JPH1136289A - Fixing method for flexible reinforcing bar - Google Patents

Fixing method for flexible reinforcing bar

Info

Publication number
JPH1136289A
JPH1136289A JP20727397A JP20727397A JPH1136289A JP H1136289 A JPH1136289 A JP H1136289A JP 20727397 A JP20727397 A JP 20727397A JP 20727397 A JP20727397 A JP 20727397A JP H1136289 A JPH1136289 A JP H1136289A
Authority
JP
Japan
Prior art keywords
reinforcing bar
flexible reinforcing
fixing
flexible
lower frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20727397A
Other languages
Japanese (ja)
Other versions
JP3684539B2 (en
Inventor
Makoto Kato
誠 加藤
Yoshihiro Tanaka
良弘 田中
Shunei Shiraishi
俊英 白石
Toshihiko Kobayashi
敏彦 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
East Japan Railway Co
Original Assignee
Taisei Corp
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, East Japan Railway Co filed Critical Taisei Corp
Priority to JP20727397A priority Critical patent/JP3684539B2/en
Publication of JPH1136289A publication Critical patent/JPH1136289A/en
Application granted granted Critical
Publication of JP3684539B2 publication Critical patent/JP3684539B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To construct a cast-in place pile of good quality efficiently in a simple constitution by collapsing the tip of a flexible reinforcing bar inserted in an insert hole of a lower frame, filling the collapsed part with a flowable hardening agent to form a ball block part, and then fixing a lower frame to the ball block part. SOLUTION: A flexible reinforcing bar storing device 1 and a frame 2 are installed on the construction foundation G of a cast-in place pile, a center hole jack 3 is fitted to the central part of the frame 2, and a guide pipe 4 for the flexible reinforcing bar is fitted to the frame. A flexible reinforcing bar 5 is inserted in an insert hole of a lower frame 6, the tip thereof is collapsed, and the collapsed part is filled with a flowable hardening agent to form a ball block part 7. After the lower frame 6 is fixed to the ball block part 7, the flexible reinforcing bar 5 is lowered in the drilled hole 9 by a suspending wire 8 supporting the lower frame 6 and simultaneously a shearing reinforcing bar 10 is wound round the flexible reinforcing bar 5. The reinforcing bar 5 is lowered to the bottom of the drilled hole 9 and concrete in water is placed in the drilled hole 9.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、場所打杭を構築す
る際のフレキシブル鉄筋の定着方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for fixing a flexible reinforcing bar when constructing a cast-in-place pile.

【0002】[0002]

【従来の技術】場所打杭の主鉄筋となるフレキシブル鉄
筋の定着方法は、PCケーブルの定着方法と同様に、図
13、図14に示すようにフレキシブル鉄筋5の先端部
に、鋼製圧着グリップ11を取付け、アンカープレート
12の支圧により、周辺のコンクリートに定着する方法
が一般的であった。しかしこれら従来の方法において
は、先端部の鋼製圧着グリップ及びアンカープレートの
製作費用が高価であり、経済効果に期待できないという
問題があった。
2. Description of the Related Art Similar to the method of fixing a PC cable, a method of fixing a flexible reinforcing bar serving as a main reinforcing bar of a cast-in-place pile is as shown in FIGS. In general, a method of attaching the anchor 11 to the surrounding concrete by supporting the anchor plate 12 is adopted. However, in these conventional methods, there is a problem that the cost of manufacturing the steel crimp grip and the anchor plate at the distal end is expensive, and it is impossible to expect an economic effect.

【0003】[0003]

【発明が解決しようとする課題】本発明は、上記従来の
問題点を解決するためになされたもので、簡単な方法に
より、経済的で、作業性のよい、高品質の場所打杭を構
築できるフレキシブル鉄筋の定着方法を提供することを
目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and is an economical, workable, high-quality cast-in-place pile constructed by a simple method. It is an object of the present invention to provide a method of fixing a flexible rebar which can be performed.

【0004】[0004]

【課題を解決するための手段】本発明は、場所打杭に使
用するフレキシブル鉄筋を定着させる方法であって、下
部フレームの挿通孔にフレキシブル鉄筋を挿通し、フレ
キシブル鉄筋先端部を圧壊し、圧壊部に流動性硬化剤を
充填して球塊部を形成後、球塊部に下部フレームを定着
したことを特徴とする、フレキシブル鉄筋の定着方法で
あり、また、下部フレームの挿通孔に挿通するフレキシ
ブル鉄筋は、複数本であることを特徴とする、フレキシ
ブル鉄筋の定着方法であり、また、圧壊部に流動性硬化
剤を充填して形成する球塊部は、それぞれのフレキシブ
ル鉄筋毎に形成することを特徴とする、フレキシブル鉄
筋の定着方法であり、また、圧壊部に流動性硬化剤を充
填して形成する球塊部は、複数本のフレキシブル鉄筋の
圧壊部をまとめて形成することを特徴とする、フレキシ
ブル鉄筋の定着方法であり、また、挿通孔に挿通するフ
レキシブル鉄筋は、楔により締め付けられることを特徴
とする、フレキシブル鉄筋の定着方法であり、また、場
所打杭下端部となるフレキシブル鉄筋を定着させて降下
途中で、別の場所打杭フレキシブル鉄筋を増設し、増設
したフレキシブル鉄筋先端部を圧壊し、圧壊部に流動性
硬化剤を充填して球塊部を形成後、球塊部を、場所打杭
の杭芯に集めたことを特徴とする、フレキシブル鉄筋の
定着方法であり、さらにまた、杭芯に集められた球塊部
の上下位置が、2箇所以上に分散していることを特徴と
する、フレキシブル鉄筋の定着方法である。
SUMMARY OF THE INVENTION The present invention relates to a method of fixing a flexible reinforcing bar used for a cast-in-place pile, by inserting the flexible reinforcing bar into an insertion hole of a lower frame, crushing the tip of the flexible reinforcing bar, and crushing the reinforcing bar. A method for fixing a flexible reinforcing bar, characterized in that a lower frame is fixed to a spherical portion after filling a fluid hardener into a spherical portion and the lower frame is fixed to the spherical portion. Flexible rebar is a fixing method of a flexible rebar characterized by being a plurality, and a spherical mass formed by filling a crushable portion with a flowable hardener is formed for each flexible rebar. It is a fixing method of a flexible rebar characterized by the fact that a spherical mass formed by filling a crushable portion with a flowable hardening agent collects the crushed portions of a plurality of flexible rebars. A method of fixing a flexible reinforcing bar, and a method of fixing a flexible reinforcing bar, wherein the flexible reinforcing bar to be inserted into the insertion hole is tightened by a wedge. During the descent, fix the flexible reinforcing bar at the lower end and add another place cast pile flexible reinforcing bar, crush the expanded flexible reinforcing bar tip, fill the crushed portion with a flowable hardening agent and remove the spherical mass. It is a method of fixing a flexible reinforcing bar, characterized in that, after formation, the ball portions are collected on a pile core of a cast-in-place pile, and furthermore, the vertical position of the ball portions collected on the pile core is two places. A fixing method of a flexible reinforcing bar characterized by being dispersed as described above.

【0005】以下に、図面を参照しながら本発明の実施
形態の一例について説明する。
Hereinafter, an example of an embodiment of the present invention will be described with reference to the drawings.

【0006】<イ>全体構成 図1は、本発明によるフレキシブル鉄筋の定着方法の施
工状況を示す側断面図である。場所打杭の施工基盤G上
に、フレキシブル鉄筋収納装置1、架台2を設置し、架
台2の中央部にセンターホールジャッキ3を取付け、さ
らに、架台2にフレキシブル鉄筋のガイドパイプを取付
ける。以上により、場所打杭のフレキシブル鉄筋建込み
のための準備作業が完了後、フレキシブル鉄筋5の先端
を、下部フレーム6の挿通孔に挿通し、フレキシブル鉄
筋先端部を圧壊し、圧壊部に流動性硬化剤を充填して球
塊部7を形成する。球塊部7に下部フレーム6を定着さ
せた後、下部フレーム6を支持している吊りワイヤー8
のセンターホールジャッキ3により、フレキシブル鉄筋
5を場所打杭の削孔9内に降下させながら、剪断補強筋
10をフレキシブル鉄筋5に巻き付け、削孔9底面まで
降下し、削孔9内に水中コンクリートを打設し完了す
る。
<A> Overall Configuration FIG. 1 is a side sectional view showing the construction of a method for fixing a flexible reinforcing bar according to the present invention. The flexible rebar storage device 1 and the gantry 2 are installed on the construction base G of the cast-in-place pile, the center hole jack 3 is attached to the center of the gantry 2, and the flexible pipe guide pipe is attached to the gantry 2. As described above, after the preparatory work for laying the flexible reinforcing bar of the cast-in-place pile is completed, the distal end of the flexible reinforcing bar 5 is inserted into the insertion hole of the lower frame 6, the flexible reinforcing bar distal end is crushed, and the fluidity is applied to the crushed portion. The spherical mass 7 is formed by filling a hardening agent. After fixing the lower frame 6 to the ball mass 7, the suspension wires 8 supporting the lower frame 6
While the flexible reinforcing bar 5 is lowered into the hole 9 of the cast-in-place pile by the center hole jack 3, the shear reinforcing bar 10 is wound around the flexible reinforcing bar 5, descends to the bottom of the hole 9, and the underwater concrete enters the hole 9. And complete.

【0007】<ロ>球塊部の形成 以下に球塊部の形成について説明する。<B> Formation of ball mass portion The formation of the ball mass portion will be described below.

【0008】圧壊 図2はフレキシブル鉄筋5先端を圧壊した拡大斜視図を
示す。フレキシブル鉄筋5は複数の高強度な素線51を
よりあわせて加工されている。 フレキシブル鉄筋5先
端から直径の15〜20倍の長さにわたり、軸方向にジ
ャッキ等を用いて圧縮し、圧壊することにより、素線5
1は外方に向けて、くの字に塑性変形する。
FIG. 2 is an enlarged perspective view of the flexible rebar 5 in which the tip is crushed. The flexible reinforcing bar 5 is formed by twisting a plurality of high-strength strands 51. The wire 5 is compressed by using a jack or the like in the axial direction over a length of 15 to 20 times the diameter from the tip of the flexible rebar 5 and crushed.
1 is outwardly plastically deformed in a U-shape.

【0009】モルタル注入 図3は圧壊した部分にモルタル71を充填し、球塊部7
を形成している状態を示す拡大斜視図である。前記によ
り、フレキシブル鉄筋5先端を圧壊した部分に、布型枠
72をかぶせ内部にモルタル71を注入する。
FIG. 3 shows a mortar 71 filled in the crushed portion and
FIG. 4 is an enlarged perspective view showing a state in which a is formed. As described above, the portion where the tip of the flexible reinforcing bar 5 is crushed is covered with the cloth frame 72 and the mortar 71 is injected into the inside.

【0010】布型枠の固定 図4はフレキシブル鉄筋5に球塊部7を固定している状
態を示す拡大斜視図である。布型枠72内部にモルタル
71を注入後、フレキシブル鉄筋5に設けたリング突起
73上部に、取付けバンド74を締め付け、布型枠72
が滑り落ちないようにして球塊部7の形成が完成する。
FIG. 4 is an enlarged perspective view showing a state where the spherical mass 7 is fixed to the flexible reinforcing bar 5. After the mortar 71 is injected into the cloth formwork 72, the mounting band 74 is tightened on the ring projection 73 provided on the flexible reinforcing bar 5, and the cloth formwork 72 is formed.
Is formed, and the formation of the ball block 7 is completed.

【0011】<ハ>球塊部の定着 図5は、球塊部7に下部フレーム6を載置する直前の状
態を示す拡大斜視図である。下部フレーム6はリング状
の鋼板で、所定間隔にフレキシブル鉄筋5を挿通する挿
通孔61があけられている。挿通孔61は下向きに孔の
直径が小さくなるようにテーパーをつけている。下部フ
レーム6には、吊りワイヤー8で吊り上げるための吊り
ピース62が設置されている。図6は、球塊部7に下部
フレーム6を定着している状態を示す拡大斜視図であ
る。下部フレーム6を球塊部7に接するまで移動させる
ことにより、フレキシブル鉄筋5に働く引張力は、下部
フレーム6と一体となって定着機構が働く。この状態に
おいて、下部フレーム6とフレキシブル鉄筋5の隙間
に、テーパー付きの鋼製楔13を打ち込み、下部フレー
ム6を吊った状態でフレキシブル鉄筋5や、剪断補強筋
10が落下しないように固定する。(図7)
<C> Fixation of Bulb Portion FIG. 5 is an enlarged perspective view showing a state immediately before the lower frame 6 is mounted on the ball mass portion 7. The lower frame 6 is a ring-shaped steel plate and has insertion holes 61 through which the flexible reinforcing bars 5 are inserted at predetermined intervals. The insertion hole 61 is tapered downward so that the diameter of the hole decreases. In the lower frame 6, a suspending piece 62 for being suspended by the suspending wire 8 is provided. FIG. 6 is an enlarged perspective view showing a state in which the lower frame 6 is fixed to the ball block 7. By moving the lower frame 6 until it comes into contact with the ball portion 7, the tensile force acting on the flexible reinforcing bar 5 is integrated with the lower frame 6 to operate the fixing mechanism. In this state, a tapered steel wedge 13 is driven into the gap between the lower frame 6 and the flexible reinforcing bar 5, and the flexible reinforcing bar 5 and the shear reinforcing bar 10 are fixed with the lower frame 6 suspended so as not to drop. (FIG. 7)

【0012】<ニ>鉄筋籠の降下 鉄筋籠を構成しているフレキシブル鉄筋5、剪断補強筋
10、下部フレーム6を施工基盤G上で組立て後、セン
ターホールジャッキ3の吊りワイヤー8を、削孔9底面
まで降下させる。(図1)
<D> Drop of Reinforcement Basket After assembling the flexible reinforcement 5, the shear reinforcement 10, and the lower frame 6 constituting the reinforcement cage on the construction base G, the suspension wire 8 of the center hole jack 3 is drilled. 9 Lower to the bottom. (Fig. 1)

【0013】<ホ>コンクリート打設 削孔9内に、図示しないトレミー管を吊り下げ、水中コ
ンクリート打設して、場所打杭の施工が完了する。
<E> Concrete Casting A tremy pipe (not shown) is suspended in the drilled hole 9 and submerged concrete is cast to complete the construction of the cast-in-place pile.

【0014】[0014]

【発明の実施の形態2】図8は、複数本のフレキシブル
鉄筋5を、1か所の挿通孔61に挿通し、球塊部7を形
成している場合を示す斜視図である。球塊部7は、各フ
レキシブル鉄筋5毎に形成されている。(図9)
[Embodiment 2] FIG. 8 is a perspective view showing a case where a plurality of flexible reinforcing bars 5 are inserted into one insertion hole 61 to form a spherical mass 7. As shown in FIG. The ball mass 7 is formed for each flexible reinforcing bar 5. (FIG. 9)

【0015】[0015]

【発明の実施の形態3】図10は、複数本のフレキシブ
ル鉄筋5を、1か所の挿通孔61に挿通し、且つ、球塊
部7を1つにまとめた場合を示す斜視図である。
Third Embodiment FIG. 10 is a perspective view showing a case in which a plurality of flexible reinforcing bars 5 are inserted into one insertion hole 61 and the ball portions 7 are integrated into one. .

【0016】[0016]

【発明の実施の形態4】図11は、発明の実施の形態4
の全体を示す縦断面図であり、図12はその部分拡大縦
断面図である。場所打杭は、杭上部の方が曲げや、剪断
力の断面力が大きい。そのため、杭上部にフレキシブル
鉄筋5の本数を増加させる必要がある。本実施の形態に
おいては、発明の実施の形態1により、フレキシブル鉄
筋5を定着させて降下途中において、別の場所打杭のた
めのフレキシブル鉄筋増設筋51を増設し、その先端部
は、発明の実施の形態1と同様に球塊部7を形成するも
のである。本実施の形態においては、下部フレーム6に
相当するものは必要としない。フレキシブル鉄筋増設筋
51を増設する際、球塊部7を、しぼりリング鉄筋14
により場所打杭の杭芯に集める。また、杭芯に集められ
たそれぞれの球塊部7の上下位置が、2箇所以上に分散
するように配置する。これにより、定着個所の全てが同
じ位置に集中せず、応力の分散を計れる。
[Embodiment 4] FIG. 11 shows Embodiment 4 of the present invention.
And FIG. 12 is a partially enlarged longitudinal sectional view of FIG. In the case of cast-in-place piles, the upper part of the pile has a larger bending or shearing sectional force. Therefore, it is necessary to increase the number of flexible reinforcing bars 5 at the upper part of the pile. In the present embodiment, according to the first embodiment of the present invention, the flexible reinforcing bar 5 is fixed, and during the descent, a flexible reinforcing bar additional reinforcing bar 51 for another cast-in-place pile is added. The spherical mass 7 is formed in the same manner as in the first embodiment. In the present embodiment, a component corresponding to the lower frame 6 is not required. When the flexible reinforcing bars 51 are added, the ball portion 7 is squeezed by the squeezed ring reinforcing bars 14.
To collect in the core of the cast-in-place pile. Moreover, it arrange | positions so that the up-and-down position of each sphere part 7 collected by the pile core may be disperse | distributed to two or more places. Thereby, all of the fixing points are not concentrated on the same position, and the dispersion of the stress can be measured.

【0017】[0017]

【発明の効果】本発明は以上説明したようになるから、
次のような効果を得ることができる。 <イ>場所打杭のフレキシブル鉄筋を定着するための高
価な鋼製圧着グリップ及びアンカープレートを使用せ
ず、経済的な、効果的な構造物とすることができる。<
ロ>定着体を、モルタル充填による球塊部としたので、
作業効率がよい。 <ハ>場所打杭の上部に、フレキシブル鉄筋増設筋を増
設したので、杭上部に集中して作用する曲げや、剪断力
に対応できる。
Since the present invention has been described above,
The following effects can be obtained. <A> An economical and effective structure can be achieved without using expensive steel crimping grips and anchor plates for fixing flexible reinforcing bars of cast-in-place piles. <
B> Since the fixing body was made into a spherical mass by mortar filling,
Work efficiency is good. <C> Flexible reinforcing bars have been added above the cast-in-place piles, so it can cope with bending and shearing forces acting intensively on the upper part of the pile.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明によるフレキシブル鉄筋の定着方法を示
す側断面図。
FIG. 1 is a side sectional view showing a fixing method of a flexible reinforcing bar according to the present invention.

【図2】フレキシブル鉄筋先端を圧壊した拡大斜視図。FIG. 2 is an enlarged perspective view in which the tip of a flexible reinforcing bar is crushed.

【図3】球塊部を形成している状態を示す拡大斜視図。FIG. 3 is an enlarged perspective view showing a state where a ball block is formed.

【図4】フレキシブル鉄筋に球塊部を固定している状態
を示す拡大斜視図。
FIG. 4 is an enlarged perspective view showing a state in which a ball portion is fixed to a flexible reinforcing bar.

【図5】球塊部に下部フレームを載置する直前の状態を
示す拡大斜視図。
FIG. 5 is an enlarged perspective view showing a state immediately before the lower frame is placed on the ball portion.

【図6】球塊部に下部フレームを定着している状態を示
す拡大斜視図。
FIG. 6 is an enlarged perspective view showing a state in which a lower frame is fixed to a ball block.

【図7】テーパー付きの鋼製楔を打ち込んでいる状態を
示す拡大斜視図。
FIG. 7 is an enlarged perspective view showing a state where a tapered steel wedge is driven.

【図8】複数本のフレキシブル鉄筋を、1か所の挿通孔
に挿通し、球塊部を形成している場合を示す斜視図。
FIG. 8 is a perspective view showing a case in which a plurality of flexible reinforcing bars are inserted into one insertion hole to form a ball portion.

【図9】各フレキシブル鉄筋毎に球塊部形成した斜視
図。
FIG. 9 is a perspective view in which a spherical mass is formed for each flexible reinforcing bar.

【図10】球塊部を1つにまとめた場合を示す斜視図。FIG. 10 is a perspective view showing a case where ball blocks are combined into one.

【図11】その他の実施の形態全体を示す縦断面図。FIG. 11 is a longitudinal sectional view showing the entire other embodiment.

【図12】同上の部分拡大縦断面図。FIG. 12 is a partially enlarged longitudinal sectional view of the above.

【図13】従来のフレキシブル鉄筋定着方法を示す斜視
図。
FIG. 13 is a perspective view showing a conventional flexible reinforcing bar fixing method.

【図14】同上斜視図。FIG. 14 is a perspective view of the same.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 白石 俊英 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 (72)発明者 小林 敏彦 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Toshihide Shiraishi 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo Taisei Construction Co., Ltd. (72) Inventor Toshihiko Kobayashi 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo Taisei Corporation

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】場所打杭に使用するフレキシブル鉄筋を定
着させる方法であって、 下部フレームの挿通孔にフレキシブル鉄筋を挿通し、 フレキシブル鉄筋先端部を圧壊し、 圧壊部に流動性硬化剤を充填して球塊部を形成後、 球塊部に下部フレームを定着したことを特徴とする、フ
レキシブル鉄筋の定着方法。
1. A method for fixing a flexible reinforcing bar used for a cast-in-place pile, comprising inserting a flexible reinforcing bar into an insertion hole of a lower frame, crushing a tip portion of the flexible reinforcing bar, and filling a crushable portion with a fluid hardener. A method of fixing a flexible reinforcing bar, comprising: forming a ball mass portion, and then fixing a lower frame to the ball mass portion.
【請求項2】請求項1に記載のフレキシブル鉄筋の定着
方法において、 下部フレームの挿通孔に挿通するフレキシブル鉄筋は、
複数本であることを特徴とする、 フレキシブル鉄筋の定着方法。
2. The method of fixing a flexible reinforcing bar according to claim 1, wherein the flexible reinforcing bar inserted into the insertion hole of the lower frame is:
A method for fixing a flexible reinforcing bar, comprising a plurality of bars.
【請求項3】請求項2に記載のフレキシブル鉄筋の定着
方法において、 圧壊部に流動性硬化剤を充填して形成する球塊部は、そ
れぞれのフレキシブル鉄筋毎に形成することを特徴とす
る、 フレキシブル鉄筋の定着方法。
3. The method of fixing a flexible reinforcing bar according to claim 2, wherein the sphere portion formed by filling the crushing portion with a flowable hardening agent is formed for each flexible reinforcing bar. How to fix flexible rebar.
【請求項4】請求項2に記載のフレキシブル鉄筋の定着
方法において、 圧壊部に流動性硬化剤を充填して形成する球塊部は、複
数本のフレキシブル鉄筋の圧壊部をまとめて形成するこ
とを特徴とする、 フレキシブル鉄筋の定着方法。
4. The method for fixing a flexible reinforcing bar according to claim 2, wherein the spherical mass formed by filling the crushing portion with a fluid hardener is formed by crushing portions of a plurality of flexible reinforcing bars. A method for fixing a flexible reinforcing bar.
【請求項5】請求項1乃至請求項4のいずれかに記載の
フレキシブル鉄筋の定着方法において、 挿通孔に挿通するフレキシブル鉄筋は、楔により締め付
けられることを特徴とする、 フレキシブル鉄筋の定着方法。
5. The fixing method for a flexible reinforcing bar according to claim 1, wherein the flexible reinforcing bar inserted into the insertion hole is tightened by a wedge.
【請求項6】請求項1に記載のフレキシブル鉄筋の定着
方法において、 場所打杭下端部となるフレキシブル鉄筋を定着させて降
下途中で、 別の場所打杭フレキシブル鉄筋を増設し、 増設したフレキシブル鉄筋先端部を圧壊し、 圧壊部に流動性硬化剤を充填して球塊部を形成後、 球塊部を、場所打杭の杭芯に集めたことを特徴とする、 フレキシブル鉄筋の定着方法。
6. The flexible reinforcing bar according to claim 1, wherein the flexible reinforcing bar serving as the lower end of the cast-in-place pile is fixed, and another flexible cast-in-place pile is added during the descent. A method for fixing a flexible reinforcing bar, comprising: crushing a tip portion, filling a crushed portion with a fluid hardener to form a ball portion, and collecting the ball portion on a pile core of a cast-in-place pile.
【請求項7】請求項6に記載のフレキシブル鉄筋の定着
方法において、 杭芯に集められた球塊部の上下位置が、2箇所以上に分
散していることを特徴とする、 フレキシブル鉄筋の定着方法。
7. The method for fixing a flexible reinforcing bar according to claim 6, wherein the vertical positions of the ball masses collected on the pile core are dispersed at two or more places. Method.
JP20727397A 1997-07-16 1997-07-16 Flexible rebar fixing method Expired - Lifetime JP3684539B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20727397A JP3684539B2 (en) 1997-07-16 1997-07-16 Flexible rebar fixing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20727397A JP3684539B2 (en) 1997-07-16 1997-07-16 Flexible rebar fixing method

Publications (2)

Publication Number Publication Date
JPH1136289A true JPH1136289A (en) 1999-02-09
JP3684539B2 JP3684539B2 (en) 2005-08-17

Family

ID=16537073

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20727397A Expired - Lifetime JP3684539B2 (en) 1997-07-16 1997-07-16 Flexible rebar fixing method

Country Status (1)

Country Link
JP (1) JP3684539B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006177010A (en) * 2004-12-22 2006-07-06 Taisei Corp Fixing structure of flexible reinforcement
JP6442104B1 (en) * 2017-07-31 2018-12-19 東京製綱株式会社 Continuous fiber reinforced strand fixing tool
JP2019148070A (en) * 2018-02-26 2019-09-05 鹿島建設株式会社 Construction method of underground structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006177010A (en) * 2004-12-22 2006-07-06 Taisei Corp Fixing structure of flexible reinforcement
JP6442104B1 (en) * 2017-07-31 2018-12-19 東京製綱株式会社 Continuous fiber reinforced strand fixing tool
WO2019026580A1 (en) * 2017-07-31 2019-02-07 東京製綱株式会社 Attachment fitting for continuous fiber reinforced stranded wire
JP2019027270A (en) * 2017-07-31 2019-02-21 東京製綱株式会社 Anchorage device of continuous fiber reinforced strand
CN110914506A (en) * 2017-07-31 2020-03-24 东京制纲株式会社 Anchoring part of continuous fiber reinforced stranded wire
CN110914506B (en) * 2017-07-31 2021-08-31 东京制纲株式会社 Anchoring part of continuous fiber reinforced stranded wire
US11268280B2 (en) 2017-07-31 2022-03-08 Tokyo Rope Manufacturing Co., Ltd. Anchorage of continuous fiber-reinforced polymer strands
JP2019148070A (en) * 2018-02-26 2019-09-05 鹿島建設株式会社 Construction method of underground structure

Also Published As

Publication number Publication date
JP3684539B2 (en) 2005-08-17

Similar Documents

Publication Publication Date Title
JP3215381B2 (en) Method, member, and reinforcing bar for constructing fixing device
CN103620130B (en) For connecting the attachment means in adjacent precast concrete portion and for the method connecting first and second precast concrete portion
JPH1136289A (en) Fixing method for flexible reinforcing bar
US4121325A (en) Cable anchoring and coupling equipment
JP4914236B2 (en) Method and structure for joining precast reinforced concrete beam members
JP3057545B2 (en) Reinforcement structure for concrete structures
CN110685282B (en) Anchor cable bearing device, anchor cable and tensioning construction method thereof
JPS6181979A (en) Precast prestressed concrete tank and execution method thereof
JPH0249816A (en) Manufacture of tensile part capable of being fixed to land and tensile part thereof
JP4683520B2 (en) Foundation structure of new building using existing piles
JP2004324153A (en) Reinforced structure of tendon anchorage part in pre-stressed concrete structure and fixed construction method
KR200263281Y1 (en) Apparatus for reinforcing a construction by enlarging its&#39; size
CN110396916A (en) U-shaped Steel Thin-Wall-prestressed concrete combination bent cap and thin wall steel tube concrete pier stud joint structure and construction technology
JPS6319649B2 (en)
JPH111994A (en) Stranded-wire reinforcing material with opening
CN212506792U (en) Beam column joint structure applied to upturning cantilever beam
JPS605968A (en) Prestress introduction of pc slab in existing structure
CN219825238U (en) Device for connecting top end of post-tensioning prestress anchor rod with basic bearing platform
KR100375500B1 (en) Free-Edge Wall Ends with Interlocking Spiral Reinforcement
JP3133966B2 (en) Law
JP2743819B2 (en) Ground anchoring part of ground anchor
JP2907038B2 (en) Joint structure and joining method between precast beam and column
KR200247031Y1 (en) a removal type anchor
JP3877493B2 (en) Precast concrete member and joining method thereof
JPS59220560A (en) Construction of flat slab

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050517

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050520

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090610

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100610

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110610

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120610

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130610

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term