JPS61117329A - Method of building crane for early starting of operation of large jib crane - Google Patents

Method of building crane for early starting of operation of large jib crane

Info

Publication number
JPS61117329A
JPS61117329A JP59238437A JP23843784A JPS61117329A JP S61117329 A JPS61117329 A JP S61117329A JP 59238437 A JP59238437 A JP 59238437A JP 23843784 A JP23843784 A JP 23843784A JP S61117329 A JPS61117329 A JP S61117329A
Authority
JP
Japan
Prior art keywords
crane
jib crane
foundation concrete
foundation
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP59238437A
Other languages
Japanese (ja)
Inventor
Junichi Masuda
益田 淳一
Sadao Sunakawa
定男 砂川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP59238437A priority Critical patent/JPS61117329A/en
Publication of JPS61117329A publication Critical patent/JPS61117329A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

PURPOSE:To enable early starting of operation of a jib crane, by a method wherein the lower part of the leg part of a crane is buried in foundation concrete, and placing of foundation concrete is effected in parallel with the setting of the leg part. CONSTITUTION:Burying of a lower part 3' of a leg part in foundation concrete 2 causes setting of anchor bolts for supporting the lower part 3' of the leg part and a foundation 8 for anchor bolt 7. This enables the lower part 3' of the leg part, a leg part 3, and a slewing part 4 to be set in parallel to the placing of concrete 2, resulting in the possibility to perform a work to install a counter weight 5 and a boom 6 and test a crane without waiting for the curing of the foundation concrete 2, and early starting operation of a jib crane is enabled.

Description

【発明の詳細な説明】 〔発明の利用分野〕 本館建物外エリアに基礎を有し、早期稼動を要求される
ジブクレーンの建方工法に関するものである6 〔発明の背景〕 本館建物外に基礎を設けたジブクレーンの建方は、一般
に、基礎コンクリートにアンカーボルトを埋込み、基礎
コンクリート施工完接、ジブクレーンを建方している。
[Detailed Description of the Invention] [Field of Application of the Invention] This relates to a construction method for a jib crane that has a foundation outside the main building and is required to be put into operation quickly.6 [Background of the Invention] The jib crane is generally erected by embedding anchor bolts in the foundation concrete, completing the foundation concrete construction, and then erecting the jib crane.

一方、本館建物の基礎コンクリートは、施工法の改善等
により、工程短縮がなされ、原子力プラント全体の建設
工程のクリティカルパスが、ジブクレーンの基礎コンク
リート・クレーン建方の方へ移ってしまう事が考えられ
、ジブクレーン早期建方の必要性が生じてきた。
On the other hand, improvements in construction methods have shortened the construction process for the foundation concrete for the main building, and it is thought that the critical path of the entire nuclear plant construction process will be shifted to the foundation concrete for the jib crane and crane erection. , the need for early erection of jib cranes has arisen.

〔発明の目的〕[Purpose of the invention]

本発明は、原子力プラント建設工期の短縮を行うため、
建物作業の1つのクリティカルパスである。大形ジブク
レーン稼動を早める事を目的とする。
In order to shorten the construction period of a nuclear power plant, the present invention
This is one critical path of building work. The purpose is to speed up the operation of large jib cranes.

〔発明の概要〕[Summary of the invention]

本発明の特徴は、基礎コンクリート内にジブクレーン脚
の一部を埋殺しとする事にある。これにより、基礎コン
クリートの施工とジブクレーン脚部の建方を並進する事
により、ジブクレーンの早期稼動が可能となる。
A feature of the present invention is that a part of the jib crane leg is buried in the foundation concrete. This will allow the jib crane to start operating earlier by moving forward with the construction of the foundation concrete and the erection of the jib crane legs.

〔発明の実施例〕[Embodiments of the invention]

以下、発明の実施例を図面を用いて説明する。 Embodiments of the invention will be described below with reference to the drawings.

第1図および第2図において1本館建物1外エリアに設
置されたジブクレーンは、ジブクレーンを支える基礎コ
ンクレート25脚部3、旋回部4、カウンターウェイト
5.ブーム6、等により構成されている。   ゛ 脚部3の下部は、第2図に示すように1脚部下部3′を
基礎コンクリート2の内部に埋込み9脚部下部3′を固
定するアンカーボルト7は、基礎コンクリート2の下端
面に、別にアンカーボルト用基1i18に埋込み固定す
る。
In Figures 1 and 2, the jib crane installed outside the main building 1 consists of a concrete foundation 25 supporting the jib crane, legs 3, slewing parts 4, counterweights 5. It is composed of a boom 6, etc. As shown in FIG. , and is separately embedded and fixed in the anchor bolt base 1i18.

従来のジブクレーン建方工法は、基礎コンクリート2の
配筋、コンクリート打設(第3図a)後。
The conventional jib crane construction method involves reinforcing the foundation concrete 2 and pouring the concrete (Figure 3a).

(アンカーボルト7は、基礎コンクリート2の上面に設
定済)(第3図b)脚部3.旋回部4を設定(第3図c
)し、カウンターウェイト5、ブーム6を取付け(第3
図d)、クレーンテスト(第3図e)を行い、稼動とな
る6本発明では、脚部下部3′ を基礎コンクリート2
内に埋殺しとすることにより9脚部下部3′を支えるア
ンカーボルト7および、アンカーボルト用基礎8を設定
(第4図b)し、脚部下部3′1脚部3.旋回部4設定
(第4図C)と基礎コンクリート2の設定(第4図a)
を並進作業とする。二九により、カウンターウェイト5
、ブーム6の取付(第4図d)、クレーンテスト(第4
図e)の作業が前倒しとなり、ジブクレーンを早期に稼
動することが出来る。
(Anchor bolts 7 are already set on the top surface of foundation concrete 2) (Figure 3b) Legs 3. Setting the turning section 4 (Fig. 3c)
) and install counterweight 5 and boom 6 (3rd
Figure d), crane test (Figure 3e) was carried out, and the crane test (Figure 3 e) was carried out, and in the present invention, the lower part 3' of the leg was connected to the base concrete 2.
An anchor bolt 7 supporting the lower part 3' of the nine legs and a foundation 8 for the anchor bolt are set by burying the lower part 3' in the lower leg part 3' (FIG. 4b). Setting of turning section 4 (Fig. 4 C) and setting of foundation concrete 2 (Fig. 4 a)
is a translational work. By 29, counterweight 5
, Installation of boom 6 (Fig. 4 d), Crane test (Fig. 4)
The work shown in Figure e) has been brought forward and the jib crane can be put into operation earlier.

〔発明の効果〕〔Effect of the invention〕

本発明によれば、本館建物外のエリアに設置されたジブ
クレーンの早期稼動が出来る。
According to the present invention, a jib crane installed in an area outside the main building can be put into operation early.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は大形ジブクレーンの構造と本館建物との位置を
示す図、第2図はジブクレーンの下部の詳細図、第3図
は従来工法による工程図、第4図は本発明における工程
図を示す。 1・・・本館建物、2・・・基礎コンクリート、3・・
・脚部。 3′・・・脚部下部、4・・・旋回部、5・・・カウン
ターウェイト、6・・・ブーム、7・・・アンカーボル
ト、8・・・翳2図
Fig. 1 is a diagram showing the structure of a large jib crane and its position with the main building, Fig. 2 is a detailed view of the lower part of the jib crane, Fig. 3 is a process diagram of the conventional construction method, and Fig. 4 is a process diagram of the present invention. show. 1...Main building, 2...Foundation concrete, 3...
·leg. 3'...Leg lower part, 4...Swivel part, 5...Counterweight, 6...Boom, 7...Anchor bolt, 8...Shadow 2

Claims (1)

【特許請求の範囲】[Claims] 1、原子力プラントの建設時において、本館建物外エリ
アに基礎を設け、建方する大型ジブクレーン建方工法に
おいて、上記大型ジブクレーンの脚部の一部を基礎コン
クリート内に埋殺しとし、基礎コンクリート施工と大型
ジブクレーン脚部の建方を並進することにより、大型ジ
ブクレーンの稼動開始時期を早めるようにしたことを特
徴とする大型ジブクレーンの早期稼動のためのクレーン
建方工法。
1. When constructing a nuclear power plant, in the large jib crane construction method in which a foundation is laid and erected in the area outside the main building, a portion of the leg of the large jib crane is buried in the foundation concrete, and the foundation concrete is constructed. A crane erection method for early operation of a large jib crane, characterized in that the start of operation of the large jib crane is brought forward by translating the erection of the legs of the large jib crane.
JP59238437A 1984-11-14 1984-11-14 Method of building crane for early starting of operation of large jib crane Pending JPS61117329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59238437A JPS61117329A (en) 1984-11-14 1984-11-14 Method of building crane for early starting of operation of large jib crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59238437A JPS61117329A (en) 1984-11-14 1984-11-14 Method of building crane for early starting of operation of large jib crane

Publications (1)

Publication Number Publication Date
JPS61117329A true JPS61117329A (en) 1986-06-04

Family

ID=17030203

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59238437A Pending JPS61117329A (en) 1984-11-14 1984-11-14 Method of building crane for early starting of operation of large jib crane

Country Status (1)

Country Link
JP (1) JPS61117329A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400472A (en) * 2011-03-22 2012-04-04 汪砚秋 Detachable water tank type tower crane foundation
JP2012211856A (en) * 2011-03-31 2012-11-01 Toshiba Corp Construction method of power plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400472A (en) * 2011-03-22 2012-04-04 汪砚秋 Detachable water tank type tower crane foundation
JP2012211856A (en) * 2011-03-31 2012-11-01 Toshiba Corp Construction method of power plant

Similar Documents

Publication Publication Date Title
GB1497321A (en) Building construction and apparatus therefor
CN108412128A (en) A kind of connection structure of steel core concrete column
JP2790986B2 (en) Bridge pier construction method and construction method
CN105839784B (en) Assembled jacking type construction techniques
CN111502095B (en) Connecting structure of large-diameter steel pipe column base and construction method thereof
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN110847599A (en) Special-shaped column formwork filling reinforcement device and construction method thereof
CN213143104U (en) Hoisting type finished product earth retaining enclosure device
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
JPS61117329A (en) Method of building crane for early starting of operation of large jib crane
CN217204610U (en) Low multilayer does not need to support assembled ultra high performance concrete frame structure and building
CN106013200A (en) Prefabricated assembly type strip foundation and construction technology
CN111576478A (en) Elevator well foundation structure
JPH04161566A (en) Constructing apparatus for large space building
JPH058305B2 (en)
JPH05286694A (en) Construction method and crane for assembling external type steel tower
JPH06146311A (en) Construction method of underground work by completely automatic building construction system
JPS6340609Y2 (en)
CN214466564U (en) Prefabricated assembled push pipe is with back structure
CN218668842U (en) Fender structure is enclosed in interim construction of assembled
CN211850939U (en) Large-span is taken one's place and is assembled base for truss
CN206859248U (en) A kind of counter weight type basis
CN212478067U (en) Base based on prefabricated building
CN216713533U (en) Plane overlapping multilayer large-span truss structure
JP2527686B2 (en) Tower-suspended building construction method