JP2527686B2 - Tower-suspended building construction method - Google Patents

Tower-suspended building construction method

Info

Publication number
JP2527686B2
JP2527686B2 JP5226486A JP22648693A JP2527686B2 JP 2527686 B2 JP2527686 B2 JP 2527686B2 JP 5226486 A JP5226486 A JP 5226486A JP 22648693 A JP22648693 A JP 22648693A JP 2527686 B2 JP2527686 B2 JP 2527686B2
Authority
JP
Japan
Prior art keywords
building
floor
tower
existing building
suspended
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5226486A
Other languages
Japanese (ja)
Other versions
JPH0754490A (en
Inventor
桶野孝男
大平徹也
Original Assignee
相鉄建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 相鉄建設株式会社 filed Critical 相鉄建設株式会社
Priority to JP5226486A priority Critical patent/JP2527686B2/en
Publication of JPH0754490A publication Critical patent/JPH0754490A/en
Application granted granted Critical
Publication of JP2527686B2 publication Critical patent/JP2527686B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建造物が高密度に建造
されている高密度敷地に新建造物を建設する際の方法で
あって、新建造物の建設当初から既存建造物のすべてを
一度に解体してしまうのではなく、新建造物の建設に伴
って既存建造物を徐々に解体し、もって、新建造物を建
設することのできる方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is a method for constructing a new structure on a high-density site where the structures are densely constructed. The present invention relates to a method of gradually dismantling an existing building along with the construction of a new building, rather than dismantling it into a new structure.

【0002】[0002]

【従来の技術】周知の通り、都市部に於ては、住宅、店
舗、工場等の各種の建造物が密集しており、特に駅周辺
ではその密集度が高く、建造物が高密度に建造された高
密度敷地となっている場所が多く、それら高密度敷地で
は、住宅、店舗、工場等の各種の建造物の老朽化、ある
いは、施設や設備の革新の為に、低層建造物から高層建
造物への移行、即ち、既存建造物から新建造物への移行
が望まれているものであった。
2. Description of the Related Art As is well known, various structures such as houses, shops, factories, etc. are densely built in urban areas, and especially in the vicinity of stations, the density of buildings is high and the buildings are densely constructed. There are many high-density sites that have been built, and in these high-density sites, various structures such as houses, shops, factories, etc. have deteriorated or the facilities and equipment have been renovated. There has been a desire for a transition to a structure, that is, a transition from an existing structure to a new structure.

【0003】そして、上記既存建造物から新建造物への
移行を行う場合には、既存建造物を解体し、更地にした
後、新建造物を建設することが一般的に行われているも
のであるが、新建造物建設中に工場等の業務を中断する
ことは好ましいものではないので、その間、別の場所へ
仮移転を行ったり、又は、既存建造物から新建造物への
移行を中止し用地確保が容易な地方へ移転することが行
われている。
In the case of transitioning from the existing structure to the new structure, it is common practice to dismantle the existing structure, vacate it, and then construct a new structure. However, it is not preferable to suspend the operations of factories, etc. during the construction of a new building, so during that time, a temporary relocation to another location or the suspension of the transition from the existing building to the new building is stopped. It is being relocated to a region where it is easy to secure.

【0004】所で、上記仮移転を行う場合には、その為
の仮移転先が必要であり、特に工場等に於ては、かなり
広い用地が必要であるので、都市部やその周辺でその様
な仮移転先を得ることは非常に困難であり、又、地方へ
の移転を行う場合には、従業員とその家族、あるいは、
取引先等の社会的問題によりその実施は容易に行えるも
のではなかった。
In the meantime, when the above-mentioned temporary relocation is carried out, a temporary relocation destination for that purpose is necessary, and especially in a factory or the like, a considerably large land is required, so that the temporary relocation is required in the urban area and its surroundings. It is very difficult to obtain such temporary relocation destination, and when relocating to a rural area, the employees and their families, or
Implementation was not easy due to social issues such as business partners.

【0005】そこで、上記工場等に於ける新建造物の建
設を、工場等の操業停止やその移転を行うことなく実施
する為の方法として、既存建造物に沿ってレールを敷設
した後、クレーンの等の建設機器が使用できる場所に於
て、上記レール間に既存建造物を跨ぐ様な新建造物を数
ブロックに分けて1ブロックずつ建設し、次いで、その
レール上を順次移動させ、最終的に必要とされる大きさ
を有する新建造物を建設し、さらに、既存建造物内の施
設を新建造物内へ移設した後、既存建造物を解体し、新
建造物の下部を建設することによって新建造物への移行
を行うものが提案され実施される様になった。
Therefore, as a method for constructing a new building in the above-mentioned factory without stopping the operation of the factory or relocating the factory, after laying rails along the existing building, In a place where construction equipment such as can be used, construct a new building that straddles the existing building between the above rails by dividing it into several blocks, construct one block at a time, and then move sequentially on that rail, and finally After constructing a new building with the required size, moving the facilities in the existing building to the new building, dismantling the existing building, and constructing the lower part of the new building to the new building The ones that make the transition have been proposed and implemented.

【0006】[0006]

【発明が解決しようとする課題】上記従来の技術による
と、工場等の営業停止や移転を行うことなく既存建造物
から新建造物への移行が可能となるものであるが、建造
物が高密度に建造され、既存建造物の周囲に余裕がない
高密度敷地の場合には、レールの敷設場所、あるいは、
クレーン等の建設機器を使用できる場所の確保ができ
ず、よって、その実施が困難になってしまうものであっ
た。
According to the above-mentioned conventional technique, it is possible to transfer an existing building to a new building without shutting down or relocating a factory or the like, but the building has a high density. In the case of a high-density site that is built in, and there is no room around the existing structure, the rail laying place, or
Since it is not possible to secure a place where construction equipment such as a crane can be used, it is difficult to carry out the implementation.

【0007】[0007]

【発明の目的】よって、本発明の目的とする所は、上述
の如き従来の技術の有する問題点を解決するものであっ
て、建造物が高密度に建造され、既存建造物の周囲に余
裕のない高密度敷地に、新建造物を建設する際の既存建
造物に於ける諸活動の休止(営業停止や移転)を必要最
小限度に抑えることができ、よって、既存建造物から新
建造物への移行をスムーズに実施できる新建造物を建設
する際の方法を提供することにある。
SUMMARY OF THE INVENTION Therefore, the object of the present invention is to solve the problems of the prior art as described above, in which a building is constructed with a high density and there is a margin around the existing building. It is possible to minimize the suspension (business suspension or relocation) of various activities in an existing building when constructing a new building in a high-density site where there is no existing building. It is to provide a method for constructing a new structure that can be smoothly transferred.

【0008】[0008]

【課題を解決する為の手段】上記目的を達成する為に本
発明は次の技術的手段を有する。即ち、実施例に対応す
る添付図面に使用した符号を用いて説明すると、建造物
が高密度に建造されている高密度敷地に、当該敷地上の
既存建造物1を新建造物2の建設当初から解体すること
なく、その建設途上で徐々に既存建造物1を解体し、も
って、新建造物2を建設する方法に於て、既存建造物1
が高密度に建造されている敷地にタワー柱3を立設する
ことができる敷地を探す工程と、その目的場所にタワー
柱3を立設する工程と、上記タワー柱3によって梁と床
構造体とより成るフロア4を上記既存建造物1の上方位
置に所定の空間Sを存して吊り下げ牽架する工程と、上
記梁と床構造体とより成るフロア4を上記既存建造物1
の上方の所定位置まで順次下方へ増設していく工程と、
上記既存建造物1内の設備等を先の工程で建設したフロ
アへ移動し既存建造物1を解体する工程と、上記既存建
造物1解体後の敷地に新建造物2を建設する工程と、上
記タワー柱3によって吊り下げられているフロア4と上
記既存建造物1解体後の敷地に建設された新建造物2の
本体部分5とを結合し竣工する工程とより成ることを特
徴とするタワー柱吊り下げ式建造物建設方法である。
In order to achieve the above object, the present invention has the following technical means. That is, to explain with reference to the reference numerals used in the accompanying drawings corresponding to the embodiments, on the high-density site where the buildings are built at high density, the existing building 1 on the site is constructed from the beginning of the construction of the new building 2. In the method of gradually dismantling the existing building 1 while constructing the new building 2 without dismantling the existing building 1,
, A process of searching for a site where the tower pillars 3 can be erected on a site that is constructed with high density, a process of erection of the tower pillars 3 at the destination, and a beam and floor structure by the tower pillars 3. A step of suspending and suspending a floor 4 composed of the above structure above the existing building 1 with a predetermined space S, and a floor 4 composed of the beam and the floor structure.
The process of sequentially expanding downward to a predetermined position above
Moving the facilities and the like in the existing building 1 to the floor constructed in the previous step to dismantle the existing building 1; building the new building 2 on the site after dismantling the existing building 1; A tower pillar suspension characterized by a process of combining a floor 4 suspended by a tower pillar 3 and a main body portion 5 of a new building 2 constructed on the site after dismantling the existing building 1 to complete the construction. It is a method of constructing a lowered building.

【0009】[0009]

【作用】本発明は、上記技術的手段より成り、建造物が
高密度に建造された高密度敷地の既存建造物1から新建
造物2への移行を行う際、既存建造物1が建造された高
密度敷地にタワー柱3を立設し、次いで、上記タワー柱
3によって、梁と床構造体とより成るフロア4を吊り下
げ牽架すると共に、フロア4を下方へ増設し、さらに、
上記フロア4内に既存建造物1内の施設や設備を移設し
た後、既存建造物1を解体し、そこに新建造物2の本体
部分5を建設し、タワー柱3によって吊り下げられてい
るフロア4と結合させることによって新建造物2が竣工
するものであるので、既存建造物1に於ける諸活動を行
いながら新建造物2の建設を行うことができ、よって、
建造物が高密度に建造された高密度敷地の既存建造物1
から新建造物2への移行がスムーズに実施できるもので
ある。
The present invention comprises the above-mentioned technical means, and the existing building 1 was built when the existing building 1 on the high-density site where the building was built densely was transferred to the new building 2. A tower pillar 3 is erected on a high-density site, and then a floor 4 composed of a beam and a floor structure is suspended and suspended by the tower pillar 3, and the floor 4 is additionally installed downward.
Floor where the facilities and equipment in the existing building 1 are transferred to the floor 4, the existing building 1 is dismantled, the main body part 5 of the new building 2 is built there, and the tower pillar 3 suspends it. Since the new building 2 is completed by combining it with 4, it is possible to build the new building 2 while performing various activities in the existing building 1.
Existing buildings on high-density site where buildings were built with high density 1
The transition from the new building to the new building 2 can be carried out smoothly.

【0010】さらに、上記タワー柱3は、新建造物2の
本体部分5にフロア4と共に結合されるものであるの
で、新建造物2内に構造体として取り込まれるものであ
り、既存建造物1から新建造物2への移行の際に使用さ
れるタワー柱3を解体する必要がないので、効率良く既
存建造物1から新建造物2への移行が実施できるもので
ある。
Further, since the tower pillar 3 is joined to the main body portion 5 of the new building 2 together with the floor 4, it is incorporated as a structure in the new building 2 and the existing building 1 is newly constructed. Since it is not necessary to dismantle the tower pillars 3 used when moving to the structure 2, the existing structure 1 can be efficiently transferred to the new structure 2.

【0011】[0011]

【実施例】以下、本発明の実施例を添付図面に基づき詳
細に説明する。本発明のタワー柱吊り下げ式建造物建設
方法は、図1,図2に示した様な既存建造物1が多数建
設された高密度敷地に新建造物2を建設する際に、既存
建物1の諸活動の休止(仮移転や営業中止等)を必要最
小限度に抑えることのできる新建造物2の建設方法であ
って、先ず初めに、既存建造物1が高密度に建設された
高密度敷地にタワー柱を立設することのできる敷地を探
し出し、上記敷地にタワー柱3を建設するものである
(図3,図4)。
Embodiments of the present invention will now be described in detail with reference to the accompanying drawings. The method for constructing a tower pillar suspended structure according to the present invention is a method of constructing a new building 2 on a high-density site where a large number of existing buildings 1 as shown in FIGS. 1 and 2 are constructed. A method of constructing a new building 2 capable of suppressing the suspension of various activities (temporary relocation, business suspension, etc.) to a necessary minimum. First, the existing building 1 is constructed on a high-density site constructed in high density. The site where the tower pillar can be erected is searched for, and the tower pillar 3 is constructed on the above site (Figs. 3 and 4).

【0012】次いで、上記高密度敷地に立設されたタワ
ー柱3によって梁と床構造体とより成るフロア4を、上
記既存建物の上方位置に所定の空間Sを存する様に吊り
下げ牽架し(図5,図6)、さらに、上記フロア4を上
記既存建造物1の上方の所定位置まで順次下方へ増設し
ていき(図7,図8)、上記フロア4を数層に渡り建設
し、内外装工事を行った後、上記既存建造物1内の設備
等をフロア4内に移設すると共に、既存建造物1を解体
する(図9,図10)。そして、上記タワー柱3によっ
て吊り下げ牽架されたフロア4下部には、数本のアンカ
ーワイヤー10が配設され、その端部11が地盤Eに係
留固定されていることによって、上記タワー柱3に吊り
下げ牽架されたフロア4の安定が確保されているもので
ある。
Next, a floor 4 composed of a beam and a floor structure is suspended and suspended by a tower pillar 3 erected on the high-density site so that a predetermined space S exists above the existing building. (FIGS. 5 and 6) Further, the floor 4 is sequentially expanded downward to a predetermined position above the existing building 1 (FIGS. 7 and 8), and the floor 4 is constructed over several layers. After performing the interior / exterior work, the facilities and the like in the existing building 1 are transferred to the floor 4 and the existing building 1 is dismantled (FIGS. 9 and 10). Then, several anchor wires 10 are arranged below the floor 4 suspended and suspended by the tower pillars 3, and the end portions 11 of the anchor wires 10 are anchored to the ground E so that the tower pillars 3 are The stability of the floor 4 suspended and suspended on the floor is ensured.

【0013】そして、上記既存建造物1が解体された敷
地に新建造物2の本体部分5を建設し(図11,図1
2)、次いで、上記タワー柱3によって吊り下げ牽架さ
れた数層のフロア4を、上記本体部分5に取り込み一体
と成すことにより新建造物2が竣工する(図13,図1
4)ものであり、この際、上記フロア4の下部に配設さ
れたアンカーワイヤー10は、その役割を終え取り除か
れるものである。
Then, the main body portion 5 of the new building 2 is constructed on the site where the existing building 1 has been demolished (see FIGS. 11 and 1).
2) Then, the new building 2 is completed by incorporating the several floors 4 suspended and suspended by the tower pillars 3 into the main body portion 5 and integrating them (FIGS. 13 and 1).
4), and at this time, the anchor wire 10 arranged in the lower part of the floor 4 is removed after its role.

【0014】次に、上記各工程を詳細に説明する。先
ず、既存建造物1が多数建造された高密度敷地にタワー
柱3を立設することのできる敷地を探す工程では、高密
度敷地のできるだけ中央付近に当該敷地を探し出すと共
に、上記敷地への資材搬入の為の搬入路を確保するもの
であり、この際、やむを得ず若干の仮移転等を伴う場合
も考えられるが、上記搬入路の確保が困難である場合に
は地下に搬入路を形成することも可能である。
Next, each of the above steps will be described in detail. First, in the process of searching for a site where tower pillars 3 can be erected on a high-density site where many existing buildings 1 have been built, the site is searched for as close to the center of the high-density site as possible, and the materials for the site are This is to secure a carry-in route for carry-in. At this time, it may be unavoidable that some temporary relocation etc. are involved, but if it is difficult to secure the above-mentioned carry-in route, form a carry-in route underground. Is also possible.

【0015】そして、上記タワー柱3を立設する為の敷
地、及び資材の搬入路が確保できた際には、タワー柱3
を立設するものであり、この時、上記タワー柱3は、立
体駐車場あるいは、新建造物2に於けるエレベーターシ
ャフト等として構成されているものである。また、上記
タワー柱3の立設される地盤条件にもよるが、上記タワ
ー柱3の基礎部分Bを、図15に示した様な端部9が幅
広に構成された幅広基礎と成すことによって、フロア4
等を吊り下げ牽架した時の荷重に十分に耐えられると共
に、フロア4を吊り下げ牽架したタワー柱3の振れを防
止できるので、フロア4の安定を確保し易いものであ
る。
When the site for erecting the tower pillar 3 and the material loading path can be secured, the tower pillar 3 is provided.
At this time, the tower pillar 3 is constructed as an elevator shaft or the like in the multistory parking lot or the new building 2. Further, depending on the ground condition for the tower pillar 3 to be erected, by forming the foundation portion B of the tower pillar 3 as a wide foundation having a wide end 9 as shown in FIG. , Floor 4
It is possible to sufficiently withstand the load when suspending and suspending the floors and the like, and it is possible to prevent the tower columns 3 that suspend and suspend the floor 4 from swinging, so that it is easy to ensure the stability of the floor 4.

【0016】さらに、上記工程により立設されたタワー
柱3によって、梁と床構造体より成るフロア4を吊り下
げ牽架する工程では、タワー柱3の内部、あるいは、そ
の周辺から資材を運び、梁と床構造体とより成るとフロ
ア4を建設すると同時に、ワイヤー6によって吊り下げ
牽架するものであり、既存建造物1の上方に所定の空間
Sを存する様に構成されており、上記既存建造物1内の
施設や設備を収容できるだけのフロア4を下方に増設す
るものである。
Further, in the step of suspending and suspending the floor 4 composed of the beam and the floor structure by the tower pillar 3 erected in the above-mentioned step, the material is carried from the inside of the tower pillar 3 or its periphery, When the floor 4 is constructed by the beams and the floor structure, the floor 4 is simultaneously constructed and suspended and suspended by the wire 6, and the predetermined space S is formed above the existing building 1. The floor 4 that can accommodate the facilities and equipment in the building 1 is added below.

【0017】そして、この際、上記タワー柱3によって
吊り下げ牽架されたフロア4下部には、数本のアンカー
ワイヤー10が配設され、その端部11が地盤Eに係留
固定されていることによって、上記タワー柱3に吊り下
げ牽架されたフロア4の安定が確保されているものであ
る。また、上記フロア4の下部に配設されたアンカーワ
イヤー10の配設位置は、等間隔である必要はなく、ア
ンカーワイヤー10の端部11の係留固定した時の張力
をバランスさせることによって、フロア4の安定を十分
に確保できるものであり、これによって、タワー柱3の
立設位置がフロア4の中心部分より外れている場合でも
フロア4の吊り下げ牽架を安全に実施できるものであ
る。
At this time, several anchor wires 10 are arranged below the floor 4 suspended and suspended by the tower pillars 3, and their end portions 11 are anchored and fixed to the ground E. Thus, the stability of the floor 4 suspended and suspended on the tower pillar 3 is ensured. Further, the positions of the anchor wires 10 arranged in the lower part of the floor 4 do not need to be equidistant, and by balancing the tension when the end portions 11 of the anchor wires 10 are fixed by mooring, It is possible to sufficiently secure the stability of the floor 4, and thereby, even if the standing position of the tower pillar 3 is deviated from the central portion of the floor 4, it is possible to safely suspend and suspend the floor 4.

【0018】そして、上記数層に渡り建設されたフロア
4の内外装が終了した際には、既存建造物1内の施設や
設備を上記フロア4内に移設すると共に、上記既存建造
物1の解体を行うものであるが、この時まで、既存建造
物1に於ける諸活動を休止する必要がないので、既存建
造物1から新建造物2への移行をスムーズに行えるもの
である。
When the interior and exterior of the floor 4 constructed over the above-mentioned several layers are completed, the facilities and equipment in the existing building 1 are moved to the floor 4 and the existing building 1 Although the dismantling is performed, it is not necessary to suspend the activities in the existing building 1 until this time, and therefore the transition from the existing building 1 to the new building 2 can be performed smoothly.

【0019】そして、既存建造物1の解体が終了した後
には、その敷地に新建造物2の本体部分5を建設し、上
記タワー柱3及びタワー柱3によって吊り下げ牽架され
ているフロア4を、上記新建造物2の本体部分5に取り
込み一体と成すことにより新建造物2が竣工するもので
あり、この際、上記フロア4の下部に配設されたアンカ
ーワイヤー10は、その役割を終え取り除かれるもので
あり、さらに、上記タワー柱3がエレベーターシャフト
等として、新建造物2の構造体として成されている場合
には、上記タワー柱3と新建造物2の本体部分5とを接
続固定し、上記タワー柱3が立体駐車場として構成され
ている場合には、上記タワー柱3と新建造物2の本体部
分5とを接続固定する必要はなく、こうすることによっ
て、立体駐車場作動時の振動が新建造物2の本体部分5
に伝わることを防止できるものである。
After the dismantling of the existing building 1, the main part 5 of the new building 2 is built on the site, and the tower pillar 3 and the floor 4 suspended by the tower pillar 3 are suspended. The new building 2 is completed by incorporating it into the main body portion 5 of the new building 2 and forming it integrally, and at this time, the anchor wire 10 arranged at the lower part of the floor 4 is removed after its role. Further, when the tower pillar 3 is formed as a structure of the new building 2 as an elevator shaft or the like, the tower pillar 3 and the main body portion 5 of the new building 2 are connected and fixed, and When the tower pillar 3 is configured as a multi-storey parking lot, it is not necessary to connect and fix the tower pillar 3 and the main body portion 5 of the new building 2 to each other. Body part 5 oscillations of new buildings 2 when
It can be prevented from being transmitted to.

【0020】そして、上記タワー柱3と新建造物2の本
体部分5との接続固定は、図16に示した様に、タワー
柱3を構成する柱7とフロア4を構成する梁8とを溶
接、あるいは、ボルト止め等の手段によって接続固定す
るものである。
The connection between the tower pillar 3 and the main body portion 5 of the new structure 2 is fixed by welding the pillar 7 forming the tower pillar 3 and the beam 8 forming the floor 4 as shown in FIG. Alternatively, it is connected and fixed by means such as bolting.

【0021】そして、上記既存建造物1から新建造物2
への移行に当たり、その間に建設された補助的な部材、
例えば、上記タワー柱等が新建造物2の本体部分5にそ
のまま取り込まれることと成るので、それらの解体とい
った煩わしい作業が不要と成り、より効率良く既存建造
物1から新建造物2への移行が行えるものである。
Then, the existing building 1 to the new building 2
The auxiliary member constructed during the transition to
For example, since the tower pillars and the like are taken into the main body portion 5 of the new building 2 as they are, troublesome work such as disassembling them is unnecessary, and the existing building 1 can be more efficiently transferred to the new building 2. It is a thing.

【0022】さらに、上記タワー柱3は、高密度敷地の
中央付近に一本柱として建設することにより、タワー柱
3によって吊り下げ牽架されるフロア4のバランスが取
り易く、よって、特別な技術を必要とすることなく実施
できるものであり、又、その構造は、鉄筋、鉄骨、その
他等その種類を問うものではない。
Furthermore, by constructing the tower pillar 3 as a single pillar near the center of the high-density site, it is easy to balance the floor 4 suspended and suspended by the tower pillar 3, and thus a special technique is used. Can be carried out without the need of the above, and the structure does not matter about the type such as a reinforcing bar, a steel frame or the like.

【0023】尚、本実施例に於て示したタワー柱3の基
礎部、フロア4の吊り下げ牽架部、及び、タワー柱3と
新建造物2の本体部分5の接続部は、その一例であっ
て、必要に応じてその方法は種々のものが考えられるも
のである。
Incidentally, the foundation of the tower pillar 3, the suspending and suspending portion of the floor 4, and the connecting portion between the tower pillar 3 and the main body portion 5 of the new structure 2 shown in this embodiment are examples thereof. Therefore, various methods can be considered as necessary.

【0024】[0024]

【発明の効果】以上詳述した如く、本発明によると次の
様な効果を奏する。即ち、請求項1によると、建造物が
高密度に建造された高密度敷地の既存建造物から新建造
物への移行を行う際、既存建造物が建造された高密度敷
地にタワー柱を立設し、次いで、上記タワー柱によっ
て、梁と床構造体とより成るフロアを吊り下げ牽架する
と共に、フロアを下方に増設し、さらに、上記フロア内
に既存建造物内の施設や設備を移設した後、既存建造物
を解体し、そこに新建造物の本体部分を建設し、タワー
柱によって吊り下げられているフロアと結合させること
によって新建造物が竣工するものであるので、既存建造
物に於ける諸活動を行いながら新建造物の建設を行うこ
とができ、よって、建造物が高密度に建造された高密度
敷地の既存建造物から新建造物への移行がスムーズに実
施できるものである。
As described above in detail, according to the present invention, the following effects can be obtained. That is, according to claim 1, when transitioning from an existing building of a high-density site where a building is densely constructed to a new building, a tower pillar is erected on the high-density site where the existing building is constructed. Then, by the tower pillar, the floor composed of the beam and the floor structure was suspended and suspended, and the floor was expanded downward, and the facilities and equipment in the existing building were relocated to the floor. Later, the existing structure is dismantled, the main part of the new structure is built there, and the new structure is completed by connecting it to the floor suspended by the tower pillars. It is possible to construct a new building while performing various activities, and therefore, it is possible to smoothly carry out a transition from an existing building to a new building on a high-density site where the buildings are densely constructed.

【0025】さらに、上記タワー柱は、新建造物の本体
部分にフロアと共に結合されるものであるので、新建造
物内に構造体として取り込まれるものであり、既存建造
物から新建造物への移行の際に使用されるタワー柱を解
体する必要がないので、効率良く既存建造物から新建造
物への移行が実施できるものである。
Further, since the tower pillar is connected to the main body of the new structure together with the floor, it is incorporated as a structure in the new structure, and when the existing structure is transferred to the new structure. Since it is not necessary to dismantle the tower pillars used for, it is possible to efficiently transition from the existing structure to the new structure.

【図面の簡単な説明】[Brief description of drawings]

【図1】新建造物の建設が行われる高密度敷地に於ける
既存建物の状態を示す平面図である。
FIG. 1 is a plan view showing a state of an existing building on a high-density site where a new building is constructed.

【図2】新建造物の建設が行われる高密度敷地に於ける
既存建物の状態を示す正面図である。
FIG. 2 is a front view showing a state of an existing building on a high-density site where a new building is constructed.

【図3】タワー柱が立設された高密度敷地を示す平面図
である。
FIG. 3 is a plan view showing a high-density site where tower columns are erected.

【図4】タワー柱が立設された高密度敷地を示す正面図
である。
FIG. 4 is a front view showing a high-density site where tower columns are erected.

【図5】タワー柱によってフロアが吊り下げ牽架された
状態を示す平面図である。
FIG. 5 is a plan view showing a state in which the floor is suspended and suspended by tower towers.

【図6】タワー柱によってフロアが吊り下げ牽架された
状態を示す正面図である。
FIG. 6 is a front view showing a state in which the floor is suspended and supported by tower columns.

【図7】タワー柱によって吊り下げ牽架されたフロアが
数層に渡り増設された状態を示す平面図である。
FIG. 7 is a plan view showing a state in which floors suspended and suspended by tower columns are added over several layers.

【図8】タワー柱によって吊り下げ牽架されたフロアが
数層に渡り増設された状態を示す正面図である。
FIG. 8 is a front view showing a state in which a floor suspended and suspended by tower pillars is added over several layers.

【図9】既存建造物が解体された状態を示す平面図であ
る。
FIG. 9 is a plan view showing a state in which an existing building is dismantled.

【図10】既存建造物が解体された状態を示す正面図で
ある。
FIG. 10 is a front view showing a state in which an existing building is dismantled.

【図11】新建造物本体が建設された状態を示す平面図
である。
FIG. 11 is a plan view showing a state in which a new building body is constructed.

【図12】新建造物本体が建設された状態を示す正面図
である。
FIG. 12 is a front view showing a state in which a new building body is constructed.

【図13】新建造物の竣工を示す平面図である。FIG. 13 is a plan view showing completion of a new building.

【図14】新建造物の竣工を示す正面図である。FIG. 14 is a front view showing completion of a new building.

【図15】タワー柱の基礎部分の拡大正面図である。FIG. 15 is an enlarged front view of the basic portion of the tower pillar.

【図16】タワー柱とフロアの接続部分の拡大正面図で
ある。
FIG. 16 is an enlarged front view of a connection portion between a tower pillar and a floor.

【符号の説明】[Explanation of symbols]

1 既存建造物 2 新建造物 3 タワー柱 4 フロア 5 本体部分 1 Existing Building 2 New Building 3 Tower Pillar 4 Floor 5 Main Body

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建造物が高密度に建造されている高密度
敷地に、当該敷地上の既存建造物1を新建造物2の建設
当初から解体することなく、その建設途上で徐々に既存
建造物1を解体し、もって、新建造物2を建設する方法
に於て、 既存建造物1が高密度に建造されている敷地にタワー柱
3を立設することができる敷地を探す工程と、その目的
場所にタワー柱3を立設する工程と、上記タワー柱3に
よって梁と床構造体とより成るフロア4を上記既存建造
物1の上方位置に所定の空間Sを存して吊り下げ牽架す
る工程と、上記梁と床構造体とより成るフロア4を上記
既存建造物1の上方の所定位置まで順次下方へ増設して
いく工程と、上記既存建造物1内の設備等を先の工程で
建設したフロア4へ移動し既存建造物1を解体する工程
と、上記既存建造物1解体後の敷地に新建造物2を建設
する工程と、上記タワー柱3によって吊り下げられてい
るフロア4と上記既存建造物1解体後の敷地に建設され
た新建造物2の本体部分5とを結合し竣工する工程とよ
り成ることを特徴とするタワー柱吊り下げ式建造物建設
方法。
1. On a high-density site where buildings are built with high density, the existing building 1 on the site is not dismantled from the beginning of the construction of the new building 2, but the existing building is gradually being built during the construction. In the method of dismantling 1 and thus constructing the new building 2, the process of searching for a site where the tower pillars 3 can be erected on the site where the existing building 1 is densely constructed, and its purpose. A step of vertically arranging a tower pillar 3 at a place, and a floor 4 composed of a beam and a floor structure is suspended and suspended by the tower pillar 3 above the existing building 1 in a predetermined space S. The process, the process of sequentially expanding the floor 4 composed of the beam and the floor structure downward to a predetermined position above the existing building 1, and the facilities in the existing building 1 in the previous process. The process of moving to the constructed floor 4 and dismantling the existing building 1, The process of constructing the new building 2 on the site after the existing building 1 is dismantled, the floor 4 suspended by the tower pillar 3 and the main part of the new building 2 constructed on the site after the existing building 1 is dismantled A method for constructing a tower pillar suspended structure, which is characterized by comprising the steps of combining 5 and completing the construction.
JP5226486A 1993-08-19 1993-08-19 Tower-suspended building construction method Expired - Fee Related JP2527686B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5226486A JP2527686B2 (en) 1993-08-19 1993-08-19 Tower-suspended building construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5226486A JP2527686B2 (en) 1993-08-19 1993-08-19 Tower-suspended building construction method

Publications (2)

Publication Number Publication Date
JPH0754490A JPH0754490A (en) 1995-02-28
JP2527686B2 true JP2527686B2 (en) 1996-08-28

Family

ID=16845859

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5226486A Expired - Fee Related JP2527686B2 (en) 1993-08-19 1993-08-19 Tower-suspended building construction method

Country Status (1)

Country Link
JP (1) JP2527686B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4600182B2 (en) * 2005-06-28 2010-12-15 株式会社大林組 Upper floor expansion method for existing buildings
JP4985816B2 (en) * 2010-05-06 2012-07-25 株式会社大林組 Upper floor expansion method for existing buildings

Also Published As

Publication number Publication date
JPH0754490A (en) 1995-02-28

Similar Documents

Publication Publication Date Title
CN110512523B (en) Construction method of large-span door type upper cross beam split support
EA006995B1 (en) Method and apparatus for precast and framed block element construction
JP2750368B2 (en) Construction method of reactor containment top slab
JP2527686B2 (en) Tower-suspended building construction method
CN109989590B (en) Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
JPH06323001A (en) Extension and reconstruction of building
JPH0633627B2 (en) New construction method on existing facility
JPH10159344A (en) Building method of multi-layered structure provided with a plurality of super beam
JPH0518192A (en) Construction method for tunnel and lining segment
JPH0642187A (en) Conventional function persistent up-and-down function conversion building method at bridge type artificial plateau with multipurpose tower column and up-down structure joint and construction system thereof
JPH06294280A (en) Method for constructing underground structure crossing under traffic road
CN116695868B (en) Vertical face dislocation spiral building adopting pipe truss structure and construction method
JP2004270377A (en) Column-beam preassembled reinforcement body, and preassembled reinforcement method using the same
CN116556570B (en) Construction method of combined high-clearance large-span variable-section roof structure
JP2014001511A (en) Dismantlement method for structure
JP3303218B2 (en) Reconstruction method
CN211313314U (en) Steel elevator shaft main structure construction operation platform frame
Chaseling Star attraction
JP2022089706A (en) Building inside staircase preceding construction method
JPH0339538A (en) Construction work of wooden building
JPS6340034A (en) Construction of building having ceiling running crane
JPH0230854A (en) Method for reconstructing multistoried building
JP2903006B2 (en) Push-up method for large roof
JPH06185120A (en) Construction method for upper structure of roof, etc.
JPH1181679A (en) Construction for building

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees