JP2022089706A - Building inside staircase preceding construction method - Google Patents
Building inside staircase preceding construction method Download PDFInfo
- Publication number
- JP2022089706A JP2022089706A JP2020202317A JP2020202317A JP2022089706A JP 2022089706 A JP2022089706 A JP 2022089706A JP 2020202317 A JP2020202317 A JP 2020202317A JP 2020202317 A JP2020202317 A JP 2020202317A JP 2022089706 A JP2022089706 A JP 2022089706A
- Authority
- JP
- Japan
- Prior art keywords
- stairs
- staircase
- temporary
- construction
- pillars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 51
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 26
- 239000010959 steel Substances 0.000 claims abstract description 26
- 238000009434 installation Methods 0.000 claims abstract description 14
- 238000000034 method Methods 0.000 claims description 14
- 239000000463 material Substances 0.000 abstract description 58
- 238000010586 diagram Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 240000004050 Pentaglottis sempervirens Species 0.000 description 1
- 235000004522 Pentaglottis sempervirens Nutrition 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000002250 progressing effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
Description
本発明は建築技術に関する。 The present invention relates to building technology.
建物は、柱と梁を先行して建て込み、その後、床、壁、階段などが構築される。
本設の階段が設置される前は、仮設階段を設けて、上階の作業が行われる。
本設の階段設置を架構ができたのちに設置することは、狭い箇所に上下階を通す鉄骨階段ユニットを搬入して設置することとなり、搬入作業と位置合わせ等難しい施工作業となる。仮設機材を立てる場合は、狭い空間に工夫して配置する必要があり、技量を伴うとともに、設置、撤去も難しい。
In the building, columns and beams are built in advance, and then floors, walls, stairs, etc. are built.
Before the main stairs are installed, temporary stairs will be installed and work on the upper floors will be carried out.
If the main staircase is installed after the frame is completed, the steel-framed staircase unit that passes through the upper and lower floors will be carried in and installed in a narrow space, which will be a difficult construction work such as carrying-in work and alignment. When setting up temporary equipment, it is necessary to devise and arrange it in a narrow space, which requires skill and is difficult to install and remove.
例えば、特許文献1(特開2018-21352号公報)には、階段ユニットの踊り場に仮設用の柱状部材を通して、階段ユニットを先行仮設し、階段ユニットを本設後、柱状部材を上昇させて次の階段ユニットを仮設する、階段先行仮設法が開示されている。この施工法では、階段ユニットに柱状材を通す穴の開口と塞ぎ作業が生じ、8本の仮設用柱状材、階段ユニットの先端部を受ける仮受け部材の取り外しを行う作業が生ずる。
特許文献2(特開2013-129961号公報)には、コンクリート構造物における鉄骨階段の構築現場において、現場に搬入した鉄骨階段を所定の位置にセットしてその鉄骨階段の下部を、折り返した階段部踊り場部分を上下にサポートする仮止め固定方法が開示されている。
For example, in Patent Document 1 (Japanese Unexamined Patent Publication No. 2018-21352), a staircase unit is temporarily installed in advance by passing a temporary columnar member through a landing of the staircase unit, and after the staircase unit is permanently installed, the columnar member is raised to the next. The staircase advance temporary construction method for temporarily constructing the staircase unit is disclosed. In this construction method, a hole for passing a columnar material is opened and closed in the staircase unit, and eight temporary columnar materials and a temporary receiving member that receives the tip of the staircase unit are removed.
In Patent Document 2 (Japanese Unexamined Patent Publication No. 2013-129961), at a construction site of a steel-framed staircase in a concrete structure, a steel-framed staircase carried into the site is set at a predetermined position, and the lower part of the steel-framed staircase is folded back. A temporary fixing method for supporting the landing area up and down is disclosed.
本発明は、建物の架構を構築する前に、先行して、本設の鉄骨階段を設置する手段を開発することを目的とする。 An object of the present invention is to develop a means for installing a main steel staircase prior to constructing a building frame.
本発明者は、階段の柱材を用いて本設の鉄骨階段ユニットを建物の架構に先駆けて仮設することにより、建物の架構の設置後に比べて、架構に制約されない階段設置作業をすることができるようになり、先行仮設した階段を作業員の昇降に利用することが可能となり、仮設階段の設置を不要とすることができた。
1.建物の内部に設置する階段を上階の施工に先行して施工する階段先行施工方法であって、
階段設置箇所に階段用柱材と階段用柱材が不要な箇所には仮設柱材を準備し、階段受梁を階段用柱材及び仮設柱材に取り付けて立設し、鉄骨階段ユニットを取り付けて、建物内部の階段を仮設することを特徴とする階段先行施工方法。
2.1.記載の階段先行施工方法を用いた階段先行施工工程、
上階部分の施工及び先行施工した階段廻りの階段室架構の施工を行う上階施工工程、
先行施工した階段を躯体に接続する施工及び仮設設備の撤去を行う階段本設工程、
を行うことを特徴とする階段の施工方法。
The present inventor can temporarily install the main steel staircase unit prior to the frame of the building by using the pillar material of the stairs, so that the stairs can be installed without being restricted by the frame as compared with the case after the frame of the building is installed. It became possible to use the stairs that had been temporarily constructed in advance for raising and lowering workers, and it was possible to eliminate the need to install temporary stairs.
1. 1. It is a stairs precedent construction method in which the stairs installed inside the building are constructed prior to the construction of the upper floors.
Prepare stair pillars and temporary stairs where stair pillars are not required at the stairs installation location, attach the stair support to the stair pillars and temporary pillars, and install the steel stair unit. A staircase advance construction method characterized by temporarily constructing stairs inside the building.
2.1. Stairs advance construction process using the described stairs advance construction method,
Upper floor construction process to construct the upper floor part and the staircase frame around the stairs that was constructed in advance,
Construction process to connect the stairs constructed in advance to the frame and removal of temporary equipment, stairs main construction process,
A method of constructing stairs, which is characterized by performing.
1.本発明は、階段を先行施工する際に、本設の部材を設置用資材に用いることにより、仮設資材を少なくするとともに、上階の作業用に本設階段を用いることができるようになって、作業員の移動用の仮設階段を不要にすることができた。特に、本設資材として、重量物で階段加工の主要部材である階段用の柱材、受梁を用いることができる。
2.躯体の架構ができたのちに、限られた階段室空間で階段の設置作業を行うことは、仮設材の設置に困難が伴い、大きな鉄骨階段ユニットを搬入することも困難であったが、本発明では、廻りがオープンな状態で階段を設置することができるので、設置工事が容易になる。
3.順次階段を先行施工することにより、屋上階の施工が早くなり、屋上が閉鎖されることによって、雨水に左右されずに屋内の作業をすることができるので、建築の進捗を計画的に進めることができ、早期竣工が可能となる。
1. 1. According to the present invention, when the stairs are constructed in advance, the main members can be used as the installation materials, so that the temporary materials can be reduced and the main stairs can be used for the work on the upper floor. , It was possible to eliminate the need for temporary stairs for moving workers. In particular, as the main material, a pillar material for stairs and a beam receiving beam, which are heavy objects and are the main members of stair processing, can be used.
2. 2. It was difficult to install temporary materials and it was difficult to bring in a large steel staircase unit to install the stairs in the limited staircase space after the frame was completed. In the invention, the stairs can be installed with the surroundings open, which facilitates the installation work.
3. 3. By constructing the stairs in advance, the construction of the rooftop floor will be quicker, and by closing the rooftop, it will be possible to work indoors without being affected by rainwater, so proceed with the construction systematically. It will be possible to complete the construction at an early stage.
本発明は、建物の内側に設けられる鉄骨階段を、上階の施工に先行し敷設する階段先行施工方法である。
鉄骨階段は、鉄骨階段ユニットの先端と後端を受梁に載せ、受梁の左右側は、階段用の柱材あるいは建物躯体に接続されている。本発明では、受梁を建物躯体に接続する部分については、階段用に仮設柱材を設け、一方、階段用の柱材をそのまま利用して先行施工する階段仮設用構造体を構築して、鉄骨階段ユニットを取り付けるものである。階段用の仮設柱材や階段用柱材には、仮控などを取り付けて、階段用仮設構造体が倒れないように支える。その後上階などの階段周りの工事の進捗に合わせて、受梁や階段用柱材を躯体側に固定する階段室廻りの架構を施工して、仮控などの仮設材を撤去して、階段を本設することとなる。
先行設置された階段は、上階へアクセスする昇降階段として利用することができるので、作業用の仮設階段の設置を軽減することができる。
また、階段をあと施工で設置する場合、上階の施工が進んだのちに階段室の空間に階段を施工するには、狭い空間に仮設材を設置する作業が必要で、そこに大きな鉄骨階段ユニットを搬入することも困難である。しかし、本発明では、周囲の工事が進んでいない広い空間を利用して、階段を敷設することができるので、設置作業の制約が少なく、大きな鉄骨階段ユニットを搬入し、据えることも容易である。そして、本設の階段用の柱材等を先行施工に利用するので、階段設置用の仮設材を減らすことができる。
使用する仮設材は、仮設柱材や仮控などであるので、次の階段の先行施工に転用する際に、上方へ持ち運ぶことも容易である。
The present invention is a staircase-preceding construction method in which a steel-framed staircase provided inside a building is laid prior to the construction of the upper floor.
In the steel staircase, the front and rear ends of the steel staircase unit are placed on the receiving beam, and the left and right sides of the receiving beam are connected to the pillar material for the stairs or the building frame. In the present invention, a temporary pillar material is provided for the stairs at the portion where the receiving beam is connected to the building frame, while the pillar material for the stairs is used as it is to construct a structure for temporary stairs to be constructed in advance. A steel staircase unit is attached. Temporary pillars for stairs and pillars for stairs are equipped with temporary holders to support the temporary structure for stairs so that they do not fall over. After that, according to the progress of the construction around the stairs such as the upper floor, the frame around the staircase to fix the beam and the pillar material for the stairs to the skeleton side was constructed, the temporary materials such as the temporary copy were removed, and the stairs Will be installed permanently.
Since the stairs installed in advance can be used as elevating stairs to access the upper floors, it is possible to reduce the installation of temporary stairs for work.
In addition, when installing the stairs by post-construction, in order to construct the stairs in the space of the stairs room after the construction of the upper floor has progressed, it is necessary to install temporary materials in a narrow space, and there is a large steel staircase. It is also difficult to bring in the unit. However, in the present invention, since the stairs can be laid in a large space where the surrounding construction has not progressed, there are few restrictions on the installation work, and it is easy to carry in and install a large steel staircase unit. .. Further, since the pillar material for the stairs of the main construction is used for the preceding construction, the temporary material for the stairs installation can be reduced.
Since the temporary materials used are temporary pillar materials, temporary holdings, etc., it is easy to carry them upward when diverting them to the preliminary construction of the next stairs.
図1に先行施工階段の俯瞰図を示す。
鉄骨階段ユニット4(4a、4b)を支持する柱材が4本設けられている。左右の柱材には階段受梁3(3a、3b)が設けられ、この階段受梁に鉄骨階段ユニット4(4a、4b)の先端が載る。図1の例では、4本の柱材の内、3本の柱材は、本設用の階段用柱材(1a、1b、1c)が用いられ、残りの1本に仮設柱材2が用いられている。仮設柱材2に載せられている階段受梁3は躯体の柱5に付け替えられ、その後仮設柱材2は撤去される。
FIG. 1 shows a bird's-eye view of the preceding construction stairs.
Four pillars are provided to support the steel staircase unit 4 (4a, 4b). The staircase receiving beams 3 (3a, 3b) are provided on the left and right column members, and the tips of the steel frame staircase units 4 (4a, 4b) are placed on the staircase receiving beams. In the example of FIG. 1, of the four pillars, three pillars are staircase pillars (1a, 1b, 1c) for main installation, and the remaining one is
階段を先行設置する工程を図2に示す。
第1工程として、階段仮設装置を準備する工程である。階段用柱材と仮設柱材、受梁、仮控などの補助材を準備する。これらの資材を階段の設置箇所に階段仮設装置として組み立てる。
第2工程として、組みあがった階段仮設装置に鉄骨階段ユニットを持ち込んで、受梁に取り付ける。
第3工程として、設置された階段を利用して、上階等の工事を進める。
第4工程として、上階の柱や梁が取り付けられて架構の工事が進み、階段室廻りの骨組みができたのちに、仮設柱材に持たせていた受梁を躯体側に付け替える。他の部分についても、本設の躯体側に必要な接続を順次行いつつ、仮設柱材や仮控などの補助材を取り外して、撤去する。撤去された資材の内、さらに上階において、階段の先行施工に用いられる材料は、上階へ移動する。
Figure 2 shows the process of installing the stairs in advance.
As the first step, it is a step of preparing a temporary staircase device. Prepare pillars for stairs and auxiliary materials such as temporary pillars, beams, and temporary holdings. These materials are assembled as a temporary staircase device at the installation location of the stairs.
As the second step, the steel staircase unit is brought into the assembled staircase temporary device and attached to the receiving beam.
As the third process, the installed stairs will be used to proceed with the construction of the upper floors.
As the fourth step, the columns and beams on the upper floor are attached and the construction of the frame progresses, and after the frame around the staircase is completed, the receiving beams held in the temporary column material are replaced on the skeleton side. For other parts as well, remove the auxiliary materials such as temporary pillars and temporary holdings while making the necessary connections to the frame side of the main building in sequence. Of the removed materials, on the upper floors, the materials used for the pre-construction of the stairs will move to the upper floors.
工程にしたがって、図3~5を用いて、工事の事例を説明する。
この例は、仮設柱材を1本用いた例を示すが、仮設柱材は1本に限られることではなく躯体側に受梁を接続するような箇所には随時用いられる。
An example of construction will be described with reference to FIGS. 3 to 5 according to the process.
This example shows an example in which one temporary column material is used, but the temporary column material is not limited to one, and is used at any time in a place where a receiving beam is connected to the skeleton side.
図3は、階段仮設装置を組み立てた状態を示している。
3本の階段用柱材1a、1b、1c、階段受梁3、仮設柱材2、仮控61、仮繋材25を準備する。
階段を設置する箇所であって、本来の階段用柱材が立つ場所に、3本の階段用柱材1a、1b、1cを立てる。柱に階段の受梁を固定するために仮設柱材2を立てる。各階段用柱材には仮控61を必要な箇所に設けて、床スラブや梁などに固定する。図3の例では、階段用柱材1cに外側に開いた2本の仮控61、61が設けられた状態が示されている。階段用柱材は、本設の柱材であるので、根元の固定は本設と同様に行うことができる。仮設柱材の本数は、1本に限らず、途中に間柱的に付加することもできる。仮設柱材の固定には、安定性のためスラブにアンカーなどを設けることができる。
階段用柱材1a、1bには、上下に受梁3a、3cが取り付けられている。この例では、上下階の階高が高く、踊り場を2か所設けてあるので、2段の受梁が設けられている。
階段用柱材1c側には階段受梁3bが設けられ、他方の端部側は仮設柱材2に持たせている。さらに、左右の階段用柱材1cと階段用柱材1bの間、階段用柱材1aと仮設柱材2の間には間隔を保持する仮繋材25を設けて、鉄骨階段ユニットの荷重で変形することを防止している。仮設の補強材として、仮繋材の他、筋交いなど適宜必要な支保工を採用して、階段の先行施工を安全に実施できるようにする。
FIG. 3 shows a state in which the staircase temporary device is assembled.
Three
Three
Receiving
A
このようにして、階段仮設装置を組み立てたのちに、鉄骨階段ユニット4a、4b、4cを搬入して、階段受梁3a、3b、3cに取り付ける。鉄骨階段ユニットが取り付けられた状態を図4に示す。なお、図4以降では、仮繋材25を省略して示す。
ここでは、階段用柱材、階段受梁にはH形鋼が用いられており、階段用柱材のフランジに階段受梁の端部を接合している。階段用柱材1cを例にすると仮控61は、H形鋼の外側のフランジとウエブに取り付けられている。
After assembling the staircase temporary device in this way, the steel
Here, H-shaped steel is used for the pillar material for stairs and the beam for stairs, and the end portion of the beam for stairs is joined to the flange of the column material for stairs. Taking the
図5には、図4の反対側から見た階段仮設装置の状態が図示されている。
階段用柱材1cと仮設柱材2の間に階段受梁3bが設けられており、階段受梁3bに鉄骨階段ユニット4bの先端が載っている。仮設柱材2は階段受梁3bを仮保持する機能なので、受梁の高さ分の長さに形成されている。仮設柱材2は短いので、仮控61も低い位置に取り付けられている。
階段受梁3bの一端は、階段用柱材1cのフランジに固定されており、他端側は仮設柱材2から張り出して設けられている仮梁受21で下から保持されている。階段受梁3bの他端はフリーの状態であり、将来完成する柱5に固定される予定である。
FIG. 5 illustrates the state of the staircase temporary device as seen from the opposite side of FIG.
A
One end of the
図6は、仮設柱材2側に躯体の構造用の柱5が完成した状態を(a)に示し、完成した柱5に階段受梁3bの他端を固定して、仮設柱材2を撤去した状態を(b)に示している。この柱は、例えば、鉄筋コンクリート(RC)で作られる。
この図では階段用柱材の上端の状態は省略してあるが、上階の施工が進むに従い上階の梁の下側に固定されることとなる。
FIG. 6 shows a state in which the
In this figure, the state of the upper end of the pillar material for stairs is omitted, but it will be fixed to the lower side of the beam on the upper floor as the construction on the upper floor progresses.
図3~6に示した、階段の設置作業は、取り付ける基準階の階段室廻りの作業スペースも広くとることができ、踊り場の両端を取り付けた状態の長い鉄骨階段ユニットを搬入して設置することも、容易に行うことができる。さらにこの例では、撤去される主な部材は、短い仮設柱材1本、仮控7本、仮繋材2本程度である。これらの資材は、バラバラになっているので、上部の階段先行施工に用いる場合でも、移設が容易である。
なお、設置した階段を工事用の昇降に用いるには、仮設に手すりを設け、養生をすることになる。
For the installation work of the stairs shown in FIGS. 3 to 6, the work space around the staircase on the reference floor to be installed can be widened, and a long steel staircase unit with both ends of the landing attached should be carried in and installed. Can be easily done. Further, in this example, the main members to be removed are about one short temporary pillar member, seven temporary holders, and two temporary connecting members. Since these materials are separated, they can be easily relocated even when they are used for the pre-construction of the upper stairs.
In addition, in order to use the installed stairs for raising and lowering for construction, a handrail will be installed in the temporary construction and it will be cured.
上階の階段廻りの施工が進み、階段用柱材1の上端を上階の梁の下面に固定した施工現場の状態を図7に示す。この工事では、階段廻りの壁などがまだ設置されていないので、階段の工事を容易に行うことができることを示している。 FIG. 7 shows the state of the construction site where the construction around the stairs on the upper floor is progressing and the upper end of the pillar material 1 for the stairs is fixed to the lower surface of the beam on the upper floor. In this construction, the walls around the stairs have not been installed yet, so it is shown that the construction of the stairs can be done easily.
図8に仮設柱材2の例をいくつか示す。
仮設柱材2は、階段受梁3の高さに応じて必要な長さに準備される。
(a)に短い例を示す。中間踊り場の高さに設ける長さの仮設柱材2、仮控61、仮梁受21を用いて、仮設材を構成する。仮設柱材を設置する場所(スラブや梁)にアンカーなどを設置しておき、H形鋼などを利用して仮設柱材2を立設する。この仮設柱材2に仮控61を斜めに取り付けて、スラブなどの基端を固定する。仮控61の設置箇所にも必要に応じてアンカーなどを設置する。階段受梁3を支える高さに仮梁受21が設けられている。H形鋼の場合、フランジ側に仮梁受け21を溶接やボルトで取り付ける。
仮梁受21の上に階段受梁3を載せて、ボルト止めなどで仮止する。この階段受梁3の上に鉄骨階段ユニット4の先端部が架けられる。
(b)は、通常の階高分の長さを有する仮設柱材2を示している。基本的構造は(a)と同様である。(c)は、仮梁受21が上下2段に設けられている長いタイプの仮設柱材2を示している。階高の高い、中間踊り場が2か所以上設けられるような場所に設けられる例である。
FIG. 8 shows some examples of the
The
(A) shows a short example. The temporary lumber is constructed by using the
The
(B) shows a
1 階段用柱材
2 仮設柱材
21 仮梁受
25 仮繋材
3 階段受梁
4 鉄骨階段ユニット
5 柱
61 仮控
1 Pillar material for
Claims (2)
階段設置箇所に階段用柱材と階段用柱材が不要な箇所には仮設柱材を準備し、階段受梁を階段用柱材及び仮設柱材に取り付けて立設し、鉄骨階段ユニットを取り付けて、建物内部の階段を仮設することを特徴とする階段先行施工方法。 It is a stairs precedent construction method in which the stairs installed inside the building are constructed prior to the construction of the upper floors.
Prepare stair pillars and temporary stairs where stair pillars are not required at the stairs installation location, attach the stair support to the stair pillars and temporary pillars, and install the steel stair unit. A staircase advance construction method characterized by temporarily constructing stairs inside the building.
上階部分の施工及び先行施工した階段廻りの階段室架構の施工を行う上階施工工程、
先行施工した階段を躯体に接続する施工及び仮設設備の撤去を行う階段本設工程、
を行うことを特徴とする階段の施工方法。 The stairs advance construction process using the stairs advance construction method according to claim 1.
Upper floor construction process to construct the upper floor part and the staircase frame around the stairs that was constructed in advance,
Construction process to connect the stairs constructed in advance to the frame and removal of temporary equipment, stairs main construction process,
A method of constructing stairs, which is characterized by performing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020202317A JP7500408B2 (en) | 2020-12-04 | 2020-12-04 | Pre-construction method for interior stairs of buildings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020202317A JP7500408B2 (en) | 2020-12-04 | 2020-12-04 | Pre-construction method for interior stairs of buildings |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2022089706A true JP2022089706A (en) | 2022-06-16 |
JP7500408B2 JP7500408B2 (en) | 2024-06-17 |
Family
ID=81989119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020202317A Active JP7500408B2 (en) | 2020-12-04 | 2020-12-04 | Pre-construction method for interior stairs of buildings |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7500408B2 (en) |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3421298B2 (en) | 2000-03-14 | 2003-06-30 | 友也 太田 | Internal stairs for buildings and method of construction |
JP2018021352A (en) | 2016-08-03 | 2018-02-08 | 大成建設株式会社 | Support and stairway construction method |
-
2020
- 2020-12-04 JP JP2020202317A patent/JP7500408B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP7500408B2 (en) | 2024-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2020100657A4 (en) | Methods and apparatus for constructing multi-storey buildings | |
KR20070010449A (en) | Construction method for arched bridge | |
JP2022089706A (en) | Building inside staircase preceding construction method | |
JPS61290164A (en) | Method and apparatus for supporting beam and slab | |
JP2018199933A (en) | Structure body and construction method of structure constructed on top of tower-like building | |
KR101959068B1 (en) | Jig structure for construction of building outer wall | |
CN107419807B (en) | Building construction method | |
JP6690988B2 (en) | How to build a composite foundation structure | |
JP2003056186A (en) | H-shape steel frame construction method in sill lifting and hauling work of wooden building using h-shape steel, specially-made anchor fitting and specially-made fine adjustment fitting in conformity with structural characteristic of wooden building | |
JP2527686B2 (en) | Tower-suspended building construction method | |
JP2019178589A (en) | Building construction method | |
JPH0681463A (en) | Building method for stair | |
JPH07217230A (en) | Hanging stair and erecting method thereof | |
JP2023053521A (en) | Reform method of architectural structure | |
JP2020159134A (en) | Method of constructing building | |
JP2009084920A (en) | Steel frame erection method and suspended scaffolding unit | |
JP2002256643A (en) | Construction method for steel-framed reinforced concrete(src) structure | |
JPH0791603A (en) | Assembly parallel progressing method for large suspension type boiler | |
JP2003120049A (en) | Reconstruction method of building | |
JP3943444B2 (en) | Steel frame one-story building and its construction method | |
US2489808A (en) | Method of erecting concrete floor forms | |
JPH03197734A (en) | Lift up method by replacement of scaffold body | |
JP2000120262A (en) | Scaffolding apparatus for constructing reinforced concrete wall body | |
JPH04333775A (en) | Erection method for steel framed construction of low-rise building | |
JP2001032376A (en) | Floor slab frame and construction method for skeleton |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230131 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20231026 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20231107 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20231117 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20240130 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240419 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20240426 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240604 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240605 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7500408 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |