JPS6039835B2 - Reinforced steel construction method - Google Patents

Reinforced steel construction method

Info

Publication number
JPS6039835B2
JPS6039835B2 JP11891878A JP11891878A JPS6039835B2 JP S6039835 B2 JPS6039835 B2 JP S6039835B2 JP 11891878 A JP11891878 A JP 11891878A JP 11891878 A JP11891878 A JP 11891878A JP S6039835 B2 JPS6039835 B2 JP S6039835B2
Authority
JP
Japan
Prior art keywords
reinforcement
column
reinforcements
hoops
joint part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP11891878A
Other languages
Japanese (ja)
Other versions
JPS5545932A (en
Inventor
強吾 鍋田
浩 松永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP11891878A priority Critical patent/JPS6039835B2/en
Publication of JPS5545932A publication Critical patent/JPS5545932A/en
Publication of JPS6039835B2 publication Critical patent/JPS6039835B2/en
Expired legal-status Critical Current

Links

Description

【発明の詳細な説明】 この発明は柱や梁の鉄筋を地上にて組立て、先に建込ん
だ柱筋の上に梁筋を吊り込んでのち接続する鉄筋先組工
法に関するものであるる。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a reinforcing bar pre-assembly method in which reinforcing bars for columns and beams are assembled on the ground, and beam bars are suspended over the previously erected column bars and then connected.

この工法か型枠内にて柱及び梁を粗立てる在釆工法より
も、柱筋及び梁筋を地組みすることから、施工精度がよ
いとされているが、柱筋と梁筋との仕口部分のフープの
施工に難点があった。
This construction method is said to have better construction accuracy because the column reinforcements and beam reinforcements are assembled into the ground than the anchor construction method, in which the columns and beams are roughened within the formwork, but the construction accuracy of the column reinforcements and beam reinforcements is There was a problem with the construction of the hoop at the mouth.

特に上筋と下筋とを下向きに折曲した梁端部では、柱筋
の仕口部分にフープを入れて置くことができず、狭い型
枠内の梁受部材上に梁筋をセットしたのち、フーブの取
付けを行っているために、時として作業が難となること
がある。この発明は鉄筋先組工法における上記欠点を排
除し、梁筋端部がアンカーのために下向きに折曲されて
いても、それに影響されることなく仕口部分へのフープ
の取付けを容易にでき、しかもフーブの間隔を揃えて仕
口部分の施工精度を更に向上させたものである。
Especially at the end of a beam where the upper and lower reinforcements are bent downward, it is not possible to insert a hoop in the joint part of the column reinforcement, so the beam reinforcement is set on the beam support member in the narrow formwork. Later on, the hooves are being installed, which sometimes makes the work difficult. This invention eliminates the above-mentioned drawbacks of the reinforcing bar pre-assembly method, and makes it possible to easily attach the hoop to the joint part without being affected by the fact that the end of the beam bar is bent downward for the purpose of anchoring. Moreover, the spacing between the hooves is made the same, further improving the construction accuracy of the joint part.

上記目的によるこの発明は、柱筋の梁筋部材材上に梁筋
のアンカー部分を落し込んでセットする前に、柱筋の仕
口部分に施す複数のフープを、梁筋の上筋と下筋との間
の柱筋周囲に嫉め、梁筋のセット後に上記フープを所定
間隔ごとに配設することを特徴とするものである。
This invention for the above-mentioned purpose has a plurality of hoops applied to the joint part of the column reinforcement before dropping and setting the anchor part of the beam reinforcement on the beam reinforcement member material of the column reinforcement. It is characterized in that the hoops are arranged at predetermined intervals around the columnar reinforcements between the beam reinforcements and after the beam reinforcements are set.

上記フープの隊込みは、柱筋の上端内に下筋のアンカー
部分が収まり、上筋は柱筋の上方にあって、柱筋上端に
一束のフープを側方から上筋の下に挿入する間隙がある
ときに人為的に行うか、あるいは、複数のフープを束ね
て梁筋の上筋端部に取付けて置き、上筋と共に落し込ん
で、柱筋の周囲に施すかのいずれでもよく、どの場合も
各フープを一定間隔ごとに針金などを用いて連結して置
けば、梁筋セット後における仕口部分への配設もきわめ
て容易となる。以上この発明を図示の実施例により詳細
に説明する。
The above hoop formation is such that the anchor part of the lower reinforcement fits within the upper end of the columnar reinforcement, the upper reinforcement is above the columnar reinforcement, and a bundle of hoops is inserted from the side under the upper reinforcement at the upper end of the columnar reinforcement. You can either do this artificially when there is a gap between them, or you can bundle multiple hoops and attach them to the ends of the upper reinforcements, drop them together with the upper reinforcements, and place them around the column reinforcements. In any case, if the hoops are connected at regular intervals using wire or the like, it will be extremely easy to install them at the joint after setting the beams. The present invention will be described in detail with reference to the illustrated embodiments.

図中1は柱筋で、コーナー主筋11にフープ12が梁受
け都材13のところまでスパイラルに巻き付けて取付け
てある。
In the figure, reference numeral 1 indicates a column reinforcement, and a hoop 12 is attached to the corner main reinforcement 11 by winding it spirally up to the beam support material 13.

2は梁筋で、上筋21の両端部と、下筋22の両端に重
ね継手でジョイントしたラップ筋22aの端部とは下向
きに折曲してアンカー23,24となっており、かつ柱
への落し込み部分を除く他の全てにスターラップ25が
施してある。
Reference numeral 2 is a beam reinforcement, and both ends of the upper reinforcement 21 and the ends of the lap reinforcement 22a, which are joined to both ends of the lower reinforcement 22 by lap joints, are bent downward to form anchors 23 and 24. Stirrups 25 are provided on the entire area except for the drop-in area.

3は仕口部分のフープで、その所定数は設計間隔に展開
自在に針金31により連結され、他の針金32を用いて
束ねておく、そして梁筋22を柱筋1に架け渡すに当っ
て、前述のような第1図aの位置においてフープの東3
を側方から挿入し、ついで梁筋2の上筋21端部に取付
けておく。
Reference numeral 3 denotes hoops for the joint part, a predetermined number of which are connected by wires 31 so as to be expandable at designed intervals, and bound together using other wires 32. , 3 east of the hoop at the location of Figure 1a as described above.
is inserted from the side and then attached to the end of the upper reinforcement 21 of the beam reinforcement 2.

しかして、第1図b‘こ示すように、柱筋1をクレーン
などにより蓮込み、柱型枠4及び梁型枠5、床型枠6を
粗立てたのち、梁筋2をクレーンにより吊り上げ、第2
図に示すようにラップ筋22aが梁受け部材13に接す
るまで落し込む。
As shown in Fig. 1 b', the column reinforcement 1 is lowered by a crane or the like, and the column formwork 4, beam formwork 5, and floor formwork 6 are roughly erected, and then the beam reinforcement 2 is lifted up by the crane. , second
As shown in the figure, the lap line 22a is lowered until it touches the beam receiving member 13.

これにより上筋端部に取付けた一束のフープ3は仕口部
分の柱筋1の周囲に鉄まり込む。次に針金32を解き、
各フープ3,3を棒などにより押し込むと、針金31に
よりフープ3は所定間隔ごとに展がる。
As a result, the bundle of hoops 3 attached to the ends of the upper reinforcements is embedded around the columnar reinforcements 1 at the joint portion. Next, untie the wire 32,
When each hoop 3 is pushed in with a rod or the like, the wire 31 causes the hoop 3 to unfold at predetermined intervals.

この結果、仕口部分にもフープ3,3が施され精度が確
保される(第3図)。なおフープ3の梁筋2への先付け
は、第2図鎖線のように下筋22上にのせても同様であ
り、針金31は引き上げげる方向にのばし上筋21に係
止すれば第3図のようになる。第4図から第6図は長辺
方向の梁筋20aと、短辺方向の梁筋20bとを重ねて
柱筋1川こ接続する場合であって、このときには長辺方
向の梁筋20aの仕口部分の上筋26にフープ3,3を
上記実施例と同様に針金31,32を用いて束ねて置き
、この梁筋20aを落し込んで梁受け都材13の上に下
筋27をセットしたのち、第5図に示すように針金32
を解いて各フープ3,3を展げ、柱筋10の仕口部分に
等間隔に配する。
As a result, hoops 3, 3 are also applied to the joint portion, ensuring accuracy (Fig. 3). Note that the hoop 3 can be attached to the beam bar 2 in the same way even if it is placed on the lower bar 22 as shown by the chain line in FIG. It will look like the figure. 4 to 6 show the case where the beam reinforcement 20a in the long side direction and the beam reinforcement 20b in the short side direction are overlapped and connected by one column reinforcement, and in this case, the beam reinforcement 20a in the long side direction is Hoops 3, 3 are tied together using wires 31, 32 on the upper reinforcement 26 of the joint part as in the above embodiment, and the beam reinforcement 20a is dropped to place the lower reinforcement 27 on the beam support material 13. After setting the wire 32 as shown in Fig.
Unravel the hoops 3, 3, and arrange them at equal intervals at the joints of the column reinforcements 10.

次に第6図に示すように、上記梁筋20bの仕口部分を
梁筋20aの上方から柱筋10の上部に落し込む。梁筋
20bの下筋28の仕口部分は落し込みの障害とならな
いように中断させてあり、その部分のジョイント鉄筋2
9aとスターラップ25は梁20b上に先付け退避させ
ておき、上筋29を上筋26にセット後にこの中断部を
ジョイント鉄筋28aとスターラップ25の取付けをも
って塞ぐ。の結果、柱筋10の仕口部分は長短両方向の
梁筋20a,20bが交互して接続されながら、仕口部
分の柱筋周囲にもフープ3,3が間隔を同じくして配設
される。この発明は上述のように、梁筋の落し込みの際
に仕口部分のフープを柱筋に隊め、梁筋の上梁と下梁と
の間にフープを所定間隔ごとに酉己設したことから、仕
口部分の作業が簡単に済み、また精度も向上するばかり
か、鉄筋の先組みと相挨つて工期の短縮を図ることがで
きる。
Next, as shown in FIG. 6, the joint portion of the beam reinforcement 20b is dropped onto the top of the column reinforcement 10 from above the beam reinforcement 20a. The joint part of the lower reinforcement 28 of the beam reinforcement 20b is interrupted so as not to become an obstacle to the lowering, and the joint reinforcement 28 at that part is interrupted.
9a and the stirrup 25 are previously attached and retracted onto the beam 20b, and after setting the upper reinforcement 29 to the upper reinforcement 26, the interrupted portion is closed by attaching the joint reinforcement 28a and the stirrup 25. As a result, the beam reinforcements 20a and 20b in both the long and short directions are alternately connected to the joint part of the column reinforcement 10, and the hoops 3, 3 are arranged at the same interval around the column reinforcement at the joint part. . As mentioned above, this invention arranges the hoops of the joint part on the pillar reinforcements when lowering the beam reinforcements, and sets the hoops at predetermined intervals between the upper and lower beams of the beam reinforcements. This not only simplifies the work on the joints and improves accuracy, but also shortens the construction period by pre-assembling the reinforcing bars.

【図面の簡単な説明】[Brief explanation of drawings]

図面はこの発明に係る鉄筋先組工法の実施例を示すもの
で、第1図は柱筋と梁筋との関係を説明する略示図、第
2図は柱筋の仕口部分に梁筋を落し込んだ際の部分図、
第3図はフープを配設したときの部分図、第4図は柱筋
の仕口部分に長辺方向の梁筋を落し込んだ際の部分図、
第5図はフープを配設したときの部分図、第6図は短辺
方向の梁筋を長辺方向の梁筋に重ねて柱筋の仕口部分に
セットしたときの部分図である。 1・・・・・・柱筋、2・・・・・・梁筋、3・・・・
・・フープ、13・・・・・・梁受け部材、21・・・
・・・上筋、22・・・・・・下筋、23,24・・・
・・・アンカー、20a・・・・・・長辺万向の梁筋、
20b…・・・短辺方向の梁筋、、25・・・・・・ス
タ−ラップ、26,29・・・・・・上筋、、27,2
8・……・・下筋、31,32・・・・・・針金。 第 1.図第2図 第3図 第4図 第5図 第6図
The drawings show an embodiment of the reinforcing bar pre-assembly method according to the present invention. Figure 1 is a schematic diagram explaining the relationship between column reinforcement and beam reinforcement, and Figure 2 shows beam reinforcement at the joint part of column reinforcement. A partial diagram when dropping the
Figure 3 is a partial view when the hoop is installed, Figure 4 is a partial view when the beam reinforcement in the long side direction is inserted into the joint part of the column reinforcement,
FIG. 5 is a partial view when the hoop is arranged, and FIG. 6 is a partial view when the beam reinforcement in the short side direction is overlapped with the beam reinforcement in the long side direction and set at the joint part of the column reinforcement. 1... Column reinforcement, 2... Beam reinforcement, 3...
... Hoop, 13... Beam receiving member, 21...
...Upper muscle, 22...Lower muscle, 23,24...
... Anchor, 20a ... Beam bar on the long side in all directions,
20b... Beam reinforcement in the short side direction, 25... Stirrup, 26, 29... Upper reinforcement, 27, 2
8...... Bottom line, 31, 32... Wire. 1st. Figure 2 Figure 3 Figure 4 Figure 5 Figure 6

Claims (1)

【特許請求の範囲】 1 柱筋と梁筋とを地組みし、柱筋を建込んだのちに梁
筋を吊上げて柱筋にわたり架設するにあたり、柱筋の仕
口部分に施す服数のフープを、梁筋の落し込みの際に梁
筋の上筋と下筋との間の柱筋周囲に嵌め、梁筋のセツト
後に上記フープを所定間隔ごとに仕口部分に配設するこ
とを特徴とする鉄筋先組工法。 2 複数のフープは梁筋の落し込み部分の上筋に予め束
ねて取付けた特許請求の範囲第1項記載の鉄筋先組工法
[Claims] 1. A hoop of the number of clothes to be applied to the joint part of the column reinforcement when the column reinforcement and the beam reinforcement are assembled into the ground, the column reinforcement is erected, and then the beam reinforcement is lifted and constructed over the column reinforcement. is fitted around the column reinforcement between the upper and lower reinforcements of the beam reinforcement when lowering the beam reinforcement, and after the beam reinforcement is set, the hoops are arranged at predetermined intervals at the joint part. Rebar pre-assembled construction method. 2. The reinforcing bar pre-assembly method according to claim 1, wherein the plurality of hoops are bundled and attached in advance to the upper reinforcement of the drop-in portion of the beam reinforcement.
JP11891878A 1978-09-27 1978-09-27 Reinforced steel construction method Expired JPS6039835B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11891878A JPS6039835B2 (en) 1978-09-27 1978-09-27 Reinforced steel construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11891878A JPS6039835B2 (en) 1978-09-27 1978-09-27 Reinforced steel construction method

Publications (2)

Publication Number Publication Date
JPS5545932A JPS5545932A (en) 1980-03-31
JPS6039835B2 true JPS6039835B2 (en) 1985-09-07

Family

ID=14748394

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11891878A Expired JPS6039835B2 (en) 1978-09-27 1978-09-27 Reinforced steel construction method

Country Status (1)

Country Link
JP (1) JPS6039835B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60261866A (en) * 1984-06-11 1985-12-25 三井建設株式会社 Assemblig of pillar iron reinforcement
JPS61177248A (en) * 1985-02-01 1986-08-08 Yokogawa Electric Corp Form plate editing device
JP2009264045A (en) * 2008-04-28 2009-11-12 Dai Ichi High Frequency Co Ltd Reinforcement arrangement construction method of concrete construction beam

Also Published As

Publication number Publication date
JPS5545932A (en) 1980-03-31

Similar Documents

Publication Publication Date Title
JPS6039835B2 (en) Reinforced steel construction method
JP2980793B2 (en) Column / beam joining method
JP2648937B2 (en) Reinforcing bar for long span beams
JP2545129B2 (en) Underground beam construction method
JP2542283B2 (en) Joining Method of Beam Reinforcement in Wall-type Ramen Column
JP2538528B2 (en) Slope stabilization method
JP3877018B2 (en) Barring prevention structure of steel reinforced concrete column / beam joint
JPH08254017A (en) Fixing method for wall reinforcing steel net and fixing method for floor reinforcing steel net
JPS6340029A (en) Beam member for prefabricated construction method
JPS6334932B2 (en)
JP2764334B2 (en) Lift slab construction method
JPH0448136B2 (en)
JPH0726385B2 (en) Construction method for underground wall
JPH0116802Y2 (en)
JPH0688349A (en) Connection structure of pc girder and post
JPH06158712A (en) Construction method of beam
JP2978011B2 (en) U-shaped beam formwork and method of constructing beam and beam joint using the same
JPH11131692A (en) Unit joint bar
JPH07113261A (en) Construction of reinforced concrete structure by use of heat-precast beam
JPS5846970B2 (en) Connection method between RC columns, Pca girders in the column direction, and cast-in-place girders in the span direction
JPH02120446A (en) Precast concrete panel
JP2984704B2 (en) Assembling method of pillar half PCa member
JPS6311499B2 (en)
JPS6352181B2 (en)
JPS6229673A (en) Construction of reinforced concrete pillar