JP2542279B2 - Joining method of main bar in wall type frame method - Google Patents

Joining method of main bar in wall type frame method

Info

Publication number
JP2542279B2
JP2542279B2 JP2184174A JP18417490A JP2542279B2 JP 2542279 B2 JP2542279 B2 JP 2542279B2 JP 2184174 A JP2184174 A JP 2184174A JP 18417490 A JP18417490 A JP 18417490A JP 2542279 B2 JP2542279 B2 JP 2542279B2
Authority
JP
Japan
Prior art keywords
wall
main
joining
main bars
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2184174A
Other languages
Japanese (ja)
Other versions
JPH0473339A (en
Inventor
利親 高澤
幸一 向井
信之 和泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2184174A priority Critical patent/JP2542279B2/en
Publication of JPH0473339A publication Critical patent/JPH0473339A/en
Application granted granted Critical
Publication of JP2542279B2 publication Critical patent/JP2542279B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、鉄筋コンクリート構造における施工方法に
係り、更に詳しくは、壁式ラーメン構造における梁主筋
の接合方法に関する。
Description: TECHNICAL FIELD The present invention relates to a construction method for a reinforced concrete structure, and more particularly to a method for joining beam main bars in a wall-type rigid frame structure.

(従来の技術) 一般に、壁式ラーメン工法は第6図乃至第7図に示す
ように、例えば一の壁柱15に対して四方から梁16及び壁
付帯梁17が接合される。従って、それらの梁主筋の施工
順序や主筋の位置関係を事前に検討しておく必要があ
る。
(Prior Art) Generally, in the wall type rigid frame method, as shown in FIGS. 6 to 7, for example, a beam 16 and a beam 17 with a wall are joined to one wall pillar 15 from four sides. Therefore, it is necessary to study in advance the construction order of the beam main bars and the positional relationship of the main bars.

そして、配筋終了後に場所打ちコンクリートを打設し
て行うものである。
Then, after the reinforcement is finished, cast-in-place concrete is cast.

(発明が解決しようとする課題) しかしながら、上述の壁式ラーメン工法では、梁16の
主筋と壁付帯梁17の主筋とが四方から交差するので、多
大な労力と時間をかけて検討,施工しなければならず工
期が長くなり、しかも鉄筋間隔が非常に狭くなった場合
に後のコンクリート打設の時に、コンクリートの流れが
悪くなり緻密に充填されず空隙が発生したりして、構造
物の品質確保に信頼がおけないと言った欠点が存在し
た。
(Problems to be solved by the invention) However, in the above-mentioned wall-type rigid frame construction method, the main bar of the beam 16 and the main bar of the beam 17 with the wall intersect from all sides, so a great deal of labor and time is required for the study and construction. If the construction period has to be long and the distance between the reinforcing bars is very narrow, the flow of the concrete will become worse and voids will not be filled densely when the concrete is placed later. There was a drawback that I could not trust in quality assurance.

本発明は、上記の課題に鑑みてなされたもので、壁式
ラーメン構造で施工性が向上し、現場打ちコンクリート
の打設状況も良好で品質の信頼のおける壁式ラーメン構
造における梁主筋の接合方法を提供することを目的とす
る。
The present invention has been made in view of the above problems, the workability is improved in the wall-type rigid frame structure, the casting condition of the cast-in-place concrete is also good, and the joining of the beam main bars in the wall-type rigid frame structure with reliable quality is possible. The purpose is to provide a method.

(課題を解決するための手段) 本発明に係る壁式ラーメン工法における主筋の接合方
法の上記課題を解決し、目的を達成するための要旨は、
鉄筋コンクリート構造物の壁式ラーメン工法における主
筋の接合方法において、梁内から柱部内へ定着される梁
主筋が、その接合用の定着長さを確保し、且つ、柱中心
を越えないで当該柱の上下方向に沿って屈曲されて前記
柱中心を間に対向して配筋され、前記梁主筋の直交方向
に配筋される壁付帯梁の主筋が、前記柱部内で対向配置
にされた梁主筋の間隙に挿通されて、当該壁付帯梁の主
筋と前記梁主筋とが互いに交差しないように配筋され、
コンクリートが打設されて梁,柱,壁付帯梁が一体に接
合されることに存する。
(Means for Solving the Problem) The gist of achieving the object by solving the above problems of the method for joining main bars in the wall-type rigid frame method according to the present invention is
In the method of joining main bars in the wall-type rigid-frame method for reinforced concrete structures, the main beam bars that are anchored from the inside of the beam to the inside of the column ensure the anchoring length for the connection and do not exceed the center of the column. The main bars of the wall-attached beam, which are bent along the up-down direction and are arranged so as to face each other with the center of the column therebetween, and which are arranged in the direction orthogonal to the main beams of the beam, are arranged to face each other in the column portion. Is inserted into the gap of, the bar reinforcement of the wall-attached beam concerned and the beam reinforcement are arranged so as not to intersect with each other,
It consists in placing concrete and joining beams, columns, and beam with walls integrally.

(作用) このように、本発明に係る壁式ラーメン工法における
主筋の接合方法によれば、柱に接合される梁と壁付帯梁
との各主筋が、直交方向に配筋されるものの直接的に交
差しないので、配筋施工能率が向上し、鉄筋加工も容易
となり、先組加工もできることになる。
(Operation) As described above, according to the method of joining main bars in the wall-type rigid frame construction method according to the present invention, the main bars of the beam to be joined to the column and the wall-attached beam are directly laid out in the direction orthogonal to each other. Since it does not intersect with, the work efficiency of reinforcing bar arrangement is improved, the rebar processing becomes easy, and the pre-assembly work becomes possible.

また、主筋同士の溶接等の補強作業も不要となる。 Further, reinforcement work such as welding of the main bars is also unnecessary.

(実施例) 以下、添付図面に従って、本発明の一実施例を説明す
る。第1図は、本発明を実施した場合の平面図であり、
第2図は同じくその縦断面図である。
Embodiment An embodiment of the present invention will be described below with reference to the accompanying drawings. FIG. 1 is a plan view when the present invention is implemented,
FIG. 2 is a vertical sectional view of the same.

本発明は、柱1に梁2や壁付帯梁3の主筋2a(上端
筋),2b(下端筋),3a(上端筋),3b(下端筋)を配筋
するに、前記梁2端部から柱1内へ定着される梁主筋2
a,2bが、その接合用定着長さ(30〜35d,dは鉄筋径)を
確保して、且つ、柱1の柱中心1aを越えないで該柱1の
上下方向に沿って約90゜屈曲され、前記柱中心1aを間に
対向して配筋される。
The present invention arranges the main bars 2a (upper bar), 2b (bottom bar), 3a (upper bar), 3b (bottom bar) of the beam 2 and the wall-supported beam 3 on the column 1 in the end part of the beam 2 Main beam 2 anchored from inside to pillar 1
a, 2b secures the fixing length for joining (30 to 35d, d is the diameter of the reinforcing bar) and is about 90 ° along the vertical direction of the pillar 1 without exceeding the pillar center 1a of the pillar 1. It is bent and arranged with the pillar center 1a in between.

この場合に、梁主筋2a,2bを屈曲させる方向として
は、柱1の上下方向に沿って上端筋2aを下方向に曲げ、
下端筋2bを上方向に曲げた一例を第2図に示したが、こ
れに限られずに、上端筋2aを上方向に曲げて下端筋2bを
下方向に曲げるようにすることを妨げるものではない。
In this case, as the direction of bending the beam main bars 2a and 2b, the upper end bars 2a are bent downward along the vertical direction of the column 1,
An example of bending the lower end streak 2b upward is shown in FIG. 2, but it is not limited to this, and it does not prevent the upper end streak 2a from bending upward and the lower end streak 2b to bend downward. Absent.

そして、壁付帯梁3の主筋3a,3bが、前記柱1内にお
いて、屈曲された前記梁主筋2a,2bが対向配置されてで
きる間隙に挿通して配筋される。
Then, the main reinforcements 3a, 3b of the wall-attached beam 3 are arranged in the column 1 by being inserted into the gap formed by the bent main reinforcements 2a, 2b facing each other.

その後、この柱1と梁2及び壁付帯梁3にそれぞれ現
場打ちコンクリートが打設されて前記梁2,柱1,壁付帯梁
3が一体に接合されるものである。
After that, in-situ concrete is poured into each of the pillar 1, the beam 2, and the wall-mounted beam 3 to join the beam 2, the pillar 1, and the wall-mounted beam 3 integrally.

本発明は、第3図乃至第5図に示すように、スラブと
梁の半PC(プレキャストコンクリート)化によっても同
様に適用できる。
The present invention can be similarly applied to the case where the slab and the beam are made of semi-PC (precast concrete) as shown in FIGS. 3 to 5.

ここで、第3図は平面図、第4図は、同じくその断面
図、第5図は、右側面図である。この半PC化による壁式
ラーメン構造を施工するには、半PC梁4に上端筋5を予
め取付けておく。
Here, FIG. 3 is a plan view, FIG. 4 is a sectional view of the same, and FIG. 5 is a right side view. In order to construct the wall type rigid frame structure by making this half PC, the upper end streak 5 is attached to the half PC beam 4 in advance.

そして、柱7では梁下までコンクリートを打設し、つ
いで所要コンクリート強度の発現後、型枠を取り外し
て、半PC梁4を架設し、その上端筋5と下端筋6とを、
その接合用定着長さを前述の場合と同様に確保して、且
つ、柱7の柱中心7aを越えないで、該柱7の上下方向に
沿って約90゜屈曲させる。
Then, in the pillar 7, concrete is placed under the beam, then after the required concrete strength is developed, the form is removed and the half-PC beam 4 is erected.
The fixing length for joining is secured in the same manner as in the above-mentioned case, and the pillar 7 is bent about 90 ° along the vertical direction without exceeding the pillar center 7a.

そして、壁付帯梁8の主筋8a,8bが、前記柱7内で屈
曲された前記梁4の上端筋5と下端筋6とが対向配置に
されてできた間隙に挿通して配筋される。
Then, the main reinforcements 8a, 8b of the wall-attached beam 8 are arranged by inserting them into a gap formed by the upper end reinforcement 5 and the lower end reinforcement 6 of the beam 4 bent in the column 7 being opposed to each other. .

その後、スラブ半PC板11の下までコンクリートを打ち
上げて該スラブ半PC板11を支持する。
After that, concrete is driven up to under the slab half PC board 11 to support the slab half PC board 11.

更に、柱7内に帯筋9を、半PC梁4の前記上端筋5が
先組みのため落とし込みができないので、左右分割して
それぞれで柱7の主筋に巻回して配筋し、これらの分割
された帯筋9を補強するために、水平補強帯筋10を前記
帯筋9に平行に沿わせるように柱7の主筋に架け渡して
配筋する。
Further, since the upper end reinforcement 5 of the half-PC beam 4 cannot be dropped because the upper end reinforcement 5 of the half-PC beam 4 is pre-assembled, the strip reinforcement 9 is divided into left and right and wound around the main reinforcement of the column 7 to arrange them. In order to reinforce the divided stirrup 9, the horizontal reinforcing stirrup 10 is laid across the main bar of the column 7 so as to run parallel to the stirrup 9.

この後、スラブ上端筋を配筋してこのスラブ上端およ
び柱7内と、半PC梁4及び壁付帯梁8の各々の梁上端に
コンクリートを打設して一体化を図る。
After that, the slab upper end reinforcement is arranged, and concrete is placed on the upper end of the slab and the pillar 7 and the upper end of each beam of the half PC beam 4 and the wall-attached beam 8 to integrate them.

(発明の効果) 以上説明したように、本発明に係る壁式ラーメン工法
における主筋の接合方法を、梁内から柱部内へ定着させ
る梁主筋が、その接合用の定着長さを確保し、且つ、柱
中心を越えないで柱の上下方向に沿って屈曲されて前記
柱中心を間に対向して配筋され、壁付帯梁主筋が、前記
柱部内で屈曲された前記梁主筋が対向配置にされてでき
た間隙に挿通して配筋され、梁,柱,壁付帯梁が一体に
接合されることとしたので、梁と壁付帯梁との主筋が直
接的に交差しないので、コンクリートが緻密に充填され
信頼性が向上するとともに配筋施工能率が向上し、鉄筋
加工も容易となり、配筋に要する工期短縮が可能とな
る。
(Effects of the Invention) As described above, the beam main bar for fixing the main bar joining method in the wall-type rigid frame construction method according to the present invention from the inside of the beam to the inside of the pillar secures the fixing length for the joining, and , The bar main bar that is bent along the up-down direction of the column and does not exceed the center of the column and is arranged so as to face the center of the column, and the beam main bar that is bent in the column section is arranged to face each other. Since it was decided that the beams, columns, and beam with walls will be integrally joined by inserting through the gap created by the above, the main bars of the beam and beam with walls do not intersect directly, so the concrete is dense. In addition to improving the reliability, the efficiency of reinforcing bar arrangement is improved, the processing of reinforcing bars is facilitated, and the work period required for reinforcing bars can be shortened.

先組加工もできることになって、工期短縮とともにコ
スト低減ともなる。
Pre-assembly processing will also be possible, shortening the construction period and reducing costs.

また、主筋同士の溶接等の補強作業も不要となり、労
力の軽減となりまた安全性も向上することになる。
Further, reinforcement work such as welding of the main bars is unnecessary, which reduces labor and improves safety.

更に、主筋の上下,左右の位置をずらす必要がないの
でコンクリートのかぶりに無駄がなくなる。
Further, since it is not necessary to shift the vertical and horizontal positions of the main reinforcing bar, there is no waste in covering concrete.

【図面の簡単な説明】[Brief description of drawings]

第1図は、本発明を実施した場合の平面図であり、第2
図は同じくその縦断面図、第3図は、本発明の他の実施
例に係る平面図、第4図は、同じくその縦断面図、第5
図は、同じくその右側面図、第6図は、従来例に係る壁
式ラーメン構造の平面図、第7図は従来例に係る壁式ラ
ーメン構造の一部を破断して示す斜視図である。 1……柱、1a……柱中心、2……梁、 2a……梁の上端筋、2b……梁の下端筋、 3……壁付帯梁、3a……壁付帯梁の上端筋、3b……壁付
帯梁の下端筋、 4……半PC梁、5……半PC梁の上端筋、6……半PC梁の
下端筋、 7……柱、7a……柱中心、 8……壁付帯梁、8a,8b……主筋、 9……帯梁、10……水平補強帯筋、11……スラブ半PC
板。
FIG. 1 is a plan view of a case where the present invention is implemented, and FIG.
FIG. 4 is a vertical sectional view thereof, FIG. 3 is a plan view according to another embodiment of the present invention, and FIG.
FIG. 7 is a right side view of the same, FIG. 6 is a plan view of a wall-type rigid frame structure according to a conventional example, and FIG. 7 is a perspective view showing a part of the conventional wall-type rigid frame structure. . 1 …… Column, 1a …… Center of center, 2 …… Beam, 2a …… Upper beam of beam, 2b …… Lower beam of beam, 3 …… Band beam with wall, 3a …… Upper beam of beam with wall, 3b ...... Lower end bar of beam with wall, 4 …… Half PC beam, 5 …… Upper end bar of half PC beam, 6 …… Lower end bar of half PC beam, 7 …… Column, 7a …… Column center, 8 …… Girder with wall, 8a, 8b …… Main bar, 9 …… Girder, 10 …… Horizontal reinforcing bar, 11 …… Slab half PC
Board.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】鉄筋コンクリート構造物の壁式ラーメン工
法における主筋の接合方法において、梁内から柱部内へ
定着される梁主筋が、その接合用の定着長さを確保し、
且つ、柱中心を越えないで当該柱の上下方向に沿って屈
曲されて前記柱中心を間に対向して配筋され、前記梁主
筋の直交方向に配筋される壁付帯梁の主筋が、前記柱部
内で対向配置にされた梁主筋の間隙に挿通されて、当該
壁付帯梁の主筋と前記梁主筋とが互いに交差しないよう
に配筋され、コンクリートが打設されて梁,柱,壁付帯
梁が一体に接合されることを特徴としてなる壁式ラーメ
ン工法における主筋の接合方法。
1. A method of joining main bars in a wall-type rigid frame construction method for a reinforced concrete structure, wherein the beam main bars anchored from the inside of the beam to the column portion secure an anchoring length for the joining,
And, the main bar of the wall-attached beam, which is bent along the vertical direction of the pillar without crossing the center of the pillar, is arranged to face the center of the pillar, and is arranged in a direction orthogonal to the main bar of the beam, Beams, columns and walls are inserted through the gaps of the beam main bars arranged opposite to each other in the column portion, and are arranged so that the main bars of the beam-attached beam and the beam main bars do not intersect with each other and concrete is cast. A method for joining main bars in a wall-type rigid frame method characterized in that ancillary beams are integrally joined.
JP2184174A 1990-07-13 1990-07-13 Joining method of main bar in wall type frame method Expired - Fee Related JP2542279B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2184174A JP2542279B2 (en) 1990-07-13 1990-07-13 Joining method of main bar in wall type frame method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2184174A JP2542279B2 (en) 1990-07-13 1990-07-13 Joining method of main bar in wall type frame method

Publications (2)

Publication Number Publication Date
JPH0473339A JPH0473339A (en) 1992-03-09
JP2542279B2 true JP2542279B2 (en) 1996-10-09

Family

ID=16148660

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2184174A Expired - Fee Related JP2542279B2 (en) 1990-07-13 1990-07-13 Joining method of main bar in wall type frame method

Country Status (1)

Country Link
JP (1) JP2542279B2 (en)

Also Published As

Publication number Publication date
JPH0473339A (en) 1992-03-09

Similar Documents

Publication Publication Date Title
JP2001342679A (en) CONNECTING METHOD FOR PCa BEAM MEMBER AT COLUMN/BEAM JUNCTION AND PCa BEAM MEMBER FOR IT
JP4657993B2 (en) Beam-column joint structure and construction method thereof
JP2542279B2 (en) Joining method of main bar in wall type frame method
JP7158996B2 (en) Joining structure and joining method of precast concrete beam members
JPH0480444A (en) Connection unit of reinforced concrete pole and steel framed beam
JPH0452321Y2 (en)
JPH1025840A (en) Constructing method for building frame with precast anti-seismic wall
JPS6312987B2 (en)
JP2651322B2 (en) Construction method of wall type rigid frame structure
JPH0420639A (en) Pc small beam
JP2651321B2 (en) Anchoring method of beam in wall type rigid frame structure
JPH0261237A (en) Joining method for half precast concrete beam and cast-in-place concrete girder
JPH026901B2 (en)
JPH1077614A (en) Construction method for superstructure work of pier
JPH084177A (en) Joint method of beam/slab
JP2715162B2 (en) Reinforcement method for joints between piles and foundations
JPH03228934A (en) Jointing method for pillar and beam
JPH0588331B2 (en)
JPH11264189A (en) Constructing method of steel-framed and steel reinforced concrete composite building
JPS5952042A (en) Joint of iron skeletal and iron wire
JPH03132544A (en) Setting of precast beam
JPH09177239A (en) Precast reinforced concrete beam and its framing method
JPS61286429A (en) Connection of pc pillar and beam
JPS61286430A (en) Connection of pc pillar and beam
JPS6251335B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070725

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080725

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080725

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090725

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees