JPS60133146A - Construction of synthetic large beam using u-shaped precast beam material - Google Patents

Construction of synthetic large beam using u-shaped precast beam material

Info

Publication number
JPS60133146A
JPS60133146A JP24056683A JP24056683A JPS60133146A JP S60133146 A JPS60133146 A JP S60133146A JP 24056683 A JP24056683 A JP 24056683A JP 24056683 A JP24056683 A JP 24056683A JP S60133146 A JPS60133146 A JP S60133146A
Authority
JP
Japan
Prior art keywords
precast beam
precast
beam material
width direction
protruding parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP24056683A
Other languages
Japanese (ja)
Other versions
JPS6312987B2 (en
Inventor
山口 芳雄
薫 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP24056683A priority Critical patent/JPS60133146A/en
Publication of JPS60133146A publication Critical patent/JPS60133146A/en
Publication of JPS6312987B2 publication Critical patent/JPS6312987B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は、下端主筋ならびに上端側が閉塞されていない
肋筋を内蔵した断面路U型のプレキャスト梁材の建方完
了後、上端主筋の配筋ならびに前記肋筋の上端側の閉塞
を行ない、当該プレキャスト梁材を打込み型枠としてコ
ンクリートを打設し、プレキャスト梁材と現場打ちコン
クリートとが構造的に一体となった合成大梁を構築する
方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention provides a method for constructing a precast beam having a U-shaped cross section, which incorporates lower end main reinforcements and unoccluded ribs on the upper end side, and then removes the upper end main reinforcements and the upper ends of the said ribs. The present invention relates to a method of constructing a composite girder in which the precast beam material and cast-in-place concrete are structurally integrated, by closing the sides and pouring concrete using the precast beam material as a pouring formwork.

上記の合成大梁構築方法は、小梁に比べて寸法が大きく
、大重量物となシがちな大梁用のプレキャスト梁材を断
面路U型とすることによって、小梁用のブレキャスト材
や床スラブ用のブレキャスト材と同程度の重賞に抑え、
資材の現場搬入、建方等を容易ならしめた′方法である
The above composite girder construction method uses precast beam materials for girders, which tend to be larger and heavier than small beams, to have a U-shaped cross section. Reducing the award to the same level as pre-cast material for slabs,
This is a method that simplifies the delivery of materials to the site and construction.

而して、U型ブレキャスト梁材に埋設される肋筋の上端
側は、プレキャスト梁材製造時における内側型枠の脱型
や建築現場で建方後に行なわれる上端主筋の配筋を容易
にするために、開放しておかれ、現場作業によシ閉塞さ
れるのである。
Therefore, the upper end side of the reinforcing bars embedded in the U-shaped precast beam material makes it easy to remove the inner formwork when manufacturing the precast beam material and to easily arrange the upper main reinforcing bars after erection at the construction site. It is left open for the purpose of operation and then closed off for on-site operations.

ところで、従来のこの種の合成大梁構築方法においては
、肋筋上端側の閉塞を次の2方法によって行なっていた
ため、スラブ厚や梁rlJによる制約が太きいという欠
点があった。
By the way, in this type of conventional synthetic girder construction method, the upper end side of the ribs was closed by the following two methods, which had the disadvantage of being heavily constrained by the slab thickness and beam rlJ.

第1の方法は、第1図(イ)に示す如く、断面路U型の
プレキャスト梁材5′の上面から突出した肋筋7′の突
出部分の先端に夫々、上端主筋12’と係合するフック
13’を折曲形成しておき、別途、上端主筋1zと係合
するフック14′を有するl]止め15’を設けて肋筋
上端側を閉塞する方法である。
As shown in FIG. 1(A), the first method is to engage the upper main reinforcements 12' at the tips of the protruding parts of the reinforcing bars 7' that protrude from the upper surface of the precast beam 5' having a U-shaped cross section. In this method, a hook 13' is bent and formed, and a stop 15' having a hook 14' that engages with the upper main reinforcement 1z is separately provided to close the upper end side of the rib.

第2の方法は、第1図(ロ)に示す如く、肋筋7′の突
出部分の先端を夫々現場で折シ曲げて、水平部分a’、
b’を形成し、これら両水平部分a′、b′間にわたっ
て直線状の巾止め15′を溶接することにより、上端側
を閉塞する方法である。
The second method is to bend the tips of the protruding parts of the ribs 7' on site, as shown in FIG.
b' and welding a linear stopper 15' between both horizontal portions a' and b' to close the upper end side.

而して、前者による場合は、プレキャスト梁材5′の上
面から肋筋7′の折曲り部までの高さhが低いと、フッ
ク13’の必要な折曲げ角度θと必要長さtを確保でき
ず、従って、スラブ厚の如何によっては、上記の合成大
梁構築方法を適用できないのである。
In the former case, if the height h from the top surface of the precast beam 5' to the bending part of the reinforcing bar 7' is low, the required bending angle θ and the required length t of the hook 13' will be Therefore, depending on the thickness of the slab, the above method of constructing a composite girder cannot be applied.

また、後者による場合は、各肋筋7′ごとに2箇所の溶
接が必要で、施工性が悪い上、梁巾が狭いと所定の溶接
長さを確保できず、梁巾の如何によっては、合成大梁構
築方法を適用できないのである。
In addition, in the case of the latter, two locations of welding are required for each reinforcing bar 7', which has poor workability, and if the beam width is narrow, it is not possible to secure the specified welding length, and depending on the beam width, Composite girder construction methods cannot be applied.

本発明は、上記の従来欠点を解消すると共に、肋筋の配
筋ピッチが小さくても、肋筋の接合が容易で、現場打ち
コンクリートの回シもよく、かつ、肋筋の現場接合によ
る強度的なアンバランスが生じないようにすることを目
的とするものであり、冒頭に述べた合成大梁構築方法に
おいて、前記プレキャスト梁材として、梁巾方向に清う
水平部分とその両端から立上った互いに長さを異にする
一対の立上り部分とから成る肋筋が、梁[1]方向にお
いてプレキャスト梁材上面から突出した部分の長さを互
いに異にし、かつ、梁長手方向においては長い突出部分
と短い突出部分とが交互に位置するように埋設されたも
のを用い、梁中方向に相対向する長・短の突出部分を夫
々プレキャスト梁材の上面から同一高さ位置において内
側へ折シ曲けて水平部分を形成し、両水平部分を圧着継
手にて接合することを特徴としている。
The present invention solves the above-mentioned conventional drawbacks, and even if the pitch of reinforcing bars is small, it is easy to join the reinforcing bars, the rolling of cast-in-place concrete is good, and the reinforcing bars can be strengthened by joining on-site. The purpose of this is to prevent any unbalance from occurring, and in the method of constructing composite girders mentioned at the beginning, the precast beams are made of a horizontal part that is clear in the beam width direction and a horizontal part that rises from both ends of the precast beam material. The ribs are made up of a pair of upright parts with different lengths, and the lengths of the parts protruding from the top surface of the precast beam in the beam [1] direction are different from each other, and the protruding parts are long in the longitudinal direction of the beam. The long and short protruding parts facing each other in the direction of the beam are bent inward at the same height from the top surface of the precast beam. It is characterized by bending to form a horizontal portion and joining both horizontal portions with a crimp joint.

以下、本発明の実施例を図面に基いて説明する。Embodiments of the present invention will be described below with reference to the drawings.

第2図、第3図は本発明による合成大梁構築方法が採用
された鉄筋コンクリート構造体の構築工法を示しておシ
、その概様は、次の通力である。
FIGS. 2 and 3 show a method for constructing a reinforced concrete structure using the method for constructing a composite girder according to the present invention, and its outline is as follows.

I 柱鉄筋の吊込み 柱鉄筋lは、吊込みに先行して、主筋及び帯筋を地組み
しておく。主筋の継手は、四隅を圧着継手とし、他を重
ね継手とする。
I Suspension of column reinforcing bars For column reinforcing bars I, the main bars and tie bars are assembled into the ground prior to hanging. The main reinforcement joints will be crimp joints at the four corners, and lap joints at the others.

■ 柱型枠の建込み 柱型枠2としては、鋼製のパネル型枠を先組みして、角
筒状に一体化したものを用い、クレーン等を用いて建込
む。
■ Erection of column formwork The column formwork 2 is made of steel panel formwork that has been pre-assembled and integrated into a rectangular tube shape, and is erected using a crane or the like.

■ 柱のコンクリート打設 ホッパー3等を用いて大梁天端までコンクリート打設を
行なう。
■ Concrete pouring for columns Use hopper 3, etc. to pour concrete up to the top of the girder.

1%) [J型ブレキャスト梁材の建方柱型枠2の脱型
後、墨出し、柱4天端のレベル調整を行ない、合成大梁
用プレキャスト梁材5の建方を行なう。プレキャスト梁
材5は断面路U型を呈し、下端主筋6ならびに上端側が
閉塞されていない肋筋7を内蔵したものであり、両端部
を柱4に、中間部を2点程度仮設サポート(図示せず)
に夫々支持させて架設する。尚、柱・太梁仕口部におい
ては、第3図に示す如く、所要長さのジヨイント筋8を
配筋する。
1%) [Erection of J-type precast beam material After demolding the column formwork 2, marking is done and the level of the top of the column 4 is adjusted, and the precast beam material 5 for the composite girder is erected. The precast beam 5 has a U-shaped cross section, and has built-in main reinforcing bars 6 at the lower end and ribs 7 that are not closed at the upper end, with pillars 4 at both ends and temporary supports at two points in the middle (not shown). figure)
The structure shall be supported and erected. In addition, at the joint portions of columns and thick beams, joint reinforcements 8 of the required length are arranged as shown in FIG.

■ ブレキャスト小梁材の建方 ブレキャスト小梁材9は、両端部を前記プレキャスト梁
材5に、中央1点を仮設サポート(図示せず)に夫々支
持させて架設する。
(2) How to construct a precast beam 9 The precast beam 9 is erected by supporting the precast beam 5 at both ends and a temporary support (not shown) at one point in the center.

■ 床スラブ用オムニア板の敷込み 床スラブ型枠のサポートを無くするために、オムニア板
(片面側に立体トラス状の鉄筋がアンカーされたブレキ
ャストコンクリート板)10を使用し、仮設材の減少に
よる省力化を図る。
■ Laying Omnia boards for floor slabs In order to eliminate support for the floor slab formwork, Omnia boards (a pre-cast concrete board with three-dimensional truss-shaped reinforcing bars anchored on one side)10 were used, reducing the amount of temporary construction materials. We aim to save labor by

vIl 梁上筋、床上筋の配筋 大梁、小梁の上端筋の配筋を行なうっ主筋の継手は、圧
接継手とし、床上筋はメツシュ状に先組みされたものを
用いる。
vIl Reinforcement for beam reinforcements and floor reinforcements The joints of the main reinforcements used for reinforcing the upper ends of large beams and small beams shall be pressure joints, and the floor reinforcements shall be pre-assembled in the form of a mesh.

頃 コンクリート打設 柱4の頭部、プレキャスト梁材5の中空部、オムニア板
10及びプレキャスト小梁材9の上部にコンクリート1
1を打設する。
Concrete 1 is placed on the head of the concrete column 4, the hollow part of the precast beam 5, the omnia plate 10, and the top of the precast small beam 9.
1.

この実施例では、本発明の合成大梁構築方法を上記の工
法(特にVl〜vlilの工程)に採用している。
In this example, the synthetic girder construction method of the present invention is applied to the above-mentioned construction method (particularly the steps from Vl to vlil).

即ち、前述した断面路U型のプレキャスト梁材5として
、第4図、第5図に示すように、梁巾方向に沿う水平部
分とその両端から立上った互いに長さを異にする一対の
立上り部分とから成る肋筋7が、梁巾方向においてはプ
レキャスト梁材5上面から突出した部分7a、7bの長
さを互いに異にし、かつ、梁長手方向においては長い突
出部分7aと短い突出部分7bとが交互に位置するよう
に埋設されたものを用いる。
That is, as shown in FIGS. 4 and 5, the precast beam material 5 having a U-shaped cross section as described above has a horizontal portion along the beam width direction and a pair of pairs having different lengths rising from both ends of the horizontal portion. The ribs 7 are made up of rising portions, and have different lengths of portions 7a and 7b that protrude from the top surface of the precast beam material 5 in the beam width direction, and a long protruding portion 7a and a short protruding portion in the longitudinal direction of the beam. The parts 7b are buried so that they are alternately located.

そして、上記■の工程において、第6図に示すように、
上端主筋12をプレキャスト梁材5の中空部に挿入し、
プレキャスト梁材5の上面間に架設したカンザシ金物(
図示せず)等で、これらの上端主筋12を仮設的に支持
させた状態で、梁巾方向に相対向する長・短の突出部分
7a、7bを夫々プレキャスト梁材5上 側へ折り曲げて、水平部分a,bを形成し、両水平部分
a,bを圧着継手にて接合する。尚、圧着用の鋼製スリ
ーブCは、突出部分μ, 7bの曲げ作業後、いずれか
一方に套嵌しておく。
Then, in the step (■) above, as shown in Figure 6,
Insert the upper end main reinforcement 12 into the hollow part of the precast beam material 5,
Kanzashi hardware installed between the upper surfaces of the precast beams 5 (
(not shown), etc., with these upper end main reinforcements 12 temporarily supported, the long and short protruding portions 7a and 7b facing each other in the beam width direction are bent upwardly of the precast beam material 5, and the horizontal Parts a and b are formed, and both horizontal parts a and b are joined using a crimp joint. Incidentally, the steel sleeve C for crimping is fitted over one of the protruding portions μ, 7b after the bending operation.

次いで、上端主筋12の位置を修正し、上端主筋12と
肋筋7を結束する。
Next, the position of the upper end main reinforcement 12 is corrected, and the upper end main reinforcement 12 and the cost reinforcement 7 are tied together.

しかる後、第7図に示す如く、コンクリート11を打設
して、プレキャスト梁材5と現場打ちコンク!J − 
) 11とが構造的に一体となった合成大梁を構築する
のである。
After that, as shown in Fig. 7, concrete 11 is poured, and precast beams 5 and cast-in-place concrete are placed! J-
) 11 will be constructed into a composite girder that is structurally integrated.

圧着継手には、圧着用の工具及びその作業スペースが必
要であるが、上記の通り、長・短の突出部分7a,7b
を交互に配置したため、圧着継手(スリーブC)の位置
が千鳥状に位置することになり、肋筋7のピッチの割に
、スリーブC両側の間隙を大きくすることができ、圧着
用工具の挿入、操作が容易である。また、コンクリ−)
11の回シが良く、しかも、圧着継手の位置が千鳥状と
なるため強度的なバランスが良く、高品質の合成大梁が
得られるのである。
A crimping joint requires a crimping tool and a working space, but as mentioned above, the long and short protruding parts 7a and 7b are
Since the crimping joints (sleeves C) are arranged alternately, the positions of the crimping joints (sleeves C) are staggered, and the gap on both sides of the sleeve C can be made large in relation to the pitch of the ribs 7, making it easier to insert the crimping tool. , easy to operate. Also, concrete)
11 has good rotation, and the position of the crimp joints is staggered, the strength is well balanced and a high quality composite girder can be obtained.

以上の通り、本発明によれば、肋筋のプレキャスト梁材
上面から突出する部分を夫々内側へ折り、曲げて水平部
分を形成し、両水平部分を圧着継手で接合するので、ス
ラブ厚や梁巾による制約が小さく、しかも、長・短の突
出部分を梁畏手方向において交互に配置したため、圧着
継手の位置が千鳥状となって、肋筋のピッチが小さくて
も、圧着用スリーブ両側に広いスペースを形成でき、圧
着作業が容易であり、また圧着用スリーブの存在にも拘
らず、コンクリートの回シが良く、かつ、継手位置が千
鳥状で強度的なバランスが良く高品質の合成大梁が得ら
れるとの効果がある。
As described above, according to the present invention, the parts of the ribs protruding from the upper surface of the precast beam are folded inward and bent to form horizontal parts, and both horizontal parts are joined with a crimp joint, so that the thickness of the slab can be adjusted. There is less restriction due to width, and since the long and short protruding parts are arranged alternately in the direction of the beam, the crimp joints are placed in a staggered manner, and even if the pitch of the ribs is small, the crimp sleeve can be placed on both sides. A high-quality synthetic girder that can create a wide space, makes crimping work easy, and has good concrete rolling despite the presence of a crimping sleeve, and has a staggered joint position with a good balance of strength. This has the effect of providing.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図0)、(口)は従来例の説明図である。第2図以
降が本発明の実施例を示し、第2図は鉄筋コンクリート
構造体の構築工法の概様を示す斜視図、第3図は柱・太
梁仕口部の概略断面図、第4図はプレキャスト梁材の一
部切欠斜視図、第5図乃至第7図は合成大梁構築手順を
説明する断面図,第8図は要部の平面図である。 5・・・プレキャスト梁材、6・・・下端主筋、7・・
・肋筋、7a,7b・・・突出部分。 第1 (イ) (ロ)
FIG. 1 (0) and (b) are explanatory diagrams of a conventional example. Figure 2 and subsequent figures show examples of the present invention, Figure 2 is a perspective view showing the outline of the construction method of a reinforced concrete structure, Figure 3 is a schematic cross-sectional view of the joint between columns and thick beams, and Figure 4. 5 is a partially cutaway perspective view of a precast beam, FIGS. 5 to 7 are cross-sectional views illustrating the procedure for constructing a composite girder, and FIG. 8 is a plan view of the main part. 5... Precast beam material, 6... Bottom main reinforcement, 7...
・costal muscles, 7a, 7b...protruding parts. 1st (a) (b)

Claims (1)

【特許請求の範囲】[Claims] 下端主筋ならびに上端側が閉塞されていない肋筋を内蔵
した断面路U型のプレキャスト梁材の建方完了後、上端
主筋の配筋ならびに前記肋筋の上端側の閉塞を行ない、
当該プレキャスト梁材を打込み型枠としてコンクリート
を打設し、プレキャスト梁材と現場打ちコンクリートと
が構造的に一体となった合成大梁を構築する方法におい
て、前記プレキャスト梁材として、梁巾方向に溢う水平
部分とその両端から立上った互いに長さを異にする一対
の立上り部分とから成る肋筋が、梁巾方向においてプレ
キャスト梁材上面から突出した部分の長さを互いに異に
し、かつ、梁長子方向においては長い突出部分と短い突
出部分とが交互に位置するように埋設されたものを用い
、梁巾方向に相対向する長・短の突出部分を夫々プレキ
ャスト梁材の上面から同一高さ位置において内側へ折り
曲げて水平部分を形成し、両水平部分を圧着継手にて接
合することを特徴とするU型ブレキャスト梁材を用いた
合成大梁構築方法。
After completing the erection of a precast beam with a U-shaped cross section that incorporates the lower end main reinforcement and the cost reinforcement whose upper end is not closed, the upper end main reinforcement is arranged and the upper end of the cost reinforcement is closed.
In a method of constructing a composite girder in which the precast beam material and cast-in-place concrete are structurally integrated by pouring concrete using the precast beam material as a pouring formwork, the precast beam material may overflow in the beam width direction. A rib consisting of a horizontal portion and a pair of rising portions of different lengths rising from both ends thereof, the lengths of the portions protruding from the top surface of the precast beam material in the beam width direction are different from each other, and , the long protruding parts and short protruding parts are buried alternately in the longitudinal direction of the beam, and the long and short protruding parts facing each other in the beam width direction are placed at the same position from the top surface of the precast beam. A method for constructing a composite girder using U-shaped precast beams, characterized by bending them inward at a height to form a horizontal portion, and joining both horizontal portions with a crimp joint.
JP24056683A 1983-12-19 1983-12-19 Construction of synthetic large beam using u-shaped precast beam material Granted JPS60133146A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24056683A JPS60133146A (en) 1983-12-19 1983-12-19 Construction of synthetic large beam using u-shaped precast beam material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24056683A JPS60133146A (en) 1983-12-19 1983-12-19 Construction of synthetic large beam using u-shaped precast beam material

Publications (2)

Publication Number Publication Date
JPS60133146A true JPS60133146A (en) 1985-07-16
JPS6312987B2 JPS6312987B2 (en) 1988-03-23

Family

ID=17061424

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24056683A Granted JPS60133146A (en) 1983-12-19 1983-12-19 Construction of synthetic large beam using u-shaped precast beam material

Country Status (1)

Country Link
JP (1) JPS60133146A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02144915U (en) * 1989-05-11 1990-12-10
JPH0331621U (en) * 1989-08-04 1991-03-27
JPH05230935A (en) * 1992-02-19 1993-09-07 Kajima Corp Precast concrete beam formwork members
JPH05287759A (en) * 1992-04-03 1993-11-02 Kajima Corp Construction method of reinforced concrete foundation beam
CN102433937A (en) * 2011-12-12 2012-05-02 中冶建工集团有限公司 Precast beam slab connecting structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02144915U (en) * 1989-05-11 1990-12-10
JPH0331621U (en) * 1989-08-04 1991-03-27
JPH05230935A (en) * 1992-02-19 1993-09-07 Kajima Corp Precast concrete beam formwork members
JPH05287759A (en) * 1992-04-03 1993-11-02 Kajima Corp Construction method of reinforced concrete foundation beam
CN102433937A (en) * 2011-12-12 2012-05-02 中冶建工集团有限公司 Precast beam slab connecting structure

Also Published As

Publication number Publication date
JPS6312987B2 (en) 1988-03-23

Similar Documents

Publication Publication Date Title
JPS60133146A (en) Construction of synthetic large beam using u-shaped precast beam material
JP3659911B2 (en) Steel / concrete composite floor slab, construction method thereof, constituent member of the composite floor slab, and bridge using the composite floor slab
CN212002420U (en) Cantilever structure patch board
JPH0248497Y2 (en)
JP2001279853A (en) Synthetic slabs and half precast slabs
CN112832406A (en) Assembled wall body and beam column and nested structure thereof
JPS6198870A (en) Construction method for precast reinforced concrete shear walls
JP2651322B2 (en) Construction method of wall type rigid frame structure
JPH03275839A (en) Connection construction of reinforced concrete column and steel beam
JPH01214641A (en) Construction of steel-pipe precast concrete pole
JPH07252882A (en) Construction method of construction frame
JPS6134468Y2 (en)
JPH0711719A (en) Precast block for aseismatic wall
JP2904648B2 (en) Construction method of earthquake-resistant wall using PC version
JPH02120446A (en) Precast version
JP2000080610A (en) Floor slab connecting structure and execution method thereof
JPH02229337A (en) Concrete pillar construction method
JPH02236328A (en) Construction method for super-highrice building
JPH0688393A (en) Flat plate structure
JPS5853152B2 (en) Joining method in prefabricated construction method
JPS61211435A (en) Long span non-timbering slab construction method
JPH0448136B2 (en)
JP2542279B2 (en) Joining method of main bar in wall type frame method
JPH0738390Y2 (en) Formwork for legal form
JPS626034A (en) Construction of concrete structure