JP2000110484A - Open shield construction method and concrete case used therefor - Google Patents

Open shield construction method and concrete case used therefor

Info

Publication number
JP2000110484A
JP2000110484A JP11301088A JP30108899A JP2000110484A JP 2000110484 A JP2000110484 A JP 2000110484A JP 11301088 A JP11301088 A JP 11301088A JP 30108899 A JP30108899 A JP 30108899A JP 2000110484 A JP2000110484 A JP 2000110484A
Authority
JP
Japan
Prior art keywords
concrete box
concrete
open shield
shield machine
flexible annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11301088A
Other languages
Japanese (ja)
Other versions
JP3194192B2 (en
Inventor
Makoto Uemura
誠 植村
Original Assignee
Makoto Uemura
誠 植村
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Makoto Uemura, 誠 植村 filed Critical Makoto Uemura
Priority to JP30108899A priority Critical patent/JP3194192B2/en
Publication of JP2000110484A publication Critical patent/JP2000110484A/en
Application granted granted Critical
Publication of JP3194192B2 publication Critical patent/JP3194192B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To cope with displacement influenced by uneven settlement or the like of the ground by arranging displacement absorbing concrete cases in an open shield construction method for burying concrete cases successively in a longitudinal row, repeating a process of excavating and discharging sediment in front of the front face or upper face opening of an open shield machine, a process of elongating a propulsion jack to advance the shield machine with the concrete case as reaction, and a process of hanging down a new concrete case from above behind the propulsion jack contracted in a tail part of the shield machine, to set it. SOLUTION: In this open shield construction method, displacement absorbing concrete cases 11 are arranged at appropriate spaces between normal concrete cases. Each displacement absorbing concrete case 11 is so constituted that the outer peripheral surface of the mutual clearance of longitudinally bisected and opposed divided bodies 11A, 11B is closed with a first flexible annular sealant 17 while closing the inner peripheral surface with a second flexible annular sealant and that a space holding member 18 is disposed between the divided bodies 11A, 11B.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION
【0001】[0001]
【発明の属する技術分野】本発明は、市街地に上下水
道、地下道等の地下構造物を施工するオープンシールド
工法およびそれに使用するコンクリート函体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an open shield method for constructing underground structures such as water and sewage systems and underpasses in an urban area, and a concrete box used for the method.
【0002】[0002]
【従来の技術】オープンシールド工法は開削工法(オー
プンカット工法)とシールド工法の長所を生かした合理
性に富む工法である。図6にその概略を示すと、図中1
はオープンシールド機で、これは左右の側壁板1aとこ
れら側壁板1aに連結する底板1bとからなる前面、後
面及び上面を開口したシールド機である。
2. Description of the Related Art The open shield method is a highly rational method utilizing the advantages of the open cutting method (open cut method) and the shield method. FIG. 6 shows the outline of the method.
Is an open shield machine, which is a shield machine having left, right and left side walls 1a and a bottom plate 1b connected to these side walls 1a, with front, rear and upper surfaces opened.
【0003】該オープンシールド機1は前記側壁板1a
と底板1bの先端を刃口として形成し、また側壁板1a
の中央又は後端近くに推進ジャッキ2を後方に向け上下
に並べて配設する。
[0003] The open shield machine 1 includes the side wall plate 1a.
And the tip of the bottom plate 1b is formed as a blade, and the side wall plate 1a
The propulsion jacks 2 are arranged vertically rearward near the center or near the rear end of the vehicle.
【0004】図示は省略するが、発進坑内にこのオープ
ンシールド機1を設置して、オープンシールド機1の推
進ジャッキ2を伸長して発進坑内の反力壁に反力をとっ
てオープンシールド機1を前進させ、地下構造物を形成
する第1番目のコンクリート函体4を上方から吊り降
し、オープンシールド機1のテール部1c内で縮めた推
進ジャッキ2の後方にセットする。推進ジャッキ2と反
力壁の間にはストラットを配設して適宜間隔調整をす
る。
[0004] Although not shown, the open shield machine 1 is installed in the start pit, the propulsion jack 2 of the open shield machine 1 is extended, and a reaction force is applied to the reaction wall in the start pit to obtain the open shield machine 1. Is moved forward, the first concrete box 4 forming the underground structure is suspended from above, and is set behind the contracted propulsion jack 2 in the tail portion 1c of the open shield machine 1. A strut is provided between the propulsion jack 2 and the reaction force wall to adjust the distance as appropriate.
【0005】また、発進坑は土留壁で構成し、オープン
シールド機1を発進させるにはこの土留壁を一部鏡切り
するが、必要に応じて薬液注入等で発進坑の前方部分に
地盤改良を施しておくこともある。
Further, the starting pit is constituted by a retaining wall, and this retaining wall is partially mirror-cut in order to start the open shield machine 1. However, if necessary, a ground improvement is performed on a front portion of the starting pit by injection of a chemical solution or the like. May be given.
【0006】ショベル等の掘削機9でオープンシールド
機1の前面又は上面から土砂を掘削しかつ排土する。こ
の排土工程と同時またはその後に推進ジャッキ2を伸長
してオープンシールド機1を前進させる。この前進工程
の場合、コンクリート函体4の前にはボックス鋼材又は
型鋼を用いた枠体よりなる押角8を配設する。
The excavator 9 such as a shovel excavates earth and sand from the front or upper surface of the open shield machine 1 and discharges the earth. Simultaneously with or after this earth removal step, the propulsion jack 2 is extended to move the open shield machine 1 forward. In the case of this advancing process, a pressing angle 8 composed of a frame using a box steel material or a mold steel is disposed in front of the concrete box 4.
【0007】そして前記第1番目のコンクリート函体4
の前に第2番目のコンクリート函体4をオープンシール
ド機1のテール部1c内に吊り降す。以下、同様の排土
工程、前進工程、コンクリート函体4のセット工程を適
宜繰返して、順次コンクリート函体4をオープンシール
ド機1の前進に伴い縦列に地中に残置し、さらにこのコ
ンクリート函体4の上面に埋戻し5を施す。
[0007] The first concrete box 4
Before the second concrete box 4 is suspended in the tail part 1c of the open shield machine 1. Hereinafter, the same earth removal process, advance process, and setting process of the concrete box 4 are appropriately repeated, and the concrete box 4 is sequentially left under the ground as the open shield machine 1 advances, and the concrete box 4 is further removed. A backfill 5 is applied to the upper surface of 4.
【0008】なお、コンクリート函体4をオープンシー
ルド機1のテール部1c内に吊り降す際には、コンクリ
ートブロック等による高さ調整材7をコンクリート函体
4下に配設し、このテール部1c内でコンクリート函体
4の左右および下部の空隙にグラウト材6を充填する。
When suspending the concrete box 4 in the tail section 1c of the open shield machine 1, a height adjusting member 7 such as a concrete block is disposed under the concrete box 4, and the tail section is provided. The grout material 6 is filled into the left and right and lower gaps of the concrete box 4 within 1c.
【0009】このようにして、オープンシールド機1が
到達坑まで達したならばこれを撤去して工事を完了す
る。
In this way, when the open shield machine 1 reaches the reaching pit, it is removed and the construction is completed.
【0010】このようなオープンシールド工法では、前
記のごとくコンクリート函体4は、オープンシールド機
1のテール部内に吊り降され、オープンシールド機1の
前進とともに該テール部1cから出て地中に残されてい
くものである。そして、コンクリート函体4は鉄筋コン
クリート製のもので、図7に示すように左側壁板4a,
右側壁板4bと上床板4cと下床板4dとからなるもの
で、前後面が開口10として開放されている。
In such an open shield method, as described above, the concrete box 4 is suspended in the tail portion of the open shield machine 1, and exits from the tail portion 1c as the open shield machine 1 advances, and remains in the ground. It is something to be done. The concrete box 4 is made of reinforced concrete, and as shown in FIG.
It is composed of a right side wall plate 4b, an upper floor plate 4c, and a lower floor plate 4d.
【0011】ところでコンクリート函体4同士の接続
は、図示は省略するが、コーナー部に前後方向の貫通孔
を設け、長ボルト等の締結をもって縦列に並ぶものを剛
に接続していく。
Though not shown, the concrete boxes 4 are connected to each other by providing through holes in the front and rear directions at the corners, and rigidly connecting those arranged in tandem by fastening long bolts or the like.
【0012】[0012]
【発明が解決しようとする課題】しかし、地下構造物と
して縦列にコンクリート函体4は、地震や軟弱地盤を原
因とする地盤の不等沈下等の影響で変位を受けることが
あり、ボルト等で剛に接続されたものでは、この変位に
対応できず継手部の破壊をもたらすおそれがある。
However, the concrete box 4 as an underground structure may be displaced due to an earthquake or uneven settlement of the ground caused by soft ground or the like. If the connection is rigid, it cannot cope with this displacement, and the joint may be broken.
【0013】本発明の目的は前記従来例の不都合を解消
し、地盤の不等沈下等の影響での変位に対応できるオー
プンシールド工法およびそれに使用するコンクリート函
体を提供することにある。
An object of the present invention is to provide an open shield method capable of solving the disadvantages of the prior art and coping with displacement caused by uneven settlement of the ground and a concrete box used for the method.
【0014】[0014]
【課題を解決するための手段】本発明は前記目的を達成
するため、オープンシールド工法としては、左右側壁板
の内側に推進ジャッキを配設し、前面、後面及び上面を
開口したオープンシールド機の前面又は上面開口より前
方の土砂を掘削排土する工程と、推進ジャッキを伸長し
てコンクリート函体を反力にしてシールド機を前進させ
る工程と、シールド機のテール部内で縮めた推進ジャッ
キの後方に新たなコンクリート函体を上方から吊り降し
てセットする工程とを適宜繰り返して順次コンクリート
函体を縦列に埋設するオープンシールド工法において、
通常のコンクリート函体の間に、前後で2分割し、対向
する分割体相互隙間の外周面を予め第1の可撓性輪状シ
ール材で閉塞し、さらに、分割体相互に間隔保持材を配
設した状態でシールド機のテール部内に吊り降し、これ
がオープンシールド機の推進ジャッキからの力を受けな
い状態になった時点で、間隔保持材を撤去して函体内部
から内周面を第2の可撓性輪状シール材で閉塞した変位
吸収コンクリート函体を適宜間隔で配置することを要旨
とするものである。
In order to achieve the above object, the present invention provides an open shield construction method in which a propulsion jack is disposed inside the left and right side wall plates and the front, rear and upper surfaces are opened. Excavating and discharging earth and sand in front of the front or top opening, elongating the propulsion jack to make the concrete box a reaction force and moving the shield machine forward, and the back of the propelled jack shrunk in the tail part of the shield machine In the open shield method, the concrete concrete box is buried in tandem by repeating the process of suspending and setting a new concrete box from above
A normal concrete box is divided into two parts at the front and back, the outer peripheral surface of the gap between the opposed divided bodies is closed in advance with a first flexible ring-shaped sealing material, and a spacing member is arranged between the divided bodies. In the state where it was installed, it was suspended in the tail part of the shield machine, and when this became not to receive the force from the propulsion jack of the open shield machine, the spacing material was removed and the inner peripheral surface from the inside of the box was removed. The gist of the present invention is to dispose displacement absorbing concrete boxes closed by a flexible annular sealing material of No. 2 at appropriate intervals.
【0015】オープンシールド工法に使用するコンクリ
ート函体としては、第1に、左右側壁板と上床板と下床
板とからなり、縦列に接続する地下構造物用コンクリー
ト函体において、通常のコンクリート函体の間で適宜間
隔で配置する変位吸収コンクリート函体は、前後で2分
割し、対向する分割体相互隙間の外周面を第1の可撓性
輪状シール材で閉塞し、内周面を第2の可撓性輪状シー
ル材で閉塞したこと、第2に、左右側壁板と上床板と下
床板とからなり、縦列に接続する地下構造物用コンクリ
ート函体において、通常のコンクリート函体の間で適宜
間隔で配置する変位吸収コンクリート函体は、前後で2
分割し、対向する分割体相互隙間の外周面を可撓性輪状
シール材で閉塞したこと、第3に、可撓性輪状シール材
は、分割体端の継手金物に水密にボルト止めし、この継
手金物は水膨潤性止水材を介在させてコンクリート函体
に取付けることを要旨とするものである。
As a concrete box used for the open shield method, firstly, in a concrete box for an underground structure composed of left and right side walls, an upper floor plate and a lower floor plate and connected in tandem, an ordinary concrete box is used. The displacement-absorbing concrete box, which is disposed at appropriate intervals between the two, is divided into two parts at the front and rear, the outer peripheral surface of the opposing divided body gap is closed with the first flexible annular sealing material, and the inner peripheral surface is set at the second Secondly, in a concrete box for an underground structure composed of left and right side plates, an upper floor plate and a lower floor plate and connected in tandem, between a normal concrete box Displacement absorbing concrete boxes placed at appropriate intervals
Divided, the outer peripheral surface of the opposing divided body gap was closed with a flexible annular sealing material. Third, the flexible annular sealing material was water-tightly bolted to a joint fitting at the end of the divided body. The joint hardware is to be attached to a concrete box with a water-swellable waterproof material interposed therebetween.
【0016】本発明によれば、縦列に接続する地下構造
物用コンクリート函体において、通常のコンクリート函
体の間で適宜間隔で配置する変位吸収コンクリート函体
は、可撓性輪状シール材で対向する分割体相互の隙間が
閉塞され、この部分で止水性を保ちながら変位可能とな
るので、他の部分に影響を及ぼさずに地盤の不等沈下等
の影響での変位に対応できる。
According to the present invention, in the concrete boxes for underground structures connected in tandem, the displacement absorbing concrete boxes arranged at appropriate intervals between ordinary concrete boxes are opposed to each other by a flexible annular sealing material. Since the gap between the divided bodies is closed and the water can be displaced while maintaining the water stopping property at this portion, it is possible to cope with displacement due to uneven settlement of the ground without affecting other portions.
【0017】そして、請求項1、請求項2記載の本発明
によれば、分割体相互の隙間はその内外周面の両方とも
に、第1、第2に可撓性輪状シール材で閉塞され、第1
の可撓性輪状シール材は外圧用として外の水が内部に入
るのを防止でき、第2の可撓性輪状シール材は内圧用と
して地下構造物を水路として構成する場合などに内部の
水が外に洩れないようにすることができる。
According to the first and second aspects of the present invention, the gaps between the divided bodies are closed by the first and second flexible annular sealing members on both the inner and outer peripheral surfaces thereof, First
The flexible ring-shaped seal material can prevent external water from entering the inside for external pressure use, and the second flexible ring-shaped seal material can prevent internal water from being used for internal pressure when an underground structure is configured as a water channel. Can be prevented from leaking out.
【0018】また、可撓性輪状シール材で内外周の閉塞
を行うのに、第1の可撓性輪状シール材を先付けとし、
第2の可撓性輪状シール材を後付けとすることで、分割
体相互に間隔保持材を介在させ、これでオープンシール
ド機の推進ジャッキからの力を受けるように一時的には
変位のない剛なコンクリート函体として構成することが
できる。
Further, when the inner and outer peripheries are closed by the flexible annular sealing material, the first flexible annular sealing material is firstly provided,
By attaching the second flexible ring-shaped sealing material afterward, a spacing member is interposed between the divided bodies, so that the rigid body having no temporary displacement can receive the force from the propulsion jack of the open shield machine. It can be configured as a simple concrete box.
【0019】さらに、請求項2記載の本発明によれば、
可撓性輪状シール材は分割体端の継手金物に水密にボル
ト止めするものであるが、この継手金物は水膨潤性止水
材を介在させてコンクリート函体に取付けるので、可撓
性輪状シール材の結合部のみならず、コンクリート函体
と継手金物間でも完全な止水性が確保できる。
Further, according to the second aspect of the present invention,
The flexible ring-shaped sealing material is watertight bolted to the fitting at the end of the split body, but since this fitting is attached to the concrete box with a water-swellable waterproof material interposed, the flexible ring-shaped sealing material is used. Complete waterproofness can be ensured not only at the joints of the materials, but also between the concrete box and the fittings.
【0020】請求項3記載の本発明によれば、分割体相
互の隙間はその外周面のみを可撓性輪状シール材で閉塞
しているが、内側を閉塞するものではないので、早い時
期にこの可撓性輪状シール材を先付けして、さらに、分
割体相互に間隔保持材を介在させ、これでオープンシー
ルド機の推進ジャッキからの力を受けるように一時的に
は変位のない剛なコンクリート函体として構成すること
ができ、この間隔保持材を撤去するのに、前記可撓性輪
状シール材の存在が邪魔になることもない。
According to the third aspect of the present invention, only the outer peripheral surface of the gap between the divided bodies is closed by the flexible annular sealing material. This flexible ring-shaped sealing material is pre-attached, and further, a spacing material is interposed between the divided bodies, so that rigid concrete without temporary displacement is received so as to receive the force from the propulsion jack of the open shield machine. It can be configured as a box, and the presence of the flexible annular sealing material does not hinder the removal of the spacing member.
【0021】[0021]
【発明の実施の形態】以下、図面について本発明の実施
形態を詳細に説明する。先に本発明の変位吸収コンクリ
ート函体11について説明すると、前記図7に示すような
通常のコンクリート函体と全体形状は同じであり、図示
は省略するが左側壁板、右側壁板、上床板と下床板とか
らなるもので前後面が開口となる。
Embodiments of the present invention will be described below in detail with reference to the drawings. First, the displacement absorbing concrete box 11 of the present invention will be described. The overall shape is the same as that of the ordinary concrete box as shown in FIG. 7, and although not shown, the left side wall plate, the right side wall plate, and the upper floor plate are omitted. And the lower floor plate, and the front and rear surfaces are open.
【0022】ただし、通常のコンクリート函体4とは相
違し、この通常のコンクリート函体を前後で2分割し、
対向する分割体11A,11Bの相互に隙間12を確保するも
のとした。
However, unlike the ordinary concrete box 4, this ordinary concrete box is divided into two parts at the front and rear.
A gap 12 is provided between the opposing divided bodies 11A and 11B.
【0023】各分割体11A,11Bは端部に継手金物13を
配設するが、この継手金物13は分割体11A,11Bの端面
との間に水膨潤性止水材14を介在させた。かかる水膨潤
性止水材14は、液状ゴムとウレタンポリマーの混練によ
る膨潤性止水材や、ゴム物質、水膨潤性物質および吸水
性物質を配合した均質混和組成物を主成分とする膨潤性
止水材である。
Each of the divided bodies 11A and 11B is provided with a joint metal 13 at an end, and the joint metal 13 has a water-swellable waterproof material 14 interposed between the joint metal 13 and the end faces of the divided bodies 11A and 11B. Such a water-swellable water-stopping material 14 is a swelling water-stopping material obtained by kneading a liquid rubber and a urethane polymer, or a swelling water-stopping material mainly composed of a rubber composition, a water-swelling substance and a water-absorbing substance. It is a waterproof material.
【0024】継手金物13は図示のようにアンカー15を介
して分割体11A,11Bの成形時に同時にセットできるよ
うにしたり、図示は省略するがナットを分割体11A,11
Bの端面に埋込んでおき、ボルト等で固定する方法もあ
る。
The fitting metal 13 can be set at the same time as forming the divided bodies 11A and 11B via the anchor 15 as shown in the figure, or a nut can be attached to the divided bodies 11A and 11B (not shown).
There is also a method of embedding in the end face of B and fixing it with bolts or the like.
【0025】なお、分割体11A,11Bの対向する端部
は、箱抜きとなるような凹部16として形成しておく。
The opposite ends of the divided bodies 11A and 11B are formed as recesses 16 so as to be boxless.
【0026】図中17a,17bは前記分割体11A,11Bの
隙間12の外周面を閉塞する第1の可撓性輪状シール材
と、内周面を閉塞する第2の可撓性輪状シール材で、耐
候性、耐水性に優れたゴムに補強繊維層を挟んだ三層構
造からなるもの、または、ナイロン基布を埋層し、その
外側に耐候性の良いクロロプレン系のゴムでカバーした
ものなどで、強力な補強繊維層で外水圧を受け止め、ま
た、山形もしくは蛇行させた形状で変位に対してスムー
ズに対応できるものとする。
In the figure, reference numerals 17a and 17b denote a first flexible annular seal member for closing the outer peripheral surface of the gap 12 between the divided bodies 11A and 11B, and a second flexible annular seal member for closing the inner peripheral surface. With a three-layer structure in which a reinforcing fiber layer is sandwiched between rubber with excellent weather resistance and water resistance, or a nylon base cloth buried and covered with a weather-resistant chloroprene rubber outside For example, a strong reinforcing fiber layer receives external water pressure, and a mountain-shaped or meandering shape can smoothly respond to displacement.
【0027】第1の可撓性輪状シール材17a、第2の可
撓性輪状シール材17bともに、端部を継手金物13に水密
にボルト止めした。
The ends of both the first flexible ring-shaped sealing material 17a and the second flexible ring-shaped sealing material 17b were bolted to the fitting metal 13 in a watertight manner.
【0028】このような変位吸収コンクリート函体11
は、通常のコンクリート函体4の間に、適宜間隔で配置
するが、コンクリート函体4との接合は、コンクリート
函体4同士の接合と同じく、コーナー部に前後方向の貫
通孔を設け、長ボルト等の締結をもって縦列に並ぶもの
を剛に接続していく方法などが採用できる。
Such a displacement absorbing concrete box 11
Are arranged at regular intervals between the ordinary concrete boxes 4, but the joints with the concrete boxes 4 are provided with through holes in the front and rear direction at the corners, like the joints between the concrete boxes 4, and It is possible to adopt a method of rigidly connecting objects arranged in tandem by fastening bolts or the like.
【0029】次に、このような変位吸収コンクリート函
体11を使用する本発明のオープンシールド工法について
説明するが、工法の全体の概要としては前記図6に示す
通りで詳細説明は省略するが、オープンシールド機1で
の掘進及びコンクリート函体4のセット工程を繰返し
て、順次コンクリート函体4をオープンシールド機1の
前進に伴い縦列に地中に残置し、さらにこのコンクリー
ト函体4の上面に埋戻し5を施す。
Next, the open shield method of the present invention using such a displacement absorbing concrete box 11 will be described. The overall method is shown in FIG. The excavation in the open shield machine 1 and the setting process of the concrete box 4 are repeated, and the concrete box 4 is sequentially left in the ground as the open shield machine 1 advances, and the concrete box 4 is further placed on the upper surface of the concrete box 4. The backfill 5 is applied.
【0030】図1、図3に示すようにその場合に、オー
プンシールド機1のテール部1c内に吊り下ろすコンク
リート函体4以外の変位吸収コンクリート函体11は、分
割体11A,11Bの相互間に鋼材による厚板の間隔保持材
18を配設して一体化し、この間隔保持材18が配置された
隙間12の外周面を予め第1の可撓性輪状シール材17aで
閉塞したものである。
As shown in FIGS. 1 and 3, in this case, a displacement absorbing concrete box 11 other than the concrete box 4 suspended in the tail portion 1c of the open shield machine 1 is provided between the divided bodies 11A and 11B. Material for thick plate made of steel
18 are arranged and integrated, and the outer peripheral surface of the gap 12 in which the spacing member 18 is arranged is closed in advance by a first flexible annular sealing material 17a.
【0031】分割体11A,11Bは間隔保持材18により連
結され一体的になるので、両方揃ってオープンシールド
機1内に吊り下ろすことができ、これら分割体11A,11
Bは、先に順次オープンシールド機1の前進に伴い縦列
に残置したコンクリート函体4に長ボルト等の締結をも
って剛に接続し、その後ではオープンシールド機1を掘
進させ、新たなコンクリート函体4をオープンシールド
機1内に吊り下ろして同様に分割体11A,11Bに長ボル
ト等の締結をもって剛に接続する。
Since the divided bodies 11A and 11B are connected and integrated by the spacing member 18, both of them can be hung in the open shield machine 1 together.
B is rigidly connected to the concrete boxes 4 left in tandem with the advance of the open shield machine 1 sequentially by fastening long bolts or the like, and then the open shield machine 1 is excavated to form a new concrete box 4. Is suspended in the open shield machine 1 and similarly rigidly connected to the divided bodies 11A and 11B by fastening long bolts or the like.
【0032】前記オープンシールド機1の掘進は、ショ
ベル等の掘削機でオープンシールド機1の前面又は上面
から土砂を掘削しかつ排土する。この排土工程と同時ま
たはその後に推進ジャッキ2を伸長してオープンシール
ド機1を前進させる。図示は省略するがこの前進工程の
場合、コンクリート函体4もしくは分割体11A,11Bの
前にはボックス鋼材又は型鋼を用いた枠体よりなる押角
を配設する。
The open shield machine 1 is excavated by excavating earth and sand from the front or upper surface of the open shield machine 1 with an excavator such as a shovel. Simultaneously with or after this earth removal step, the propulsion jack 2 is extended to move the open shield machine 1 forward. Although not shown, in the case of this forward process, a pressing angle made of a box body made of box steel or steel is provided in front of the concrete box 4 or the divided bodies 11A and 11B.
【0033】推進ジャッキ2の推力を受け、反力受け体
となる分割体11A,11Bは間隔保持材18により連結され
一体的になっているので、そのまま後方に推進ジャッキ
2の推力を伝えることができる。
The divided bodies 11A and 11B, which receive the thrust of the propulsion jack 2 and are reaction receiving bodies, are connected and integrated by the spacing member 18, so that the thrust of the propulsion jack 2 can be transmitted to the rear as it is. it can.
【0034】このようにしてかなり後方になり、オープ
ンシールド機1の推進ジャッキ2からの力を受けない状
態になった時点で、間隔保持材18をそのまま内側に引き
抜くことで撤去して、函体内部から隙間12の内周面に第
2の可撓性輪状シール材17bを取り付け、これで閉塞す
る。
In this manner, when the vehicle is considerably rearward and no longer receives the force from the propulsion jack 2 of the open shield machine 1, the space holding member 18 is removed by pulling it inward as it is to remove it. A second flexible annular seal member 17b is attached to the inner peripheral surface of the gap 12 from the inside, and the second annular seal member 17b is closed.
【0035】図4は本発明の第2実施形態を示すもの
で、間隔保持材18はジャッキ等で伸縮出来るものとし、
これを撤去する際には縮小させて抜けるようにした。こ
のようにすれば隙間12の幅を大きく確保することがで
き、大きな変位に対応できるものとなる。また、第1の
可撓性輪状シール材17aも蛇行させた変位量の多いもの
とし、図5に示すように第2の可撓性輪状シール材17b
も蛇行させた変位量の多いものとする。
FIG. 4 shows a second embodiment of the present invention. The spacing member 18 can be expanded and contracted by a jack or the like.
When removing it, it was reduced to allow it to exit. By doing so, a large width of the gap 12 can be ensured, and a large displacement can be handled. In addition, the first flexible annular sealing material 17a is also assumed to have a large meandering displacement, and as shown in FIG. 5, the second flexible annular sealing material 17b.
It is also assumed that the meandering displacement amount is large.
【0036】[0036]
【発明の効果】以上述べたように本発明のオープンシー
ルド工法およびそれに使用するコンクリート函体は、変
位吸収コンクリート函体を適宜間隔で配置することで、
地盤の不等沈下等の影響での変位に対応できるものであ
る。
As described above, the open shield method of the present invention and the concrete box used therein can be obtained by disposing displacement absorbing concrete boxes at appropriate intervals.
It can respond to displacement due to uneven settlement of the ground.
【図面の簡単な説明】[Brief description of the drawings]
【図1】本発明のオープンシールド工法の第1実施形態
を示す縦断側面図である。
FIG. 1 is a longitudinal sectional side view showing a first embodiment of an open shield method according to the present invention.
【図2】本発明のオープンシールド工法に使用するコン
クリート函体の第1実施形態を示す要部の縦断側面図で
ある。
FIG. 2 is a longitudinal sectional side view of a main part showing a first embodiment of a concrete box used in the open shield method of the present invention.
【図3】本発明のオープンシールド工法の第1実施形態
を示す前段階でのコンクリート函体の要部の縦断側面図
である。
FIG. 3 is a longitudinal sectional side view of a main part of a concrete box at a previous stage showing a first embodiment of the open shield method of the present invention.
【図4】本発明のオープンシールド工法に使用するコン
クリート函体の第2実施形態を示す要部の縦断側面図で
ある。
FIG. 4 is a longitudinal sectional side view of a main part showing a second embodiment of a concrete box used in the open shield method of the present invention.
【図5】本発明のオープンシールド工法の第2実施形態
を示す前段階でのコンクリート函体の要部の縦断側面図
である。
FIG. 5 is a longitudinal sectional side view of a main part of a concrete box in a previous stage showing a second embodiment of the open shield method of the present invention.
【図6】オープンシールド工法の概要を示す縦断側面図
である。
FIG. 6 is a vertical sectional side view showing an outline of an open shield method.
【図7】通常のコンクリート函体の斜視図である。FIG. 7 is a perspective view of a normal concrete box.
【符号の説明】[Explanation of symbols]
1…オープンシールド機 1a…側壁板 1b…底板 1c…テール部 2…推進ジャッキ 3…隔壁 4…コンクリート
函体 4a…左側壁板 4b…右側壁板 4c…上床板 4d…下床板 5…埋戻し 6…グラウト材 7…高さ調整材 8…押角 9…掘削機 10…開口 11…変位吸収コンクリート函体 11A,11B…分割
体 12…隙間 13…継手金物 14…水膨潤性止水材 15…アンカー 16…凹部 17a…第1の可撓
性輪状シール材 17b…第2の可撓性輪状シール材 18…間隔保持材
DESCRIPTION OF SYMBOLS 1 ... Open shield machine 1a ... Side wall board 1b ... Bottom board 1c ... Tail part 2 ... Propulsion jack 3 ... Partition wall 4 ... Concrete box 4a ... Left wall board 4b ... Right wall board 4c ... Upper floor board 4d ... Lower floor board 5 ... Backfilling 6 ... Grouting material 7 ... Height adjusting material 8 ... Pushing angle 9 ... Excavator 10 ... Opening 11 ... Displacement absorbing concrete box 11A, 11B ... Split body 12 ... Gap 13 ... Joint hardware 14 ... Water swelling water stopping material 15 ... Anchor 16: recess 17a: first flexible annular sealing material 17b: second flexible annular sealing material 18: spacing material

Claims (4)

    【特許請求の範囲】[Claims]
  1. 【請求項1】 左右側壁板の内側に推進ジャッキを配設
    し、前面、後面及び上面を開口したオープンシールド機
    の前面又は上面開口より前方の土砂を掘削排土する工程
    と、推進ジャッキを伸長してコンクリート函体を反力に
    してシールド機を前進させる工程と、シールド機のテー
    ル部内で縮めた推進ジャッキの後方に新たなコンクリー
    ト函体を上方から吊り降してセットする工程とを適宜繰
    り返して順次コンクリート函体を縦列に埋設するオープ
    ンシールド工法において、通常のコンクリート函体の間
    に、前後で2分割し、対向する分割体相互隙間の外周面
    を予め第1の可撓性輪状シール材で閉塞し、さらに、分
    割体相互に間隔保持材を配設した状態でシールド機のテ
    ール部内に吊り降し、これがオープンシールド機の推進
    ジャッキからの力を受けない状態になった時点で、間隔
    保持材を撤去して函体内部から内周面を第2の可撓性輪
    状シール材で閉塞した変位吸収コンクリート函体を適宜
    間隔で配置することを特徴とするオープンシールド工
    法。
    1. A step of disposing a propulsion jack inside a left and right side wall plate, excavating and discharging earth and sand in front of a front or top opening of an open shield machine having a front surface, a rear surface and a top surface, and extending the propulsion jack. The concrete box as a reaction force to advance the shield machine, and the step of hanging a new concrete box from above and setting it behind the propelled jack shrunk in the tail part of the shield machine as appropriate In the open shield method in which concrete boxes are sequentially buried in tandem, the front and rear are divided into two parts between ordinary concrete boxes, and the outer peripheral surface of the gap between the opposing divided bodies is first made of a first flexible annular sealing material. And suspended in the tail part of the shield machine with the spacing material arranged between the divided bodies, which removes the force from the propulsion jack of the open shield machine. At the time when it is not received, the gap retaining material is removed and the displacement absorbing concrete box whose inner peripheral surface is closed from the inside of the box with the second flexible annular sealing material is arranged at appropriate intervals. And open shield method.
  2. 【請求項2】 左右側壁板と上床板と下床板とからな
    り、縦列に接続する地下構造物用コンクリート函体にお
    いて、通常のコンクリート函体の間で適宜間隔で配置す
    る変位吸収コンクリート函体は、前後で2分割し、対向
    する分割体相互隙間の外周面を第1の可撓性輪状シール
    材で閉塞し、内周面を第2の可撓性輪状シール材で閉塞
    したことを特徴とするオープンシールド工法に使用する
    コンクリート函体。
    2. In a concrete box for an underground structure, which comprises left and right side walls, an upper floor and a lower floor, and is connected in tandem, a displacement-absorbing concrete box arranged at appropriate intervals between ordinary concrete boxes is provided. , The front and rear portions are divided into two, and the outer peripheral surface of the gap between the opposing divided bodies is closed with a first flexible annular sealing material, and the inner peripheral surface is closed with a second flexible annular sealing material. Concrete box used for open shield method.
  3. 【請求項3】 左右側壁板と上床板と下床板とからな
    り、縦列に接続する地下構造物用コンクリート函体にお
    いて、通常のコンクリート函体の間で適宜間隔で配置す
    る変位吸収コンクリート函体は、前後で2分割し、対向
    する分割体相互隙間の外周面を可撓性輪状シール材で閉
    塞したことを特徴とするオープンシールド工法に使用す
    るコンクリート函体。
    3. In a concrete box for an underground structure comprising left and right side wall boards, an upper floor board and a lower floor board and connected in tandem, a displacement absorbing concrete box arranged at appropriate intervals between ordinary concrete boxes is provided. A concrete box for use in an open shield method, wherein a front and rear part is divided into two, and an outer peripheral surface of a gap between opposed divided bodies is closed with a flexible annular sealing material.
  4. 【請求項4】 可撓性輪状シール材は、分割体端の継手
    金物に水密にボルト止めし、この継手金物は水膨潤性止
    水材を介在させてコンクリート函体に取付ける請求項2
    または請求項3記載のオープンシールド工法に使用する
    コンクリート函体。
    4. The flexible annular sealing material is bolted to a joint fitting at the end of the split body in a watertight manner, and the fitting is attached to a concrete box with a water-swellable waterproof material interposed therebetween.
    A concrete box used for the open shield method according to claim 3.
JP30108899A 1999-10-22 1999-10-22 Open shield method Expired - Lifetime JP3194192B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30108899A JP3194192B2 (en) 1999-10-22 1999-10-22 Open shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30108899A JP3194192B2 (en) 1999-10-22 1999-10-22 Open shield method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP8331710A Division JP3041434B2 (en) 1996-12-12 1996-12-12 Open shield method

Publications (2)

Publication Number Publication Date
JP2000110484A true JP2000110484A (en) 2000-04-18
JP3194192B2 JP3194192B2 (en) 2001-07-30

Family

ID=17892730

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30108899A Expired - Lifetime JP3194192B2 (en) 1999-10-22 1999-10-22 Open shield method

Country Status (1)

Country Link
JP (1) JP3194192B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002364059A (en) * 2001-06-13 2002-12-18 Bridgestone Kbg Co Ltd Flexible joint
JP2003056297A (en) * 2001-08-10 2003-02-26 Sumitomo Rubber Ind Ltd Flexible sealing material mounting structure and flexible sealing material mounting method
JP2016079660A (en) * 2014-10-16 2016-05-16 植村 誠 Open shield method
JP2016148165A (en) * 2015-02-10 2016-08-18 早川ゴム株式会社 Method of attaching expansion joint for concrete structure

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5705891B2 (en) * 2013-01-31 2015-04-22 植村 誠 Method for forming flexible joint of concrete box
JP3199478U (en) * 2015-06-02 2015-08-27 有限会社ハマショク Mozuku granule

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002364059A (en) * 2001-06-13 2002-12-18 Bridgestone Kbg Co Ltd Flexible joint
JP2003056297A (en) * 2001-08-10 2003-02-26 Sumitomo Rubber Ind Ltd Flexible sealing material mounting structure and flexible sealing material mounting method
JP4656773B2 (en) * 2001-08-10 2011-03-23 住友ゴム工業株式会社 Flexible sealing material mounting structure and mounting method
JP2016079660A (en) * 2014-10-16 2016-05-16 植村 誠 Open shield method
JP2016148165A (en) * 2015-02-10 2016-08-18 早川ゴム株式会社 Method of attaching expansion joint for concrete structure

Also Published As

Publication number Publication date
JP3194192B2 (en) 2001-07-30

Similar Documents

Publication Publication Date Title
JP3194192B2 (en) Open shield method
CN104895100B (en) Building close quarters builds underground space Caisson method
KR100656194B1 (en) Open cut and cover method applying tunnel cut method
GB2264739A (en) Diaphragm wall with liquid tight joints
KR100289256B1 (en) Tunnel construction method in shallow toffee area
KR100928566B1 (en) Roof assembly and constructing method thereof
JP3114093B2 (en) Concrete box used for open shield method
JP3041434B2 (en) Open shield method
JPH09324431A (en) Construction method of basement
JP2554507B2 (en) Underground space construction method
JP2666015B2 (en) Open shield method and concrete box used for it
JP3373469B2 (en) Joint structure of underground structure
JP3302661B2 (en) Open shield machine and construction method of underground structure using it
JPH0762436B2 (en) Open shield method
JP2005030061A (en) Open shield construction method
KR20210119710A (en) Slurry wall, construction method for the same and wire mesh assembly
JP2005213799A (en) Method for constructing water channel
JP2693028B2 (en) Construction method of human hole in middle of pipeline
JP2617418B2 (en) Construction method of underground large space structure
JP3333770B2 (en) Construction method for underground structures
JPH09158174A (en) Water stopping mechanism and method between case bodies of underground continuous wall
JP2018053466A (en) Open shield method
JP2609179B2 (en) Water stop device of open shield machine
JP2767168B2 (en) Open shield method and concrete box used for it
JP2829805B2 (en) How to build a continuous underground water barrier

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080601

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090601

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100601

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100601

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110601

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130601

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130601

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140601

Year of fee payment: 13

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term