CN205116239U - Engineering pile foundation static load detects resistance anchor hoe - Google Patents

Engineering pile foundation static load detects resistance anchor hoe Download PDF

Info

Publication number
CN205116239U
CN205116239U CN201520909760.4U CN201520909760U CN205116239U CN 205116239 U CN205116239 U CN 205116239U CN 201520909760 U CN201520909760 U CN 201520909760U CN 205116239 U CN205116239 U CN 205116239U
Authority
CN
China
Prior art keywords
supporting seat
drag strut
hoe
pile foundation
strut plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520909760.4U
Other languages
Chinese (zh)
Inventor
陆剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520909760.4U priority Critical patent/CN205116239U/en
Application granted granted Critical
Publication of CN205116239U publication Critical patent/CN205116239U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The utility model provides an engineering pile foundation static load detects resistance anchor hoe which characterized in that: include supporting seat, drag strut board, take off a device and rings, the supporting seat on be equipped with the back shaft, the drag strut board passes through back shaft and support connection, the drag strut board can be made the circumference along the back shaft and rotate, take off a device locate the supporting seat upper portion and support connection, the top intermediate position of supporting seat is located to rings, the supporting seat bottom is equipped with recovery unit. The utility model discloses an it is reasonable that engineering pile foundation static load detects resistance anchor hoe has structural design, and easy operation is convenient, and the manufacturing of equipment, maintenance, implementation cost are low, and detection field easily assembles and dismantles, and the convenience is retrieved to the experimental back of accomplishing, can show characteristics such as the work efficiency that improves pile foundation static load testing and security.

Description

Engineering pile foundation dead-load detection resistance anchor is uprooted
Technical field
The utility model relate to a kind of resistance anchor hoe, be a kind of be specifically designed to the pile foundation of construction project carry out dead-load detection test resistance anchor hoe.
Background technology
Along with the continuous progress of society, increasing of highrise building, to the corresponding increase of the consumption of pile foundation, proposes higher requirement by pile foundation; In addition, for geotechnical engineering, pile foundation has vital effect, and along with the development of geotechnical engineering, also proposes higher requirement by building pile foundation.No matter adopt any pile foundation, in order to avoid or reduce pile foundation and go wrong, the relevant peremptory norm of country specifies to select the pile foundation doing some to carry out field load test, determines whether the ultimate bearing capacity of single pile of pile foundation reaches designing requirement.
The method used when carrying out dead-load detection test to the pile foundation in construction project field is at present ballast method mostly, anchored pile-testing method and resistance cylinder method, this several method is all adopt oil jack to withstand on test pile stake top load application, and the counter-force of jack, ballast method balances with it by the heap on reaction frame is heavy, counter-force is passed to anchoring pile by reaction frame by anchored pile-testing method, balance with the uplift resistance of anchoring pile, resistance cylinder is then utilize in the engaging-in subterranean strata adjacent outside cylindrical shell of the drag strut plate outside resistance cylindrical shell, the upwards resistance to plucking overall drag body of a larger load is produced when resistance cylindrical shell is promoted, balance by this resistance body and jack.
Its subject matter existed is:
Ballast method must solve hundreds of ton even go up kiloton load source, pile into and transportation problem; Anchored pile-testing method must arrange many anchoring piles and counter-force crossbeam, many anchoring piles not only required somewhat expensive, and curing time is longer, and is subject to the restriction of tonnage and site condition; Resistance cylinder is then because the uneven easy generation of mass strength of cylindrical shell both sides is bored deeply inconsistent.1, the concrete in mass block needed for ballast method effectively goes along with sb. to guard him protection because lacking; concrete block landing and ballast carrier total Collapse phenomenon is often there is in detection experiment process; cause the work safety accidents such as Site Detection staff injures and deaths, all there is the problem such as each assembly installing/dismounting, detection experiment implementation process time length in ballast detection method simultaneously.2, anchored pile-testing method is in process of the test, when the pressure loaded is excessive, the plumb joint of anchoring pile and the main muscle of anchoring pile pile crown may be caused to split or be pulled off, the reaction frame directly causing girder steel to combine with anchoring pile caves in by this, so not only can be damaged to the coherent detection such as jack and displacement transducer instrument, and will hide some dangers for the safety of testing crew.
So the applicant has invented a kind of engineering pile foundation dead-load detection resistance cylinder and detection method in June, 2014, as follows:
1. Chinese patent: (application number is: 201410298942.2) for engineering pile foundation dead-load detection resistance cylinder and detection method, disclose a kind of engineering pile foundation dead-load detection resistance cylinder and detection method, be characterized in: comprise resistance cylindrical shell, drag strut plate, propulsion plant and distance rod, described drag strut plate and propulsion plant are located in resistance cylindrical shell, drag strut plate is connected by distance rod with propulsion plant, resistance cylindrical shell is provided with hole, drag strut plate moves horizontally along hole under the promotion of propulsion plant, also drag strut panel assembly can be located on the lateral surface of resistance cylindrical shell, drag strut plate from resistance cylindrical shell hole stretch out or lateral surface launch after, creep in underground rock-soil layer adjacent outside resistance cylindrical shell the upwards anti-group resistance strengthening resistance cylindrical shell, ground crossbeam counterforce device is by this resistance body, again by hydraulic jack to crossbeam counterforce device load application, dead-load detection test is carried out to pile foundation.Engineering pile foundation dead-load detection resistance cylinder of the present invention and detection method have reasonable in design, simple to operation, can significantly improve the feature such as operating efficiency and safety of static load of pile foundation detection experiment.
But the applicant finds through using after a period of time, and this resistance cylinder also also exists some defects, this be due to: 1. cost is high, and make more than at least 10 ten thousand yuan, a resistance cylinder, cost of investment is high.2. reclaim difficulty, resistance cylinder is in process of the test, when the underground mass strength of resistance cylindrical shell lateral surface is inconsistent, drag strut plate on resistance cylindrical shell is engaging-in deeply different to boring during the rock-soil layer of underground, easily cause above resistance cylindrical shell to tilt to alarmed and panicky soft rock soil layer one side, make resistance cylinder discontinuity, and resistance cylindrical shell upper outside and surperficial generation of adjacent underground rock-soil layer are rubbed, when this frictional force is larger, ground lifting appliance cannot promote upper earthward for resistance cylindrical shell, the resistance cylindrical shell of fabricating cost costliness easily will cause loss.
Summary of the invention
The purpose of this utility model is to provide a kind of reasonable in design, simple to operation, the manufacture of equipment, maintenance, implementation cost are low, Test Field is easy to assembly and disassembly, test rear recovery convenient, the operating efficiency of static load of pile foundation detection experiment and the engineering pile foundation dead-load detection resistance anchor hoe of safety can have been significantly improved.
The utility model is achieved in that
A kind of engineering pile foundation dead-load detection resistance anchor hoe, it is characterized in that: comprise supporting seat, drag strut plate, de-shaft device and suspension ring, described supporting seat is provided with back shaft, drag strut plate is connected with supporting seat by back shaft, drag strut plate can make circular-rotation along back shaft, described de-shaft device to be located on supporting seat and to be connected with supporting seat, and the crown center position of supporting seat is located at by suspension ring, is provided with retracting device bottom supporting seat.
Further, described drag strut plate and back shaft are located at top or the bottom of supporting seat.
Further, described drag strut plate in working order time be the level of state be positioned at supporting seat both sides or multiple lateral surface on.
Further, described de-shaft device adopts working method that is electronic or hydraulic pressure.
Further, be provided with hinge in described retracting device, hinge is connected with drag strut plate.
Further, described drag strut plate end is provided with plate point.
The detection method of the utility model engineering pile foundation dead-load detection resistance anchor hoe is:
(1) artificial near engineering test pile foundation or mechanical equivalent of light excavation foundation ditch, the diameter of excavation pit, the degree of depth and quantity are depending on the static load class requirement of engineering pile foundation, then with crane, resistance anchor hoe body is hung at the bottom of the Foundation Pit put into and excavated, install the upwards lifting cable wire of resistance anchor hoe body, resistance anchor hoe body is installed simultaneously and upwards promotes cable wire on ground crossbeam counterforce device.
(2) resistance anchor hoe body hangs after at the bottom of the Foundation Pit put into and excavated by crane, unclamp resistance anchor hoe body on drag strut plate tie up rope, two or more drag strut plate will be naturally outward-dipping from the both sides of resistance anchor hoe body because conducting oneself with dignity, rotate, conflict in tip meeting nature and the foundation pit walls surface of drag strut plate, now resistance anchor hoe body upwards promotes by ground lifting appliance, the adjacent underground rock-soil layer surface phase mutual friction in external side uprooted by drag strut plate tip meeting and resistance anchor under effect of inertia on resistance anchor hoe body, when ground lifting appliance continues resistance anchor hoe body upwards to promote, drag strut plate on resistance anchor hoe body most advanced and sophisticated under rubbing action Automatic-expanding creep into and engaging-inly uproot in the adjacent subterranean strata in external side to resistance anchor, now continue upwards to promote resistance anchor hoe body, drag strut plate on resistance anchor hoe body can fit tightly with underground rock-soil layer more firmly, form the upwards resistance to plucking overall drag body of a larger load, strengthen the entirety upwards resistance to plucking resistance of resistance anchor hoe body, ground pretension fixing device is used to proceed upwards prestretching to resistance anchor hoe body, when the resistance of generation after the resistance anchor hoe drag strut plate of body and underground rock-soil layer fit tightly cannot continue upwards after prestretching, the upwards lifting cable wire installing resistance anchor hoe body is to ground crossbeam counterforce device and be fastenedly connected, again by hydraulic jack to crossbeam counterforce device load application, dead-load detection test is carried out to pile foundation.
(3) after static load of pile foundation detection experiment end-of-job, the de-shaft device of resistance of start anchor hoe body, de-shaft device on resistance anchor hoe body is released back shaft from hole, lose back shaft support drag strut plate can nature from resistance anchor hoe body pine from, then the hinge on retracting device is utilized to hitch drag strut plate, prevent drag strut plate to come off losss from resistance anchor hoe body, the drag strut plate after recovery will reinstall to resistance anchor and uproot on body, is convenient to the recycling again of drag strut plate.
(4) after the drag strut plate on resistance anchor hoe body is deviate from, resistance anchor hoe body loses upwards resistance to plucking resistance, start ground lifting appliance, utilize ground lifting appliance to be hung out from foundation ditch by resistance anchor hoe body, complete the Site Detection experiment work of engineering pile foundation static load.
The utility model substantive distinguishing features and significant progress are:
1, resistance anchor hoe of the present utility model is the detection experiment kit assembled in advance, staff only need transport and lift resistance anchor and uproot at the bottom of the Foundation Pit excavated, then install and upwards promote cable wire on crossbeam counterforce device, just can implement the dead-load detection experiment work to engineering pile foundation.Operating process is simple and convenient, solve and use concrete block to come limited amount and the insecurity of ballast at present, concrete block landing is avoided to cause the work safety accidents such as testing staff's injures and deaths in detection experiment process, resistance anchor hoe body facilitates amount transport, lifting and storage simultaneously, greatly increases work efficiency.
2, resistance anchor hoe of the present utility model can replace anchoring pile and the resistance cylinder of multiple large-sized concrete block and manufacturing cost costliness, can greatly improve to pile foundation carry out dead-load detection test time working strength, improve the controlled requirement of safety of static load of pile foundation detection experiment process, the each assembly material of remarkable minimizing, in transport and the cost of handling process, reduces the use cost of testing equipment significantly.
3, the detection method of the utility model resistance anchor hoe uses simple, testing process safety, hoisting process time short, and only just need can complete the recovery of drag strut plate after test with hinge, retracting device conveniently.
4, resistance anchor hoe reasonable in design of the present utility model, simple to operation, the manufacture of equipment, maintenance, implementation cost are low, manufacture a resistance anchor hoe and only need about 10,000 yuan, greatly reduce manufacturing cost, Test Field is easy to assembly and disassembly, can significantly improve operating efficiency and the safety of static load of pile foundation detection experiment.
Accompanying drawing explanation
Fig. 1 is the perspective view of the utility model resistance anchor hoe.
Fig. 2 is that the drag strut plate of the utility model resistance anchor hoe and back shaft are located at the perspective view on the top of supporting seat.
Fig. 3 is the perspective view that the drag strut plate of the utility model resistance anchor hoe is positioned on supporting seat three lateral surfaces.
Fig. 4 is that Fig. 1 does not enter duty side-looking structural representation.
Fig. 5 is that Fig. 1 has started to enter duty side-looking structural representation.
Fig. 6 is that Fig. 1 enters duty side-looking structural representation completely.
Fig. 7 is Fig. 1 side-looking structural representation when finishing the work.
Fig. 8 is that Fig. 2 enters duty side-looking structural representation completely.
The component names that in figure, sequence number is relative:
Supporting seat 1, drag strut plate 2, back shaft 3, de-shaft device 4, roof supporting 5, retracting device 6, suspension ring 7.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model engineering pile foundation dead-load detection resistance anchor hoe is further described.
embodiment 1
As shown in Figure 1, engineering pile foundation dead-load detection resistance anchor hoe of the present utility model comprises supporting seat 1, drag strut plate 2, back shaft 3, de-shaft device 4, roof supporting 5, retracting device 6, suspension ring 7, described supporting seat 1 is provided with back shaft 3, drag strut plate 2 is connected with supporting seat 1 by back shaft 3, drag strut plate 2 can make circular-rotation along back shaft 3, described de-shaft device 4 to be located on supporting seat 1 and to be connected with supporting seat 1, the crown center position of supporting seat 1 is located at by suspension ring 7, is provided with retracting device 6 bottom supporting seat 1;
Further, described drag strut plate 2 and back shaft 3 are located at the bottom of supporting seat 1;
Further, described drag strut plate 2 in working order time be the level of state and be positioned at the both sides of supporting seat 1;
Further, described de-shaft device 4 adopts electronic working method;
Further, be provided with hinge in described retracting device 6, hinge is connected with drag strut plate 2;
Further, described drag strut plate 2 end is provided with plate point;
As shown in Figure 4, the both sides that plumbness is positioned at supporting seat 1 presented by drag strut plate 2, and resistance anchor hoe does not enter duty;
As shown in Figure 5, drag strut plate 2 can make circular-rotation along back shaft 3, and in Figure 5, drag strut plate 2 starts outwards to rotate from the both sides of supporting seat 1, tilt, and resistance anchor hoe has started to enter duty;
As shown in Figure 6, drag strut plate 2 can make circular-rotation along back shaft 3, and drag strut plate 2 cannot continue when turning to roof supporting 5 to make circular-rotation, and now described drag strut plate 2 is the level of state substantially; In figure 6, described drag strut plate 2 is the level of state and is positioned at the both sides of supporting seat 1, and resistance anchor hoe enters duty completely;
As shown in Figure 7, drag strut plate 2 is in lower vertical mode bit in the below of supporting seat 1, and retracting device 6 is connected with drag strut plate 2, convenient recovery drag strut plate 2, state when now resistance anchor hoe is finished the work.
embodiment 2
As shown in Figure 2, engineering pile foundation dead-load detection resistance anchor hoe of the present utility model comprises supporting seat 1, drag strut plate 2, back shaft 3, de-shaft device 4, roof supporting 5, retracting device 6, suspension ring 7, described supporting seat 1 is provided with back shaft 3, drag strut plate 2 is connected with supporting seat 1 by back shaft 3, drag strut plate 2 can make circular-rotation along back shaft 3, described de-shaft device 4 to be located on supporting seat 1 and to be connected with supporting seat 1, the crown center position of supporting seat 1 is located at by suspension ring 7, is provided with retracting device 6 bottom supporting seat 1;
Further, described drag strut plate 2 and back shaft 3 are located at the top of supporting seat 1;
Further, described drag strut plate 2 in working order time be the level of state and be positioned at the both sides of supporting seat 1;
Further, described de-shaft device 4 adopts the working method of hydraulic pressure;
Further, be provided with hinge in described retracting device 6, hinge is connected with drag strut plate 2;
Further, described drag strut plate 2 end is provided with plate point;
As shown in Figure 8, described drag strut plate 2 is positioned at the top of supporting seat 1, and described drag strut plate 2 is the level of state and is positioned at the both sides of supporting seat 1, and resistance anchor hoe enters duty completely.
embodiment 3
As shown in Figure 3, engineering pile foundation dead-load detection resistance anchor hoe of the present utility model comprises supporting seat 1, drag strut plate 2, back shaft 3, de-shaft device 4, roof supporting 5, retracting device 6, suspension ring 7, described supporting seat 1 is provided with back shaft 3, drag strut plate 2 is connected with supporting seat 1 by back shaft 3, drag strut plate 2 can make circular-rotation along back shaft 3, described de-shaft device 4 to be located on supporting seat 1 and to be connected with supporting seat 1, the crown center position of supporting seat 1 is located at by suspension ring 7, is provided with retracting device 6 bottom supporting seat 1;
Further, described drag strut plate 2 and back shaft 3 are located at the top of supporting seat 1;
Further, described drag strut plate 2 in working order time be the level of state and be positioned on three lateral surfaces of supporting seat 1.
Further, described de-shaft device 4 adopts electronic working method;
Further, be provided with hinge in described retracting device 6, hinge is connected with drag strut plate 2;
Further, described drag strut plate 2 end is provided with plate point.
As shown in Figure 3, described drag strut plate 2 is positioned at the top of supporting seat 1, and drag strut plate 2 is the level of state and is positioned on three lateral surfaces of supporting seat 1, and resistance anchor hoe enters duty completely.
Although embodiment of the present utility model is open as above, but it is not restricted to listed in manual and embodiment utilization, it can be applied to various applicable the field of the invention completely, for those skilled in the art, can easily realize other amendment, therefore do not deviating under the universal that claim and equivalency range limit, the utility model is not limited to specific details and illustrates here and the legend described.

Claims (6)

1. an engineering pile foundation dead-load detection resistance anchor hoe, it is characterized in that: comprise supporting seat (1), drag strut plate (2), de-shaft device (4) and suspension ring (7), described supporting seat (1) is provided with back shaft (3), drag strut plate (2) is connected with supporting seat (1) by back shaft (3), drag strut plate (2) can make circular-rotation along back shaft (3), described de-shaft device (4) is located at supporting seat (1) and is gone up and be connected with supporting seat (1), the crown center position of supporting seat (1) is located at by suspension ring (7), supporting seat (1) bottom is provided with retracting device (6).
2. engineering pile foundation dead-load detection resistance anchor hoe according to claim 1, is characterized in that: described drag strut plate (2) and back shaft (3) are located at top or the bottom of supporting seat (1).
3. engineering pile foundation dead-load detection resistance anchor according to claim 1 hoe, is characterized in that: described drag strut plate (2) in working order time be the level of state be positioned at supporting seat (1) both sides or multiple lateral surface on.
4. engineering pile foundation dead-load detection resistance anchor hoe according to claim 1, is characterized in that: described de-shaft device (4) adopts working method that is electronic or hydraulic pressure.
5. engineering pile foundation dead-load detection resistance anchor hoe according to claim 1, is characterized in that: be provided with hinge in described retracting device (6), hinge is connected with drag strut plate (2).
6. engineering pile foundation dead-load detection resistance anchor hoe according to claim 1, is characterized in that: described drag strut plate (2) end is provided with plate point.
CN201520909760.4U 2015-11-16 2015-11-16 Engineering pile foundation static load detects resistance anchor hoe Withdrawn - After Issue CN205116239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520909760.4U CN205116239U (en) 2015-11-16 2015-11-16 Engineering pile foundation static load detects resistance anchor hoe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520909760.4U CN205116239U (en) 2015-11-16 2015-11-16 Engineering pile foundation static load detects resistance anchor hoe

Publications (1)

Publication Number Publication Date
CN205116239U true CN205116239U (en) 2016-03-30

Family

ID=55571859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520909760.4U Withdrawn - After Issue CN205116239U (en) 2015-11-16 2015-11-16 Engineering pile foundation static load detects resistance anchor hoe

Country Status (1)

Country Link
CN (1) CN205116239U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350587A (en) * 2015-11-16 2016-02-24 陆剑 Engineering pile foundation static load detection resistance anchor hoe
CN106854878A (en) * 2016-12-28 2017-06-16 陆剑 Engineering pile foundation dead-load detection resistance support panel assembly and its application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350587A (en) * 2015-11-16 2016-02-24 陆剑 Engineering pile foundation static load detection resistance anchor hoe
CN105350587B (en) * 2015-11-16 2017-05-10 陆剑 Engineering pile foundation static load detection resistance anchor hoe
CN106854878A (en) * 2016-12-28 2017-06-16 陆剑 Engineering pile foundation dead-load detection resistance support panel assembly and its application method
CN106854878B (en) * 2016-12-28 2019-11-15 陆剑 Engineering pile foundation dead-load detection resistance support panel assembly and its application method

Similar Documents

Publication Publication Date Title
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN108086340A (en) Open caisson construction structure and construction method thereof
CN106759442A (en) A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure and its construction method
CN109440778A (en) Active inclined in two-way method for supporting and protecting row pile pit
CN104032775B (en) Engineering pile foundation dead-load detection resistance cylinder and detection method
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN2926319Y (en) Rooted foundation and anchored topped-push construction set apparatus
CN104564091A (en) Method and device for removing anchor rods from shield crossing area
CN106638655A (en) Conical-head tendon body post-tensioning pile foundation and construction process thereof
CN109898521A (en) A kind of anchored pile supporting and construction method for foundation pit external corner
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN104727324B (en) Irregular basement construction method for supporting
CN205116239U (en) Engineering pile foundation static load detects resistance anchor hoe
CN107642040A (en) The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter
CN109024660B (en) Pile foundation dismantling method for offshore foundation and offshore foundation dismantling method
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN110080775A (en) Complex environment digs a well basic microvariations excavation method
CN205676933U (en) Big load mill resistance support stand body device
CN206256893U (en) Short space internal drilling pile-forming apparatus
CN108798508A (en) Pile hole excavating method
CN203685192U (en) Novel device for disassembling anchor rod in shield crossing zone
CN205676934U (en) Big resistance support stand body device
CN105350587B (en) Engineering pile foundation static load detection resistance anchor hoe
CN205296177U (en) Dado bearing structure suitable for hole friction pile stake hole is dug in manual work
CN209620033U (en) Active inclined in two-way supporting and protecting row pile pit structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160330

Effective date of abandoning: 20170510

AV01 Patent right actively abandoned