JPH1166149A - 情報処理装置およびその方法 - Google Patents
情報処理装置およびその方法Info
- Publication number
- JPH1166149A JPH1166149A JP22691097A JP22691097A JPH1166149A JP H1166149 A JPH1166149 A JP H1166149A JP 22691097 A JP22691097 A JP 22691097A JP 22691097 A JP22691097 A JP 22691097A JP H1166149 A JPH1166149 A JP H1166149A
- Authority
- JP
- Japan
- Prior art keywords
- work
- process chart
- information processing
- evaluation
- processing apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22691097A JPH1166149A (ja) | 1997-08-22 | 1997-08-22 | 情報処理装置およびその方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22691097A JPH1166149A (ja) | 1997-08-22 | 1997-08-22 | 情報処理装置およびその方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1166149A true JPH1166149A (ja) | 1999-03-09 |
| JPH1166149A5 JPH1166149A5 (enExample) | 2001-11-02 |
Family
ID=16852523
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22691097A Pending JPH1166149A (ja) | 1997-08-22 | 1997-08-22 | 情報処理装置およびその方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH1166149A (enExample) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002318947A (ja) * | 2001-04-19 | 2002-10-31 | Being:Kk | ネットワークを用いた工程管理システム |
| KR100968709B1 (ko) | 2010-04-14 | 2010-07-06 | 지에스건설 주식회사 | 공사 프로젝트의 이정표 달성 요구 백분율 획득 방법, 이정표 일정 수립 방법, 이정표 일정에 관한 평가정보 제공 방법 |
| WO2016208276A1 (ja) * | 2015-06-23 | 2016-12-29 | 株式会社小松製作所 | 施工管理システム及び施工管理方法 |
-
1997
- 1997-08-22 JP JP22691097A patent/JPH1166149A/ja active Pending
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002318947A (ja) * | 2001-04-19 | 2002-10-31 | Being:Kk | ネットワークを用いた工程管理システム |
| KR100968709B1 (ko) | 2010-04-14 | 2010-07-06 | 지에스건설 주식회사 | 공사 프로젝트의 이정표 달성 요구 백분율 획득 방법, 이정표 일정 수립 방법, 이정표 일정에 관한 평가정보 제공 방법 |
| WO2016208276A1 (ja) * | 2015-06-23 | 2016-12-29 | 株式会社小松製作所 | 施工管理システム及び施工管理方法 |
| JPWO2016208276A1 (ja) * | 2015-06-23 | 2018-04-05 | 株式会社小松製作所 | 施工管理システム及び施工管理方法 |
| US11783248B2 (en) | 2015-06-23 | 2023-10-10 | Komatsu Ltd. | United states construction management system and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7597104B2 (ja) | 作業受発注システム及び発注者端末 | |
| US7042468B2 (en) | Text overlay for multi-dimensional construction project models | |
| Bansal | Application of geographic information systems in construction safety planning | |
| Bennett et al. | Simulation applied to construction projects | |
| KR102112748B1 (ko) | 통합 일정 계획을 이용한 건설 공사 토공량과 골조량의 관리 방법 및 이를 실행시키는 프로그램 및 컴퓨터 판독 가능한 기록 매체 | |
| JP2000001988A (ja) | 建築物施工に対する工程管理支援装置及び建築物施工に対する工程管理支援プログラムを記録したコンピュータ読み取り可能な記録媒体 | |
| Wang et al. | A relationship-based and object-oriented software for monitoring management during geotechnical excavation | |
| Assaf et al. | Computerized system for application of value engineering methodology | |
| CN111971705A (zh) | 作业选择系统以及作业选择方法 | |
| Bansal et al. | GIS based projects information system for construction management | |
| JP2000034835A (ja) | 工事管理システム及び工事管理方法並びにコンピュ―タ可読媒体 | |
| JP2009500715A (ja) | 実写イメージを基盤にする造景設計システム及び方法 | |
| Zouein | MoveSchedule: A planning tool for scheduling space use on construction sites | |
| KR20050094643A (ko) | 4차원 건설관리 시스템 및 이를 이용한 건설관리정보제공방법 | |
| JP2024171245A (ja) | 設計支援装置、設計支援プログラム及び設計支援方法 | |
| JP3262522B2 (ja) | 土木工事原価管理装置 | |
| Rahbar et al. | Repetitive activity scheduling process | |
| JPH1166177A (ja) | 情報処理装置およびその方法 | |
| Alkass et al. | Computerized crane selection for construction projects | |
| Dzeng et al. | Automatic schedule integration for highway projects | |
| JP2002007516A (ja) | 単価演算装置及び単価演算プログラムを記録したコンピュータ読取可能な記録媒体並びに単価演算システム | |
| Duffy | Linear scheduling of pipeline construction projects with varying production rates | |
| Mohieldin | Analysis of construction processes with nonstationary work task durations | |
| JP2004118686A (ja) | 土木建設原価管理プログラムおよび記録媒体 | |
| JP2001003566A (ja) | 工事工程管理装置と工事工程管理プログラムを記録した媒体 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20011203 |