JPH05287759A - Construction method of reinforced concrete foundation beam - Google Patents
Construction method of reinforced concrete foundation beamInfo
- Publication number
- JPH05287759A JPH05287759A JP8201092A JP8201092A JPH05287759A JP H05287759 A JPH05287759 A JP H05287759A JP 8201092 A JP8201092 A JP 8201092A JP 8201092 A JP8201092 A JP 8201092A JP H05287759 A JPH05287759 A JP H05287759A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- slab
- stirrups
- precast plates
- projected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は上下にスラブを有し、
成の大きい鉄筋コンクリート基礎の構築法に関するもの
である。This invention has slabs on the top and bottom,
It relates to a method of constructing a reinforced concrete foundation with a large growth.
【0002】[0002]
【従来技術と発明が解決しようとする課題】鉄筋コンク
リート構造のプレハブ化は多種多様でありプレキャスト
コンクリートの永久型枠を使用することが多いが基礎梁
については鉄筋のプレハブ化が多く提案されている。2. Description of the Related Art There are various types of prefabricated reinforced concrete structures, and a permanent formwork of precast concrete is often used, but many prefabricated reinforcing bars have been proposed for foundation beams.
【0003】ところで基礎梁の施工はかなりの手間を要
している。その理由の一つとして地上部の構造部材に比
較して部材断面が大きいことにある。また他の理由とし
て通常基礎梁はマットスラブと上部スラブの二重スラブ
間に位置することが多く、梁型枠の撤去に際し、上部ス
ラブに取出し用の仮設開口を設け、また梁成が大きいた
め仮設用の足場が必要となる。By the way, the construction of the foundation beam requires a considerable amount of work. One of the reasons is that the member cross section is larger than that of the structural member on the ground. Another reason is that the foundation beams are usually located between the double slabs of the mat slab and the upper slab.When removing the beam formwork, a temporary opening for removal is provided in the upper slab and the beam formation is large. A temporary scaffold is required.
【0004】この発明は前記事情に鑑み、脱型不要な永
久型枠を応用した基礎梁の構築法を開発したものであ
る。In view of the above circumstances, the present invention has developed a method for constructing a foundation beam to which a permanent mold that does not require demolding is applied.
【0005】[0005]
【課題を解決するための手段】この発明に係る鉄筋コン
クリート基礎梁の構築に際し、梁側面とをプレキャスト
板で構成し、そのプレキャスト板の上下に突出させた縦
肋筋を上下スラブ位置に配筋し、かつ上下梁主筋および
横肋筋を配筋し、かつプレキャスト板間のコンクリート
および上下スラブのコンクリートを打設する。When constructing a reinforced concrete foundation beam according to the present invention, the side surfaces of the beam are made of precast plates, and the vertical ribs projecting up and down of the precast plate are arranged at the upper and lower slab positions. And, the upper and lower beam main bars and transverse ribs are arranged, and the concrete between the precast plates and the concrete of the upper and lower slabs are placed.
【0006】[0006]
【実施例】掘削底の地盤A上に敷砂1、捨コンクリート
2を布設し、マットスラブ3の主筋となる上下鉄筋4を
配筋する。[Example] Laying sand 1 and waste concrete 2 are laid on the ground A at the bottom of excavation, and upper and lower reinforcing bars 4 which are the main bars of the mat slab 3 are laid.
【0007】また捨コンクリート2上にレベル調整用受
台5を設置しその上に梁側面を形成する鉄筋コンクリー
ト製のプレキャスト板Bを所要の間隔をもって設置す
る。その際プレキャスト板B間にはセパレーター6を設
ける。Further, a level adjusting pedestal 5 is installed on the waste concrete 2, and a reinforced concrete precast plate B forming a beam side surface is installed on the level adjusting pedestal 5 at a required interval. At that time, a separator 6 is provided between the precast plates B.
【0008】またこのプレキャスト板Bの上下端にはハ
ンチ部7が突設されておりまた縦肋筋8が上下に突出し
てあり、この突出した肋筋8はその端部を折曲げてスラ
ブ位置に配筋した状態とし、かつ上下梁主筋9および横
肋筋10を配筋する上部のハンチ部7上にハーフPC板
11、上部スラブ12の配筋13を配置する。コンクリ
ートの打設に際してはマットスラブ3、プレキャスト板
B間、上部スラブ12の順序にコンクリートを打設す
る。A haunch portion 7 is projectingly provided on the upper and lower ends of the precast plate B, and vertical ribs 8 project vertically. The projecting ribs 8 are bent at the slab position. The half PC board 11 and the reinforcing bar 13 of the upper slab 12 are arranged on the upper haunch part 7 for reinforcing the upper and lower beam main bars 9 and the transverse ribs 10. When pouring concrete, the concrete is poured between the mat slab 3, the precast plate B and the upper slab 12 in this order.
【0009】なお、図2に示すようにプレキャスト板間
の後打ちコンクリートの一体化をより、高める方法とし
ては、プレキャスト板の内側(後打ちコンクリート側)
面を凹凸形状にするとか、鉄筋を突出させるとか、ある
いは鉄筋トラスの一部をプレキャスト板に埋込むとか等
により、主に、せん断伝達及び一体化を計ることが出来
る。As shown in FIG. 2, as a method of further increasing the integration of the post-cast concrete between the pre-cast plates, the inside of the pre-cast plate (post-cast concrete side) can be used.
It is possible to mainly measure shear transmission and integration by making the surface uneven, by projecting the reinforcing bar, or by embedding a part of the reinforcing bar truss in the precast plate.
【0010】[0010]
【発明の効果】この発明は以上の構成からなり基礎梁の
側面のプレキャスト板は型枠兼用の構造体となり脱型撤
去の必要がない。またプレキャスト板の上下端には肋筋
が突出して、上下スラブ間の連結も確実となり、上下ス
ラブの配筋も容易である。さらに足場等仮設材も不要で
あり、施工能率も向上する。According to the present invention, the precast plate on the side surface of the foundation beam has the structure described above and serves as a formwork, and there is no need to remove the mold. In addition, the ribs project from the upper and lower ends of the precast plate to ensure the connection between the upper and lower slabs, and the arrangement of the upper and lower slabs is easy. Furthermore, temporary materials such as scaffolds are not required, and construction efficiency is improved.
【図1】この発明の実施例の断面図である。FIG. 1 is a sectional view of an embodiment of the present invention.
【図2】この発明のプレキャスト板の要部断面図であ
る。FIG. 2 is a sectional view of a main part of a precast plate according to the present invention.
A…地盤、B…プレキャスト板1…敷砂、2…捨コンク
リート、3…マットスラブ、4…鉄筋、5…受台、6…
セパレーター、7…ハンチ部、8…縦肋筋、9…梁主
筋、10…横肋筋、11…ハーフPC板、12…上部ス
ラブ、13…配筋。A ... Ground, B ... Precast board 1 ... Sand, 2 ... Waste concrete, 3 ... Mat slab, 4 ... Reinforcing bar, 5 ... Cradle, 6 ...
Separator, 7 ... Hunch part, 8 ... Vertical ribs, 9 ... Main ribs, 10 ... Horizontal ribs, 11 ... Half PC board, 12 ... Upper slab, 13 ... Bar arrangement.
Claims (1)
プレキャスト板の上下に突出させた縦肋筋を上下スラブ
位置に配筋し、かつ上下梁主筋および横肋筋を配筋し、
かつプレキャスト板間のコンクリートおよび上下スラブ
のコンクリートを打設することを特徴とする鉄筋コンク
リート基礎梁の構築法。1. A beam side surface is composed of a precast plate, vertical ribs projecting up and down of the precast plate are arranged at upper and lower slab positions, and upper and lower beam main bars and horizontal ribs are arranged.
A method of constructing a reinforced concrete foundation beam characterized by placing concrete between precast plates and concrete of upper and lower slabs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8201092A JPH05287759A (en) | 1992-04-03 | 1992-04-03 | Construction method of reinforced concrete foundation beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8201092A JPH05287759A (en) | 1992-04-03 | 1992-04-03 | Construction method of reinforced concrete foundation beam |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH05287759A true JPH05287759A (en) | 1993-11-02 |
Family
ID=13762556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8201092A Pending JPH05287759A (en) | 1992-04-03 | 1992-04-03 | Construction method of reinforced concrete foundation beam |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH05287759A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07145627A (en) * | 1993-11-24 | 1995-06-06 | Takamura Kensetsu Kk | Form for concrete retaining wall |
JPH07145626A (en) * | 1993-11-24 | 1995-06-06 | Takamura Kensetsu Kk | Method of constructing concrete building |
JP2002242206A (en) * | 2001-02-22 | 2002-08-28 | Koji Sumiyama | Continuous footing construction method |
KR20180094674A (en) * | 2017-02-16 | 2018-08-24 | 주식회사 청진이엔씨 | Construction structure of balcony integral type building structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58204243A (en) * | 1982-05-21 | 1983-11-28 | 株式会社竹中工務店 | Construction of reinforced concrete building |
JPS60133146A (en) * | 1983-12-19 | 1985-07-16 | 株式会社竹中工務店 | Construction of synthetic large beam using u-shaped precast beam material |
JPS61146922A (en) * | 1984-12-18 | 1986-07-04 | Fujita Corp | Method of constructing foundation beam with double slab |
JPS61146966A (en) * | 1984-12-19 | 1986-07-04 | 林精工株式会社 | Support of mold frame for constructing foundation of concrete |
JPS6237419A (en) * | 1985-08-12 | 1987-02-18 | Hitoshi Mori | Mold connecting unit |
JPS6450743A (en) * | 1987-08-19 | 1989-02-27 | Mitsubishi Electric Corp | Squirrel-cage induction motor |
-
1992
- 1992-04-03 JP JP8201092A patent/JPH05287759A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58204243A (en) * | 1982-05-21 | 1983-11-28 | 株式会社竹中工務店 | Construction of reinforced concrete building |
JPS60133146A (en) * | 1983-12-19 | 1985-07-16 | 株式会社竹中工務店 | Construction of synthetic large beam using u-shaped precast beam material |
JPS61146922A (en) * | 1984-12-18 | 1986-07-04 | Fujita Corp | Method of constructing foundation beam with double slab |
JPS61146966A (en) * | 1984-12-19 | 1986-07-04 | 林精工株式会社 | Support of mold frame for constructing foundation of concrete |
JPS6237419A (en) * | 1985-08-12 | 1987-02-18 | Hitoshi Mori | Mold connecting unit |
JPS6450743A (en) * | 1987-08-19 | 1989-02-27 | Mitsubishi Electric Corp | Squirrel-cage induction motor |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07145627A (en) * | 1993-11-24 | 1995-06-06 | Takamura Kensetsu Kk | Form for concrete retaining wall |
JPH07145626A (en) * | 1993-11-24 | 1995-06-06 | Takamura Kensetsu Kk | Method of constructing concrete building |
JP2002242206A (en) * | 2001-02-22 | 2002-08-28 | Koji Sumiyama | Continuous footing construction method |
JP4610757B2 (en) * | 2001-02-22 | 2011-01-12 | 孝治 住山 | Cloth foundation method |
KR20180094674A (en) * | 2017-02-16 | 2018-08-24 | 주식회사 청진이엔씨 | Construction structure of balcony integral type building structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3879914A (en) | Method of making a platform structure | |
JPH05287759A (en) | Construction method of reinforced concrete foundation beam | |
EP0054026B1 (en) | Lost formwork for use when casting concrete floors | |
US4912896A (en) | Beam/flooring system | |
JPH0579049A (en) | Constructing method for beam and slab in underground body construction work | |
CN214061940U (en) | Precast concrete assembled structure with rib mold structure | |
JPH046450Y2 (en) | ||
CN112359965A (en) | Precast concrete assembled structure with rib mold structure and construction method thereof | |
GB2249329A (en) | Concrete floor beams | |
JP3399924B2 (en) | Seawall protection structure | |
JP2000355910A (en) | Space truss with concrete extra form for civil engineering such as bridge floor | |
JPH02311639A (en) | Construction of composite floor | |
JP2674470B2 (en) | Floor frame structure by combining precast members | |
CN216428029U (en) | Box culvert structure | |
JPH0725363Y2 (en) | Concrete beam | |
JP2643760B2 (en) | How to build foundation beams | |
JP2541570Y2 (en) | Precast concrete board | |
AU704885B2 (en) | Flooring system | |
SU1488390A1 (en) | Method of erecting solid ferroconcrete wall on foundation slab | |
JPS60341Y2 (en) | stacked block foundation frame | |
JPS59177445A (en) | Semi-pc slab construction method and semi-pc panel used therein | |
JPH0841899A (en) | Construction method for foundation beam and pc plate for beam | |
JPH0639823B2 (en) | Joint structure between precast concrete slab and beam | |
JPS62253821A (en) | Construction of concrete floor slab | |
JP2611764B2 (en) | Wall-type composite building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 19970107 |