JP2002256643A - Construction method for steel-framed reinforced concrete(src) structure - Google Patents

Construction method for steel-framed reinforced concrete(src) structure

Info

Publication number
JP2002256643A
JP2002256643A JP2001060154A JP2001060154A JP2002256643A JP 2002256643 A JP2002256643 A JP 2002256643A JP 2001060154 A JP2001060154 A JP 2001060154A JP 2001060154 A JP2001060154 A JP 2001060154A JP 2002256643 A JP2002256643 A JP 2002256643A
Authority
JP
Japan
Prior art keywords
steel
construction
floorboard
floor
src
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001060154A
Other languages
Japanese (ja)
Inventor
Kentaro Nomura
健太郎 野村
Masaru Saito
賢 斎藤
Takeshi Kaei
岳司 嘉永
Mutsuyasu Kono
陸泰 甲野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2001060154A priority Critical patent/JP2002256643A/en
Publication of JP2002256643A publication Critical patent/JP2002256643A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To enhance working efficiency and shorten a construction period with respect to a construction method for constructing, for example, an SRC structure by means of a half precast concrete floor slab. SOLUTION: In the construction method for the SRC structure, directly after a receiving angle 2 for placing the half precast concrete floor slab 5 is mounted on a steel-framed beam 1 so as to erect a steel frame, the floor slab 5 is laid via the receiving angle 2. After that, construction work for a beam form is executed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば、鉄骨鉄筋
コンクリート造(SRC造)において、ハーフプレキャ
スト(PC)床板を用いて構築する際の、構築方法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of building a steel reinforced concrete structure (SRC) using a half precast (PC) floorboard, for example.

【0002】[0002]

【従来の技術】従来、SRC造におけるハーフPC床板
を使用した施工方法としては、図6に示すように、例え
ば、1階用の鉄骨柱に梁配筋を地組した後に鉄骨建方
(ステップ1、S1と略記する、以下同じ)を行い、そ
の後、梁型枠工事S2を行い、そして、ハーフPC床板
をクレーン等で吊り込み、大梁間に該ハーフPC床板の
敷き込みS3をする。その後、スラブ配筋S4を施工す
るとともに、上階(2階)の鉄骨小梁の取付S21を同
時に施工する。
2. Description of the Related Art Conventionally, as a construction method using a half-PC floorboard in SRC construction, as shown in FIG. 1, abbreviated as S1; the same applies hereinafter), then beam formwork S2 is performed, and the half-PC floorboard is hung by a crane or the like, and the half-PC floorboard is laid S3 between girders. After that, the slab reinforcement S4 is constructed, and the attachment S21 of the steel beam on the upper floor (the second floor) is simultaneously constructed.

【0003】前記スラブ配筋S4の後に、生コンクリー
トを搬入して前記1階の柱・梁接合部、梁部、ハーフP
C床板にコンクリートを打設する。これと同時に、2階
において梁型枠工事S22を平行して施工する。その
後、図6に示すように、上階へと移動しながら構築して
いくものである。
After the slab reinforcement S4, ready-mixed concrete is carried in and the column / beam joints, beams, and half P
Cast concrete on the C floorboard. At the same time, beam formwork S22 is performed in parallel on the second floor. Thereafter, as shown in FIG. 6, the building is performed while moving to the upper floor.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、従来の
構築方法では、梁型枠工事(例えば、S2、S22、又
はS32等)の終了後にハーフPC床板の吊り込みを施
工しなければならないという制限がある。更に、そのハ
ーフPC床板の吊り込みをするためには、上階の鉄骨小
梁の取付工事も邪魔にならないように待機していなけれ
ばならない。このように、ハーフPC床板の敷き込みが
遅れることによって、上階の工事も待機時間が長くな
り、その結果、全体の工期も長くなると言うという課題
がある。本発明に係るSRC造の構築方法は、このよう
な課題を解消するために提案されるものである。
However, in the conventional construction method, there is a limitation that the half PC floorboard must be suspended after the completion of the beam formwork (for example, S2, S22, or S32). is there. Further, in order to suspend the half PC floorboard, it is necessary to stand by so as not to disturb the installation work of the steel beam on the upper floor. As described above, the delay in laying the half PC floorboards causes an increase in the waiting time for the upper floor construction, and as a result, there is a problem that the overall construction period is also increased. The SRC construction method according to the present invention is proposed to solve such a problem.

【0005】[0005]

【課題を解決するための手段】本発明に係るSRC造の
構築方法の上記課題を解決するための要旨は、鉄骨梁に
ハーフPC床板載置用の受けアングルを設けて鉄骨の建
方を行い、その後、直ちにハーフPC床板を前記受けア
ングルを介して敷き込み、その後に梁型枠工事を行うこ
とである。
The gist of the present invention for solving the above-mentioned problems in the method of constructing an SRC structure according to the present invention is to provide a steel beam with a receiving angle for placing a half-PC floor plate and to construct a steel frame. Then, immediately after that, the half PC floorboard is laid through the receiving angle, and thereafter, the beam formwork is performed.

【0006】前記ハーフPC床板の敷き込み後に、スラ
ブ配筋と梁型枠工事と上階の鉄骨小梁取付工事とを同時
に施工することを含むものである。
[0006] After the half PC floorboard is laid, the slab reinforcement, the beam formwork construction, and the upper frame steel beam installation work are simultaneously performed.

【0007】本発明に係るSRC造の構築方法によれ
ば、梁配筋の地組において、鉄骨梁に受けアングルを予
め設けておく。その後、鉄骨建方をすることで、梁型枠
工事をする前に、ハーフPC床板をクレーンで吊り込む
ことができるようになり、その結果、上階の鉄骨小梁の
取付工事をハーフPC床板の敷き込み後、直ちに施工す
ることができる。よって、上階の鉄骨小梁の取付工事ま
での待機時間が、従来では「鉄骨建方、梁型枠工事、ハ
ーフPC敷き込み」の3工程を待つ必要があったが、本
発明では「鉄骨建方、ハーフPC敷き込み」の2工程後
に施工できるものである。また、PC床板を早期に敷き
込めるので、スラブ用鉄筋・その他の建築資材等を仮置
きさせることが可能となり作業能率の向上となる。
According to the SRC construction method of the present invention, a receiving angle is previously provided to a steel beam in a beam-arranged terrain. After that, the half PC floor panel can be hung by a crane before the beam formwork is performed by constructing the steel frame, and as a result, the installation work of the steel frame beam on the upper floor is completed by the half PC floor panel. Can be constructed immediately after installation. Therefore, the waiting time until the installation work of the steel beam on the upper floor had to wait for three steps of “steel frame construction, beam formwork construction, half PC laying” in the past. It can be constructed after two steps of "establishment and half PC installation". In addition, since the PC floorboard can be laid at an early stage, it is possible to temporarily place the reinforcing steel for slabs and other building materials, thereby improving work efficiency.

【0008】[0008]

【発明の実施の形態】次に、本発明に係るSRC造の構
築方法について図面を参照して説明する。なお、発明の
理解の容易のため従来例に対応する部分には従来例と同
一符号を付けて説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, an SRC construction method according to the present invention will be described with reference to the drawings. To facilitate understanding of the present invention, portions corresponding to those of the conventional example will be denoted by the same reference numerals as those of the conventional example.

【0009】本発明のSRC造の構築は、図1に示すよ
うに、鉄骨梁1の地組をする際に、ハーフPC床板載置
用の受けアングル2を予め取り付けておく。具体的に
は、図2乃至図3(A)に示すように、鉄骨梁1のウエ
ブ1aに溶接手段により金属製(例えば、鋼製)の受け
基部材2aを、所定間隔毎に鉄骨梁1の長手方向に固着
する。そして、該受け基部材2a間に鋼製のL型アング
ル2bを架設して溶接手段により固着する。
In the construction of the SRC structure of the present invention, as shown in FIG. 1, when the steel beam 1 is laid, a receiving angle 2 for placing a half PC floorboard is attached in advance. Specifically, as shown in FIGS. 2 and 3A, a metal (for example, steel) receiving base member 2a is welded to the web 1a of the steel beam 1 at predetermined intervals by welding means. In the longitudinal direction. Then, a steel L-shaped angle 2b is erected between the receiving base members 2a and fixed by welding means.

【0010】前記L型アングルは、その大きさは、例え
ば、65×65×9(mm)で、長さが300mm程度
のものである。受け基部材2aは、例えば、鋼製で箱形
のものである。このほか、鉄骨梁1に、梁主筋3、スタ
ーラップ3a、補助筋3b等を各々地組みするものであ
る。
The L-shaped angle has a size of, for example, 65 × 65 × 9 (mm) and a length of about 300 mm. The receiving base member 2a is, for example, a steel and box-shaped. In addition, the beam main reinforcement 3, the stirrup 3a, the auxiliary reinforcement 3b, and the like are laid on the steel beam 1.

【0011】前記鉄骨梁1の地組を施工した後に鉄骨小
梁4とともに、図1に示すように、鉄骨建方S1を行
う。前記鉄骨小梁4は、ハーフPC床板5の長手方向に
直交する方向に架設する。
After the groundwork of the steel beam 1 has been constructed, a steel frame construction S1 is performed together with the steel beam 4 as shown in FIG. The steel beam 4 is erected in a direction perpendicular to the longitudinal direction of the half PC floor panel 5.

【0012】次に、従来例ではステップ3であったハー
フPC床板5の敷き込み作業S2を直ちに施工する。な
お、このハーフPC床板5には、前記鉄骨小梁4のスタ
ッド4aの位置に対応した箇所に、100×200mm
程度の開口部5aが所要数に設けられている。かかる、
前記ハーフPC床板5の大きさは、一実施例として6.
55×2.55mで細長いものであって、図2に示すよ
うに、例えば、1区画に、4枚のハーフPC床板5をク
レーンなどで吊り込んで敷設するものである。
Next, the laying work S2 of the half PC floorboard 5, which is step 3 in the conventional example, is immediately performed. It should be noted that the half PC floor plate 5 has a size of 100 × 200 mm at a position corresponding to the position of the stud 4 a of the steel beam 4.
The required number of openings 5a are provided. Such,
The size of the half PC floor panel 5 is, as an example, 6.
As shown in FIG. 2, for example, four half PC floor boards 5 are suspended and laid by a crane or the like in one section as shown in FIG.

【0013】その後、鉄骨小梁4には、図3(B)に示
すように、ハーフPC床板との接合を図るスタッド4a
が溶接手段によって立設される。
Then, as shown in FIG. 3 (B), the stud 4a for joining with the half PC floor plate is formed on the steel beam 4 as shown in FIG.
Is erected by welding means.

【0014】前記ハーフPC床板5は、従来の梁型枠に
代わって、前記鉄骨梁1の受けアングル2によって支持
される。なお、この実施例では、中間の前記鉄骨小梁4
によってもハーフPC床板5が支持されるので、加重負
担の割合は、図4に示すように、例えば、ハーフPC床
板5の自重が168kg/mで、他の雑荷重との合計
で300kg/mとすると、鉄骨小梁4において略2
20kg/mの荷重が掛かり、全荷重の約73%が負
担され、受けアングル2においては、80kg/m
荷重が掛かり、残りの27%程度の荷重が負担されるこ
とになる。このように、鉄骨小梁4によって、受けアン
グル2の負担が軽減されるものである。
The half PC floor plate 5 is supported by the receiving angle 2 of the steel beam 1 instead of the conventional beam formwork. In this embodiment, the intermediate steel beam 4
Since half PC floorboard 5 is supported by the percentage of weight burden, as shown in FIG. 4, for example, the own weight of the half PC floorboard 5 is at 168 kg / m 2, the sum of the other miscellaneous load 300 kg / m 2 , approximately 2 in the steel beam 4
A load of 20 kg / m 2 is applied, and about 73% of the total load is applied. In the receiving angle 2, a load of 80 kg / m 2 is applied, and the remaining load of about 27% is applied. Thus, the load on the receiving angle 2 is reduced by the steel beam 4.

【0015】次に、図1に示すように、前記ハーフPC
床板5上のスラブ配筋の工事S3を施工するとともに、
上階の鉄骨小梁4の取付け工事S21を行う。該上階の
鉄骨小梁4は、前記下階のハーフPC床板5の吊り込み
を行うために、待機していたものである。
Next, as shown in FIG.
While constructing the slab reinforcement S3 on the floorboard 5,
Installation work S21 of the steel beam 4 on the upper floor is performed. The steel beam 4 on the upper floor is on standby to suspend the half PC floorboard 5 on the lower floor.

【0016】その後、梁型枠工事S4を施工するととも
に、上階(例えば、2階)でもハーフPC床板5の敷き
込み工事S22を同時に施工する。該型枠工事S4の後
に、コンクリート打設S5を施工し、上階ではスラブ配
筋S23、及び、更に上階(例えば、3階)のハーフP
C床板5の吊り込みS31を同時施工する。
Thereafter, the beam formwork S4 is carried out, and the laying work S22 of the half PC floorboard 5 is carried out simultaneously on the upper floor (for example, the second floor). After the formwork S4, concrete placing S5 is performed, and slab reinforcement S23 is provided on the upper floor, and a half P of the upper floor (for example, the third floor) is further provided.
The suspension S31 of the C floor panel 5 is simultaneously performed.

【0017】このように、ハーフPC床板5の敷き込み
を早期に実施できるようにすることで、上階との同時施
工が早期に行われるようになり、待機時間が短縮される
とともに、全体の工期も軽減されることになる。即ち、
図1に示すように、例えば、1階の鉄骨建方S1から上
階のコンクリート打設S25までの工期L1が、図6に
示すように、従来例における工期L3よりも短縮される
ものである。
As described above, by laying the half PC floorboards 5 at an early stage, simultaneous construction with the upper floor can be carried out at an early stage, and the waiting time can be shortened. The construction period will also be reduced. That is,
As shown in FIG. 1, for example, the construction period L1 from the steel frame construction S1 on the first floor to the concrete placing S25 on the upper floor is shorter than the construction period L3 in the conventional example, as shown in FIG. .

【0018】また、早期にハーフPC床板5の敷き込み
ができることで、スラブ鉄筋等の建築資材を該ハーフP
C床板5に仮置きすることができるようになり、作業能
率も向上するものである。そのほか、層間の水平養生ネ
ットを早期に取り外すことができるものである。早期に
ハーフPC床板5を敷設することで、溶接の火花等の飛
散を防止することもできるものである。
Further, since the half PC floorboard 5 can be laid at an early stage, building materials such as slab reinforcing bars can be removed from the half PC floor plate.
The temporary placement on the C floor plate 5 becomes possible, and the work efficiency is also improved. In addition, the horizontal curing net between the layers can be removed at an early stage. By laying the half PC floor panel 5 at an early stage, it is possible to prevent scattering of sparks of welding and the like.

【0019】本発明の第2実施例は、図5に示すよう
に、鉄骨建方S1、ハーフPC床板5の敷き込みの工事
S2が終了した後に、当該階のスラブ配筋S3aと梁型
枠工事S3bを同時施工とし、更に、上階の鉄骨小梁4
の取付工事S21も同時施工する、という方法である。
In the second embodiment of the present invention, as shown in FIG. 5, after the steel frame construction S1 and the work S2 for laying the half PC floorboard 5 are completed, the slab reinforcement S3a and the beam formwork of the floor are used. The construction S3b is performed simultaneously, and the steel beams 4 on the upper floor
Is also carried out at the same time.

【0020】この第2実施例の方法によれば、一つの階
の工事が、4工程に短縮され、また、受けアングルによ
って、梁型枠の工事を待たずにハーフPC床板5の敷き
込みを早期実施できることから、鉄骨建方S1から上階
のコンクリート打設S24までの工期L2が、実施例1
の場合の工期L1よりも更に短縮されるものである。
According to the method of the second embodiment, the work of one floor is reduced to four steps, and the half PC floorboards 5 can be laid by the receiving angles without waiting for the work of the beam formwork. Since the work can be carried out early, the construction period L2 from the steel frame construction S1 to the concrete placement S24 on the upper floor is the same as in the first embodiment.
In this case, the construction period L1 is further shortened.

【0021】[0021]

【発明の効果】以上説明したように、本発明に係るSR
C造の構築方法は、鉄骨梁にハーフPC床板載置用の受
けアングルを設けて鉄骨の建方を行い、その後、直ちに
ハーフPC床板を前記受けアングルを介して敷き込み、
その後に梁型枠工事を行う構築方法なので、前記受けア
ングルにより梁型枠工事を後にして先にハーフPC床板
の敷き込みが可能となり、上階の鉄骨小梁の待機時間が
短縮され、全体の工期が短縮されると言う優れた効果を
奏するものである。また、ハーフPC床板の早期敷き込
みで、スラブ配筋や建設資材を早期にハーフPC床板上
に仮置きする事ができるばかりでなく、層間の水平養生
ネットを早期に撤去することができ、仮設資材のコスト
低減となると言う優れた効果を奏するものである。
As described above, the SR according to the present invention is
The construction method of the C-structure is to provide a receiving angle for placing a half-PC floor plate on a steel beam to construct a steel frame, and then immediately lay a half-PC floor plate through the receiving angle,
Since it is a construction method in which the beam formwork is performed afterwards, it is possible to lay the half PC floorboard first after the beam formwork by the receiving angle, and the waiting time of the steel beams on the upper floor is shortened, This has an excellent effect that the construction period is shortened. In addition, by laying half PC floorboards early, not only can slab reinforcement and construction materials be temporarily placed on half PC floorboards at an early stage, but also horizontal curing nets between layers can be removed at an early stage. This has an excellent effect of reducing material costs.

【0022】前記ハーフPC床板の敷き込み後に、スラ
ブ配筋と梁型枠工事と上階の鉄骨小梁取付工事とを同時
に施工することにより、全体の工期が飛躍的に短縮され
ると言う優れた効果を奏するものである。
After the half PC floorboard is laid, by simultaneously performing the slab arrangement, the beam formwork construction, and the installation work of the steel beam on the upper floor, the overall construction period is greatly reduced. It has the effect that it has.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るSRC造の構築方法の手順・工程
を示す説明図である。
FIG. 1 is an explanatory view showing the procedure and steps of an SRC construction method according to the present invention.

【図2】同本発明に係るSRC造の構築方法において、
ハーフPC床板の敷き込みをした状態の平面図である。
FIG. 2 shows a method for constructing an SRC structure according to the present invention;
It is a top view in the state where the half PC floorboard was laid.

【図3】同本発明に係るSRC造の構築方法における、
鉄骨梁に設けた受けアングルでハーフPC床板を支持し
ている様子を示す一部正面図(A)、鉄骨小梁にスタッ
ドを立設した状態の側面図(B)である。
FIG. 3 is a diagram showing a construction method of an SRC structure according to the present invention;
It is the front view (A) which shows a mode that the half PC floorboard is supported by the receiving angle provided in the steel beam, and the side view (B) in the state which stood upright on the steel beam.

【図4】同本発明に係るSRC造の構築方法における、
ハーフPC床板の荷重の支持状態を示す説明図である。
FIG. 4 is a diagram showing a construction method of an SRC structure according to the present invention;
It is explanatory drawing which shows the support state of the load of a half PC floorboard.

【図5】同本発明の第2実施例に係るSRC造の構築方
法の手順・工程を示す説明図である。
FIG. 5 is an explanatory view showing a procedure and steps of an SRC construction method according to a second embodiment of the present invention.

【図6】従来例に係るSRC造の構築方法における手順
・工程を示す説明図である。
FIG. 6 is an explanatory view showing procedures and steps in an SRC construction method according to a conventional example.

【符号の説明】[Explanation of symbols]

1 鉄骨梁、2 受けアングル、2a 受け基部材、2
b L型アングル、4 鉄骨小梁、4a スタッド、5
ハーフPC床板、5a 開口部、LI,L2,L3
工期。
1 steel beam, 2 receiving angle, 2a receiving base member, 2
b L-shaped angle, 4 steel beam, 4a stud, 5
Half PC floorboard, 5a opening, LI, L2, L3
Construction period.

フロントページの続き (72)発明者 嘉永 岳司 福岡市中央区白金2−13−12 戸田建設株 式会社九州支店内 (72)発明者 甲野 陸泰 横浜市西区北幸1−11−15 戸田建設株式 会社横浜支店内Continued on the front page (72) Inventor Takeshi Kaei 2-13-12 Shirogane, Chuo-ku, Fukuoka Toda Construction Co., Ltd. Kyushu Branch (72) Inventor Rikuyasu Kono 1-1-11-15 Kitako, Nishi-ku, Yokohama Toda Construction Co., Ltd. Company Yokohama Branch

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】鉄骨梁にハーフPC床板載置用の受けアン
グルを設けて鉄骨の建方を行い、その後、直ちにハーフ
PC床板を前記受けアングルを介して敷き込み、その後
に梁型枠工事を行うこと、 を特徴とするSRC造の構築方法。
1. A steel beam is provided with a receiving angle for placing a half-PC floor plate, and a steel frame is constructed. Thereafter, a half-PC floor plate is immediately laid through the receiving angle, and then a beam formwork is performed. A method of constructing an SRC structure.
【請求項2】ハーフPC床板の敷き込み後に、スラブ配
筋と梁型枠工事と上階の鉄骨小梁取付工事とを同時に施
工すること、 を特徴とする請求項1に記載のSRC造の構築方法。
2. The SRC structure according to claim 1, wherein after the half-PC floorboard is laid, the slab reinforcement, the beam formwork construction, and the steel beam mounting work on the upper floor are simultaneously performed. How to build.
JP2001060154A 2001-03-05 2001-03-05 Construction method for steel-framed reinforced concrete(src) structure Pending JP2002256643A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001060154A JP2002256643A (en) 2001-03-05 2001-03-05 Construction method for steel-framed reinforced concrete(src) structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001060154A JP2002256643A (en) 2001-03-05 2001-03-05 Construction method for steel-framed reinforced concrete(src) structure

Publications (1)

Publication Number Publication Date
JP2002256643A true JP2002256643A (en) 2002-09-11

Family

ID=18919613

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001060154A Pending JP2002256643A (en) 2001-03-05 2001-03-05 Construction method for steel-framed reinforced concrete(src) structure

Country Status (1)

Country Link
JP (1) JP2002256643A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010053534A (en) * 2008-08-26 2010-03-11 Taisei Corp Composite girder
CN104532997A (en) * 2014-12-26 2015-04-22 宝钢建筑系统集成有限公司 Assembly type floor system and construction method thereof
CN105064511A (en) * 2015-08-12 2015-11-18 浙江绿筑建筑系统集成有限公司 Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010053534A (en) * 2008-08-26 2010-03-11 Taisei Corp Composite girder
CN104532997A (en) * 2014-12-26 2015-04-22 宝钢建筑系统集成有限公司 Assembly type floor system and construction method thereof
CN105064511A (en) * 2015-08-12 2015-11-18 浙江绿筑建筑系统集成有限公司 Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof

Similar Documents

Publication Publication Date Title
JP2008038449A (en) Bridge girder constructing method
JP2002256643A (en) Construction method for steel-framed reinforced concrete(src) structure
JP2017089288A (en) Overhang erection method
JP2000273946A (en) Method for constructing reinforced concrete structure
JP2019178589A (en) Building construction method
JP2003041516A (en) Integral structure of upper and lower parts of continuous girder bridge and method of constructing it
JPH0517996A (en) Building constructing method
JP3281972B2 (en) Reinforcing unit and method of constructing reinforced concrete building using the same
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JP2907047B2 (en) How to build a composite frame
JPH05148817A (en) Construction of pc bridge
JPH07286393A (en) Slab construction method using arched slab board
JPH11166207A (en) Form for floor slab
JP2003213953A (en) Plant building constructing method
JPH0762875A (en) Construction method of floor
JP2904043B2 (en) How to build a composite frame
JP2023022563A (en) Concrete wall construction method
JP2023067236A (en) Slab base structure before concrete placement, reinforced concrete slab structure, method of constructing slab base structure before concrete placement, and method of constructing reinforced concrete slab structure
JPH02167937A (en) Connecting work of steel plate-concrete structure
JP2001032376A (en) Floor slab frame and construction method for skeleton
CN110821039A (en) Construction method of steel ladle beam supporting structure
JP2021088882A (en) Method of constructing building
JP2019178588A (en) Building construction method
JP2010144388A (en) Method for constructing skeleton of steel-reinforced concrete structure
JPH0431523A (en) Binding method of column and beam and construction thereof