JPH11131692A - Unit joint bar - Google Patents

Unit joint bar

Info

Publication number
JPH11131692A
JPH11131692A JP9309999A JP30999997A JPH11131692A JP H11131692 A JPH11131692 A JP H11131692A JP 9309999 A JP9309999 A JP 9309999A JP 30999997 A JP30999997 A JP 30999997A JP H11131692 A JPH11131692 A JP H11131692A
Authority
JP
Japan
Prior art keywords
bar
bars
wall
reinforcing
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9309999A
Other languages
Japanese (ja)
Inventor
Toshiyuki Kikuchi
俊行 菊地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyoei Steel Ltd
Original Assignee
Kyoei Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyoei Steel Ltd filed Critical Kyoei Steel Ltd
Priority to JP9309999A priority Critical patent/JPH11131692A/en
Publication of JPH11131692A publication Critical patent/JPH11131692A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To achieve power-saving and speed-up of bar joint work in a beam- wall concrete placing joining part. SOLUTION: A lower part is taken as an anchor part 2a buried in reinforced concrete of a beam, and an upper part is taken as a joint part 2b buried in the reinforced concrete of a wall. Plural joint bars 2 are juxtaposedly arranged by being kept coincident with the bar arrangement intervals of vertical bars 10a for forming the grid-like reinforcement 10 of the wall. The upper parts of the anchor parts 2a of the joint bars 2 are welded to one crawling bar 3 to be united in a body.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、コンクリートの
打継ぎ部分の構造的一体化を図るために、あらかじめ挿
入しておく棒状鉄筋であるさし筋に係り、特に梁と壁と
のコンクリート打継ぎ部分に挿入するさし筋の改良に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing bar which is a bar-shaped reinforcing bar which is inserted in advance in order to structurally integrate a joint portion of concrete. The present invention relates to improvement of a cut line inserted in a part.

【0002】[0002]

【従来の技術】ビルやマンション等の鉄筋コンクリート
構造物の建築工事においては、例えば梁とその梁上に構
築する壁のようにコンクリートの打込み時期の異なる部
分の新旧コンクリートの構造的一体化を図るために、現
場にてさし筋作業を行う必要がある。
2. Description of the Related Art In the construction of reinforced concrete structures such as buildings and condominiums, structural integration of old and new concrete at portions where concrete is poured at different times, such as beams and walls constructed on the beams, for example. In addition, it is necessary to carry out the cutting work on site.

【0003】従来より行われているさし筋作業の一例
を、前記梁と壁のコンクリート打継ぎ部分について説明
すると、図8に示すように、まず、所定の径及び長さの
棒状鉄筋であるさし筋2を2〜3本準備し、これらを梁
4の型枠4′内に組み込まれた梁鉄筋5に所定の間隔を
置いて取り付ける。このとき、これらの各さし筋2は、
その下部の所定長さが梁4の打設コンクリート中に埋め
込む定着部2aとなり、上部の所定長さが、後に梁4上
に構築する壁の打設コンクリート中に埋め込む継手部2
bとなるように高さ位置を調節して、梁鉄筋5のあばら
筋5b部に番線6により取り付ける。
[0003] An example of a conventional piercing operation will be described with respect to a concrete joint portion between the beam and the wall. As shown in Fig. 8, a bar-shaped reinforcing bar having a predetermined diameter and length is first used. Two or three studs 2 are prepared, and these are attached at predetermined intervals to a beam reinforcing bar 5 incorporated in a mold 4 ′ of the beam 4. At this time, each of these studs 2
The predetermined length of the lower portion is the anchoring portion 2a embedded in the cast concrete of the beam 4, and the predetermined length of the upper portion is the joint portion 2 embedded in the cast concrete of the wall to be built on the beam 4 later.
The height position is adjusted so as to be b, and it is attached to the stirrup 5b of the beam reinforcing bar 5 by the number line 6.

【0004】次に、図9に示すように、段取筋8と称す
る仮止め用の鉄筋を梁鉄筋5が架設してある柱筋7,7
間に張設する。そして、この段取筋8に前記各さし筋2
の上部を番線結束6し、これらのさし筋2を真っ直ぐに
固定する。
[0004] Next, as shown in FIG. 9, temporary reinforcing bars called setup bars 8 are provided on the column bars 7, 7 on which the beam reinforcing bars 5 are installed.
It is installed between them. Then, each of the above-mentioned studs 2
Are bound by a wire bundle 6 and these studs 2 are fixed straight.

【0005】次に、図10に示すように、上記の如く固
定した2〜3本のさし筋を基準として、これらのさし筋
間に複数本の同様のさし筋を規定の間隔(後に梁鉄筋5
上に建て付ける格子状壁鉄筋10の縦筋10a間隔P
(図11参照))を置いて、1本ずつ前記同様に番線6
であばら筋5bと段取筋8に結束して、真っ直ぐに取り
付けてゆく。ただし、あばら筋5bとの結束は、さし筋
2の間隔Pとあばら筋5bの間隔が必ずしも一致しない
ため、可能な箇所のみとする。そうして、型枠4′内に
コンクリート9を打設し、該コンクリート中に上記各さ
し筋2の定着部2aを埋め込んだ後、その養生を待って
前記段取筋8を取り外す。これにより一連のさし筋作業
が完了する。
[0005] Next, as shown in FIG. 10, a plurality of similar reeds are provided at predetermined intervals between these two reeds with reference to the two or three reeds fixed as described above. Later beam reinforcement 5
Longitudinal bar 10a interval P of lattice wall reinforcing bar 10 to be built on top
(See FIG. 11)
The stitches are bound to the stirrups 5b and the setup streaks 8, and are attached straight. However, the unity with the stirrup 5b is limited to possible locations because the interval P between the stirrups 2 and the interval between the stirrups 5b do not always match. Then, concrete 9 is poured into the formwork 4 ', and the fixing portion 2a of each of the above-mentioned studs 2 is buried in the concrete. This completes a series of cutting operations.

【0006】その後、各さし筋2の継手部2bには、図
11に示すように、複数本の縦筋10aと横筋10b
を、それぞれ所定の間隔P,P′で直角に組み合わせて
なる格子状の壁鉄筋10が、その各縦筋10a下部を番
線結束6して建て付けられる。
Then, as shown in FIG. 11, a plurality of vertical bars 10a and horizontal bars 10b
Are arranged at predetermined intervals P and P 'at right angles to each other.

【0007】[0007]

【発明が解決しようとする課題】このように、従来のさ
し筋作業は、作業員が棒状のさし筋を1本ずつ規定の間
隔に、かつ高さを揃えて真っ直ぐに番線結束してゆく作
業であり。多大の時間と労力、それに熟練を必要とする
ものであった。
As described above, in the conventional cutting work, the worker straightly binds the bar-shaped cutting lines one by one at a specified interval and at the same height to the number line. It is going to work. It required a great deal of time, effort, and skill.

【0008】しかも、このような作業により取り付けら
れたさし筋2は、その大半が上部を段取筋8に結束した
だけの吊り下げ状態であるため、前記段取筋8が撓んだ
り、あるいは工事中の振動や打設コンクリートの圧力等
によって傾き易く、このため規定どおりのさし筋間隔や
コンクリートのかぶり厚さが確保されない場合が多々あ
った。
Moreover, since most of the studs 2 attached by such a work are in a suspended state in which only the upper part is tied to the set-up streaks 8, the set-up streaks 8 may be bent. Or, it is liable to tilt due to vibrations during construction or the pressure of cast concrete, etc. Therefore, in many cases, the spacing between the cut bars and the cover thickness of the concrete cannot be ensured.

【0009】本発明は、このような問題を解決するため
になされたものであり、梁と壁とのコンクリート打継ぎ
部分におけるさし筋作業を熟練を要さず、極めて簡単か
つ迅速に行うことができ、しかもさし筋自体が容易に傾
きを生じることのないユニット化したさし筋の提供を目
的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problem, and it is possible to perform a cutting work at a joint portion between a beam and a wall at a concrete joint very simply and quickly without skill. It is another object of the present invention to provide a unitized rein which can be easily mounted and does not easily tilt.

【0010】[0010]

【課題を解決するための手段】上記目的を達成する本発
明のユニットさし筋は、所定長さの棒状鉄筋であって、
その下部を梁の鉄筋コンクリート中に埋め込む定着部と
なし、上部を上記梁上に構築する壁の鉄筋コンクリート
中に埋め込む継手部となすさし筋の複数本を、前記壁の
格子状鉄筋を構成する縦筋の配筋間隔に一致させて並列
配置し、これらのさし筋の前記定着部上部を、これらの
さし筋と直角に配置する1本の棒状鉄筋であるはわせ筋
に溶接して一体化したことを特徴する。
According to the present invention, there is provided a unit-reinforcing bar which is a bar-shaped reinforcing bar having a predetermined length,
The lower part is a fixing part to be embedded in the reinforced concrete of the beam, and the upper part is a joint part embedded in the reinforced concrete of the wall constructed on the beam and a plurality of the reinforcing bars are formed by forming the lattice reinforcement of the wall. They are arranged in parallel with the arrangement of the bars, and the upper part of the anchoring portion of these bars is welded to a bar bar, which is a single bar-shaped reinforcing bar arranged at right angles to these bars, to be integrated. It is characterized by having

【0011】この場合、はわせ筋の代わりに、壁の格子
状鉄筋を構成する横筋部材を用いるとともに、一体化し
た各さし筋の継手部に、上記同様の横筋部材の複数本を
直角に、かつ壁の格子状鉄筋を構成する横筋の配筋間隔
に一致させて配設するようにしてもよい。
In this case, instead of the reinforcing bars, horizontal reinforcing members constituting the grid-like reinforcing bars of the wall are used, and a plurality of the same horizontal reinforcing members as described above are perpendicularly connected to the joints of the integrated cross bars. Also, they may be arranged so as to match the arrangement intervals of the horizontal reinforcing bars constituting the lattice reinforcing bars of the wall.

【0012】[0012]

【発明の実施の形態】図1は、本発明を実施したユニッ
トさし筋の一例を示している。同図に示すように、この
ユニットさし筋1は、複数本(図示例では7本)のさし
筋2を1本の棒状鉄筋であるはわせ筋3に溶接して一体
化したものである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows an example of a unit streak embodying the present invention. As shown in the figure, the unit stud 1 is obtained by welding a plurality of (seven in the illustrated example) studs 2 to a single bar-shaped reinforcing bar 3 to be integrated. is there.

【0013】すなわち、複数本のさし筋2は、いずれも
D13、長さL1100mmの棒状鉄筋である。これら
のさし筋2は、いずれもその下部所定長さL1 (図示例
では550mm)が梁の鉄筋コンクリート中に埋め込む
定着部2aとなり、その上部所定長さL2 (図示例では
550mm)が、後に梁上に構築する壁の鉄筋コンクリ
ート中に埋め込む継手部2bとなるものである。また、
これらのさし筋2は、一定の間隔Pで並列配置してある
が、この間隔Pは前記壁の格子状鉄筋10(図11参
照)を構成する縦筋10aの配筋間隔Pに一致させてあ
る。
That is, each of the plurality of studs 2 is a bar-shaped rebar having a length of D13 and a length of L1100 mm. Each of these studs 2 has a lower fixed length L 1 (550 mm in the illustrated example) serving as an anchoring portion 2 a embedded in reinforced concrete of a beam, and an upper predetermined length L 2 (550 mm in the illustrated example). The joint 2b is to be embedded in the reinforced concrete of the wall to be built on the beam later. Also,
These studs 2 are arranged in parallel at a fixed interval P, and this interval P is made to coincide with the interval P of the vertical bars 10a constituting the lattice reinforcing bars 10 (see FIG. 11) of the wall. It is.

【0014】はわせ筋3は、直径D10、長さL3 15
00mmの棒状鉄筋である。このはわせ筋3は、前記し
た複数本のさし筋2に対して直角に配置され、各さし筋
2の定着部2a上部(図示例では各さし筋2の下端から
500mm、高さL1 ′の位置)に溶接して固定されて
いる。これにより、複数本のさし筋2が一体化され、1
つのユニットとなっている。
[0014] Wawase muscle 3, diameter D10, length L 3 15
It is a bar-shaped rebar of 00 mm. The studs 3 are arranged at right angles to the plurality of studs 2, and are located above the fixing portion 2 a of each of the studs 2 (in the illustrated example, 500 mm from the lower end of each stud 2, L 1 ′). Thereby, the plurality of studs 2 are integrated, and 1
Has become one unit.

【0015】なお、ユニット化するさし筋2の直径や長
さL、本数とその間隔P、定着部2aの長さL1 、継手
部2bの長さL2 、等については図示例に限るものでは
なく、構築する梁や壁の設計事項に応じて適宜変更する
ものである。また、はわせ筋3は、構造部材ではないた
め、鉄筋に限らず、さし筋を支え得る他の部材でもよ
い。
[0015] The diameter and length of the pointing muscle 2 into a unit L, the number and the interval P, the length L 1 of the fixing portion 2a, the length L 2, like the joint portion 2b limited to the illustrated examples Instead, they are changed appropriately according to the design items of the beams and walls to be constructed. Further, since the reinforcing bar 3 is not a structural member, it is not limited to a reinforcing bar, but may be another member capable of supporting the connecting bar.

【0016】上記構成よりなるユニットさし筋1を用い
るさし筋作業の手順について説明すると、図2に示すよ
うに、梁4の型枠4′内には、柱鉄筋7,7(片側のみ
図示)間に架設する主筋5aとあばら筋5b(主筋5a
に等間隔で巻き付ける剪断補強筋)とで組まれた梁鉄筋
5を組み込んでおく。そして、この梁鉄筋5の上方にユ
ニットさし筋1を人力あるいはクレーン等で位置させ
る。このとき、ユニットさし筋1は、各さし筋2の定着
部2aが下側に、またはわせ筋3が前記主筋5aと平行
となるように位置させる。
The procedure of the penetrating operation using the unit penetrating bar 1 having the above-mentioned construction will be described. As shown in FIG. 2, the column reinforcing bars 7, 7 (only one side) Main bars 5a and stirrups 5b (main bars 5a)
The beam reinforcement 5 assembled with a shear reinforcing bar wound around at equal intervals is previously installed. Then, the unit insert bar 1 is positioned above the beam reinforcing bar 5 by human power or a crane. At this time, the unit studs 1 are positioned so that the fixing portions 2a of the respective studs 2 are on the lower side, or the stitches 3 are parallel to the main streaks 5a.

【0017】そうしてユニットさし筋1を梁鉄筋5に向
けて真っ直ぐに降ろしてゆくと、図3に示すように、は
わせ筋3が梁鉄筋5のあばら筋5bに当たる。これによ
りユニットさし筋1の各定着部2aは、全て自動的に梁
鉄筋5内部に差し込まれた状態となる。この状態で、ユ
ニットさし筋1の位置ずれを修正し、該ユニットさし筋
を梁鉄筋5上の規定どおりの建て付け位置に固定する。
この固定は、はわせ筋3の両端部および中央部を、あば
ら筋5bに番線結束6することにより行う。
When the unit insert 1 is straightened down toward the beam rebar 5, the rebar 3 hits the stirrup 5b of the beam 5 as shown in FIG. As a result, all the fixing portions 2a of the unit insert 1 are automatically inserted into the beam reinforcing bars 5. In this state, the displacement of the unit insert 1 is corrected, and the unit insert 1 is fixed to the prescribed mounting position on the beam reinforcing bar 5.
This fixation is performed by binding the both ends and the central portion of the stirrup 3 to the stirrup 5b with a number line 6.

【0018】次いで、図4に示すように、梁鉄筋5が架
け渡してある柱鉄筋7,7間に段取り筋8を水平に張設
し、これに適当な2〜3本のさし筋の継手部2b上端を
番線結束6して、ユニットさし筋1全体を真っ直ぐに保
持する。これにより、さし筋作業が完了する。
Next, as shown in FIG. 4, a setup bar 8 is horizontally stretched between the column bars 7, 7 on which the beam bar 5 is bridged, and two or three suitable bars are provided for this. The upper end of the joint portion 2b is bound by a number line 6, and the entire unit stud 1 is held straight. Thus, the cutting work is completed.

【0019】後は、梁4の型枠4′内にコンクリート9
を打設し、その養生を待って段取り筋8を取り外す。そ
して、図5に示すように、各さし筋2の継手部2bに格
子状の壁鉄筋10を番線結束6して建て付け、最後に壁
側のコンクリート11を打設する。
Thereafter, concrete 9 is placed in the form 4 'of the beam 4.
And wait for the curing, and remove the setup line 8. Then, as shown in FIG. 5, a grid-like wall reinforcing bar 10 is tied to the joint portion 2 b of each of the bars 2 by wire bundle 6, and finally concrete 11 on the wall side is cast.

【0020】図6は、本発明の他の実施例を示してい
る。
FIG. 6 shows another embodiment of the present invention.

【0021】同図に示すユニットさし筋1は、前記はわ
せ筋3の代わりに格子状壁鉄筋10を構成する横筋部材
10bを使用するとともに、各さし筋2の継手部2bに
上記同様の横筋部材10bの複数本(図示例では5本)
を、これらの継手部と直角に、かつ壁鉄筋10を構成す
る横筋10bの配筋間隔P′(図11参照)に一致させ
て配設した例である。
The unit stud 1 shown in FIG. 1 uses a horizontal streak member 10b constituting a lattice wall reinforcing bar 10 in place of the cross stud 3, and the joint 2b of each stud 2 as described above. Of the horizontal streak members 10b (five in the illustrated example)
Are arranged at right angles to these joints and in accordance with the spacing P ′ (see FIG. 11) of the horizontal bars 10 b constituting the wall reinforcing bar 10.

【0022】なお、横筋部材10bの両端部10b′,
10b′は、さし筋2の両端に並ぶものより外方へ所定
長さ突出させてあるが、これは他の同じユニットさし筋
1と連結する場合の継手部や、柱鉄筋に取り付ける場合
の定着部とするものである。
Incidentally, both end portions 10b 'of the horizontal streak member 10b,
10b 'is protruded by a predetermined length outward from those lined up at both ends of the bar 2, but when it is connected to another same unit bar 1 at the joint portion or when it is attached to a column bar. Fixing section.

【0023】このように構成したものは、その各さし筋
2の継手部2bに取り付ける壁鉄筋10の下部に配する
複数本の横筋10b(図示例では5本)を省略すること
ができ、壁鉄筋の組立て作業の効率化を図ることができ
る。また、壁鉄筋10にメッシュ筋を使用する場合に
は、該メッシュ筋の下部に配する複数本(4本)の横筋
10bを、予め省略しておくことができ、メッシュ筋全
体の軽量化を図ることができる。
In the above construction, a plurality of horizontal bars 10b (five in the illustrated example) arranged below the wall reinforcing bar 10 attached to the joint portion 2b of each of the bars 2 can be omitted. The efficiency of assembling the wall rebar can be improved. When mesh reinforcement is used for the wall reinforcement 10, a plurality (four) of horizontal reinforcements 10b arranged below the mesh reinforcement can be omitted in advance, and the weight of the entire mesh reinforcement can be reduced. Can be planned.

【0024】なお、本発明のユニットさし筋は、図7に
示すように、各さし筋2の継手部2bをはわせ筋3に沿
って直角に曲げ成形することにより、梁鉄筋5と床鉄筋
12との接合にも使用することができる。
As shown in FIG. 7, the unit stud of the present invention is formed by bending the joint 2b of each stud 2 at a right angle along the streak 3 to form It can also be used for joining with the floor reinforcing bar 12.

【0025】[0025]

【発明の効果】以上に説明したとおり、本発明のユニッ
トさし筋によれば、これを梁鉄筋上の所定の位置に真っ
直ぐに降ろして、数カ所を番線結束するだけで、複数本
のさし筋が自動的に規定の配筋間隔で、かつ定着部およ
び継手部の高さを揃えて取り付けられた状態となる。ま
た、取り付けたさし筋はコンクリートの打設圧力等が加
わっても容易に傾くことがない。したがって、さし筋を
1本ずつ取り付けていた従来に比べて、さし筋作業に要
する時間を著しく短縮することができる。また、その労
力を著しく軽減するだけでなく、熟練を要さず精度の高
いさし筋作業を可能とする。
As described above, according to the unit insert of the present invention, the unit insert is straightened down to a predetermined position on the beam reinforcing bar, and only a few places are bundled with a wire. The streaks are automatically attached at the specified spacing of the streaks and with the heights of the anchoring portion and the joint portion aligned. Further, the attached scoring bars do not easily tilt even when a concrete placing pressure or the like is applied. Therefore, the time required for the work of the insert can be remarkably reduced as compared with the related art in which the insert is attached one by one. Further, not only the labor can be remarkably reduced, but also a highly precise cutting work can be performed without skill.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るユニットさし筋の正面図である。FIG. 1 is a front view of a unit streak according to the present invention.

【図2】本発明に係るユニットさし筋を用いたさし筋作
業の手順を説明する正面図である。
FIG. 2 is a front view for explaining a procedure of a penetrating work using a unit insert according to the present invention.

【図3】本発明に係るユニットさし筋を用いたさし筋作
業の手順を説明する正面図である。
FIG. 3 is a front view illustrating a procedure of a penetrating work using a unit insert according to the present invention.

【図4】本発明に係るユニットさし筋を用いたさし筋作
業の手順を説明する正面図である。
FIG. 4 is a front view for explaining a procedure of a penetrating work using a unit insert according to the present invention.

【図5】本発明に係るユニットさし筋を用いたさし筋作
業の手順を説明する正面図である。
FIG. 5 is a front view illustrating a procedure of a penetrating operation using a unit insert according to the present invention.

【図6】本発明に係るユニットさし筋の他の実施態様を
説明する正面図である。
FIG. 6 is a front view illustrating another embodiment of the unit stud according to the present invention.

【図7】本発明に係るユニットさし筋の他の実施態様を
説明する断面図である。
FIG. 7 is a cross-sectional view illustrating another embodiment of a unit streak according to the present invention.

【図8】従来のさし筋作業の手順を説明する正面図であ
る。
FIG. 8 is a front view illustrating a procedure of a conventional cutting work.

【図9】従来のさし筋作業の手順を説明する正面図であ
る。
FIG. 9 is a front view for explaining the procedure of a conventional cutting work.

【図10】従来のさし筋作業の手順を説明する正面図で
ある。
FIG. 10 is a front view for explaining the procedure of a conventional cutting work.

【図11】従来のさし筋作業の手順を説明する正面図で
ある。
FIG. 11 is a front view for explaining the procedure of a conventional cutting work.

【符号の説明】[Explanation of symbols]

1 ユニットさし筋 2 さし筋 2a 定着部 2b 継手部 3 はわせ筋 4 梁 5 梁鉄筋 10 壁鉄筋 10a 縦筋 10b 横筋 REFERENCE SIGNS LIST 1 unit cutout 2 cutout 2 a anchoring section 2 b joint 3 jointing 4 beam 5 beam reinforcing bar 10 wall reinforcing bar 10 a vertical bar 10 b horizontal bar

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 所定長さの棒状鉄筋であって、その下部
を梁の鉄筋コンクリート中に埋め込む定着部となし、上
部を上記梁上に構築する壁の鉄筋コンクリート中に埋め
込む継手部となすさし筋の複数本を、前記壁の格子状鉄
筋を構成する縦筋の配筋間隔に一致させて並列配置し、
これらのさし筋の前記定着部上部を、これらのさし筋と
直角に配置する1本の棒状鉄筋であるはわせ筋に溶接し
て一体化したことを特徴するユニットさし筋。
1. A bar-shaped reinforcing bar having a predetermined length, a lower portion of which is a fixing portion embedded in reinforced concrete of a beam, and an upper portion is a joint portion embedded in reinforced concrete of a wall constructed on the beam. A plurality of, arranged in parallel with the arrangement of the longitudinal bars constituting the lattice reinforcing bars of the wall,
A unit insert bar, wherein an upper portion of the fixing portion of each of the insert bars is welded and integrated with a single bar-shaped reinforcing bar disposed at right angles to the insert bars.
【請求項2】 はわせ筋の代わりに、壁の格子状鉄筋を
構成する横筋部材を用いるとともに、一体化した各さし
筋の継手部に、上記同様の横筋部材の複数本を直角に、
かつ壁の格子状鉄筋を構成する横筋の配筋間隔に一致さ
せて配設したことを特徴する請求項1に記載のユニット
さし筋。
2. The method according to claim 2, wherein a plurality of horizontal reinforcing members are formed at right angles to a joint portion of each of the integrated reinforcing bars, using a horizontal reinforcing member constituting a grid-like reinforcing bar of the wall instead of the reinforcing bar.
2. The unit stud according to claim 1, wherein the studs are arranged so as to correspond to the spacing of the horizontal streaks constituting the lattice reinforcing bars of the wall. 3.
【請求項3】 請求項1または2に記載のユニットさし
筋の各さし筋下部定着部を梁の鉄筋コンクリート中に埋
設した後、該各さし筋の上部継手部に壁鉄筋を構成する
縦筋の下部を重ねて結束することを特徴とする壁鉄筋の
建て付け工法。
3. The unit reinforcement according to claim 1 or 2, wherein the lower fixing portion of each of the reinforcements is buried in the reinforced concrete of the beam, and a wall reinforcement is formed at an upper joint portion of each of the reinforcements. A method of constructing a wall reinforcing bar, wherein the lower portion of a vertical bar is overlapped and bound.
JP9309999A 1997-10-24 1997-10-24 Unit joint bar Pending JPH11131692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9309999A JPH11131692A (en) 1997-10-24 1997-10-24 Unit joint bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9309999A JPH11131692A (en) 1997-10-24 1997-10-24 Unit joint bar

Publications (1)

Publication Number Publication Date
JPH11131692A true JPH11131692A (en) 1999-05-18

Family

ID=17999935

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9309999A Pending JPH11131692A (en) 1997-10-24 1997-10-24 Unit joint bar

Country Status (1)

Country Link
JP (1) JPH11131692A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009264045A (en) * 2008-04-28 2009-11-12 Dai Ichi High Frequency Co Ltd Reinforcement arrangement construction method of concrete construction beam
CN110206323A (en) * 2019-06-05 2019-09-06 上海建工四建集团有限公司 Framework of steel reinforcement formation system and its application method
CN114215274A (en) * 2021-11-19 2022-03-22 上海建工一建集团有限公司 Force transmission structure of new and old concrete and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009264045A (en) * 2008-04-28 2009-11-12 Dai Ichi High Frequency Co Ltd Reinforcement arrangement construction method of concrete construction beam
CN110206323A (en) * 2019-06-05 2019-09-06 上海建工四建集团有限公司 Framework of steel reinforcement formation system and its application method
CN110206323B (en) * 2019-06-05 2023-05-30 上海建工四建集团有限公司 Reinforcement framework forming system and application method thereof
CN114215274A (en) * 2021-11-19 2022-03-22 上海建工一建集团有限公司 Force transmission structure of new and old concrete and construction method thereof

Similar Documents

Publication Publication Date Title
JP3410736B2 (en) Modular reinforcing cage for ductile concrete frame members and method of manufacturing and erection thereof
JP2023106618A (en) Beam structure, support member for beam main reinforcement, and reinforcement method for beam main reinforcement
JPH05311747A (en) Pole-beam structure
JPH11131692A (en) Unit joint bar
JPH0893083A (en) Precast seismic wall and its joining method
JP3579333B2 (en) Floor slab structure and construction method of floor slab
JP2542283B2 (en) Joining Method of Beam Reinforcement in Wall-type Ramen Column
JP2538528B2 (en) Slope stabilization method
JPH1150468A (en) Pc concrete strip footing and installation method thereof
JP3281972B2 (en) Reinforcing unit and method of constructing reinforced concrete building using the same
JPH0849329A (en) Increased thickness reinforcing method of existing earthquake resisting wall
JPH04143350A (en) Semi-prefabricated reinforcement for beam stirrup and arranging method of beam reinforcement therewith
JP2004068303A (en) Constituent and horizontal member of architectual civil engineering structure equipped with opening reinforcement structure
JP2568987B2 (en) Support member for reinforcing steel assembly and bridge construction method using the same
JPH0437129Y2 (en)
JP2003013493A (en) Beam-column connection joint and beam-column connection method
JPH0642037A (en) Construction method of wall type rigid frame construction
CN116378312A (en) Prefabricated reinforcement cage device and manufacturing method thereof
JP2700637B2 (en) Slope stable structure
JP2001011942A (en) Method for building in steel frame erected from foundation after completion of foundation work
JPS6114295B2 (en)
JPH058303B2 (en)
JPH0542547B2 (en)
JPH084176A (en) Joint method of beam/slab
JP2003176696A (en) Prefabricated tunnel and construction method therefor

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071102

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081102

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 7

Free format text: PAYMENT UNTIL: 20081102

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20091102

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091102

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101102

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111102

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20111102

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20121102

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121102

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131102

Year of fee payment: 12