JPS58222211A - Pile driving work using platform and temporary pier - Google Patents
Pile driving work using platform and temporary pierInfo
- Publication number
- JPS58222211A JPS58222211A JP10390282A JP10390282A JPS58222211A JP S58222211 A JPS58222211 A JP S58222211A JP 10390282 A JP10390282 A JP 10390282A JP 10390282 A JP10390282 A JP 10390282A JP S58222211 A JPS58222211 A JP S58222211A
- Authority
- JP
- Japan
- Prior art keywords
- platform
- pile
- temporary pier
- garter
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/14—Components for drivers inasmuch as not specially for a specific driver construction
- E02D7/16—Scaffolds or supports for drivers
Abstract
Description
【発明の詳細な説明】 本発明はセップと仮桟橋を用いた杭打工法に関する。[Detailed description of the invention] The present invention relates to a pile driving method using cep and a temporary pier.
LPG、石油、化学品等の貯蔵管理および受払い業務等
の目的とした流通基地となるシーバースを建設するには
、海底下に基礎となる杭を打込む。In order to construct a sea berth, which will serve as a distribution base for storing and managing LPG, petroleum, and chemicals, as well as receiving and receiving operations, piles will be driven into the seabed to serve as the foundation.
この杭打ち施工には、通常、セップと称けられる海上作
業台を用いてケーシングパイプの建込みや岩盤掘削ある
いは杭の打込みを行うようにしている。しかし従来は、
セップの舷側で施工していたので、ごくかぎられた範囲
しか施工できなかった。また仮桟橋のみで杭打施工する
方式もあるが、この方式による場合は、仮桟橋が大がか
りになり、かつ施工機械の移動が大変であった。For this pile driving work, an offshore workbench called a SEP is usually used to install casing pipes, excavate rock, or drive piles. However, conventionally,
Since construction was being carried out on the side of the cep, construction could only be done in a very limited area. There is also a method of driving piles using only a temporary pier, but with this method, the temporary pier would be large-scale and it would be difficult to move the construction machinery.
したがって本発明は、小型なセップでもって広範囲にし
かも大型杭打の施工が可能な杭打工法を提供することを
目的としてなされたものである。Therefore, it is an object of the present invention to provide a pile driving method that allows large-sized piles to be driven over a wide range with a small-sized sepp.
このため本発明の杭打ら工法によれば、杭を打・込む個
所の海底に比較的小型のセップを設置ツると共に、その
セップに近接させて仮桟橋を海底に設置し、セップには
移動可能なガーターが搭載されていると共にそのガータ
ーにはガーター上を移動可能で杭打槽を支持した旋回台
が設けられており、ガーターをセップの舷側に張出しガ
ーターに取付(プたカーター受ジヤツキの脚を伸ばして
仮桟橋に固定し、かつ旋回台も張出し、ケーシングパイ
プあるいは鋼管杭の荷重をセツプと仮桟橋により支持し
てケーシングパイプの建込みあるいは岩盤掘削あるいは
鋼管杭の打込みを行う。Therefore, according to the pile driving method of the present invention, a relatively small CEP is installed on the seabed at the location where the piles will be driven, and a temporary pier is installed on the seabed in close proximity to the CEP. A movable garter is installed, and the garter is equipped with a swivel base that can be moved on the garter and supports the pile driving tank. The legs of the casing pipe are extended and fixed to the temporary pier, the swivel table is extended, and the load of the casing pipe or steel pipe pile is supported by the sep and the temporary pier, and the casing pipe is erected, rock is excavated, or the steel pipe pile is driven.
以下、図面を参照し本発明の実施例につき説明する。Embodiments of the present invention will be described below with reference to the drawings.
この実施例では、シーバースを建設するにあたっての基
礎杭として斜杭を打込み、かつ海底地層は堆積層が薄く
、1#積層のみでは根大長が不足して所定の引抜抵抗力
が得られず、岩盤に引抜抵抗力をとる必要がある場合を
例に挙げ説明する。In this example, diagonal piles were driven as foundation piles when constructing a sea berth, and the sedimentary layer of the seabed strata was thin, and with only 1# lamination, the root length was insufficient and the specified pullout resistance could not be obtained. This will be explained using an example where it is necessary to provide a pull-out resistance force to the rock.
第1図および第2図において、全体を1で示すものはセ
ップで、セツプ1は杭打現場の海底に従来の態様で据付
ける。このセツブ1としては比較的小型のものを用いる
。セップ1上には従来のセップと同様、ヒップを固定す
るために用いるアン□
カーウィンチ2、ケーシングパイプや鋼管杭を吊上げる
クローラクレーン3、油圧ユニット4、発電機5、仮設
ハウス6等が設【)られている。セツプ1上には移動可
能なガーター7が設りられており、このガーター7はジ
ヤツキ8により廿ツブ1の舷側に張出されるようになっ
ている。ガーター7の比較的先端側には下方に延びるガ
ーター受ジヤツキ9が設けられており、またガーター7
上には杭打機を支持する旋回台10がガーター7に対し
て移動可能に設(プられており、この旋回台10はジヤ
ツキ11により張出されるようになっている。旋回台1
0にはウィンチ12等が設番プられている′。13は杭
打機であって、その下端は旋回台10の先端に軸支14
されていて旋回台10と杭打機13どの間に設けられた
シリンダ15により傾斜角度が変えられるようになって
いる。杭打機13の下端にはケーシングパイプあるい鋼
管杭を掴むパテルキャッチ16が設けられている。全体
を17で示すものはセツプ1に近接させて海底に据付け
られた仮桟橋であり、図示のようにガーター7をセップ
1の岐・側に張出し、ガーター受ジヤツキ9の脚を伸ば
して板側17に固定することによりケーシングパイプや
鋼管杭の荷重をセツブ1と仮桟橋17どで支持する。In Figures 1 and 2, the number 1 in its entirety indicates a sep, which is installed on the seabed at the pile driving site in a conventional manner. As this set 1, a relatively small one is used. On top of the SEP 1, similar to the conventional SEP, there is an anchor winch 2 used to fix the hips, a crawler crane 3 for hoisting casing pipes and steel pipe piles, a hydraulic unit 4, a generator 5, a temporary house 6, etc. [) is being done. A movable garter 7 is provided on the sep 1, and this garter 7 is extended to the side of the septum 1 by means of a jack 8. A garter receiving jack 9 extending downward is provided at a relatively distal end side of the garter 7.
A swivel base 10 for supporting a pile driver is installed on the top so as to be movable relative to the garter 7, and this swivel base 10 is extended by a jack 11.
0 has the installation number of winch 12, etc. Reference numeral 13 denotes a pile driver, the lower end of which is attached to a pivot 14 at the tip of the swivel base 10.
The angle of inclination can be changed by a cylinder 15 provided between the swivel table 10 and the pile driver 13. A patel catch 16 for gripping a casing pipe or a steel pipe pile is provided at the lower end of the pile driver 13. The one indicated as a whole by 17 is a temporary pier installed on the seabed close to Sep 1. As shown in the figure, the garter 7 is extended to the fork/side of Sep 1, and the legs of the garter jacks 9 are extended to the board side. By fixing it to 17, the load of the casing pipe and steel pipe pile is supported by the set 1 and the temporary pier 17.
杭打IN :Tに際しては、杭を打込む個所の海底にセ
ップ1を設置すると共にそのセツプ1に近接させて仮桟
橋17を海底に設置する。ガーター7をジトツ4:8に
よりLツブ1の舷側に張出し、ガーター受ジヤツキ9の
脚を伸ばして仮桟橋17に固定する。これによりケーシ
ングパイプあるいは鋼管杭の荷重はセツブ1と仮桟橋1
7により支持されることになる。シリンダ15を作動し
て杭打機13の傾斜角痩を定め、またジヤツキ11によ
り旋回台10を張出す。Pile driving IN: When performing T, a SEP 1 is installed on the seabed at the location where the pile is to be driven, and a temporary pier 17 is installed on the seabed close to the SEP 1. The garter 7 is extended to the side of the L-tube 1 with a pitch of 4:8, and the legs of the garter receiving jack 9 are extended and fixed to the temporary pier 17. As a result, the load on the casing pipe or steel pipe pile is reduced to Setsubu 1 and Temporary Pier 1.
7. The cylinder 15 is actuated to determine the inclination angle of the pile driver 13, and the swing table 10 is extended by the jack 11.
この状態でまずケーシングパイプPを杭打機13と杭打
機(図示せず)により岩盤に達するまでシルト、砂等の
堆積層に打込む。図ではケーシングパイプPを堆積層に
打込み、ケーシングパイプPをパテルキャッチ16で掴
み、掘削機のドリルパイプをケーシングパイプPに通し
て岩盤掘削している状態を示し、掘削111Kをウィン
チ12のワイヤロープに連結し杭打機13にセットして
岩盤掘削を行う。所定の深度だけ岩盤掘削を終えれば5
−
掘削機1くを杭打機13から撤去し、クレーン3により
図示されていない鋼管杭を吊下げ杭打機13を利用して
鋼管杭をケーシングパイプP内に通して掘削機で掘削し
た岩盤掘削孔内に建込み。次いで鋼管杭内を通してグラ
ウトパイプによりモルタルのようなグラウト材を岩盤と
鋼管杭との間に充填し、岩盤と鋼管杭との一体化をはか
り、グラウト材の所定の養生期間を終えたのちケーシン
グパイプPをパワーケーシングジヤツキ等により引扱く
。前述の作業を繰り返し、斜杭が完了したならば鋼管杭
の頭部の結構を行う。そしてこの杭を用いてシーバース
を建設する。In this state, first, the casing pipe P is driven into the deposited layer of silt, sand, etc. using the pile driver 13 and the pile driver (not shown) until it reaches the bedrock. The figure shows a state in which the casing pipe P is driven into the sedimentary layer, the casing pipe P is grabbed by the Patel catch 16, and the drill pipe of the excavator is passed through the casing pipe P to excavate the rock. It is connected to the pile driver 13 and set in the pile driver 13 to perform rock excavation. 5 if the rock excavation is completed to the specified depth.
- Remove the excavator 1 from the pile driver 13, suspend the steel pipe pile (not shown) using the crane 3, pass the steel pipe pile through the casing pipe P using the pile driver 13, and excavate the rock with the excavator. Built inside the excavation hole. Next, a grout material such as mortar is filled between the rock mass and the steel pipe pile using a grout pipe passed through the steel pipe pile to integrate the rock mass and the steel pipe pile, and after the specified curing period of the grout material is completed, the casing pipe is removed. Handle P using a power casing jack, etc. Repeat the above work, and once the diagonal pile is completed, construct the head of the steel pipe pile. The sea berth will then be constructed using these piles.
その他種の打込工法としては、掘削機で掘削する岩盤掘
削孔の孔径を鋼管杭の径よりややアンダーサイズにして
おき鋼管杭を杭打機で打込んで岩盤と鋼管杭との摩擦力
により杭に引抜抵抗力を与えるようにしてもよい。Another type of driving method is to make the diameter of the hole in the rock excavated with an excavator slightly smaller than the diameter of the steel pipe pile, and then drive the steel pipe pile with a pile driver, so that the friction force between the bedrock and the steel pipe pile is used. The pile may be provided with a pulling resistance force.
以上説明したように本発明では、セツプに移動可能なガ
ーターを搭載し、かつセツプと仮桟橋とを組合せてケー
シングパイプあるいは鋼管杭の荷6−
重をセップと仮桟橋で支持づるようにしているので、小
型なLツブでもって広範囲にしかも大型杭打の施■が可
能となり、また仮桟橋のみで施工する方式のように仮桟
橋が大がかりになったり施工機械の移動が大変であった
りする等の不都合を生じない。As explained above, in the present invention, a movable garter is mounted on the sep, and the sep and the temporary pier are combined so that the load of the casing pipe or steel pipe pile is supported by the sep and the temporary pier. Therefore, it is possible to drive large piles over a wide area with a small L-tube, and it also eliminates the problem of construction methods that use only temporary piers, which require large-scale temporary piers and difficulty in moving construction machinery. This will not cause any inconvenience.
図面は本発明に係る杭打T法を実m する装置の一例を
示し、第1図に1.側面図、第2図は平面図である。
1・・・セップ 7・・・ガーター 8・・・ジヤ
ツキ 9・・・ガーター受ジヤツキ10・・・旋回台
11・・・シトツキ13・・・杭打槽 15・・
・シリンダ 17・・・仮桟橋The drawings show an example of an apparatus for implementing the pile driving T method according to the present invention, and FIG. 1 shows 1. The side view and FIG. 2 are plan views. 1... Sep 7... Garter 8... Jacket 9... Garter receiver jack 10... Swivel base 11... Shitotsuki 13... Pile driving tank 15...
・Cylinder 17...Temporary pier
Claims (1)
ップに近接させて仮桟橋を海底に設置し、セップには移
動可能なガーターが搭載されていると共に、そのガータ
ーにはガーター上を移動可能で杭打槽を支持した旋回台
が設けられており、ガーターをセップの舷側に張出しガ
ーターに取付けたガーター受ジヤツキの脚を伸ばして仮
桟橋に固定し、かつ旋回台も張出し、ケーシングパイプ
あるいは鋼管杭の荷重をセップと仮桟橋により支持して
ケーシングパイプの建込みあるいは岩盤掘削あるいは鋼
管杭の打込みを行うことを特徴とするセップと仮桟橋を
用いた杭打工法。A cep is installed on the seabed at the location where the piles will be driven, and a temporary pier is installed on the seabed in close proximity to the cep.The cep is equipped with a movable garter, and the garter can be moved on the garter. A swivel base supporting the pile driving tank is installed, and the garter is extended to the side of the cep, and the legs of the garter jack attached to the garter are extended and fixed to the temporary pier, and the swivel base is also extended, and the casing pipe or steel pipe is A pile driving method using a CEP and a temporary pier, which is characterized by supporting the load of the pile with a CEP and a temporary pier, and then erecting a casing pipe, excavating rock, or driving a steel pipe pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10390282A JPS58222211A (en) | 1982-06-18 | 1982-06-18 | Pile driving work using platform and temporary pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10390282A JPS58222211A (en) | 1982-06-18 | 1982-06-18 | Pile driving work using platform and temporary pier |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS58222211A true JPS58222211A (en) | 1983-12-23 |
JPS6133930B2 JPS6133930B2 (en) | 1986-08-05 |
Family
ID=14366351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10390282A Granted JPS58222211A (en) | 1982-06-18 | 1982-06-18 | Pile driving work using platform and temporary pier |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS58222211A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6375219A (en) * | 1986-09-16 | 1988-04-05 | Kajima Corp | Pile driving work by offshore working platform |
WO2014045077A1 (en) * | 2012-09-21 | 2014-03-27 | Soletanche Freyssinet | Dock building apparatus and method of construction using the same |
CN111411627A (en) * | 2019-12-12 | 2020-07-14 | 中国船舶重工集团应急预警与救援装备股份有限公司 | Vehicle-mounted piling and plugging device |
-
1982
- 1982-06-18 JP JP10390282A patent/JPS58222211A/en active Granted
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6375219A (en) * | 1986-09-16 | 1988-04-05 | Kajima Corp | Pile driving work by offshore working platform |
WO2014045077A1 (en) * | 2012-09-21 | 2014-03-27 | Soletanche Freyssinet | Dock building apparatus and method of construction using the same |
KR20150056798A (en) * | 2012-09-21 | 2015-05-27 | 소레탄체 프레씨네트 | Dock building apparatus and method of construction using the same |
CN104736465A (en) * | 2012-09-21 | 2015-06-24 | 索列丹斯-弗莱西奈公司 | Dock building apparatus and method of construction using the same |
US20150218765A1 (en) * | 2012-09-21 | 2015-08-06 | Soletanche Freyssinet | Dock building apparatus and method of construction the same |
JP2015530331A (en) * | 2012-09-21 | 2015-10-15 | ソレタンシュ フレシネSoletanche Freyssinet | Dock building apparatus and construction method using the building apparatus |
AU2012390560B2 (en) * | 2012-09-21 | 2018-08-09 | Soletanche Freyssinet | Dock building apparatus and method of construction using the same |
US10179984B2 (en) | 2012-09-21 | 2019-01-15 | Soletanche Freyssinet | Dock building apparatus and method of construction using the same |
CN111411627A (en) * | 2019-12-12 | 2020-07-14 | 中国船舶重工集团应急预警与救援装备股份有限公司 | Vehicle-mounted piling and plugging device |
CN111411627B (en) * | 2019-12-12 | 2022-01-21 | 中国船舶重工集团应急预警与救援装备股份有限公司 | Vehicle-mounted piling and plugging device |
Also Published As
Publication number | Publication date |
---|---|
JPS6133930B2 (en) | 1986-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105386408B (en) | Deep-water bridge pile foundation construction method | |
CN102803616B (en) | For the method and apparatus manufacturing the underwater foundation of building | |
CN103741657B (en) | The construction method of large-sized multifunction waterborne traffic accident | |
CN109797749B (en) | Underwater foundation pit construction device and construction method | |
CN209741877U (en) | Cofferdam structure with concrete ring beam water stop additionally arranged at root of steel sheet pile | |
CN107642041A (en) | The hollow clump of piles anchorage of super-large diameter | |
CN104727324B (en) | Irregular basement construction method for supporting | |
CN106869138A (en) | A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method | |
JP5813109B2 (en) | Surface-projecting reusable underwater template for installing one or more underwater struts or piles | |
CN203654196U (en) | Guide apparatus for large and multifunctional over-water construction platform | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
JP2515888B2 (en) | Construction method of steel pipe pile for building offshore structure and its equipment | |
CN107642040A (en) | The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter | |
JP2004285735A (en) | Method of constructing temporary landing bridge by using truss frame | |
WO2023109014A1 (en) | Construction apparatus and construction method for steel pipe pile in bare rock riverbed | |
CN106498957A (en) | Steel sheet pile cofferdam construction platform and integral construction method | |
US3115013A (en) | Artificial island and method of constructing the same | |
JPS58222211A (en) | Pile driving work using platform and temporary pier | |
CN202969333U (en) | Steel truss rock-socketed wharf structure | |
JP2020128672A (en) | Installation method of mono-pile foundation for offshore wind power generation and mono-pile foundation for offshore wind power generation | |
CN205116239U (en) | Engineering pile foundation static load detects resistance anchor hoe | |
KR100819379B1 (en) | Concrete construction using hydraulic system and anti-noise non-vibration manufacturing method of concrete construction | |
JP2000154538A (en) | Plumb bob type device for driving steel pipe in inner moat and plumb bob type construction method of driving steel pipe in inner moat | |
CN108978645A (en) | Rich water sandy gravel shallow embedding riverbed uplift pile anti-floating plate reinforced construction method is worn under shield | |
CN215888268U (en) | Utilize slant steel of steel stand biography power to trade and prop system |