JPS61146922A - Method of constructing foundation beam with double slab - Google Patents

Method of constructing foundation beam with double slab

Info

Publication number
JPS61146922A
JPS61146922A JP26548784A JP26548784A JPS61146922A JP S61146922 A JPS61146922 A JP S61146922A JP 26548784 A JP26548784 A JP 26548784A JP 26548784 A JP26548784 A JP 26548784A JP S61146922 A JPS61146922 A JP S61146922A
Authority
JP
Japan
Prior art keywords
slab
concrete
foundation beam
foundation
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26548784A
Other languages
Japanese (ja)
Other versions
JPH0326738B2 (en
Inventor
Tsuguhiko Yoshino
次彦 吉野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP26548784A priority Critical patent/JPS61146922A/en
Publication of JPS61146922A publication Critical patent/JPS61146922A/en
Publication of JPH0326738B2 publication Critical patent/JPH0326738B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures

Abstract

PURPOSE:To build a foundation having structural reliability, by a method wherein precast concrete vertical plates are located facing each other on a pressure resistant plate part, arrangement of bars for upper and lower beam is effected, and concrete is placed between the vertical plate parts and in the pressure resistant plate part to build an upper slab. CONSTITUTION:A pair of vertical plats A and A' are located facing each other on a pressure resistant plate, and an upper hook part 1a of each rib bar 1 and main bars 2 for an upper beam are arranged. Thereafter, main bars 3 for an lower part are arranged, concretes 5 and 6 are placed between the vertical plates A and A' and in the pressure resistant part, respectively, for integral formation. Groove type bars 8 are coupled between the main bars 2 for the upper beam, and concrete 9 is placed in a slab on a foundation beam to build an upper slab C. This causes the vertical plate to additionally serve as forms for a foundation beam and eliminates a form work, resulting in the possibility to sharply simplify the construction.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は二重スラブ付基礎梁の施工方法に係るものであ
る。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a method of constructing a foundation beam with double slabs.

(従来の技術)及び(発明が解決しようとする問題点)
一般に基礎が二重スラブとなるような設計では、第6図
に示すように、耐圧板(α)、地中梁(b)、床版(C
)の順序で鉄筋組、コンクリート打設を行なうため、作
業が大変であった。
(Prior art) and (Problem to be solved by the invention)
Generally, in a design where the foundation is a double slab, as shown in Figure 6, pressure plates (α), underground beams (b), and floor slabs (C
) The work was difficult because reinforcing bars and concrete were poured in this order.

このような場合、地中梁のみをプレキャスト化しても、
地中梁と耐圧板との一体化が困難で、構造上好ましくな
い。
In such cases, even if only the underground beams are precast,
It is difficult to integrate the underground beam and the pressure plate, which is unfavorable from a structural standpoint.

また地中梁は一般に梁成が大きく、断面も太ぎいため、
プレキャスト化しても重fikが大で、運搬、建方が困
難であった。
In addition, underground beams generally have a large beam size and a thick cross section, so
Even if it was precast, it was heavy and difficult to transport and erect.

(問題点を解決するための手段) 本発明はこのような問題点を解決するために提案された
もので、肋筋が埋設され、且つ同肋筋の上下突出端部に
フック部が曲成された内外一双のプレキャストコンクリ
ート垂直版を耐圧板部上に対設し、前記内外両垂直版の
上下における前記各肋筋のフック部及びその中間部に、
夫々上下梁主筋を配筋し、しかるのち前記内外両垂直版
間及び耐圧板部に亘ってコンクリートを打設し、次いで
上側スラブを構築することを特徴とする二重スラブ付基
礎梁の施工方法に係るものである。
(Means for Solving the Problems) The present invention has been proposed to solve these problems, and includes a structure in which the ribs are buried and the hook portions are bent at the upper and lower protruding ends of the ribs. A pair of inner and outer precast concrete vertical plates are installed oppositely on the pressure plate part, and the hook parts of each of the ribs on the upper and lower sides of both the inner and outer vertical plates and the intermediate part thereof,
A method for constructing a foundation beam with double slabs, which comprises arranging upper and lower beam main reinforcements, then pouring concrete between the inner and outer vertical slabs and across the pressure plate, and then constructing an upper slab. This is related to.

(作用)及び(発明の効果) 本発明においては前記したように、肋筋が埋設され、そ
の上下端突出部にフック部が曲成された内外一双の基礎
梁構築用型枠を兼用するプレキャストコンクリート垂直
版を予め製作し、回内外一双の垂直版を耐圧板上に対設
し、間両垂直版の上下部において、前記内外両肋筋のフ
ック部、及び同上下沓内外フック部間に夫々上下の梁主
筋を配筋したのち、前記内外一双の垂直版間及び耐圧板
部間にコンクリートを打設するようにしたので、前記内
外両型枠及び同両型枠間に打設されたコンクリートによ
って基礎梁が構築され、且つ同基礎梁は前記耐圧板と一
体化される。
(Function) and (Effects of the Invention) As described above, in the present invention, the precast steel is used as a formwork for constructing a pair of inner and outer foundation beams, in which the reinforcing bars are embedded and the hook parts are bent at the upper and lower end protrusions. Concrete vertical plates are made in advance, and one pair of pronated and pronated vertical plates are placed oppositely on a pressure plate, and at the upper and lower parts of both vertical plates, between the hooks of both the inner and outer ribs, and the inner and outer hooks of the upper and lower shoes. After arranging the upper and lower main beam reinforcements, concrete was poured between the vertical slabs and between the pressure plate parts of the above-mentioned inner and outer pairs. A foundation beam is constructed of concrete, and the foundation beam is integrated with the pressure plate.

而してこの間に前記内外一双の垂直版は基礎梁の型枠を
兼用するので、型枠作業が不要となシ、施工が著しく簡
略化される。
During this time, the pair of inner and outer vertical plates also serve as the formwork for the foundation beam, so there is no need for formwork work, and construction is significantly simplified.

次いで本発明においては前記基礎梁上部に上部スラブを
構築することによシ、耐圧板及び地中梁釜に上部スラブ
が一体化された、構造的に信頼性のある基礎構造が構成
される。
Next, in the present invention, by constructing an upper slab on top of the foundation beam, a structurally reliable foundation structure in which the upper slab is integrated with the pressure plate and the underground beam pot is constructed.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

(AJ仏′)は内外一双のプレキャストコンクリート垂
直版で、基礎梁の内外両側肋筋(1)が埋設され、同各
肋筋(1)の上下突出端部は135°曲成され、上下の
フック部(1α)(IA)が設けられている。
(AJ Buddha') is a precast concrete vertical slab with one pair of inner and outer sides, and the reinforcing bars (1) on both the inner and outer sides of the foundation beam are buried, and the upper and lower protruding ends of each of the reinforcing bars (1) are bent at 135 degrees, and the upper and lower A hook portion (1α) (IA) is provided.

而して耐圧板部のコンクリート打設準備が完了後、同耐
圧板部に前記一双のプレキャストコンクリート垂直版(
AJ(A’)を対設し、各肋筋(1)(1)の上端フッ
ク部(1α)(1す、及び同両フック部(1す(1り間
に上部梁主筋(2)を配筋するとともに、各肋筋(1バ
1)の下端フック部(Ib) (Ib)及び同両フック
部(1b)(1b)間に下部梁主筋(3)を配筋し、且
つ下部梁主筋(3)間には内外の肋筋(11(1)を連
絡する溝型筋(4)を連結し、しかるのち前記内外一双
の垂直版(A)(A′)間及び耐圧版部に夫々コンクI
J −ト(5)(6)を打設し、かくして前記両垂直版
(A) <A′>と打設コンクリート(5)とによって
構築された基礎梁と、前記打設コンク17− ト(6)
によって構築された耐圧板(B)とを一体化する。(第
1図参照)なお図中(力は耐圧板(B)に配筋されたス
ラブ筋である。
After completing preparations for pouring concrete on the pressure plate, the pair of precast concrete vertical slabs (
AJ (A') is installed oppositely, and the upper end hook part (1α) (1) of each cost reinforcement (1) (1), and both hook parts (1) (the upper main beam reinforcement (2) is installed between At the same time, lower beam main reinforcement (3) is placed between the lower end hook part (Ib) (Ib) of each cost reinforcement (1 bar 1) and both hook parts (1b) (1b), and Between the main reinforcements (3), groove-shaped reinforcements (4) connecting the inner and outer ribs (11 (1)) are connected, and then between the above-mentioned inner and outer vertical plates (A) and (A') and the pressure plate part. Conch I
J-to (5) and (6) are cast, thus forming a foundation beam constructed by the above-mentioned vertical slabs (A) <A'> and the poured concrete (5), and the above-mentioned poured concrete 17- 6)
The pressure plate (B) constructed by (See Figure 1) Note that the force in the figure is the slab reinforcement arranged on the pressure plate (B).

この間前記内外一双のプレキャストコンクリート垂直版
(A) (A’)が基礎梁コンクリート打設の型枠を兼
用し、型枠作業が皆無となシ、施工が著しく簡略化され
る。
During this time, the pair of inner and outer precast concrete vertical plates (A) and (A') also serve as formwork for pouring concrete for the foundation beam, eliminating any formwork work and greatly simplifying construction.

次いで上部梁主筋(2)間に、内外の肋筋(1)を接続
する溝型筋(8)を連結し、基礎梁上のスラブコンクリ
ート(9)を打設して、上部スラブ(C)を構築する。
Next, channel reinforcements (8) connecting the inner and outer cost reinforcements (1) are connected between the upper beam main reinforcements (2), and slab concrete (9) is poured on the foundation beam to form the upper slab (C). Build.

(第2図か照)図中(IQはスラブ筋である。(See Figure 2) In the figure (IQ is a slab muscle.

なお上部スラブはPC板を使用してもよい。Note that a PC board may be used for the upper slab.

かくして耐圧板(B)、基礎梁及び上部スラブ(C)が
一体化された基礎が構築される。
In this way, a foundation is constructed in which the pressure plate (B), the foundation beam, and the upper slab (C) are integrated.

以上本発明を実施例について説明したが、本発明は勿論
このような実施例にだけ局限されるものではなく、本発
明の精神を逸脱しない範囲内で種々の設計の改変を施し
うるものである。
Although the present invention has been described above with reference to embodiments, the present invention is, of course, not limited to such embodiments, and can be modified in various ways without departing from the spirit of the present invention. .

【図面の簡単な説明】[Brief explanation of the drawing]

第1図及び第2図は本発明に係る二重スラブ付基礎梁の
施工方法の一実施例の工程を示す縦断面図、第3図は基
礎梁の配置を示す平面図、第41図は基礎梁の分解図、
第5図はプレキャストコンクリート垂直版の斜面図、第
6図は従来工法によって構築された二重スラブ付基礎梁
の縦断面図である。 囚(A′)・・・プレキャストコンクリート垂直版、(
B)・・・耐圧板、((J・・・上部スラブ、(1)・
・・肋筋、(1α)・・・フック部、(2)・・・上部
梁主筋、(3)・・・下部梁主筋、(5)・・・基礎梁
部の打設コンク1,1− ) 、(6)・・・耐圧板部
の打設コンクリート 代理人 弁理士 岡 本 重 文 外3名 脈        城
Figures 1 and 2 are longitudinal sectional views showing the steps of an embodiment of the method for constructing a foundation beam with double slabs according to the present invention, Figure 3 is a plan view showing the arrangement of the foundation beam, and Figure 41 is a Exploded view of the foundation beam,
Figure 5 is a slope view of a precast concrete vertical version, and Figure 6 is a vertical cross-sectional view of a foundation beam with double slabs constructed using the conventional construction method. Prisoner (A')...Precast concrete vertical version, (
B)...Pressure plate, ((J...upper slab, (1)
・・Core reinforcing bars, (1α) ・・Hook part, (2) ・・・・・・・・・・Upper beam main reinforcement, (3) ・・・Lower beam main reinforcement, (5) ・・・Pour concrete 1, 1 of foundation beam” − ) , (6)...Concrete pouring agent for pressure plate section Patent attorney Shige Okamoto 3 outside connections Shiro

Claims (1)

【特許請求の範囲】[Claims] 肋筋が埋設され、且つ同肋筋の上下突出端部にフツク部
が曲成された内外一双のプレキャストコンクリート垂直
版を耐圧板部上に対設し、前記内外両垂直版の上下にお
ける前記各肋筋のフツク部及びその中間部に、夫々上下
梁主筋を配筋し、しかるのち前記内外両垂直版間及び耐
圧板部に亘つてコンクリートを打設し、次いで上側スラ
ブを構築することを特徴とする二重スラブ付基礎梁の施
工方法。
A pair of inner and outer precast concrete vertical plates, in which reinforcing bars are buried and hooks are bent at the upper and lower protruding ends of the reinforcing bars, are installed oppositely on the pressure plate, and the above-mentioned The main reinforcement of the upper and lower beams is arranged at the hook part of the ribs and the intermediate part thereof, and then concrete is poured between the inner and outer vertical plates and over the pressure plate part, and then the upper slab is constructed. Construction method of foundation beam with double slab.
JP26548784A 1984-12-18 1984-12-18 Method of constructing foundation beam with double slab Granted JPS61146922A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26548784A JPS61146922A (en) 1984-12-18 1984-12-18 Method of constructing foundation beam with double slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26548784A JPS61146922A (en) 1984-12-18 1984-12-18 Method of constructing foundation beam with double slab

Publications (2)

Publication Number Publication Date
JPS61146922A true JPS61146922A (en) 1986-07-04
JPH0326738B2 JPH0326738B2 (en) 1991-04-11

Family

ID=17417859

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26548784A Granted JPS61146922A (en) 1984-12-18 1984-12-18 Method of constructing foundation beam with double slab

Country Status (1)

Country Link
JP (1) JPS61146922A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04350221A (en) * 1991-05-28 1992-12-04 Fujita Corp Construction method for underground beam
JPH05287759A (en) * 1992-04-03 1993-11-02 Kajima Corp Construction method of reinforced concrete foundation beam
JPH06287961A (en) * 1993-04-01 1994-10-11 Kajima Corp Method for constructing foundation beam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04350221A (en) * 1991-05-28 1992-12-04 Fujita Corp Construction method for underground beam
JPH05287759A (en) * 1992-04-03 1993-11-02 Kajima Corp Construction method of reinforced concrete foundation beam
JPH06287961A (en) * 1993-04-01 1994-10-11 Kajima Corp Method for constructing foundation beam

Also Published As

Publication number Publication date
JPH0326738B2 (en) 1991-04-11

Similar Documents

Publication Publication Date Title
JP3265502B2 (en) How to build a box culvert
JPS61146922A (en) Method of constructing foundation beam with double slab
JP2763443B2 (en) Beam and floor structure
JP2622013B2 (en) Reinforced concrete shear wall structure
JPS611729A (en) Construction of foundation for structure
JPH0746652Y2 (en) Precast Steel Reinforced Concrete Beam
JP2917159B2 (en) Column, beam joining method
JP2554499Y2 (en) Precast concrete column members
JPH08144402A (en) Hollow precast concrete member for wall
JPS6198870A (en) Construction method of precast reinforced concrete earthquake-proof wall
JPS6127538B2 (en)
JPH11172826A (en) Floor slab and structure
KR920009316B1 (en) Reinforcing elements for half precast concrete slab
JPH0350846B2 (en)
JPH0461142B2 (en)
JPH0642171A (en) Bending type semiprecast beam form
JPH0376384B2 (en)
JPH05179700A (en) Jointing method of precast girder to precast beam
JP2634098B2 (en) How to build underground beams
JPH026901B2 (en)
JPH1122106A (en) Composite bending principal member of concrete structure and constructing method of concrete structure by using composite bending principal member
JP2541570Y2 (en) Precast concrete board
JPH11166295A (en) Steel frame reinforced precast concrete beam for one side bearing wall and construction method using the beam
JPH06185108A (en) Constructing method for beam
JPH07216907A (en) Building method of building foundation and manufacture of foundation member