JPH05287759A - Construction method of reinforced concrete foundation beam - Google Patents

Construction method of reinforced concrete foundation beam

Info

Publication number
JPH05287759A
JPH05287759A JP8201092A JP8201092A JPH05287759A JP H05287759 A JPH05287759 A JP H05287759A JP 8201092 A JP8201092 A JP 8201092A JP 8201092 A JP8201092 A JP 8201092A JP H05287759 A JPH05287759 A JP H05287759A
Authority
JP
Japan
Prior art keywords
concrete
slab
stirrups
precast plates
projected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8201092A
Other languages
Japanese (ja)
Inventor
Toshiyuki Yoshimatsu
敏行 吉松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP8201092A priority Critical patent/JPH05287759A/en
Publication of JPH05287759A publication Critical patent/JPH05287759A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To enhance execution efficiency by forming beam sides of precast plates, arranging longitudinal stirrups projected to up and down of the precast plates to up and down slab positions, arranging up and down beams, main reinforcing bars and horizontal stirrups, and placing concrete between the precast plates and concrete of the up and down slabs. CONSTITUTION:Sand 1 and levelling concrete 2 are placed on the ground A of an excavated bottom, and an up and down reinforcing bar 4 as a main reinforcing bar of a mat slab 3 is arranged. After that, level adjusting cradles 5 are provided on the levelling concrete 2, and reinforced concrete precast plates B forming the beam sides are provided on them. Then, a separator 6 is provided between the precast plates B. Haunch sections 7 are projected to both up and down ends of the precast plates B, and longtidudinal stirrups 8 are projected up and down. In addition, the ends of the projected stirrups 8 are bent in a state to arrange them to the slab positions, and bar arrangement 13 of half PC plates 11 and an upper slab 12 is made on the upper haunch section 7 arranging up and down beam main reinforcing bars 9 and horizontal stirrups 10.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は上下にスラブを有し、
成の大きい鉄筋コンクリート基礎の構築法に関するもの
である。
This invention has slabs on the top and bottom,
It relates to a method of constructing a reinforced concrete foundation with a large growth.

【0002】[0002]

【従来技術と発明が解決しようとする課題】鉄筋コンク
リート構造のプレハブ化は多種多様でありプレキャスト
コンクリートの永久型枠を使用することが多いが基礎梁
については鉄筋のプレハブ化が多く提案されている。
2. Description of the Related Art There are various types of prefabricated reinforced concrete structures, and a permanent formwork of precast concrete is often used, but many prefabricated reinforcing bars have been proposed for foundation beams.

【0003】ところで基礎梁の施工はかなりの手間を要
している。その理由の一つとして地上部の構造部材に比
較して部材断面が大きいことにある。また他の理由とし
て通常基礎梁はマットスラブと上部スラブの二重スラブ
間に位置することが多く、梁型枠の撤去に際し、上部ス
ラブに取出し用の仮設開口を設け、また梁成が大きいた
め仮設用の足場が必要となる。
By the way, the construction of the foundation beam requires a considerable amount of work. One of the reasons is that the member cross section is larger than that of the structural member on the ground. Another reason is that the foundation beams are usually located between the double slabs of the mat slab and the upper slab.When removing the beam formwork, a temporary opening for removal is provided in the upper slab and the beam formation is large. A temporary scaffold is required.

【0004】この発明は前記事情に鑑み、脱型不要な永
久型枠を応用した基礎梁の構築法を開発したものであ
る。
In view of the above circumstances, the present invention has developed a method for constructing a foundation beam to which a permanent mold that does not require demolding is applied.

【0005】[0005]

【課題を解決するための手段】この発明に係る鉄筋コン
クリート基礎梁の構築に際し、梁側面とをプレキャスト
板で構成し、そのプレキャスト板の上下に突出させた縦
肋筋を上下スラブ位置に配筋し、かつ上下梁主筋および
横肋筋を配筋し、かつプレキャスト板間のコンクリート
および上下スラブのコンクリートを打設する。
When constructing a reinforced concrete foundation beam according to the present invention, the side surfaces of the beam are made of precast plates, and the vertical ribs projecting up and down of the precast plate are arranged at the upper and lower slab positions. And, the upper and lower beam main bars and transverse ribs are arranged, and the concrete between the precast plates and the concrete of the upper and lower slabs are placed.

【0006】[0006]

【実施例】掘削底の地盤A上に敷砂1、捨コンクリート
2を布設し、マットスラブ3の主筋となる上下鉄筋4を
配筋する。
[Example] Laying sand 1 and waste concrete 2 are laid on the ground A at the bottom of excavation, and upper and lower reinforcing bars 4 which are the main bars of the mat slab 3 are laid.

【0007】また捨コンクリート2上にレベル調整用受
台5を設置しその上に梁側面を形成する鉄筋コンクリー
ト製のプレキャスト板Bを所要の間隔をもって設置す
る。その際プレキャスト板B間にはセパレーター6を設
ける。
Further, a level adjusting pedestal 5 is installed on the waste concrete 2, and a reinforced concrete precast plate B forming a beam side surface is installed on the level adjusting pedestal 5 at a required interval. At that time, a separator 6 is provided between the precast plates B.

【0008】またこのプレキャスト板Bの上下端にはハ
ンチ部7が突設されておりまた縦肋筋8が上下に突出し
てあり、この突出した肋筋8はその端部を折曲げてスラ
ブ位置に配筋した状態とし、かつ上下梁主筋9および横
肋筋10を配筋する上部のハンチ部7上にハーフPC板
11、上部スラブ12の配筋13を配置する。コンクリ
ートの打設に際してはマットスラブ3、プレキャスト板
B間、上部スラブ12の順序にコンクリートを打設す
る。
A haunch portion 7 is projectingly provided on the upper and lower ends of the precast plate B, and vertical ribs 8 project vertically. The projecting ribs 8 are bent at the slab position. The half PC board 11 and the reinforcing bar 13 of the upper slab 12 are arranged on the upper haunch part 7 for reinforcing the upper and lower beam main bars 9 and the transverse ribs 10. When pouring concrete, the concrete is poured between the mat slab 3, the precast plate B and the upper slab 12 in this order.

【0009】なお、図2に示すようにプレキャスト板間
の後打ちコンクリートの一体化をより、高める方法とし
ては、プレキャスト板の内側(後打ちコンクリート側)
面を凹凸形状にするとか、鉄筋を突出させるとか、ある
いは鉄筋トラスの一部をプレキャスト板に埋込むとか等
により、主に、せん断伝達及び一体化を計ることが出来
る。
As shown in FIG. 2, as a method of further increasing the integration of the post-cast concrete between the pre-cast plates, the inside of the pre-cast plate (post-cast concrete side) can be used.
It is possible to mainly measure shear transmission and integration by making the surface uneven, by projecting the reinforcing bar, or by embedding a part of the reinforcing bar truss in the precast plate.

【0010】[0010]

【発明の効果】この発明は以上の構成からなり基礎梁の
側面のプレキャスト板は型枠兼用の構造体となり脱型撤
去の必要がない。またプレキャスト板の上下端には肋筋
が突出して、上下スラブ間の連結も確実となり、上下ス
ラブの配筋も容易である。さらに足場等仮設材も不要で
あり、施工能率も向上する。
According to the present invention, the precast plate on the side surface of the foundation beam has the structure described above and serves as a formwork, and there is no need to remove the mold. In addition, the ribs project from the upper and lower ends of the precast plate to ensure the connection between the upper and lower slabs, and the arrangement of the upper and lower slabs is easy. Furthermore, temporary materials such as scaffolds are not required, and construction efficiency is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例の断面図である。FIG. 1 is a sectional view of an embodiment of the present invention.

【図2】この発明のプレキャスト板の要部断面図であ
る。
FIG. 2 is a sectional view of a main part of a precast plate according to the present invention.

【符号の説明】[Explanation of symbols]

A…地盤、B…プレキャスト板1…敷砂、2…捨コンク
リート、3…マットスラブ、4…鉄筋、5…受台、6…
セパレーター、7…ハンチ部、8…縦肋筋、9…梁主
筋、10…横肋筋、11…ハーフPC板、12…上部ス
ラブ、13…配筋。
A ... Ground, B ... Precast board 1 ... Sand, 2 ... Waste concrete, 3 ... Mat slab, 4 ... Reinforcing bar, 5 ... Cradle, 6 ...
Separator, 7 ... Hunch part, 8 ... Vertical ribs, 9 ... Main ribs, 10 ... Horizontal ribs, 11 ... Half PC board, 12 ... Upper slab, 13 ... Bar arrangement.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 梁側面をプレキャスト板で構成し、その
プレキャスト板の上下に突出させた縦肋筋を上下スラブ
位置に配筋し、かつ上下梁主筋および横肋筋を配筋し、
かつプレキャスト板間のコンクリートおよび上下スラブ
のコンクリートを打設することを特徴とする鉄筋コンク
リート基礎梁の構築法。
1. A beam side surface is composed of a precast plate, vertical ribs projecting up and down of the precast plate are arranged at upper and lower slab positions, and upper and lower beam main bars and horizontal ribs are arranged.
A method of constructing a reinforced concrete foundation beam characterized by placing concrete between precast plates and concrete of upper and lower slabs.
JP8201092A 1992-04-03 1992-04-03 Construction method of reinforced concrete foundation beam Pending JPH05287759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8201092A JPH05287759A (en) 1992-04-03 1992-04-03 Construction method of reinforced concrete foundation beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8201092A JPH05287759A (en) 1992-04-03 1992-04-03 Construction method of reinforced concrete foundation beam

Publications (1)

Publication Number Publication Date
JPH05287759A true JPH05287759A (en) 1993-11-02

Family

ID=13762556

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8201092A Pending JPH05287759A (en) 1992-04-03 1992-04-03 Construction method of reinforced concrete foundation beam

Country Status (1)

Country Link
JP (1) JPH05287759A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07145627A (en) * 1993-11-24 1995-06-06 Takamura Kensetsu Kk Form for concrete retaining wall
JPH07145626A (en) * 1993-11-24 1995-06-06 Takamura Kensetsu Kk Method of constructing concrete building
JP2002242206A (en) * 2001-02-22 2002-08-28 Koji Sumiyama Continuous footing construction method
KR20180094674A (en) * 2017-02-16 2018-08-24 주식회사 청진이엔씨 Construction structure of balcony integral type building structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58204243A (en) * 1982-05-21 1983-11-28 株式会社竹中工務店 Construction of reinforced concrete building
JPS60133146A (en) * 1983-12-19 1985-07-16 株式会社竹中工務店 Construction of synthetic large beam using u-shaped precast beam material
JPS61146922A (en) * 1984-12-18 1986-07-04 Fujita Corp Method of constructing foundation beam with double slab
JPS61146966A (en) * 1984-12-19 1986-07-04 林精工株式会社 Support of mold frame for constructing foundation of concrete
JPS6237419A (en) * 1985-08-12 1987-02-18 Hitoshi Mori Mold connecting unit
JPS6450743A (en) * 1987-08-19 1989-02-27 Mitsubishi Electric Corp Squirrel-cage induction motor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58204243A (en) * 1982-05-21 1983-11-28 株式会社竹中工務店 Construction of reinforced concrete building
JPS60133146A (en) * 1983-12-19 1985-07-16 株式会社竹中工務店 Construction of synthetic large beam using u-shaped precast beam material
JPS61146922A (en) * 1984-12-18 1986-07-04 Fujita Corp Method of constructing foundation beam with double slab
JPS61146966A (en) * 1984-12-19 1986-07-04 林精工株式会社 Support of mold frame for constructing foundation of concrete
JPS6237419A (en) * 1985-08-12 1987-02-18 Hitoshi Mori Mold connecting unit
JPS6450743A (en) * 1987-08-19 1989-02-27 Mitsubishi Electric Corp Squirrel-cage induction motor

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07145627A (en) * 1993-11-24 1995-06-06 Takamura Kensetsu Kk Form for concrete retaining wall
JPH07145626A (en) * 1993-11-24 1995-06-06 Takamura Kensetsu Kk Method of constructing concrete building
JP2002242206A (en) * 2001-02-22 2002-08-28 Koji Sumiyama Continuous footing construction method
JP4610757B2 (en) * 2001-02-22 2011-01-12 孝治 住山 Cloth foundation method
KR20180094674A (en) * 2017-02-16 2018-08-24 주식회사 청진이엔씨 Construction structure of balcony integral type building structure

Similar Documents

Publication Publication Date Title
US3879914A (en) Method of making a platform structure
JPH05287759A (en) Construction method of reinforced concrete foundation beam
EP0054026B1 (en) Lost formwork for use when casting concrete floors
US4912896A (en) Beam/flooring system
JPH0579049A (en) Constructing method for beam and slab in underground body construction work
CN214061940U (en) Precast concrete assembled structure with rib mold structure
JPH046450Y2 (en)
CN112359965A (en) Precast concrete assembled structure with rib mold structure and construction method thereof
GB2249329A (en) Concrete floor beams
JP3399924B2 (en) Seawall protection structure
JP2000355910A (en) Space truss with concrete extra form for civil engineering such as bridge floor
JPH02311639A (en) Construction of composite floor
JP2674470B2 (en) Floor frame structure by combining precast members
CN216428029U (en) Box culvert structure
JPH0725363Y2 (en) Concrete beam
JP2643760B2 (en) How to build foundation beams
JP2541570Y2 (en) Precast concrete board
AU704885B2 (en) Flooring system
SU1488390A1 (en) Method of erecting solid ferroconcrete wall on foundation slab
JPS60341Y2 (en) stacked block foundation frame
JPS59177445A (en) Semi-pc slab construction method and semi-pc panel used therein
JPH0841899A (en) Construction method for foundation beam and pc plate for beam
JPH0639823B2 (en) Joint structure between precast concrete slab and beam
JPS62253821A (en) Construction of concrete floor slab
JP2611764B2 (en) Wall-type composite building structure

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19970107