetermined depth using a drop hammer or a vibrohammer, so this disposable steel pipe 3 is an expensive one with a predetermined strength. I have to give something.
さらに第3の方法は、鋼管3″に注入管4°の付設とい
う加工を要するという不利ばかりか、当該注入管4”が
ウォータージェットまたはバイブロハンマー等を用いて
所定の深さまで嵌入させる際に大なる嵌入抵抗になると
いう難点がある。Furthermore, the third method not only has the disadvantage of requiring processing to attach the injection tube 4° to the steel pipe 3'', but also has the disadvantage that the injection tube 4'' takes a lot of effort when inserted to a predetermined depth using a water jet or vibro hammer. However, there is a problem in that it results in resistance to insertion.
尚、第2.第3の方法はいずれも場所打ち机面化をまっ
てからの施工であるので、工事工程の長期化をもたらし
、好ましくない。In addition, the second. The third method is undesirable because it requires construction after waiting for the casting-in-place table surface, which prolongs the construction process.
「問題点を解決するための手段」、「作用」本発明は叙
上の事情に鑑みなされたもので、その要旨とするところ
は、アスファルト等の摩擦力切断材を内壁表面に付着し
た平断面浮輪状の止水性シート材よりなる袋体を鉄筋か
ごの所定位置にあらかじめ捲着し、かかる鉄筋かごを掘
削孔に建込んだ後、当該袋体を掘削用泥水等を注入充満
させて膨脹状態に保持させ、この状態下にてコンクリー
ト打設をとり行うとして、圧密沈下層に於いて、外周面
に摩擦力切断材付着層を同時繞囲形成したところの場所
打ち杭を提供するとして、既述した従来手段の諸難点を
全く解消した点にある。``Means for Solving Problems'' and ``Operations'' The present invention was made in view of the above circumstances, and its gist is to provide a planar cross-section of a friction-cutting material such as asphalt attached to an inner wall surface. A bag body made of a floating ring-shaped water-stopping sheet material is wrapped in advance around a predetermined position on a reinforcing bar cage, and after the reinforcing bar cage is erected in an excavation hole, the bag body is inflated by injecting muddy water for drilling, etc. Assuming that concrete is placed under this condition, we will provide a cast-in-place pile with a layer of frictional cutting material attached to the outer circumferential surface simultaneously formed in the consolidation settlement layer. The problem lies in completely eliminating the problems of the conventional means mentioned above.
「実施例」 以下、これを図に基づいて詳細に説明する。"Example" This will be explained in detail below based on the drawings.
第1図a、bは本発明の特徴である袋体16の説明図で
、これは平断面浮輪状の止水性シート材を長寸にして袋
としたもので、その内壁16aの表面にはアスファルト
等の摩擦力切断材17が付着され、上端所定個所には注
水用パイプ16bが付設されている。FIGS. 1a and 1b are explanatory diagrams of a bag 16, which is a feature of the present invention. This bag is made of a water-stopping sheet material with a flat cross-section floating ring shape, and the surface of the inner wall 16a is A friction force cutting material 17 such as asphalt is attached, and a water injection pipe 16b is attached to a predetermined location on the upper end.
しかして、該注水用パイプ16bより袋内に水18を注
入充満させると、膨張し剛性が付与されて筒状に安定す
るので、b図に示す如く摩擦力切断材17の外側周囲に
所定厚の水18の層を介在させた層が形成されることと
なる。When the water 18 is injected and filled into the bag from the water injection pipe 16b, it expands, imparts rigidity, and becomes stable in a cylindrical shape. A layer with a layer of water 18 interposed therein is formed.
本発明はこれを建込み鉄筋かごの所定位置つまり圧密沈
下層に該当する部位にあらかじめ配し、しかる後にコン
クリート打設を行うことによって、縁切り措置を同時に
形成する場所打ち杭とせんとするものである。The present invention is a cast-in-place pile that simultaneously forms edge cutting measures by placing these in advance at a predetermined position of a built-in reinforcing bar cage, that is, at a location corresponding to the consolidation settlement layer, and then placing concrete. be.
すなわち、第7図a、b、cは本発明方法の施工手順を
平面、縦断で示した図で、ワイヤ20等の止め手段で袋
体16を捲着させた鉄筋かご19を掘削孔21内に建込
む(a)。That is, FIGS. 7a, b, and c are diagrams showing the construction procedure of the method of the present invention in plan and longitudinal section, in which the reinforcing bar cage 19 with the bag body 16 wrapped around it with a fastening means such as a wire 20 is inserted into the excavated hole 21. Build on (a).
次いで、注水用パイプ16aより袋体1内へ注水(掘削
用泥水でよい)充満して袋16を膨張させると、剛性が
付与さ、れて輪状に大径化する袋体16はその外壁16
cを掘削孔21面に押し付け、掘削孔21壁面にへばり
付く形態となる(b)。Next, when water is injected into the bag 1 from the water injection pipe 16a (mud for drilling may be used) and the bag 16 is expanded, rigidity is imparted and the bag 16, which has a larger diameter in a ring shape, has its outer wall 16
c is pressed against the surface of the excavation hole 21, and becomes stuck to the wall surface of the excavation hole 21 (b).
しかして、後述のコンクリート打設によっても袋体1と
掘削孔21壁面との間に侵入することはない。Therefore, even when concrete is poured to be described later, the concrete will not enter between the bag 1 and the wall surface of the excavation hole 21.
注水用パイプ16bに栓をする等の措置にて袋体lの膨
張保持をしておいてから、コンクリート22の打設を行
えば、コンクリート22の固化による場所打ち杭の完成
と同時に圧密沈下層に該当する部位のコンクリート22
外周に摩擦力切断材17層を有した縁切り措置も完成す
る(C)。If the concrete 22 is poured after the bag l is maintained in expansion by taking measures such as plugging the water injection pipe 16b, the consolidation settlement layer will be formed at the same time as the concrete 22 hardens and the cast-in-place pile is completed. Concrete 22 in the area corresponding to
The edge cutting device with 17 layers of friction cutting material on the outer periphery is also completed (C).
尚、本発明方法では、袋体1の掘削孔21壁面への押し
付き態様に摩擦力切断材17が従かうこととなるので、
最良の形態である平滑面な縁切り層形成のためには掘削
孔21壁面が平滑に仕上る地盤に適用されるを良しとす
る。In addition, in the method of the present invention, since the friction force cutting material 17 follows the manner in which the bag body 1 is pressed against the wall surface of the excavation hole 21,
In order to form the edge cutting layer on a smooth surface in the best form, it is best to apply it to the ground where the wall surface of the excavation hole 21 is finished smooth.
また、袋体16には所定間隔にて破裂防止の補強ハンド
を設けるとしてもよく、さらに、袋体16は既述より明
らかな如く、場所打ち杭の固化までの期間保もたれてく
れればよ(、摩擦力除去層が形成されたならば不要であ
り、耐久性もその範囲内でよいものである。Further, the bag 16 may be provided with reinforcing hands at predetermined intervals to prevent bursting, and furthermore, as is clear from the above, the bag 16 can be maintained for a period of time until the cast-in-place pile hardens. If a frictional force removing layer is formed, it is unnecessary, and the durability is good within this range.
「発明の効果」
以上より明らかなる如く、本発明によるならば、多数の
分割体を鉄筋かごに取り付けねばならぬ煩られしさがな
く、また、摩擦力切断を妨げることとなるコンクリート
の摩擦力除去層外側への侵入もない。"Effects of the Invention" As is clear from the above, according to the present invention, there is no need to attach a large number of divided bodies to a reinforcing cage, and the frictional force of concrete that would hinder frictional force cutting is eliminated. There is no invasion to the outside of the layer.
また、捨て材として高価なものを供することなく、且つ
、その設置に困難を伴なうこともない。Further, there is no need to provide expensive materials as waste materials, and there is no difficulty in installing them.
さらには、コンクリート固化と同時に、つまり、従来の
場所打ち杭の完成と同時に摩擦力除去層も出来るもので
あって、何んら工期の遅延をもたらすこともなく、実際
上、極めて有意義である。Furthermore, the friction force removal layer can be formed at the same time as the concrete solidifies, that is, at the same time as the conventional cast-in-place pile is completed, and it does not cause any delay in the construction period, which is extremely meaningful in practice.
第1図a、bは本発明が用いる袋体の説明としての全体
俯瞼図、a図中b−b矢視平断面図、第2図〜第4図並
びに第5〜6図は夫々従来手段の説明図、第7図a ”
−cは本発明方法の施工手順図である。
1.1′・・・地盤、2.2゛・・・コンクリート杭、
3,3°・・・鋼管、4・・・外周壁、4゛・・・注入
管、5・・・潤滑材、6′・・・先端、7″・・・潤滑
材、8′・・・浸透層、11・・・アスファルト、12
・・・板、13・・・鉄筋かご、14・・・ワイヤ、1
5・・・掘削孔、16・・・袋体、16a・・・内壁、
16b・・・注水用パイプ、16c・・・外壁、17・
・・摩擦力切断材、18・・・水、19・・・鉄筋かご
、20・・・ワイヤ、21・・・掘削孔、22・・・コ
ンクリート。
ンラシ7り
ズ鏝ろ勿Figures 1a and 1b are overall overhead views illustrating the bag used in the present invention, a plane sectional view taken along line bb in figure a, Figures 2 to 4, and 5 to 6 are conventional Explanatory diagram of the means, Figure 7a ”
-c is a construction procedure diagram of the method of the present invention. 1.1'...ground, 2.2'...concrete pile,
3,3°...Steel pipe, 4...Outer peripheral wall, 4''...Injection pipe, 5...Lubricant, 6'...Tip, 7''...Lubricant, 8'...・Permeation layer, 11... Asphalt, 12
...Plate, 13...Rebar cage, 14...Wire, 1
5... Excavation hole, 16... Bag body, 16a... Inner wall,
16b...Water injection pipe, 16c...Outer wall, 17.
...Friction force cutting material, 18...Water, 19...Reinforced cage, 20...Wire, 21...Drilled hole, 22...Concrete. Nrashi 7ri's trowel
Claims (1)
断面浮輪状の止水性シート材よりなる袋体を鉄筋かごの
所定位置にあらかじめ捲着し、かかる鉄筋かごを掘削孔
に建込んだ後、当該袋体を掘削用泥水等を注入充満させ
て膨脹状態に保持させ、この状態下にてコンクリート打
設をとり行うとして、圧密沈下層に於いて、外周面に摩
擦力切断材付着層を同時繞囲形成するとしたことを特徴
とする場所打ち杭の負の摩擦力除去方法。A bag made of a water-stopping sheet material in the shape of a flat cross-section floating ring with a friction-cutting material such as asphalt attached to the inner wall surface is wrapped in advance at a predetermined position on a reinforcing bar cage, and after the reinforcing bar cage is erected in the excavation hole, The bag is filled with drilling mud, etc. and kept in an expanded state, and concrete is poured under this condition.At the same time, a layer of frictional cutting material is attached to the outer peripheral surface in the consolidation settlement layer. A method for removing negative frictional force from a cast-in-place pile, characterized by forming an encirclement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP27512084A JPS61151318A (en) | 1984-12-25 | 1984-12-25 | Method of elimianting negative friction force of cast-in-place pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP27512084A JPS61151318A (en) | 1984-12-25 | 1984-12-25 | Method of elimianting negative friction force of cast-in-place pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS61151318A true JPS61151318A (en) | 1986-07-10 |
JPH0133607B2 JPH0133607B2 (en) | 1989-07-14 |
Family
ID=17550985
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP27512084A Granted JPS61151318A (en) | 1984-12-25 | 1984-12-25 | Method of elimianting negative friction force of cast-in-place pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS61151318A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0230807A (en) * | 1988-07-21 | 1990-02-01 | Satou Yoshiko | Execution of cast-in-place concrete piling work |
CN109972610A (en) * | 2019-03-02 | 2019-07-05 | 华北水利水电大学 | A kind of inflation pore-creating filling pile method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5865817A (en) * | 1982-02-12 | 1983-04-19 | Takenaka Komuten Co Ltd | Construction of on-site concrete pile |
-
1984
- 1984-12-25 JP JP27512084A patent/JPS61151318A/en active Granted
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5865817A (en) * | 1982-02-12 | 1983-04-19 | Takenaka Komuten Co Ltd | Construction of on-site concrete pile |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0230807A (en) * | 1988-07-21 | 1990-02-01 | Satou Yoshiko | Execution of cast-in-place concrete piling work |
CN109972610A (en) * | 2019-03-02 | 2019-07-05 | 华北水利水电大学 | A kind of inflation pore-creating filling pile method |
Also Published As
Publication number | Publication date |
---|---|
JPH0133607B2 (en) | 1989-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4463140B2 (en) | Seismic reinforcement method for masonry walls | |
KR100618597B1 (en) | Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this | |
JP4516847B2 (en) | Construction method and joint structure of joint part of water shielding material | |
JPS61151318A (en) | Method of elimianting negative friction force of cast-in-place pile | |
JPS6354093B2 (en) | ||
JPS63277319A (en) | Setting of friction pile | |
KR102070912B1 (en) | Phc pile for soil retaining wall, mold assembly and manufacturing method thereof | |
JP2000045265A (en) | Formation method of ground surface vibration cut-off ditch | |
JPS61155512A (en) | Removal of negative frictional force of in-site pile | |
KR101047257B1 (en) | Construction method of earth wall using composite sheet pile | |
JPS61155511A (en) | Removal of negative frictional force of in-situ pile | |
JPS61151317A (en) | Method of eliminating negative friction force of cast-in-place pile | |
JPS60246918A (en) | Method of removing negative friction force of cast-in-place concrete pile | |
JP2905129B2 (en) | Ground improvement method | |
CN213204225U (en) | Bored concrete pile construction structures of protection anti-filter cloth | |
KR200331377Y1 (en) | Soil Cement Wall with Removable H-Pile | |
KR200375610Y1 (en) | Cast in place concrete pile using vibro magnetic shovel hammer | |
JP4248716B2 (en) | Caisson top end construction method | |
JPS64530B2 (en) | ||
JPH04182509A (en) | Land slide protection structure | |
JP2005113672A (en) | Pile extracting construction method and heterogeneous coating material of pile | |
JPH0324924B2 (en) | ||
JPS6138015A (en) | Sheathing work | |
JPH03140594A (en) | Construction work of water-stopping shaft | |
JPH0672517B2 (en) | How to build a shaft |