JPS57155422A - Continuous execution method for underground continuous wall - Google Patents
Continuous execution method for underground continuous wallInfo
- Publication number
- JPS57155422A JPS57155422A JP3916381A JP3916381A JPS57155422A JP S57155422 A JPS57155422 A JP S57155422A JP 3916381 A JP3916381 A JP 3916381A JP 3916381 A JP3916381 A JP 3916381A JP S57155422 A JPS57155422 A JP S57155422A
- Authority
- JP
- Japan
- Prior art keywords
- ditch
- wall
- excavating
- cushion materials
- materials
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
PURPOSE:To construct the underground continuous wall continuously by successively excavating an excavating ditch in the horizontal direction, fast sticking a cushion material for preventing the collapse of a ditch wall to the groove wall and partitioning the excavating ditch. CONSTITUTION:Soil and sand are continuously scraped up in a stabilizing liquid such as bentonite muddy water while successively moving a continuous excavator 2 according to a bucket elevator system in the horizontal direction. The cushion materials 3 for preventing the collapse of the ditch walls are built to a section B where excavation is completed at regular intervals. The cushion materials 3 are manufactured by mounting rubber tubes at both sides of the webs of H-steel. Joint materials 4 are built to sections partitioned by the cushion materials 3, the cushion materials 3 are extracted, and concrete is placed to a section C. the underground continuous wall D is completed when concerete cures.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3916381A JPS57155422A (en) | 1981-03-18 | 1981-03-18 | Continuous execution method for underground continuous wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3916381A JPS57155422A (en) | 1981-03-18 | 1981-03-18 | Continuous execution method for underground continuous wall |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS57155422A true JPS57155422A (en) | 1982-09-25 |
Family
ID=12545450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3916381A Pending JPS57155422A (en) | 1981-03-18 | 1981-03-18 | Continuous execution method for underground continuous wall |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS57155422A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60141920A (en) * | 1983-12-27 | 1985-07-27 | Taiko Kensetsu:Kk | Method of constructing underground continuous wall |
JPS6121222A (en) * | 1984-07-09 | 1986-01-29 | Fusao Sakano | Continuous sheathing construction |
-
1981
- 1981-03-18 JP JP3916381A patent/JPS57155422A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60141920A (en) * | 1983-12-27 | 1985-07-27 | Taiko Kensetsu:Kk | Method of constructing underground continuous wall |
JPS6121222A (en) * | 1984-07-09 | 1986-01-29 | Fusao Sakano | Continuous sheathing construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS62288218A (en) | Settlement caisson | |
EP0136355A1 (en) | Method and apparatus for constructing reinforced concrete walls in the earth | |
US4367057A (en) | Method of forming a foundation with liquid tight joints | |
JPS57155422A (en) | Continuous execution method for underground continuous wall | |
CA1112466A (en) | Foundation with liquid tight joints, and method of forming the same | |
US3245222A (en) | Construction of underground dams | |
US4430027A (en) | Method of forming a foundation with liquid tight joints | |
JP2000110484A (en) | Open shield construction method and concrete case used therefor | |
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
JPS56159419A (en) | Continuous underground wall and construction thereof | |
CN114033391B (en) | Construction and monitoring method for shield underpass highway viaduct of water-rich sand layer | |
JPS63304821A (en) | Construction work of underground continuous cut-off wall | |
JPS5768419A (en) | Executing method for underground continuous wall | |
SU753987A1 (en) | Method of erecting a prefabricated-monolithic wall in soil | |
JP3424117B2 (en) | Construction method of continuous underground wall | |
SU960436A1 (en) | Method and apparatus for earth-filling narrow-profile structures | |
JPS5526334A (en) | Constructing method of underground continuous wall | |
JP3586744B2 (en) | Construction method of impermeable wall | |
SU1118739A1 (en) | Arrangement for forming a cavity in soil | |
RU1818417C (en) | Method for erection of underground structure | |
JPH028084B2 (en) | ||
JPS5526312A (en) | Executing method of underground continuous wall | |
JPS63219727A (en) | Construction of water-stop sheet pile wall | |
SU947293A1 (en) | Method of constructing a shallow-depth tunnel | |
SU1213126A1 (en) | Method of hydraulic insulation of test site for investigating salt transfer parameters |