JPS56142935A - Stabilized piling method for earth slope - Google Patents

Stabilized piling method for earth slope

Info

Publication number
JPS56142935A
JPS56142935A JP4640780A JP4640780A JPS56142935A JP S56142935 A JPS56142935 A JP S56142935A JP 4640780 A JP4640780 A JP 4640780A JP 4640780 A JP4640780 A JP 4640780A JP S56142935 A JPS56142935 A JP S56142935A
Authority
JP
Japan
Prior art keywords
slope
anchor rods
rods
tied
driven
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4640780A
Other languages
Japanese (ja)
Inventor
Masayuki Kurose
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
K M KIKAKU KK
KEI EMU KIKAKU KK
Original Assignee
K M KIKAKU KK
KEI EMU KIKAKU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by K M KIKAKU KK, KEI EMU KIKAKU KK filed Critical K M KIKAKU KK
Priority to JP4640780A priority Critical patent/JPS56142935A/en
Publication of JPS56142935A publication Critical patent/JPS56142935A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE: To preform the slope stabilization effectively a method wherein two or more anchor rods are driven into the slope and tightly bound or tied up each other at the rod head on the slope.
CONSTITUTION: Several anchor rods 1 are driven into the soil slope at a regular or an irregular driving pattern. The driven anchor rods 1 or at least a part thereof are grouped by at least two or more rods or by unequal number of rods such as two each or three each, then group by group the anchor rods are tightly bound or tied up each other at the rod head on the slope using a wire or rod shaped material or a tight binding device 2. The effect for example, when the anchor rods 1 are tightly tied up at the rod head on the slope with use of the requied means, the earth slope, subjected to the force F2 at deeper part also the force F1 at shallower part, is compacted and accordingly kept stabilized.
COPYRIGHT: (C)1981,JPO&Japio
JP4640780A 1980-04-08 1980-04-08 Stabilized piling method for earth slope Pending JPS56142935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4640780A JPS56142935A (en) 1980-04-08 1980-04-08 Stabilized piling method for earth slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4640780A JPS56142935A (en) 1980-04-08 1980-04-08 Stabilized piling method for earth slope

Publications (1)

Publication Number Publication Date
JPS56142935A true JPS56142935A (en) 1981-11-07

Family

ID=12746288

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4640780A Pending JPS56142935A (en) 1980-04-08 1980-04-08 Stabilized piling method for earth slope

Country Status (1)

Country Link
JP (1) JPS56142935A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5940862U (en) * 1982-09-07 1984-03-15 日本電気株式会社 Peak value voltage detection circuit
JPS59185225A (en) * 1983-04-04 1984-10-20 K M Kikaku Kk Stabilization work of slope by anchor rod
JPS59156934U (en) * 1983-04-05 1984-10-22 溝部 達司 Slope construction method using belts
JPS6055124A (en) * 1983-08-31 1985-03-30 K M Kikaku Kk Stabilization work of slope by anchor rod
JPS60242223A (en) * 1984-05-15 1985-12-02 Taiyo Gijutsu Kaihatsu Kk Stabilization work for slope by insertion of reinforcement
JP2009114726A (en) * 2007-11-06 2009-05-28 Yuji Nakano Bank fall prevention method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5940862U (en) * 1982-09-07 1984-03-15 日本電気株式会社 Peak value voltage detection circuit
JPH025420Y2 (en) * 1982-09-07 1990-02-08
JPS59185225A (en) * 1983-04-04 1984-10-20 K M Kikaku Kk Stabilization work of slope by anchor rod
JPH0128166B2 (en) * 1983-04-04 1989-06-01 Giken Kogyo Kk
JPS59156934U (en) * 1983-04-05 1984-10-22 溝部 達司 Slope construction method using belts
JPS6055124A (en) * 1983-08-31 1985-03-30 K M Kikaku Kk Stabilization work of slope by anchor rod
JPS60242223A (en) * 1984-05-15 1985-12-02 Taiyo Gijutsu Kaihatsu Kk Stabilization work for slope by insertion of reinforcement
JP2009114726A (en) * 2007-11-06 2009-05-28 Yuji Nakano Bank fall prevention method

Similar Documents

Publication Publication Date Title
JPS56142935A (en) Stabilized piling method for earth slope
JPS573923A (en) Slope protecting member
JPS5598519A (en) Driving method of sand pile and its apparatus
JPS5536147A (en) Method of constructing structure on sea-surface
JPS5774432A (en) Construction method for sheathing structure
JPS5585733A (en) Method and apparatus for pressing in sheet pile
JPS56163320A (en) Rope ladder shaped cylinder
JPS56142922A (en) Treatment of top of in-place concrete pile
JPS5754632A (en) Preventing method for landslide and resisting block for preventing the same
JPS5552426A (en) Method of forming anchor and pile
JPS554440A (en) Method of filling hollow space located beneath foundation
JPS5598515A (en) Pile for constructing wave dissipating structure, wave dissipating structure and their construction method
JPS554446A (en) Method of preventing water-tight sheet embedded in reclaimed land from being exposed by slide of sand
JPS5578713A (en) Constructing method for strengthening ground
JPS56424A (en) Reinforcing of foundation for existing building with irregular sheet pile
JPS5648436A (en) Protection method of face of slope
JPS5616727A (en) Submarine anchor and method of producing the same
JPS5735254A (en) Tube with through-holes
JPS55161119A (en) Pile driving method and pile
JPS5545910A (en) Pile pulling method
JPS5673715A (en) Stabilization of soft ground by construction of underground wall
JPS56115422A (en) Planting bag and planting method
JPS56142924A (en) Net pile structure
JPS55161123A (en) Sg-reinforced piping method
JPS5652218A (en) Improving method of construction for viscous subsurface