JPH07113261A - Construction of reinforced concrete structure by use of heat-precast beam - Google Patents

Construction of reinforced concrete structure by use of heat-precast beam

Info

Publication number
JPH07113261A
JPH07113261A JP28436293A JP28436293A JPH07113261A JP H07113261 A JPH07113261 A JP H07113261A JP 28436293 A JP28436293 A JP 28436293A JP 28436293 A JP28436293 A JP 28436293A JP H07113261 A JPH07113261 A JP H07113261A
Authority
JP
Japan
Prior art keywords
precast
column
bar
main
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28436293A
Other languages
Japanese (ja)
Inventor
Masami Kuromiya
正美 黒宮
Katsumi Mashita
勝巳 真下
Keiichi Hara
径一 原
Akira Sumi
彰 角
Tetsuo Watanabe
哲夫 渡辺
Rikuta Murakami
陸太 村上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP28436293A priority Critical patent/JPH07113261A/en
Publication of JPH07113261A publication Critical patent/JPH07113261A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To reduce dangerous works in high positions to make the works safe and construct efficiently a structure in a short time and improve the quality thereof, in construction of a reinforced concrete structure by use of half-precast beams. CONSTITUTION:One way of a half-precast beam A is made so that beam reinforcements 6 are buried in a precast concrete 5 in the state that the upper end of stirrups 9 and the upper main reinforcements 7 of beam are exposed at the upper side. Before the half-precast beam A is hung down, the pre- assembled body 10 of beam reinforcements for the beam crossing in right angles and the hoops 16 at the joint of beam and column are assembled in advance in the state that they are supported by the beam reinforce ments 6 of the half- precast beam A. And then the half-precast beam A is hung down on a column B and the arrangement work of reinforcements at the column and beam is completed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ハーフプレキャスト梁
を用いた鉄筋コンクリート構造物の構築方法に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a reinforced concrete structure using a half precast beam.

【0002】[0002]

【従来の技術】ハーフプレキャスト梁を用いた鉄筋コン
クリート構造物を構築する場合、従来では、図10に示
すように、梁下端主筋8とスターラップ9がプレキャス
トコンクリート5に埋設されたハーフプレキャスト梁A
を、工場やサイト(敷地内の作業場)で作製し、このハ
ーフプレキャスト梁Aを柱Bの上に吊り込んだ後、現地
で、柱・梁仕口部のフープ筋16、直交方向梁の主筋ア
ンカー部11,12を配筋し、更に、前記ハーフプレキ
ャスト梁Aの梁上端主筋7を配筋していた。
2. Description of the Related Art In the case of constructing a reinforced concrete structure using a half precast beam, conventionally, as shown in FIG. 10, a half precast beam A in which a beam lower end main bar 8 and a stirrup 9 are embedded in a precast concrete 5.
Was manufactured at a factory or site (work site on the premises), and after hanging this half-precast beam A on the column B, the hoop reinforcement 16 of the column / beam connection part, the main reinforcement of the orthogonal direction beam were on-site. The anchor portions 11 and 12 were reinforced, and the beam upper end main reinforcement 7 of the half precast beam A was reinforced.

【0003】このため、梁材をハーフプレキャスト化し
て、現地作業を少なくしているにもかかわらず、危険を
伴う高所作業が多く残り、しかも、この高所作業は、柱
・梁仕口部という多数の柱主筋3が林立し且つプレキャ
ストコンクリート5で周囲を拘束された狭小なスペース
での面倒な配筋作業となるので、施工能率が悪く、配筋
精度を確保することが困難で、施工品質面でも問題があ
った。
Therefore, although the beam material is half-precast to reduce the on-site work, a lot of dangerous work at high places remains, and the work at high places is caused by the pillar / beam joint section. Since many pillar main bars 3 are forested and the surroundings are constrained by precast concrete 5, it is a troublesome bar arrangement work, so the construction efficiency is poor and it is difficult to secure the bar arrangement accuracy. There was also a problem in terms of quality.

【0004】[0004]

【発明が解決しようとする課題】本発明は、上記の現状
に鑑みてなされたものであって、その目的とするところ
は、ハーフプレキャスト梁を用いて鉄筋コンクリート構
造物を構築するにあたり、危険な高所作業を減少して安
全に、しかも、短時間に能率良く施工でき、施工品質の
向上も可能となる構築方法を提供することにある。
DISCLOSURE OF THE INVENTION The present invention has been made in view of the above situation, and an object thereof is to construct a reinforced concrete structure using a half precast beam. An object of the present invention is to provide a construction method that can be performed safely by reducing work in place, can be efficiently constructed in a short time, and can improve construction quality.

【0005】[0005]

【課題を解決するための手段】上記の目的を達成するた
めに本発明が講じた技術的手段は次のとおりである。即
ち、本発明のハーフプレキャスト梁を用いた鉄筋コンク
リート構造物の構築方法は、梁上端主筋と梁下端主筋と
スターラップを備えた梁鉄筋がプレキャストコンクリー
トに、スターラップの上端側と梁上端主筋をプレキャス
トコンクリートの上部に露出させた状態に埋設された一
方向のハーフプレキャスト梁を作製し、このハーフプレ
キャスト梁の吊込み前に、直交方向梁の主筋アンカー部
及びその延長部と、延長部に巻き付け固定したスターラ
ップとを備えた直交方向梁用の梁鉄筋先組体と、柱・梁
仕口部のフープ筋とを、前記ハーフプレキャスト梁の梁
鉄筋で支持された状態に組み立てておき、しかる後、前
記ハーフプレキャスト梁を柱上に吊り込むことを特徴と
している。
The technical means taken by the present invention to achieve the above object are as follows. That is, the method for constructing a reinforced concrete structure using a half precast beam of the present invention is a beam rebar having a beam top main rebar, a beam bottom main rebar and a stirrup precast concrete, and a stirrup upper end side and a beam top rebar precast. Create a unidirectional half precast beam that is buried in an exposed state on the top of concrete, and hang it around the main beam anchor part of the orthogonal direction beam and its extension part and the extension part before suspending this half precast beam. The beam reinforcement front assembly for orthogonal beams with the stirrup and the hoop reinforcement of the column / beam joint are assembled in a state of being supported by the beam reinforcement of the half-precast beam, and after that, The half precast beam is suspended on a pillar.

【0006】[0006]

【作用】上記の構成によれば、ハーフプレキャスト梁を
用いて鉄筋コンクリート構造物を構築するにあたり、予
め、ハーフプレキャスト梁の梁上端主筋や柱・梁仕口部
の複雑な鉄筋群が先組みされ、ハーフプレキャスト梁と
一体化されているので、揚重機でハーフプレキャスト梁
を柱の上に吊り込むだけで、柱・梁仕口部の配筋が完了
することになる。
According to the above configuration, in constructing a reinforced concrete structure using a half precast beam, a complex rebar group of a beam top main bar and a pillar / beam joint of the half precast beam is previously assembled. Since it is integrated with the half-precast beam, simply by hanging the half-precast beam on the column with a lifting machine, the reinforcement of the column / beam connection is completed.

【0007】[0007]

【実施例】図1〜図3は、ハーフプレキャスト梁Aを用
いた鉄筋コンクリート構造物の構築途中の状態を示す。
Bは鉄筋コンクリート造の柱であり、現場打ちされた柱
コンクリート1とそれに内蔵された柱筋2とから構成さ
れ、柱筋2は多数の柱主筋3とそれに巻き付け固定され
たフープ筋4とによって構成されている。柱筋2は工場
又はサイトで先組みしたものであるが、現地で組み立て
る場合もある。
EXAMPLES FIGS. 1 to 3 show a state in which a reinforced concrete structure using a half precast beam A is being constructed.
B is a reinforced concrete pillar, which is composed of cast-in-place concrete concrete 1 and built-in pillar reinforcement 2, and pillar reinforcement 2 is composed of a large number of main pillar reinforcements 3 and hoop reinforcements 4 wound around and fixed to them. Has been done. The column bars 2 are assembled in advance at a factory or site, but may be assembled locally.

【0008】5はハーフプレキャスト梁Aのプレキャス
トコンクリート、6はプレキャストコンクリート5に埋
設された梁鉄筋であり、2段配筋とされた梁上端主筋
7、2段配筋とされた梁下端主筋8、スターラップ9等
によって構成されている。梁鉄筋6のうち、スターラッ
プ9の上端側とそれに針金等で結束して固定された上段
の梁上端主筋7とはプレキャストコンクリート5の上方
に露出しており、2段目の梁上端主筋7と梁下端主筋8
はプレキャストコンクリート5の梁長手方向端面から突
出している。
Reference numeral 5 is a precast concrete of the half precast beam A, 6 is a beam reinforcing bar embedded in the precast concrete 5, and a beam top main bar 7 having a two-step bar arrangement and a beam bottom main bar 8 having a two-step bar bar 8 , Stirrup 9 and the like. Of the beam reinforcing bars 6, the upper end side of the stirrup 9 and the upper beam upper end main bar 7 which is fixed to the stirrup 9 by being tied together with wire or the like are exposed above the precast concrete 5, and the second upper beam end bar 7 And beam bottom main bar 8
Project from the end face of the precast concrete 5 in the beam longitudinal direction.

【0009】10は直交方向梁用の梁鉄筋先組体であ
る。この梁鉄筋先組体10は、ハーフプレキャスト梁A
の梁上端主筋7及び梁下端主筋8と直交する主筋アンカ
ー部11,12及びその延長部13,14と、上下の延
長部13,14に巻き付け固定したスターラップ15
と、図外の腹筋及び幅止め筋を備えている。16は、柱
・梁仕口部のフープ筋であり、上下方向に適当間隔を隔
てて複数段(図示の実施例では5段)に配筋されてい
る。
Reference numeral 10 is a beam reinforcing bar front assembly for orthogonal beams. This beam reinforcement front assembly 10 is a half precast beam A.
Main beam anchor portions 11 and 12 and their extension portions 13 and 14 orthogonal to the beam upper end reinforcement 7 and the beam lower end reinforcement 8 and the stirrup 15 wound around and fixed to the upper and lower extension portions 13 and 14.
And abdominal muscles and width stop muscles (not shown). Reference numeral 16 denotes a hoop streak of the column / beam joint, which is arranged in a plurality of stages (five in the illustrated embodiment) at appropriate intervals in the vertical direction.

【0010】尚、この実施例では、柱主筋3、ハーフプ
レキャスト梁Aの梁上端主筋7、梁下端主筋8、梁鉄筋
先組体10の主筋アンカー部11,12及び延長部1
3,14として、ねじ節鉄筋(コンクリートとの付着力
を高めるためのリブが螺旋状に形成された異形鉄筋)が
使用されている。17は、長ナット17aとロックナッ
ト17bとによって構成される主筋継手金物である。ま
た、この実施例では、梁鉄筋先組体10の主筋アンカー
部11,12及び延長部13,14が、夫々、1本物の
ねじ節鉄筋を中央部で略U字状に曲げ加工することによ
って構成されており、略U字状の屈曲部とその近辺の水
平鉄筋部分(柱・梁仕口部の内部に位置する上下のねじ
節鉄筋)とで、前記主筋アンカー部11,12を構成し
ている。
In this embodiment, the column main reinforcement 3, the beam upper main reinforcement 7 of the half precast beam A, the beam lower main reinforcement 8, the main reinforcement anchor portions 11 and 12 of the beam reinforcement front assembly 10 and the extension portion 1 are used.
As 3 and 14, threaded joint reinforcing bars (deformed reinforcing bars in which ribs are spirally formed to increase the adhesive force with concrete) are used. Reference numeral 17 is a main joint metal fitting constituted by a long nut 17a and a lock nut 17b. In addition, in this embodiment, the main bar anchor portions 11 and 12 and the extension parts 13 and 14 of the beam reinforcing bar front assembly 10 are formed by bending a single threaded joint bar into a substantially U-shape at the center. The main reinforcement anchor portions 11 and 12 are configured by a substantially U-shaped bent portion and a horizontal reinforcing bar portion (upper and lower threaded bar reinforcing bars located inside the column / beam joint portion) in the vicinity thereof. ing.

【0011】図1〜図3の状態に至る鉄筋コンクリート
構造物の構築方法を説明すると、先ず、工場又はサイト
で、図4〜図6に示すように、梁上端主筋7と梁下端主
筋8とスターラップ9を備えた梁鉄筋6がプレキャスト
コンクリート5に、スターラップ9の上端側と梁上端主
筋7をプレキャストコンクリート5の上部に露出させた
状態に埋設された一方向のハーフプレキャスト梁Aを作
製する。
A method of constructing a reinforced concrete structure reaching the states shown in FIGS. 1 to 3 will be described. First, at a factory or a site, as shown in FIGS. 4 to 6, a beam upper end main bar 7, a beam lower end main bar 8 and a star. A unidirectional half-precast beam A in which the beam reinforcing bar 6 provided with the wrap 9 is embedded in the precast concrete 5 with the upper end side of the star wrap 9 and the beam upper end main bar 7 exposed above the precast concrete 5 is produced. .

【0012】梁上端主筋7は、2段とも、プレキャスト
コンクリート5のコンクリート打設前にスターラップ9
に結束線で固定したものであるが、プレキャストコンク
リート5の上面よりも上方に位置する梁上端主筋7につ
いては、プレキャストコンクリート5のコンクリート打
設後、スターラップ9に結束線で固定するようにしても
よい。梁上端主筋7及び梁下端主筋8の両端には適当な
時点でロックナット17b又はロックナット17b及び
長ナット17aの双方を螺着しておくものとする。
Both the upper ends of the beams 7 are stirrup 9 before the concrete is cast into the precast concrete 5.
The beam top main bar 7 located above the upper surface of the precast concrete 5 is fixed to the stirrup 9 with the binding line. Good. The lock nut 17b or both the lock nut 17b and the long nut 17a are screwed to both ends of the beam upper end main bar 7 and the beam lower end main bar 8 at appropriate times.

【0013】尚、この実施例では、T字状に交差した梁
を対象にしているため、一対のプレキャストコンクリー
ト5,5が柱・梁仕口部に相当する間隙を隔てて相対向
した状態に配置されており、梁上端主筋7と梁下端主筋
8は、夫々、両側のプレキャストコンクリート5,5に
わたって連続した1本物となっている。
In this embodiment, since the beams crossing in a T-shape are targeted, the pair of precast concrete 5 and 5 are opposed to each other with a gap corresponding to the column / beam joints. The beam upper end main bar 7 and the beam lower end main bar 8 are arranged as one continuous piece over the precast concrete 5 and 5 on both sides.

【0014】上記のハーフプレキャスト梁Aを作製した
ら、当該ハーフプレキャスト梁Aを吊り込む前に、柱主
筋3の位置を表示する格子状の定規(図示せず)等を使
用して、地上での配筋作業により、柱・梁仕口部のフー
プ筋16と、直交方向梁用の梁鉄筋先組体10とを、ハ
ーフプレキャスト梁Aの梁鉄筋(プレキャストコンクリ
ート5,5間に位置する梁上端主筋7や梁下端主筋8)
6で支持された状態に配筋する。
After the above half precast beam A is produced, before suspending the half precast beam A, a grid-like ruler (not shown) or the like for indicating the position of the column main bar 3 is used on the ground. By the bar arrangement work, the hoop reinforcements 16 of the column / beam joints and the beam reinforcement front assembly 10 for the orthogonal beams are connected to the beam reinforcement of the half precast beam A (the beam upper end located between the precast concretes 5 and 5). Main bars 7 and beam bottom main bars 8)
Arrange the muscles so that they are supported by 6.

【0015】具体的には、直交方向梁用の梁鉄筋先組体
10における主筋アンカー部11,12を梁上端主筋7
や梁下端主筋8に針金等で結束して固定している。ま
た、柱・梁仕口部のフープ筋16については、最上段の
フープ筋16をハーフプレキャスト梁Aの梁上端主筋7
に針金等で結束して固定し、このフープ筋16に針金等
で結束して固定した垂直な吊下げ用の鉄筋(図示せず)
に、2段目以下のフープ筋16を針金等で結束して固定
している。
Specifically, the main reinforcement anchor portions 11 and 12 of the beam reinforcement front assembly 10 for the orthogonal beam are connected to the beam upper end reinforcement 7.
It is also fixed to the beam bottom main bar 8 by binding it with a wire or the like. As for the hoop reinforcement 16 of the column / beam connection, the uppermost hoop reinforcement 16 is used for the beam top main reinforcement 7 of the half precast beam A.
Reinforcing bar for vertical suspension, which is fixed to the hoop muscle 16 by bundling and fixing it to the hoop muscle 16 and fixing
In addition, the hoop muscles 16 of the second stage and below are bound and fixed with a wire or the like.

【0016】一方、各柱主筋3の上端には、図7に示す
ように、筒軸部18aとその上端に設けた先鋭部18b
とから成るガイド治具18を適当な時点で上方から套嵌
しておく。
On the other hand, at the upper end of each pillar main bar 3, as shown in FIG. 7, a cylindrical shaft portion 18a and a sharpened portion 18b provided at the upper end thereof.
The guide jig 18 composed of and is fitted from above at an appropriate time.

【0017】そして、図8、図9に示すように、クレー
ン等の揚重機を用いて前記ハーフプレキャスト梁Aを柱
B上に吊り込む。ハーフプレキャスト梁Aには、上述し
たとおり、柱・梁仕口部のフープ筋16や直交方向梁用
の鉄筋先組体10が先組みされているので、ハーフプレ
キャスト梁Aを柱Bの上に吊り込むだけで、柱・梁仕口
部の配筋が完了することになる。従って、危険な高所作
業が減少し、安全に且つ短時間に能率良く施工でき、し
かも、柱・梁仕口部の複雑な配筋の全てを、地上で行う
ため、配筋精度を確保することが容易であり、施工品質
の向上を図り得るのである。
Then, as shown in FIGS. 8 and 9, the half precast beam A is suspended on the pillar B using a lifting machine such as a crane. As described above, the half-precast beam A is pre-assembled with the hoop reinforcement 16 of the column / beam joint and the reinforcing bar preassembly 10 for the orthogonal beam, so that the half-precast beam A is placed on the pillar B. Simply hang it up, and the bar / beam connection will be completed. Therefore, dangerous high-place work is reduced, safe and efficient construction can be done in a short time, and all the complicated bar arrangements of the column / beam joints are performed on the ground, ensuring the bar arrangement accuracy. It is easy and the construction quality can be improved.

【0018】殊に、この実施例では、各柱主筋3の上端
に先鋭なガイド治具18が套嵌されているので、柱主筋
3の上端部どうしの間隔、柱主筋3の上端部と直交方向
梁用の鉄筋先組体10や柱・梁仕口部のフープ筋16と
の位置関係が多少ずれていても、ハーフプレキャスト梁
Aが下降する際、フープ筋16や主筋アンカー部11,
12がガイド治具18の先鋭部18bでガイドされ、柱
主筋3群の上に柱・梁仕口部の鉄筋群を円滑に差し込む
ことができる。
In particular, in this embodiment, since the sharp guide jigs 18 are fitted on the upper ends of the respective column main bars 3, the intervals between the upper ends of the column main bars 3 and the upper ends of the column main bars 3 are orthogonal to each other. Even if the positional relationship between the reinforced beam front assembly 10 for the directional beam and the hoop reinforcement 16 of the column / beam joint is slightly different, when the half precast beam A descends, the hoop reinforcement 16 and the main reinforcement anchor portion 11,
12 is guided by the sharpened portion 18b of the guide jig 18, and the rebar group of the column / beam joint can be smoothly inserted onto the main group 3 of the column.

【0019】しかる後、図9に示すように、ガイド治具
18を上方へ引き抜くのである。以後は、従来通り、柱
・梁仕口部の周囲への型枠の組立、ハーフプレキャスト
梁Aに対するハーフプレキャスト床板等の架設、コンク
リートの現場打ち等の工程を経て、鉄筋コンクリート構
造物を構築することになる。
After that, as shown in FIG. 9, the guide jig 18 is pulled out upward. After that, as before, construct a reinforced concrete structure through the steps of assembling the form around the column / beam joints, erection of the half precast floor boards for the half precast beam A, and in-situ casting of concrete. become.

【0020】尚、上記の実施例では、T字状に交差する
梁を対象にして本発明を説明したが、本発明は、十字状
に交差した梁やL字状に交差した梁についても適用可能
である。十字状に交差した梁を対象とする場合には、直
交方向梁用の鉄筋先組体10における主筋アンカー部1
1,12が柱・梁仕口部内に位置する上下の水平な鉄筋
によって構成されることになる。L字状に交差した梁を
対象とする場合には、ハーフプレキャスト梁Aにおける
梁上端主筋7及び梁下端主筋8のプレキャストコンクリ
ート5の端面から突出した部分を、直交方向梁用の鉄筋
先組体10における主筋アンカー部11,12の形状と
同じように、略U字状に曲げ加工して構成することにな
る。
In the above embodiments, the present invention has been described for a beam that intersects in a T shape, but the present invention is also applied to a beam that intersects in a cross shape and a beam that intersects in an L shape. It is possible. When a beam crossing in a cross shape is targeted, the main bar anchor portion 1 in the reinforcing bar front assembly 10 for the orthogonal beam
1 and 12 are composed of upper and lower horizontal reinforcing bars located in the column / beam joints. When targeting a beam intersecting in an L-shape, the portions of the beam upper end reinforcement 7 and the beam lower end reinforcement 8 of the half precast beam A protruding from the end surface of the precast concrete 5 are the reinforcing bar front assembly for orthogonal beams. Similar to the shape of the main bar anchor portions 11 and 12 in 10, the structure is formed by bending into a substantially U shape.

【0021】[0021]

【発明の効果】本発明は、上述した構成よりなり、ハー
フプレキャスト梁の梁上端主筋や柱・梁仕口部の複雑な
鉄筋群を予めハーフプレキャスト梁に先組みしておくた
め、揚重機でハーフプレキャスト梁を柱の上に吊り込む
だけで、柱・梁仕口部の配筋が完了することになる。従
って、ハーフプレキャスト梁を用いて鉄筋コンクリート
構造物を構築するにあたり、危険な高所作業を減少して
安全に、しかも、短時間に能率良く施工でき、柱・梁仕
口部の複雑な配筋を地上で行うため配筋精度の確が容易
であり、施工品質も向上する等の効果がある。
According to the present invention, which has the above-described structure, since the beam upper main reinforcement of the half precast beam and the complicated reinforcing bar group of the column / beam joint are preassembled to the half precast beam, the lifting machine is used. By simply suspending the half-precast beam on the column, the bar / column connection will be completed. Therefore, when constructing a reinforced concrete structure using half-precast beams, dangerous high-place work can be reduced, and it can be constructed safely and efficiently in a short time, and complicated bar arrangement of columns and beams Since it is performed on the ground, it is easy to ensure the accuracy of the bar arrangement, and the construction quality is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】ハーフプレキャスト梁を用いた鉄筋コンクリー
ト構造物の構築途中の状態を示す正面図である。
FIG. 1 is a front view showing a state where a reinforced concrete structure using a half precast beam is being constructed.

【図2】要部の縦断側面図である。FIG. 2 is a vertical sectional side view of a main part.

【図3】要部の平面図である。FIG. 3 is a plan view of a main part.

【図4】ハーフプレキャスト梁に、直交方向梁用の梁鉄
筋先組体と、柱・梁仕口部のフープ筋を先組みした状態
を示す斜視図である。
FIG. 4 is a perspective view showing a state in which a beam pre-assembly of a beam for orthogonal beams and a hoop bar of a column / beam joint are assembled in advance on a half precast beam.

【図5】ハーフプレキャスト梁に、直交方向梁用の梁鉄
筋先組体と、柱・梁仕口部のフープ筋を先組みした状態
を示す平面図である。
FIG. 5 is a plan view showing a state in which a beam pre-assembly of a beam for orthogonal beams and a hoop bar of a column / beam joint are assembled in advance on a half precast beam.

【図6】ハーフプレキャスト梁に、直交方向梁用の梁鉄
筋先組体と、柱・梁仕口部のフープ筋を先組みした状態
を示す要部の縦断側面図である。
FIG. 6 is a vertical cross-sectional side view of a main part showing a state in which a beam rebar preassembly for orthogonal beams and a hoop reinforcement of a column / beam joint are preassembled to a half precast beam.

【図7】ガイド治具の一部切欠き斜視図である。FIG. 7 is a partially cutaway perspective view of a guide jig.

【図8】構築方法を説明する正面図である。FIG. 8 is a front view illustrating a construction method.

【図9】構築方法を説明する正面図である。FIG. 9 is a front view illustrating a construction method.

【図10】従来例の説明図である。FIG. 10 is an explanatory diagram of a conventional example.

【符号の説明】[Explanation of symbols]

A…ハーフプレキャスト梁、B…柱、5…プレキャスト
コンクリート、6…梁鉄筋、7…梁上端主筋、8…梁下
端主筋、9…スターラップ、10…直交方向梁用の梁鉄
筋先組体、11,12…主筋アンカー部、13,14…
延長部、15…スターラップ、16…柱・梁仕口部のフ
ープ筋。
A ... Half precast beam, B ... Column, 5 ... Precast concrete, 6 ... Beam rebar, 7 ... Beam top main bar, 8 ... Beam bottom main bar, 9 ... Star wrap, 10 ... Beam rebar tip assembly for orthogonal beam, 11,12 ... Main anchors, 13,14 ...
Extensions, 15 ... Star wrap, 16 ... Hoop streaks for column / beam connections.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 角 彰 大阪市中央区本町4丁目1番13号 株式会 社竹中工務店大阪本店内 (72)発明者 渡辺 哲夫 大阪市中央区本町4丁目1番13号 株式会 社竹中工務店大阪本店内 (72)発明者 村上 陸太 大阪市中央区本町4丁目1番13号 株式会 社竹中工務店大阪本店内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Akira Kaku 4-1-1, Honmachi, Chuo-ku, Osaka City Takenaka Corporation Osaka Main Store (72) Inventor Tetsuo Watanabe 4-1-1, Honmachi, Chuo-ku, Osaka No. 13 Stock Company Takenaka Corporation Osaka Main Store (72) Inventor Ryuta Murakami 4-1-1 Hommachi, Chuo-ku, Osaka City Stock Company Takenaka Corporation Osaka Main Store

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 梁上端主筋と梁下端主筋とスターラップ
を備えた梁鉄筋がプレキャストコンクリートに、スター
ラップの上端側と梁上端主筋をプレキャストコンクリー
トの上部に露出させた状態に埋設された一方向のハーフ
プレキャスト梁を作製し、このハーフプレキャスト梁の
吊込み前に、直交方向梁の主筋アンカー部及びその延長
部と、延長部に巻き付け固定したスターラップとを備え
た直交方向梁用の梁鉄筋先組体と、柱・梁仕口部のフー
プ筋とを、前記ハーフプレキャスト梁の梁鉄筋で支持さ
れた状態に組み立てておき、しかる後、前記ハーフプレ
キャスト梁を柱上に吊り込むことを特徴とするハーフプ
レキャスト梁を用いた鉄筋コンクリート構造物の構築方
法。
1. A unidirectional embedding method in which a beam reinforcing bar having a beam upper end bar, a beam lower end bar and a stirrup is embedded in precast concrete, and the upper end side of the stirrup and the beam upper end bar are exposed above the precast concrete. A half precast beam for a cross beam is provided with a main bar anchor part of the cross beam and its extension and a stirrup wrapped around the extension before suspending the half precast beam. The front assembly and the hoop reinforcement of the column / beam joint are assembled in a state of being supported by the beam reinforcement of the half precast beam, and then the half precast beam is suspended on the column. Construction method of reinforced concrete structure using half precast beams.
JP28436293A 1993-10-18 1993-10-18 Construction of reinforced concrete structure by use of heat-precast beam Pending JPH07113261A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28436293A JPH07113261A (en) 1993-10-18 1993-10-18 Construction of reinforced concrete structure by use of heat-precast beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28436293A JPH07113261A (en) 1993-10-18 1993-10-18 Construction of reinforced concrete structure by use of heat-precast beam

Publications (1)

Publication Number Publication Date
JPH07113261A true JPH07113261A (en) 1995-05-02

Family

ID=17677612

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28436293A Pending JPH07113261A (en) 1993-10-18 1993-10-18 Construction of reinforced concrete structure by use of heat-precast beam

Country Status (1)

Country Link
JP (1) JPH07113261A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007285040A (en) * 2006-04-18 2007-11-01 Okumura Corp Beam member made of precast concrete
JP2014173273A (en) * 2013-03-06 2014-09-22 Taisei Corp Preassembled reinforcement and installation method thereof
CN115288446A (en) * 2022-07-08 2022-11-04 中国建筑第二工程局有限公司 Construction method for prefabricated half cage beam steel bars of floor of assembly structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007285040A (en) * 2006-04-18 2007-11-01 Okumura Corp Beam member made of precast concrete
JP2014173273A (en) * 2013-03-06 2014-09-22 Taisei Corp Preassembled reinforcement and installation method thereof
CN115288446A (en) * 2022-07-08 2022-11-04 中国建筑第二工程局有限公司 Construction method for prefabricated half cage beam steel bars of floor of assembly structure
CN115288446B (en) * 2022-07-08 2024-01-26 中国建筑第二工程局有限公司 Construction method for prefabricated half-cage beam steel bars of building surface with assembly structure

Similar Documents

Publication Publication Date Title
JPH07113261A (en) Construction of reinforced concrete structure by use of heat-precast beam
JPH0747544Y2 (en) Shear reinforcement structure of reinforced concrete or steel reinforced concrete beams
JP2737099B2 (en) Construction method of underground beam reinforcing bars and underground beams
JP2004068303A (en) Constituent and horizontal member of architectual civil engineering structure equipped with opening reinforcement structure
JPS5831921Y2 (en) Anchoring structure of pre-assembled beam main reinforcement
JPH0344881Y2 (en)
JPS6321605Y2 (en)
JPH0135886Y2 (en)
JPH076252Y2 (en) Joint structure of PC beam and beam
JPH0967899A (en) Reinforcement cage and assembling method therefor
JPH10169009A (en) Column base structure and construction method therefor
TWM624603U (en) Seismic-strengthened confinement stirrup structures for steel-framed or reinforced concrete columns and seismic-strengthened column structures
JPH10292558A (en) Fixing method of reinforcing bar for beam in column-beam connecting section
JPH0688349A (en) Connection structure of pc girder and post
JPS5817055Y2 (en) Spiral stirrup for beams
JPH05331863A (en) Fixing method of steel frame column
JPH06336732A (en) Slope-stabilizing construction method
JPS59229251A (en) Assembling method of reinforcing steel bar using annular reinforcement
JP2791824B2 (en) Construction method of reinforced concrete structure using partial pre-brake and partial pre-brake
JPH07212B2 (en) Method of assembling beam reinforcement and stirrups used for it
CN116378312A (en) Prefabricated reinforcement cage device and manufacturing method thereof
JPH0598694A (en) Pillar/beam connection section structure
JPS6229673A (en) Construction of reinforced concrete pillar
CN109162206A (en) A kind of constructing structure and its construction method of cast-in-situ box girder prestressed strand
JP2000328648A (en) Reinforcing structure of column structure