JP3659911B2 - Steel / concrete composite floor slab, construction method thereof, constituent member of the composite floor slab, and bridge using the composite floor slab - Google Patents

Steel / concrete composite floor slab, construction method thereof, constituent member of the composite floor slab, and bridge using the composite floor slab Download PDF

Info

Publication number
JP3659911B2
JP3659911B2 JP2001277528A JP2001277528A JP3659911B2 JP 3659911 B2 JP3659911 B2 JP 3659911B2 JP 2001277528 A JP2001277528 A JP 2001277528A JP 2001277528 A JP2001277528 A JP 2001277528A JP 3659911 B2 JP3659911 B2 JP 3659911B2
Authority
JP
Japan
Prior art keywords
concrete
steel plate
steel
floor slab
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001277528A
Other languages
Japanese (ja)
Other versions
JP2002180420A (en
Inventor
一美 田村
収 中出
伊知郎 増田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2001277528A priority Critical patent/JP3659911B2/en
Publication of JP2002180420A publication Critical patent/JP2002180420A/en
Application granted granted Critical
Publication of JP3659911B2 publication Critical patent/JP3659911B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は鋼・コンクリート合成床版及びその施工方法並びに前記合成床版の構成部材及び前記合成床版を用いた橋梁に関する。
【0002】
【従来の技術】
橋梁の床版を構成する場合、鋼板と鉄筋コンクリートとを合成してなる鋼・コンクリート合成床版が用いられることがある。かかる鋼・コンクリート合成床版としては種々の構成のものが実用化されているが、基本的には鋼板と鉄筋コンクリートとをスタッドなどで合成した構造となっている。また、基本的な施工方法としては、工場において鉄筋やスタッドなどを配設した鋼板を、現場まで搬送して橋梁の主桁上に架設した後、鋼板上にコンクリートを打設して合成床版とする。
【0003】
【発明が解決しようとする課題】
ところが、上記従来の鋼・コンクリート合成床版では、合成前の死荷重保持のため、即ち、鋼板を橋梁の主桁上に架設してコンクリートを打設するときの死荷重(鋼板やコンクリートなどの重量)を支持するために鋼板に多数の補強リブを設けたり形鋼などと組み合わせることによって鋼板を補強する必要があった。このため鋼材重量が大きくなる。しかも、これらの補強鋼材の大部分は打設したコンクリートが硬化した後には鋼・コンクリート合成床版の強度上不要なものとなる。
【0004】
従って、本発明は上記の問題点に鑑み、鋼板上にコンクリートを現場打ちする際の剛性を確保し、且つ、鋼材重量の低減を図ることができる鋼・コンクリート合成床版及びその施工方法並びに前記合成床版の構成部材及び前記合成床版を用いた橋梁を提供することを課題とする。
【0005】
【課題を解決するための手段】
上記課題を解決する第1発明の鋼・コンクリート合成床版の構成部材は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の構成部材であって、
前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備えたものであり、前記コンクリート梁を形成後、橋梁の所定位置に架設されて、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートが後打ちされて合成床版となるものであることを特徴とする。
【0006】
また、第2発明の鋼・コンクリート合成床版は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版であって、
前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備え、その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートを後打ちすることより合成床版としたことを特徴とする。
【0007】
また、第3発明の鋼・コンクリート合成床版の施工方法は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の施工方法であって、
前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備える工程と、
その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートを後打ちすることにより合成床版とする工程とを有することを特徴とする。
【0008】
また、第4発明の鋼・コンクリート合成床版の構成部材は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の構成部材であって、
前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することによって、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備えたことを特徴とする。
【0009】
また、第5発明の鋼・コンクリート合成床版は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版であって、
前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することによって、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備え、その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分及び前記コンクリート梁の上にコンクリートを後打ちすることより合成床版としたことを特徴とする。
【0010】
また、第6発明の鋼・コンクリート合成床版の施工方法は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の施工方法であって、
前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することにより、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備える工程と、
その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分及び前記コンクリート梁の上にコンクリートを後打ちすることにより合成床版とする工程とを有することを特徴とする。
【0011】
また、第7発明の鋼・コンクリート合成床版は、第2又は第5発明の鋼・コンクリート合成床版において、
前記鋼板に補強リブを設けないリブレス構造であることを特徴とする。
【0012】
また、第8発明の橋梁は、第2,第5又は第7発明の鋼・コンクリート合成床版を複数枚接合することにより、橋梁の床版を構成してなることを特徴とする。
【0013】
【発明の実施の形態】
以下、本発明の実施の形態を図面に基づき詳細に説明する。
【0014】
<実施の形態1>
図1は本発明の実施1の形態に係る橋梁の横断面図、図2は前記橋梁の床版を構成する鋼・コンクリート合成床版の斜視図、図3は図1のA−A線矢視断面図、図4は図2のB−B線矢視断面拡大図、図5〜図12は本発明の実施の形態1に係る鋼・コンクリート合成床版の施工方法を示す説明図である。
【0015】
図1において、左右方向が橋梁1の幅方向(路面の幅員方向)、紙面と直交する方向が橋梁1の軸方向であり、この橋梁1の幅は10m程度である。図1に示すように、橋梁1は主桁2の上に多数の鋼・コンクリート合成床版3を接合してなる床版を設け、この床版の表面にアスファルト舗装部4を設けた構成となっている。
【0016】
図2〜図4に示すように、鋼・コンクリート合成床版3は、厚さが8mm程度の鋼板5と、鋼板5の表面にコンクリートのずれ止め部材として突設された多数の鋼製のスタッド8と、鋼板5の上方に配設された鉄筋(主筋6及び配力筋7)と、鋼板5上に打設されたコンクリート10とを有してなるオープンサンドイッチ構造のものである。但し、実際にはコンクリート梁部分(詳細後述)以外にもコンクリートが打設されているが、このコンクリート梁部分以外のコンクリートの図示は省略している。つまり、図2〜図4には現場でコンクリートを打設して鋼・コンクリート合成床版3を形成する前の構成部材の構造を示している。
【0017】
この鋼・コンクリート合成床版の構成部材の構造は、図2〜図4に示すように、鋼板5上に打設すべきコンクリートの一部を工場などにて先行打設することにより、この先行打設したコンクリート10と鉄筋6,7の一部と鋼板5の一部とを有してなるコンクリート梁(鉄筋コンクリートの梁)11、即ち、鉄筋コンクリートと鋼板とからなるRCH(Reinforced Concrete Hybrid) 梁11を鋼板5の幅方向(橋梁の幅方向)に沿って2本平行に形成し、このコンクリート梁11を合成前死荷重保持のための鋼板補強材として備えた構造となっている。
【0018】
そして、この鋼・コンクリート合成床版の構成部材を橋梁1の主桁2上に架設した後、鋼板5上のコンクリート梁11が設けられていない部分にコンクリートを後打ち(現場打ち)することにより、鋼・コンクリート合成床版3が形成される。なお、施工方法の詳細については後述する。
【0019】
鋼・コンクリート合成床版3は、その1枚のパネル幅(橋梁の幅方向の長さ)が10m程度であり、1枚のパネル長さ(橋梁の軸方向の長さ)が2mである。この鋼・コンクリート合成床版3を、図3に示すようにパネル接合部12において橋梁1の軸方向に多数接合することにより、橋梁1の床版が形成される。なお、鋼・コンクリート合成床版としては橋梁の軸方向だけでなく、橋梁の幅方向にも分割される場合もある。
【0020】
ここで、図5〜図10に基づき、鋼・コンクリート合成床版の施工方法について詳述する。なお、これらの図に例示する鋼・コンクリート合成床版3は橋梁の幅方向にも2分割されたものであり、1枚のパネル幅が8.5m、1枚のパネル長さが2.5mのものである。図5〜図8は工場での施工作業であり、図9及び図10は橋梁建設現場での施工作業である。
【0021】
(1)まず、図5に示すように厚さ8mm程度の鋼板5を曲げ加工する。このとき鋼板5は自立が困難であるため、鋼板5の下に支持具を設けるなどの適宜の支持手段により鋼板5を支持する必要がある。このときの全重量は約1tonである。
【0022】
(2)続いて、図6に示すように鋼板5の表面に多数のスタッド8を溶接により突設する。このときの全重量は約1.2tonである。このときにも自立は困難であるため、適宜の支持手段により鋼板5を支持する必要がある。
【0023】
(3)次に、図7(a)及び(b)((a)のC−C線矢視断面図)に示すように、鋼板5の上方に鉄筋(主筋6及び配力筋7)を配設する。主筋6と配力筋7は直交するように配設され、また、主筋6の一端側はループ状に形成されて鋼板5に溶接されており、このループ継手において橋梁の幅方向に隣接する対称形状の他の鋼・コンクリート合成床版と結合される。
【0024】
そして、鋼板5上に打設すべきコンクリートの一部を工場で先行打設することにより、この先行打設したコンクリート10と鉄筋(主筋6及び配力筋7)の一部と鋼板5の一部とを有してなるコンクリート梁(RCH梁)11を鋼板5の幅方向(橋梁の幅方向)に沿って2本平行に形成し、このコンクリート梁11を合成前死荷重保持のための鋼板補強材として備える。なお、コンクリート梁11の1本の幅(橋梁の軸方向長さ)は0.3mである。かかる鋼・コンクリート合成床版の構成部材の全重量は約4.4tonである。この場合、コンクリート10を先行打設する間は自立が困難であるため適宜の支持手段により鋼板5を支持する必要があるが、先行打設したコンクリート10が硬化した後はコンクリート梁11によって十分な剛性が得られるため、鋼板5は自立が可能となる。
【0025】
(4)先行打設したコンクリート10が硬化した後、図8に矢印で示すように鋼・コンクリート合成床版の構成部材をハンドリングする。そして、適宜の搬送手段により、この鋼・コンクリート合成床版の構成部材を橋梁の建設現場まで搬送する。
【0026】
(5)橋梁建設現場では、図9に示すように、上記の鋼・コンクリート合成床版の構成部材を橋梁の主桁2上に架設する。
【0027】
(6)そして、図10(a)及び(b)((a)のD−D矢視断面図)に示すように、鋼板5上のコンクリート梁11が設けられていない部分にコンクリート13を後打ち(現場打ち)することより、鋼・コンクリート合成床版3を形成する。このとき、鋼板5などの構成部材には後打ちのコンクリート13も含めた全重量(約15ton)が作用するが、コンクリート10の先行打設により、コンクリート梁11を鋼板補強材として設けているため、鋼板5に補強リブを設けることなく、このときの合成前(後打ちコンクリート13の硬化前)死荷重を保持することができる。
【0028】
つまり、鋼・コンクリート合成床版3はコンクリート梁11を設けることにより、鋼板5に補強リブを全く設けないリブレス構造となっている。なお、所望の強度などによっては補強リブを設ける場合も考えられるが、この場合にも、鋼板にコンクリート梁を設けることにより、ごく僅かな量の補強リブを鋼板に設けるだけでよい。
【0029】
以上のように、本実施の形態1によれば、鋼板5上に打設すべきコンクリートの一部を先行打設することにより、この先行打設したコンクリート10と鉄筋6,7の一部と鋼板5の一部とを有してなるコンクリート梁11を形成し、このコンクリート梁11を合成前死荷重保持のための鋼板補強材として備えることにより、後打ちコンクリートの硬化後に不要となるような補強リブなどの補強鋼材を全く或いはごく僅かしか設ける必要がないため、従来に比べて鋼材重量を大幅に低減することができる。
【0030】
[表1]には本発明の鋼・コンクリート合成床版3の鋼材重量と従来の主な鋼・コンクリート合成床版の鋼材重量との比較を示す。この[表1]からも明らかなように、本発明の鋼・コンクリート合成床版3は、従来の鋼・コンクリート合成床版A〜Eに比べて大幅に鋼材重量が低減されている。従って、補強鋼材の設置作業がなくなり或いは大幅に低減され、また、現場でのコンクリート打ち作業も低減されることから、施工性も向上する。
【0031】
【表1】

Figure 0003659911
【0032】
このため、鋼・コンクリート合成床版3は従来の鋼・コンクリート合成床版に比べて低コストとなり、また、ひいてはこの鋼・コンクリート合成床版3を複数枚接合して橋梁の床版を構成することにより、橋梁のコスト低減なども図ることができる。
【0033】
<実施の形態2>
図11は本発明の実施の形態2に係る鋼・コンクリート合成床版の構成部材の断面図、図12は本発明の実施の形態2に係る鋼・コンクリート合成床版の断面図である。なお、図11及び図12は上記実施の形態1の図4及び図10(b)に相当する図である。
【0034】
図11及び図12に示すように、鋼板5の表面にはコンクリートのずれ止め部材としてスタッド8が立設され、且つ、2本のコンクリート梁11が配設されている。これら2本のコンクリート梁11は図11及び図12の紙面と直交する方向(橋梁の幅方向)に平行に延びている。この点は上記実施の形態1と同様である。
【0035】
しかし、本実施の形態2では上記実施の形態1に比べてコンクリート梁11の高さを低くしている。即ち、本実施の形態2における鋼・コンクリート合成床版の構成部材の構造は、鋼板5の上方で且つ鉄筋(主筋6及び配力筋7)よりも低い位置に架設時鉄筋21を配設し、鋼板5上に打設すべきコンクリートの一部(コンクリート10)を架設時鉄筋21の位置付近まで先行打設することによって、この先行打設したコンクリート10と架設時鉄筋21と鋼板5の一部とを有してなり且つ高さd1 が完成後の合成床版の厚さd2 よりも低いコンクリート梁(鉄筋コンクリートの梁)11を形成し、このコンクリート梁11を合成前死荷重保持のための鋼板補強材として備えた構造となっている。この構成部材の施工作業は工場で行うことができる。
【0036】
そして、この構成部材を橋梁建設現場まで搬送して橋梁の所定位置(主桁上)に架設した後、鋼板5上のコンクリート梁11が設けられていない部分(コンクリート梁11の側方)及びコンクリート梁11の上にコンクリート13を後打ち(現場打ち)することにより、鋼・コンクリート合成床版3を形成している。この場合、主筋6及び配力筋7は、構成部材を架設後、現場にて鋼板5の上方(コンクリート梁11の上方)に配設する。その後、この主筋6及び配力筋7の位置付近までコンクリート13を後打ちする。
【0037】
従って、本実施の形態2によれば、上記実施の形態1と同様の効果が得られ、しかも、上記実施の形態1に比べて次のような効果が得られる。
【0038】
即ち、上記実施の形態1では架設時に必要な剛性を、完成後の合成床版の厚さを高さ(梁せい)とするコンクリート梁11によって確保している(図10(b)参照)。つまり、完成後の合成床版の厚さとコンクリート梁11の高さとが同じになっている。このため、工場で打設するコンクリート10と現場で打設するコンクリート13の打継ぎ部が床版表面(打設したコンクリートの表面)に存在する。また、コンクリート梁11の位置を考慮して主筋6や配力筋7を配設する必要があるため、配筋上の制約がある。更には、床版表面の横断勾配や縦断勾配に応じて、コンクリート梁11の表面の勾配を設定する必要があるため、コンクリート梁の施工が面倒である。
【0039】
これに対して本実施の形態2では鉄筋(主筋6及び配力筋7)の下方に架設時鉄筋21を設けて、この架設時鉄筋21の位置付近までコンクリートを先行打設するとにより、コンクリート梁11の高さd1 を完成後の合成床版の厚さd2 よりも低くしており、このコンクリート梁11の上にもコンクリート13を後打ちするため、図12に示すように完成後の合成床版の表面3aが全面的に後打ちしたコンクリート13の表面となる。このため、打設したコンクリート10,13の打継ぎ部が床版表面3aに出ない。また、配筋上の制約もない。即ち、主筋6や配力筋7は、架設後に現場で自由に設置することができる。更には、床版表面3aの横断勾配や縦断勾配は、コンクリート梁11に関係なく現場で自由に調整することができる。
【0040】
なお、この実施の形態2と比較した場合、上記実施の形態1ではコンクリート梁の形成に架設時鉄筋を要しないため、その分、本実施の形態2よりも更に鋼材量を少なくすることができるという利点を有している。
【0041】
また、上記実施の形態1,2では1枚のパネル(鋼・コンクリート合成床版)に対して2本のコンクリート梁を設けているが、必ずしもこれに限定するものではなく、パネルの大きさ等、必要に応じて適宜コンクリート梁の本数を変更してもよい。
【0042】
【発明の効果】
以上、発明の実施の形態とともに具体的に説明したように、第1発明の鋼・コンクリート合成床版の構成部材は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の構成部材であって、前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備えたものであり、前記コンクリート梁を形成後、橋梁の所定位置に架設されて、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートが後打ちされて合成床版となるものであることを特徴とする。
【0043】
また、第2発明の鋼・コンクリート合成床版は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版であって、前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備え、その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートを後打ちすることより合成床版としたことを特徴とする。
【0044】
また、第3発明の鋼・コンクリート合成床版の施工方法は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の施工方法であって、前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備える工程と、その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートを後打ちすることにより合成床版とする工程とを有することを特徴とする。
【0045】
従って、これら第1発明の鋼・コンクリート合成床版の構成構造、第2発明の鋼・コンクリート合成床版、又は、第3発明の鋼・コンクリート合成床版の施工方法によれば、鋼板上に打設すべきコンクリートの一部を先行打設することにより、この先行打設したコンクリートと鉄筋の一部と鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備えることにより、後打ちコンクリートの硬化後に不要となるような補強リブなどの補強鋼材を全く或いはごく僅かしか設ける必要がないため、従来に比べて鋼材重量を大幅に低減することができる。このため、鋼・コンクリート合成床版は従来の鋼・コンクリート合成床版に比べて低コストとなる。
【0046】
また、第4発明の鋼・コンクリート合成床版の構成部材は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の構成部材であって、前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することによって、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備えたことを特徴とする。
【0047】
また、第5発明の鋼・コンクリート合成床版は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版であって、前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することによって、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備え、その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分及び前記コンクリート梁の上にコンクリートを後打ちすることより合成床版としたことを特徴とする。
【0048】
また、第6発明の鋼・コンクリート合成床版の施工方法は、鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の施工方法であって、前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することにより、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備える工程と、その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分及び前記コンクリート梁の上にコンクリートを後打ちすることにより合成床版とする工程とを有することを特徴とする。
【0049】
従って、これら第4発明の鋼・コンクリート合成床版の構成構造、第5発明の鋼・コンクリート合成床版、又は、第6発明の鋼・コンクリート合成床版の施工方法によれば、上記第1,第2又は第発明と同様の効果が得られ、しかも、鉄筋(主筋や配力筋など)の下方に架設時鉄筋を設けて、この架設時鉄筋の位置付近までコンクリートを先行打設するとにより、コンクリート梁の高さを完成後の合成床版の厚さよりも低くしており、このコンクリート梁の上にもコンクリートを後打ちするため、完成後の合成床版の表面が全面的に後打ちしたコンクリートの表面となる。このため、打設したコンクリートの打継ぎ部が床版表面に出ない。また、配筋上の制約もない。更には、床版表面の横断勾配や縦断勾配は、コンクリート梁に関係なく現場で自由に調整することができる。
【0050】
また、第7発明の鋼・コンクリート合成床版は、第2又は第5発明の鋼・コンクリート合成床版において、前記鋼板に補強リブを設けないリブレス構造であることを特徴とする。
【0051】
従って、この第7発明の鋼・コンクリート合成床版によれば、リブレス構造であるため、特に鋼材重量の低減効果が大きい。
【0052】
また、第8発明の橋梁は、第2,第5又は第7発明の鋼・コンクリート合成床版を複数枚接合することにより、橋梁の床版を構成してなることを特徴とする。
【0053】
従って、この第8発明の橋梁によれば、第2,第5又は第7発明の鋼・コンクリート合成床版を複数枚接合して橋梁の床版を構成することにより、橋梁のコスト低減などを図ることができる。
【図面の簡単な説明】
【図1】本発明の実施の形態1に係る橋梁の横断面図である。
【図2】前記橋梁の床版を構成する鋼・コンクリート合成床版の斜視図である。
【図3】図1のA−A線矢視断面図である。
【図4】図2のB−B線矢視断面拡大図である。
【図5】本発明の実施の形態1に係る鋼・コンクリート合成床版の施工方法を示す説明図である。
【図6】本発明の実施の形態1に係る鋼・コンクリート合成床版の施工方法を示す説明図である。
【図7】本発明の実施の形態1に係る鋼・コンクリート合成床版の施工方法を示す説明図である。
【図8】本発明の実施の形態1に係る鋼・コンクリート合成床版の施工方法を示す説明図である。
【図9】本発明の実施の形態1に係る鋼・コンクリート合成床版の施工方法を示す説明図である。
【図10】本発明の実施の形態1に係る鋼・コンクリート合成床版の施工方法を示す説明図である。
【図11】本発明の実施の形態2に係る鋼・コンクリート合成床版の構成部材の断面図である。
【図12】本発明の実施の形態2に係る鋼・コンクリート合成床版の断面図である。
【符号の説明】
1 橋梁
2 主桁
3 鋼・コンクリート合成床版
3a 床版表面
4 アスファルト舗装部
5 鋼板
6 主筋
7 配力筋
8 スタッド
10 先行打設したコンクリート
11 コンクリート梁
12 パネル接合部
13 後打ちしたコンクリート
21 架設時鉄筋[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a steel / concrete composite floor slab, a construction method thereof, a component of the composite floor slab, and a bridge using the composite floor slab.
[0002]
[Prior art]
When constructing a bridge slab, a steel / concrete composite slab composed of a steel plate and reinforced concrete may be used. Such steel / concrete composite floor slabs have been put into practical use, but basically have a structure in which steel plates and reinforced concrete are combined with studs. Also, as a basic construction method, steel plates with reinforcing bars and studs installed at the factory are transported to the site and installed on the main girder of the bridge, and then concrete is placed on the steel plates and composite floor slabs. And
[0003]
[Problems to be solved by the invention]
However, in the above conventional steel / concrete composite slab, the dead load is maintained in order to maintain the dead load before synthesis, that is, when the concrete is placed by placing the steel plate on the main girder of the bridge (such as steel plate or concrete). In order to support (weight), it was necessary to reinforce the steel plate by providing a number of reinforcing ribs on the steel plate or combining it with a shape steel or the like. For this reason, steel material weight becomes large. Moreover, most of these reinforced steel materials are unnecessary in terms of the strength of the steel / concrete composite slab after the cast concrete has hardened.
[0004]
Therefore, in view of the above-mentioned problems, the present invention secures the rigidity when hitting concrete on a steel sheet in the field, and can reduce the weight of the steel and concrete, and its construction method and the above-mentioned construction method It is an object of the present invention to provide a structural member of a composite floor slab and a bridge using the composite floor slab.
[0005]
[Means for Solving the Problems]
The constituent members of the steel / concrete composite slab of the first invention for solving the above problems are a steel plate, a concrete slip-preventing member projecting on the surface of the steel plate, a reinforcing bar disposed above the steel plate, A structural member of a steel / concrete composite slab for a bridge slab having concrete placed on a steel plate,
By placing a part of the concrete to be placed on the steel plate in advance, a concrete beam having the concrete placed in advance, a part of the reinforcing bar and a part of the steel plate is formed. This concrete beam is provided as a steel plate reinforcement for holding dead load before synthesis. After the concrete beam is formed, the bridge is installed at a predetermined position of the bridge, and the concrete is post-cast on the portion of the steel plate where the concrete beam is not provided to form a composite floor slab. It is characterized by that.
[0006]
Further, the steel / concrete composite slab of the second invention is a steel plate, a concrete slip-preventing member projecting on the surface of the steel plate, a reinforcing bar disposed above the steel plate, and placed on the steel plate. A steel / concrete composite slab for a bridge slab comprising concrete,
By placing a part of the concrete to be placed on the steel plate in advance, a concrete beam having the concrete placed in advance, a part of the reinforcing bar and a part of the steel plate is formed. This concrete beam is provided as a steel plate reinforcement for holding the pre-synthesis dead load, and then the steel / concrete composite floor slab is installed at a predetermined position on the bridge to provide the concrete beam on the steel plate. It is characterized in that it is a composite slab by post-casting concrete to the unfinished part.
[0007]
Moreover, the construction method of the steel / concrete composite slab of the third invention includes a steel plate, a concrete slip-off member protruding from the surface of the steel plate, a reinforcing bar disposed above the steel plate, and the steel plate. It is a construction method of a steel / concrete composite slab for a bridge slab having concrete placed,
By placing a part of the concrete to be placed on the steel plate in advance, a concrete beam having the concrete placed in advance, a part of the reinforcing bar and a part of the steel plate is formed. , A step of providing this concrete beam as a steel plate reinforcement for holding a dead load before synthesis,
Then, constructing the steel / concrete composite floor slab at a predetermined position of the bridge, and post-casting the concrete on the steel plate where the concrete beam is not provided, It is characterized by having.
[0008]
Moreover, the structural members of the steel / concrete composite slab of the fourth invention are a steel plate, a concrete slip-preventing member projecting from the surface of the steel plate, a reinforcing bar disposed above the steel plate, and the steel plate. It is a structural member of a steel / concrete composite slab for a bridge slab having a cast concrete,
By placing the reinforcing bar at the position above the steel plate and lower than the reinforcing bar, by placing a part of the concrete to be placed on the steel plate up to the vicinity of the position of the reinforcing bar at the time of installation, A concrete beam is formed which has the concrete placed in advance, the reinforcing bar at the time of erection, and a part of the steel plate, and whose height is lower than the thickness of the composite floor slab after completion. It is provided as a steel plate reinforcement for holding dead loads.
[0009]
Further, the steel / concrete composite slab of the fifth invention is a steel plate, a concrete slip-off member protruding from the surface of the steel plate, a reinforcing bar disposed above the steel plate, and placed on the steel plate. A steel / concrete composite slab for a bridge slab comprising concrete,
By placing the reinforcing bar at the position above the steel plate and lower than the reinforcing bar, by placing a part of the concrete to be placed on the steel plate up to the vicinity of the position of the reinforcing bar at the time of installation, A concrete beam is formed which has the concrete placed in advance, the reinforcing bar at the time of erection, and a part of the steel plate, and whose height is lower than the thickness of the composite floor slab after completion. It is provided as a steel plate reinforcement for holding dead load, and then the steel / concrete composite floor slab is erected at a predetermined position of the bridge, and the portion of the steel plate not provided with the concrete beam and the concrete It is characterized by a composite floor slab by post-casting concrete on the beam.
[0010]
Moreover, the construction method of the steel / concrete composite slab of the sixth invention includes a steel plate, a concrete slip-preventing member protruding from the surface of the steel plate, a reinforcing bar disposed above the steel plate, and the steel plate. It is a construction method of a steel / concrete composite slab for a bridge slab having concrete placed,
By placing the reinforcing bar at the position above the steel plate and lower than the reinforcing bar, by placing a part of the concrete to be placed on the steel plate up to the vicinity of the position of the reinforcing bar at the time of installation, A concrete beam is formed which has the concrete placed in advance, the reinforcing bar at the time of erection, and a part of the steel plate, and whose height is lower than the thickness of the composite floor slab after completion. Providing as a steel plate reinforcement for holding dead loads,
After that, the steel / concrete composite floor slab components are installed at a predetermined position of the bridge, and the concrete is post-placed on the part where the concrete beam is not provided on the steel plate and on the concrete beam. And a step of making a floor slab.
[0011]
The steel / concrete composite floor slab of the seventh invention is the steel / concrete composite floor slab of the second or fifth invention,
The steel plate has a ribless structure in which no reinforcing rib is provided.
[0012]
The bridge of the eighth invention is characterized in that a bridge slab is formed by joining a plurality of steel / concrete composite slabs of the second, fifth or seventh invention.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0014]
<Embodiment 1>
1 is a cross-sectional view of a bridge according to a first embodiment of the present invention, FIG. 2 is a perspective view of a steel / concrete composite slab constituting the floor slab of the bridge, and FIG. 3 is an arrow AA line in FIG. 4 is an enlarged cross-sectional view taken along the line B-B in FIG. 2, and FIGS. 5 to 12 are explanatory diagrams illustrating a method for constructing the steel / concrete composite deck according to Embodiment 1 of the present invention. .
[0015]
In FIG. 1, the left-right direction is the width direction of the bridge 1 (the width direction of the road surface), and the direction orthogonal to the paper surface is the axial direction of the bridge 1. The width of the bridge 1 is about 10 m. As shown in FIG. 1, a bridge 1 is provided with a floor slab formed by joining a number of steel / concrete composite floor slabs 3 on a main girder 2, and an asphalt pavement 4 is provided on the surface of the floor slab. It has become.
[0016]
As shown in FIGS. 2 to 4, the steel / concrete composite floor slab 3 is composed of a steel plate 5 having a thickness of about 8 mm, and a number of steel studs protruding on the surface of the steel plate 5 as concrete slip-off members. 8, an open sandwich structure having reinforcing bars (main bars 6 and distribution bars 7) disposed above the steel plate 5 and concrete 10 placed on the steel plate 5. However, concrete is actually placed in addition to the concrete beam portion (described later in detail), but illustration of the concrete other than the concrete beam portion is omitted. That is, FIG. 2 to FIG. 4 show the structure of the constituent members before the concrete is placed on site to form the steel / concrete composite floor slab 3.
[0017]
As shown in FIGS. 2 to 4, the structure of the steel / concrete composite slab is constructed by placing a part of concrete to be placed on the steel plate 5 in advance at a factory or the like. A concrete beam (reinforced concrete beam) 11 having a cast concrete 10, a part of reinforcing bars 6 and 7 and a part of a steel plate 5, that is, an RCH (Reinforced Concrete Hybrid) beam 11 made of reinforced concrete and a steel plate. Are formed in parallel along the width direction of the steel plate 5 (the width direction of the bridge), and the concrete beam 11 is provided as a steel plate reinforcing material for holding a pre-synthesis dead load.
[0018]
Then, after constructing the steel / concrete composite floor slab on the main girder 2 of the bridge 1, the concrete is post-placed (on-site) on the part of the steel plate 5 where the concrete beam 11 is not provided. A steel / concrete composite floor slab 3 is formed. Details of the construction method will be described later.
[0019]
The steel / concrete composite floor slab 3 has a panel width (length in the width direction of the bridge) of about 10 m and a panel length (length in the axial direction of the bridge) of 2 m. The steel / concrete composite floor slab 3 is joined together in the axial direction of the bridge 1 at the panel joint 12 as shown in FIG. The steel / concrete composite slab may be divided not only in the axial direction of the bridge but also in the width direction of the bridge.
[0020]
Here, based on FIGS. 5-10, the construction method of a steel and concrete synthetic slab is explained in full detail. In addition, the steel / concrete composite slab 3 illustrated in these figures is divided into two in the width direction of the bridge. One panel width is 8.5 m, and one panel length is 2.5 m. belongs to. 5 to 8 show construction work at a factory, and FIGS. 9 and 10 show construction work at a bridge construction site.
[0021]
(1) First, as shown in FIG. 5, a steel plate 5 having a thickness of about 8 mm is bent. At this time, since the steel plate 5 is difficult to stand by itself, it is necessary to support the steel plate 5 by appropriate support means such as providing a support under the steel plate 5. The total weight at this time is about 1 ton.
[0022]
(2) Subsequently, as shown in FIG. 6, a large number of studs 8 are protruded from the surface of the steel plate 5 by welding. The total weight at this time is about 1.2 ton. At this time, it is difficult to stand on its own, so it is necessary to support the steel plate 5 by appropriate support means.
[0023]
(3) Next, as shown in FIGS. 7A and 7B (cross-sectional view taken along the line CC in FIG. 7A), the reinforcing bars (the main reinforcement 6 and the distribution reinforcement 7) are disposed above the steel plate 5. Arrange. The main reinforcing bars 6 and the distribution bars 7 are arranged so as to be orthogonal to each other, and one end side of the main reinforcing bars 6 is formed in a loop shape and welded to the steel plate 5. In this loop joint, the symmetry adjacent to the width direction of the bridge is provided. Combined with other steel / concrete composite slabs in shape.
[0024]
Then, a part of the concrete to be placed on the steel plate 5 is placed in advance at the factory, whereby a part of the concrete 10 and the reinforcing bars (the main reinforcement 6 and the distribution reinforcement 7) placed in advance and one of the steel plates 5 are placed. Are formed in parallel along the width direction of the steel plate 5 (the width direction of the bridge), and the concrete beam 11 is a steel plate for holding a pre-synthesis dead load. Provide as a reinforcing material. Note that the width of one concrete beam 11 (the length in the axial direction of the bridge) is 0.3 m. The total weight of the components of such a steel / concrete composite deck is about 4.4 tonnes. In this case, since it is difficult to stand independently while the concrete 10 is placed in advance, it is necessary to support the steel plate 5 with an appropriate support means. However, the concrete beam 11 is sufficient after the concrete 10 placed in advance is cured. Since rigidity is obtained, the steel plate 5 can be self-supporting.
[0025]
(4) After the concrete 10 placed in advance is hardened, the structural members of the steel / concrete composite slab are handled as shown by arrows in FIG. And the structural member of this steel and concrete composite slab is conveyed to the construction site of a bridge with a suitable conveyance means.
[0026]
(5) At the bridge construction site, as shown in FIG. 9, the steel / concrete composite floor slab members are installed on the main girder 2 of the bridge.
[0027]
(6) Then, as shown in FIGS. 10 (a) and 10 (b) (cross-sectional view taken along line DD in FIG. 10 (a)), the concrete 13 is placed on the portion of the steel plate 5 where the concrete beam 11 is not provided. The steel / concrete composite floor slab 3 is formed by hitting (on-site hitting). At this time, the total weight (about 15 tons) including the post-cast concrete 13 acts on the constituent members such as the steel plate 5, but the concrete beam 11 is provided as a steel plate reinforcement by the prior placement of the concrete 10. The dead load before synthesis (before hardening of the post-cast concrete 13) can be maintained without providing reinforcing ribs on the steel plate 5.
[0028]
That is, the steel / concrete composite floor slab 3 has a ribless structure in which the steel plate 5 is not provided with any reinforcing ribs by providing the concrete beam 11. Although it is conceivable to provide reinforcing ribs depending on the desired strength or the like, in this case as well, only a very small amount of reinforcing ribs need be provided on the steel sheet by providing concrete beams on the steel sheet.
[0029]
As described above, according to the first embodiment, by placing a part of the concrete to be placed on the steel plate 5 in advance, the concrete 10 and the parts of the reinforcing bars 6 and 7 that have been placed in advance are By forming a concrete beam 11 having a part of the steel plate 5 and providing the concrete beam 11 as a steel plate reinforcing material for holding a pre-synthesis dead load, it becomes unnecessary after hardening the post-cast concrete. Since it is not necessary to provide a reinforcing steel material such as a reinforcing rib at all or very little, the weight of the steel material can be greatly reduced as compared with the prior art.
[0030]
[Table 1] shows a comparison between the steel material weight of the steel / concrete composite floor slab 3 of the present invention and the steel material weight of the conventional main steel / concrete composite floor slab. As is clear from this [Table 1], the steel / concrete composite floor slab 3 of the present invention has the steel material weight significantly reduced as compared with the conventional steel / concrete composite floor slabs A to E. Therefore, the installation work of the reinforcing steel material is eliminated or greatly reduced, and the concrete placing work on site is also reduced, so that the workability is improved.
[0031]
[Table 1]
Figure 0003659911
[0032]
For this reason, the steel / concrete composite floor slab 3 is lower in cost than the conventional steel / concrete composite floor slab, and as a result, a plurality of the steel / concrete composite floor slabs 3 are joined to form a bridge floor slab. Therefore, it is possible to reduce the cost of the bridge.
[0033]
<Embodiment 2>
FIG. 11 is a cross-sectional view of structural members of a steel / concrete composite floor slab according to Embodiment 2 of the present invention, and FIG. 12 is a cross-sectional view of a steel / concrete composite floor slab according to Embodiment 2 of the present invention. 11 and 12 are diagrams corresponding to FIGS. 4 and 10B of the first embodiment.
[0034]
As shown in FIGS. 11 and 12, a stud 8 is erected on the surface of the steel plate 5 as a concrete slip prevention member, and two concrete beams 11 are arranged. These two concrete beams 11 extend in parallel to a direction (the width direction of the bridge) orthogonal to the paper surface of FIGS. 11 and 12. This is the same as in the first embodiment.
[0035]
However, in the second embodiment, the height of the concrete beam 11 is made lower than that in the first embodiment. That is, the structure of the structural members of the steel / concrete composite floor slab according to the second embodiment is such that the rebar 21 is installed at a position above the steel plate 5 and lower than the reinforcing bars (the main reinforcement 6 and the distribution reinforcement 7). A part of the concrete (concrete 10) to be placed on the steel plate 5 is placed in advance up to the vicinity of the position of the reinforcing bar 21 at the time of construction. And has a height d 1 The thickness d of the composite floor slab after completion 2 A lower concrete beam (reinforced concrete beam) 11 is formed, and the concrete beam 11 is provided as a steel plate reinforcing material for holding a pre-synthesis dead load. The construction work of this component can be performed at the factory.
[0036]
And after conveying this structural member to a bridge construction site and erection it at a predetermined position (on the main girder) of the bridge, a portion of the steel plate 5 where the concrete beam 11 is not provided (side of the concrete beam 11) and concrete A steel / concrete composite floor slab 3 is formed by post-casting (in-situ) concrete 13 on the beam 11. In this case, the main reinforcement 6 and the distribution reinforcement 7 are disposed above the steel plate 5 (above the concrete beam 11) at the site after the constituent members are installed. Thereafter, the concrete 13 is post-placed to the vicinity of the positions of the main reinforcement 6 and the distribution reinforcement 7.
[0037]
Therefore, according to the second embodiment, the same effects as those of the first embodiment can be obtained, and the following effects can be obtained as compared with the first embodiment.
[0038]
That is, in Embodiment 1 described above, the rigidity required at the time of erection is ensured by the concrete beam 11 in which the thickness of the composite floor slab after completion is the height (because of the beam) (see FIG. 10B). That is, the thickness of the composite floor slab after completion and the height of the concrete beam 11 are the same. For this reason, the joint part of the concrete 10 cast in a factory and the concrete 13 cast in the field exists in the floor slab surface (surface of the cast concrete). Moreover, since it is necessary to arrange the main reinforcement 6 and the distribution bar 7 in consideration of the position of the concrete beam 11, there is a restriction on the arrangement. Furthermore, since it is necessary to set the gradient of the surface of the concrete beam 11 according to the transverse gradient and longitudinal gradient of the floor slab surface, the construction of the concrete beam is troublesome.
[0039]
On the other hand, in the second embodiment, the reinforcing bar 21 is provided below the reinforcing bars (the main reinforcing bar 6 and the distribution bar 7), and the concrete is pre-placed to the vicinity of the position of the reinforcing bar 21 at the time of installation. 11 height d 1 The thickness d of the finished composite floor slab 2 Since the concrete 13 is post-placed on the concrete beam 11 as well, the surface 3a of the finished composite slab as shown in FIG. Become. For this reason, the joint portion of the placed concrete 10, 13 does not come out on the floor slab surface 3a. In addition, there are no restrictions on the bar arrangement. That is, the main muscle 6 and the distribution bar 7 can be freely installed at the site after erection. Furthermore, the transverse gradient and longitudinal gradient of the floor slab surface 3a can be freely adjusted at the site regardless of the concrete beam 11.
[0040]
In addition, when compared with the second embodiment, in the first embodiment, since a reinforcing bar is not required for the formation of the concrete beam, the amount of steel material can be further reduced as compared with the second embodiment. Has the advantage.
[0041]
In the first and second embodiments, two concrete beams are provided for one panel (steel / concrete composite floor slab). However, the present invention is not necessarily limited to this, and the size of the panel, etc. The number of concrete beams may be changed as necessary.
[0042]
【The invention's effect】
As described above in detail with the embodiment of the invention, the structural members of the steel / concrete composite floor slab of the first invention are a steel plate, a concrete slip-preventing member protruding from the surface of the steel plate, A structural member of a steel / concrete composite slab for a bridge floor slab having a reinforcing bar disposed above a steel plate and concrete placed on the steel plate, and should be placed on the steel plate By placing a part of the concrete in advance, a concrete beam having the concrete placed in advance, a part of the reinforcing bar, and a part of the steel plate is formed. It is provided as a steel plate reinforcement for load retention. After the concrete beam is formed, the bridge is installed at a predetermined position of the bridge, and the concrete is post-cast on the portion of the steel plate where the concrete beam is not provided to form a composite floor slab. It is characterized by that.
[0043]
Further, the steel / concrete composite slab of the second invention is a steel plate, a concrete slip prevention member protruding on the surface of the steel plate, a reinforcing bar disposed above the steel plate, and placed on the steel plate. A steel / concrete composite slab for a bridge floor slab comprising concrete, and by placing a part of the concrete to be placed on the steel plate in advance, A concrete beam comprising a part of the reinforcing bar and a part of the steel plate is formed, and the concrete beam is provided as a steel plate reinforcing material for holding a dead load before synthesis. The above-mentioned structural member is erected at a predetermined position of a bridge, and a concrete floor slab is formed by post-coating concrete on a portion of the steel plate where the concrete beam is not provided.
[0044]
Moreover, the construction method of the steel / concrete composite slab of the third invention includes a steel plate, a concrete slip-off member protruding from the surface of the steel plate, a reinforcing bar disposed above the steel plate, and the steel plate. A method for constructing a steel / concrete composite slab for a bridge floor slab having a cast concrete, and by placing a part of the concrete to be cast on the steel plate in advance, Forming a concrete beam having a concrete placed in advance, a part of the reinforcing bar and a part of the steel plate, and providing the concrete beam as a steel plate reinforcement for holding a dead load before synthesis; and thereafter The steel / concrete composite floor slab is installed at a predetermined position on the bridge, and the concrete is post-placed on the part of the steel plate where the concrete beam is not provided to form a composite floor slab. Characterized by a step.
[0045]
Therefore, according to the construction structure of the steel / concrete composite slab of the first invention, the steel / concrete composite slab of the second invention, or the construction method of the steel / concrete composite slab of the third invention, on the steel plate By placing a part of the concrete to be cast in advance, a concrete beam having the concrete that has been cast in advance, a part of the reinforcing bar, and a part of the steel plate is formed. By providing it as a steel plate reinforcement for holding dead loads, it is not necessary to provide any or very little reinforcing steel such as reinforcing ribs that are unnecessary after hardening of post-cast concrete. It can be greatly reduced. For this reason, the steel / concrete composite slab is less expensive than the conventional steel / concrete composite slab.
[0046]
Moreover, the structural members of the steel / concrete composite slab of the fourth invention are a steel plate, a concrete slip-preventing member projecting from the surface of the steel plate, a reinforcing bar disposed above the steel plate, and the steel plate. A steel / concrete composite floor slab for a bridge floor slab having cast concrete, wherein a reinforcing bar is disposed above the steel plate and at a position lower than the reinforcing bar, By placing a part of the concrete to be placed on a steel plate in advance up to the vicinity of the position of the reinforcing bar at the time of installation, the concrete placed at the preceding stage, the reinforcing bar at the time of installation, and a part of the steel plate are provided. And a concrete beam having a height lower than the thickness of the finished composite slab is formed, and the concrete beam is provided as a steel plate reinforcement for holding a dead load before synthesis.
[0047]
Further, the steel / concrete composite slab of the fifth invention is a steel plate, a concrete slip-off member protruding from the surface of the steel plate, a reinforcing bar disposed above the steel plate, and placed on the steel plate. A steel / concrete composite slab for a bridge floor slab comprising concrete, wherein a reinforcing bar is disposed at a position above the steel plate and lower than the reinforcing bar, and is placed on the steel plate By placing a part of the concrete that should be advanced up to the vicinity of the position of the reinforcing bar at the time of installation, the concrete that has been previously installed, the reinforcing bar at the time of installation, and a part of the steel plate are provided and the height is completed. A concrete beam lower than the thickness of the later composite floor slab is formed, and this concrete beam is provided as a steel plate reinforcing material for holding the dead load before synthesis. Rack in position To, characterized in that the synthetic slab than to hit back the concrete on the concrete beam is not provided part and the concrete beam on the steel sheet.
[0048]
Moreover, the construction method of the steel / concrete composite slab of the sixth invention includes a steel plate, a concrete slip-preventing member protruding from the surface of the steel plate, a reinforcing bar disposed above the steel plate, and the steel plate. A method for constructing a steel / concrete composite floor slab for a bridge floor slab having cast concrete, wherein a reinforcing bar is disposed at a position above the steel plate and lower than the reinforcing bar, By placing a part of the concrete to be placed on a steel plate in advance up to the vicinity of the position of the reinforcing bar at the time of construction, the concrete placed previously, the reinforcing steel at the time of construction, and a part of the steel plate are provided. Forming a concrete beam having a height lower than the thickness of the composite floor slab after completion, and providing the concrete beam as a steel plate reinforcing material for holding a dead load before synthesis, and then the steel / concrete composite floor Version structure A member is erected at a predetermined position of a bridge, and a portion of the steel plate where the concrete beam is not provided and a concrete floor slab is formed by post-casting concrete on the concrete beam. And
[0049]
Therefore, according to the construction structure of the steel / concrete composite slab of the fourth invention, the steel / concrete composite slab of the fifth invention, or the construction method of the steel / concrete composite slab of the sixth invention, The effect similar to that of the second or the second invention can be obtained, and the reinforcement is provided below the reinforcing bars (main reinforcing bars, distribution reinforcing bars, etc.), and the concrete is pre-placed near the position of the reinforcing bars at the time of installation. The height of the concrete beam is lower than the thickness of the composite floor slab after completion, and the concrete is struck on the concrete beam. It becomes the surface of the finished concrete. For this reason, the cast-in part of the cast concrete does not come out on the floor slab surface. In addition, there are no restrictions on the bar arrangement. Furthermore, the transverse slope and longitudinal slope of the floor slab surface can be freely adjusted in the field regardless of the concrete beam.
[0050]
The steel / concrete composite slab of the seventh invention is a steel / concrete composite slab of the second or fifth invention, wherein the steel / concrete composite slab has a ribless structure in which no reinforcing rib is provided on the steel plate.
[0051]
Therefore, according to the steel / concrete composite slab of the seventh invention, since it has a ribless structure, the effect of reducing the weight of the steel material is particularly great.
[0052]
The bridge of the eighth invention is characterized in that a bridge slab is formed by joining a plurality of steel / concrete composite slabs of the second, fifth or seventh invention.
[0053]
Therefore, according to the bridge of the eighth invention, the bridge floor slab is constructed by joining a plurality of steel / concrete composite slabs of the second, fifth or seventh invention, thereby reducing the cost of the bridge. Can be planned.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view of a bridge according to Embodiment 1 of the present invention.
FIG. 2 is a perspective view of a steel / concrete composite floor slab constituting the bridge slab.
3 is a cross-sectional view taken along line AA in FIG.
4 is an enlarged cross-sectional view taken along line BB in FIG.
FIG. 5 is an explanatory diagram showing a construction method of the steel / concrete composite slab according to the first embodiment of the present invention.
FIG. 6 is an explanatory diagram showing a construction method of the steel / concrete composite slab according to the first embodiment of the present invention.
FIG. 7 is an explanatory diagram showing a construction method for a steel / concrete composite deck according to Embodiment 1 of the present invention.
FIG. 8 is an explanatory view showing a construction method of the steel / concrete composite deck according to the first embodiment of the present invention.
FIG. 9 is an explanatory diagram showing a construction method of the steel / concrete composite deck according to Embodiment 1 of the present invention.
FIG. 10 is an explanatory view showing a construction method of the steel / concrete composite deck according to the first embodiment of the present invention.
FIG. 11 is a cross-sectional view of constituent members of a steel / concrete composite deck according to Embodiment 2 of the present invention.
FIG. 12 is a cross-sectional view of a steel / concrete composite deck according to Embodiment 2 of the present invention.
[Explanation of symbols]
1 Bridge
2 Main digits
3 Steel / concrete composite floor slab
3a Floor slab surface
4 Asphalt pavement
5 Steel plate
6 main muscles
7 Strengthening muscles
8 Stud
10 Concrete cast in advance
11 Concrete beams
12 Panel joint
13 Post-cast concrete
21 Reinforcing bar

Claims (8)

鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の構成部材であって、
前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備えたものであり、前記コンクリート梁を形成後、橋梁の所定位置に架設されて、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートが後打ちされて合成床版となるものであることを特徴とする鋼・コンクリート合成床版の構成部材。
Steel for a bridge floor slab comprising a steel plate, a concrete slip-preventing member projecting on the surface of the steel plate, a reinforcing bar disposed above the steel plate, and concrete placed on the steel plate A component of a concrete composite floor slab,
By placing a part of the concrete to be placed on the steel plate in advance, a concrete beam having the concrete placed in advance, a part of the reinforcing bar and a part of the steel plate is formed. The concrete beam is provided as a steel plate reinforcement for holding a dead load before synthesis. After the concrete beam is formed, the concrete beam on the steel plate is provided at a predetermined position of a bridge. A structural member of a steel / concrete composite floor slab, in which concrete is post-placed into a non-exposed portion to form a composite floor slab .
鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版であって、
前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備え、その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートを後打ちすることより合成床版としたことを特徴とする鋼・コンクリート合成床版。
Steel for a bridge floor slab comprising a steel plate, a concrete slip-preventing member projecting on the surface of the steel plate, a reinforcing bar disposed above the steel plate, and concrete placed on the steel plate A concrete composite floor slab,
By placing a part of the concrete to be placed on the steel plate in advance, a concrete beam having the concrete placed in advance, a part of the reinforcing bar and a part of the steel plate is formed. This concrete beam is provided as a steel plate reinforcement for holding the pre-synthesis dead load, and then the steel / concrete composite floor slab is installed at a predetermined position on the bridge to provide the concrete beam on the steel plate. A steel / concrete composite slab characterized in that it is made into a composite slab by post-casting concrete in an unfinished part.
鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の施工方法であって、
前記鋼板上に打設すべき前記コンクリートの一部を先行打設することにより、この先行打設したコンクリートと前記鉄筋の一部と前記鋼板の一部とを有してなるコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備える工程と、
その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分にコンクリートを後打ちすることにより合成床版とする工程とを有することを特徴とする鋼・コンクリート合成床版の施工方法。
Steel for a bridge floor slab comprising a steel plate, a concrete slip-preventing member projecting on the surface of the steel plate, a reinforcing bar disposed above the steel plate, and concrete placed on the steel plate A construction method for a concrete composite slab,
By placing a part of the concrete to be placed on the steel plate in advance, a concrete beam having the concrete placed in advance, a part of the reinforcing bar and a part of the steel plate is formed. , A step of providing this concrete beam as a steel plate reinforcement for holding a dead load before synthesis,
Then, constructing the steel / concrete composite floor slab at a predetermined position of the bridge, and post-casting the concrete on the steel plate where the concrete beam is not provided, A method for constructing a steel / concrete composite floor slab characterized by comprising:
鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の構成部材であって、
前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することによって、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備えたことを特徴とする鋼・コンクリート合成床版の構成部材。
Steel for a bridge floor slab comprising a steel plate, a concrete slip-preventing member projecting on the surface of the steel plate, a reinforcing bar disposed above the steel plate, and concrete placed on the steel plate A component of a concrete composite floor slab,
By placing the reinforcing bar at the position above the steel plate and lower than the reinforcing bar, by placing a part of the concrete to be placed on the steel plate up to the vicinity of the position of the reinforcing bar at the time of installation, A concrete beam is formed which has the concrete placed in advance, the reinforcing bar at the time of erection, and a part of the steel plate, and whose height is lower than the thickness of the composite floor slab after completion. A structural member of a steel / concrete composite slab characterized by being provided as a steel plate reinforcement for holding dead loads.
鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版であって、
前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することによって、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備え、その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分及び前記コンクリート梁の上にコンクリートを後打ちすることより合成床版としたことを特徴とする鋼・コンクリート合成床版。
Steel for a bridge floor slab comprising a steel plate, a concrete slip-preventing member projecting on the surface of the steel plate, a reinforcing bar disposed above the steel plate, and concrete placed on the steel plate A concrete composite floor slab,
By placing the reinforcing bar at the position above the steel plate and lower than the reinforcing bar, by placing a part of the concrete to be placed on the steel plate up to the vicinity of the position of the reinforcing bar at the time of installation, A concrete beam is formed which has the concrete placed in advance, the reinforcing bar at the time of erection, and a part of the steel plate, and whose height is lower than the thickness of the composite floor slab after completion. It is provided as a steel plate reinforcement for holding dead load, and then the steel / concrete composite floor slab is erected at a predetermined position of the bridge, and the portion of the steel plate not provided with the concrete beam and the concrete A steel / concrete composite slab characterized by a composite slab made by post-casting concrete on the beam.
鋼板と、前記鋼板の表面に突設したコンクリートのずれ止め部材と、前記鋼板の上方に配設した鉄筋と、前記鋼板上に打設したコンクリートとを有してなる橋梁床版用の鋼・コンクリート合成床版の施工方法であって、
前記鋼板の上方で且つ前記鉄筋よりも低い位置に架設時鉄筋を配設し、前記鋼板上に打設すべき前記コンクリートの一部を前記架設時鉄筋の位置付近まで先行打設することにより、この先行打設したコンクリートと前記架設時鉄筋と前記鋼板の一部とを有してなり且つ高さが完成後の合成床版の厚さよりも低いコンクリート梁を形成し、このコンクリート梁を合成前死荷重保持のための鋼板補強材として備える工程と、
その後、この鋼・コンクリート合成床版の構成部材を橋梁の所定位置に架設して、前記鋼板上の前記コンクリート梁が設けられていない部分及び前記コンクリート梁の上にコンクリートを後打ちすることにより合成床版とする工程とを有することを特徴とする鋼・コンクリート合成床版の施工方法。
Steel for a bridge floor slab comprising a steel plate, a concrete slip-preventing member projecting on the surface of the steel plate, a reinforcing bar disposed above the steel plate, and concrete placed on the steel plate A construction method for a concrete composite slab,
By placing the reinforcing bar at the position above the steel plate and lower than the reinforcing bar, by placing a part of the concrete to be placed on the steel plate up to the vicinity of the position of the reinforcing bar at the time of installation, A concrete beam is formed which has the concrete placed in advance, the reinforcing bar at the time of erection, and a part of the steel plate, and whose height is lower than the thickness of the composite floor slab after completion. Providing as a steel plate reinforcement for holding dead loads,
After that, the steel / concrete composite floor slab components are installed at a predetermined position of the bridge, and the concrete is post-placed on the part where the concrete beam is not provided on the steel plate and on the concrete beam. A method for constructing a steel / concrete composite floor slab characterized by comprising a step of making a floor slab.
請求項2又は5に記載する鋼・コンクリート合成床版において、
前記鋼板に補強リブを設けないリブレス構造であることを特徴とする鋼・コンクリート合成床版。
In the steel / concrete composite deck according to claim 2 or 5,
A steel / concrete composite slab characterized by having a ribless structure in which no reinforcing rib is provided on the steel plate.
請求項2,5又は7に記載する鋼・コンクリート合成床版を複数枚接合することにより、橋梁の床版を構成してなることを特徴とする橋梁。  A bridge comprising a bridge slab formed by joining a plurality of steel / concrete composite slabs according to claim 2, 5 or 7.
JP2001277528A 2000-10-05 2001-09-13 Steel / concrete composite floor slab, construction method thereof, constituent member of the composite floor slab, and bridge using the composite floor slab Expired - Lifetime JP3659911B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001277528A JP3659911B2 (en) 2000-10-05 2001-09-13 Steel / concrete composite floor slab, construction method thereof, constituent member of the composite floor slab, and bridge using the composite floor slab

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2000-305715 2000-10-05
JP2000305715 2000-10-05
JP2001277528A JP3659911B2 (en) 2000-10-05 2001-09-13 Steel / concrete composite floor slab, construction method thereof, constituent member of the composite floor slab, and bridge using the composite floor slab

Publications (2)

Publication Number Publication Date
JP2002180420A JP2002180420A (en) 2002-06-26
JP3659911B2 true JP3659911B2 (en) 2005-06-15

Family

ID=26601584

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001277528A Expired - Lifetime JP3659911B2 (en) 2000-10-05 2001-09-13 Steel / concrete composite floor slab, construction method thereof, constituent member of the composite floor slab, and bridge using the composite floor slab

Country Status (1)

Country Link
JP (1) JP3659911B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008088634A (en) * 2006-09-29 2008-04-17 Sumitomo Metal Ind Ltd Composite steel-concrete floor slab
JP5184836B2 (en) * 2007-07-25 2013-04-17 三井造船株式会社 Construction method of synthetic steel slab girder bridge
KR101004618B1 (en) 2010-08-12 2011-01-03 이엔이건설주식회사 Composite girder bridge construction method using temporary steel lateral rib and permanent concrete lateral rib
KR101004617B1 (en) 2010-08-12 2011-01-03 이엔이건설주식회사 Steel slab pannel and composited bridge construction method using temporary steel reinforcing rib and concrete reinforcing rib
JP5559075B2 (en) * 2011-02-04 2014-07-23 大成建設株式会社 Underground structure
KR101978748B1 (en) * 2017-04-03 2019-05-15 (주)엔테이지 Deck Plate With Compression Parts Reinforcement Structure
CN111535455A (en) * 2020-04-14 2020-08-14 中铁第四勘察设计院集团有限公司 Assembly type plate connecting structure and construction method thereof
CN112343405A (en) * 2020-10-13 2021-02-09 中铁十九局集团第二工程有限公司 Construction method for high-speed railway bridge contact net foundation

Also Published As

Publication number Publication date
JP2002180420A (en) 2002-06-26

Similar Documents

Publication Publication Date Title
KR101301076B1 (en) Wall structure construction method using precast front wall panel and precast back wall panel
KR101311530B1 (en) Strucutres of steel-concrete composite borad and composite bridge and construction method thereof
JP5184836B2 (en) Construction method of synthetic steel slab girder bridge
JP6108595B2 (en) Ribbed precast concrete plate and method of placing concrete floor slab and beam using it
JP3659911B2 (en) Steel / concrete composite floor slab, construction method thereof, constituent member of the composite floor slab, and bridge using the composite floor slab
JP5317949B2 (en) Concrete assembly structure and construction method thereof
JP2769936B2 (en) Construction method of beams and slabs in underground skeleton construction
JP3176309B2 (en) Precast concrete slab for bridge structure and joining method thereof
JPH09221706A (en) Floor slab for road surface and layout method thereof
JP2003193544A (en) Concrete assembly structure
JP5318294B2 (en) Concrete assembly structure and construction method thereof
JP4293696B2 (en) Construction method of composite floor slab bridge
JPS60133146A (en) Construction of synthetic large beam using u-shaped precast beam material
JPH09165860A (en) Joint structure of precast concrete floor
JPS59109645A (en) Construction of floor panel
JP2000355910A (en) Space truss with concrete extra form for civil engineering such as bridge floor
JP2010281040A (en) Steel concrete composite floor slab, panel for constructing the steel concrete composite floor slab, and construction method for steel concrete composite floor slab
JPH05222766A (en) Building method
JP2001279853A (en) Synthetic floor slab and half precast floor slab
JP3512737B2 (en) Precast concrete board and its installation method
JPH10196027A (en) Deck panel for concrete form
JPS5856261Y2 (en) Concrete plate using truss reinforcing bars
JP4319775B2 (en) Seismic reinforcement wall and its manufacturing method
JP3684196B2 (en) Floor slab structural material
JPH02296948A (en) Construction method of reinforced concrete construction slab

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040817

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040824

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041021

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050301

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050315

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080325

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090325

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090325

Year of fee payment: 4

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090325

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100325

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110325

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110325

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120325

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130325

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140325

Year of fee payment: 9

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name