JPH11294093A - Method for placing concrete for tunnel, and its device - Google Patents

Method for placing concrete for tunnel, and its device

Info

Publication number
JPH11294093A
JPH11294093A JP10110165A JP11016598A JPH11294093A JP H11294093 A JPH11294093 A JP H11294093A JP 10110165 A JP10110165 A JP 10110165A JP 11016598 A JP11016598 A JP 11016598A JP H11294093 A JPH11294093 A JP H11294093A
Authority
JP
Japan
Prior art keywords
formwork
tunnel
traveling
concrete
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10110165A
Other languages
Japanese (ja)
Inventor
Shunji Takaoka
俊司 高岡
Masahito Uchida
雅人 内田
Teruaki Saegusa
輝昭 三枝
Tsutomu Kitagawa
勉 北川
Masahito Aoi
雅人 青井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gifu Industry Co Ltd
Ohmoto Gumi Co Ltd
Daisue Construction Co Ltd
Original Assignee
Gifu Industry Co Ltd
Ohmoto Gumi Co Ltd
Daisue Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gifu Industry Co Ltd, Ohmoto Gumi Co Ltd, Daisue Construction Co Ltd filed Critical Gifu Industry Co Ltd
Priority to JP10110165A priority Critical patent/JPH11294093A/en
Publication of JPH11294093A publication Critical patent/JPH11294093A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a method for placing concrete in which a mold and a gantry can be easily moved on a curved part of a tunnel, and concrete for a secondary lining can be safely and efficiently placed. SOLUTION: A mold 12 is split in the longitudinal direction, a pair of traveling trucks 30 are movable in the mold 12, and the length of the mold 12 and the distance between a pair of traveling trucks 30 are variable corresponding to the tunnel length for concrete placement. The mold 12 is moved by varying the distance between a pair of traveling trucks 30 corresponding to the length of a mold 12b not to be used and the length of a mold 12a to be used, and concrete for the secondary lining is placed in a tunnel 14.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、トンネルの曲線部
に対応させて型枠の全長を縮短させ、効率良く二次覆工
用コンクリートを打設することができるトンネル用コン
クリート打設方法およびその装置に関するものである。
なお、本明細書中、「打設」とは、養生硬化してない流
動性コンクリートを型枠と、トンネル掘削面または一次
覆工面(スチールセグメント等)と、の間に充填させる
ことをいう。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete casting method for a tunnel capable of efficiently casting concrete for secondary lining by shortening the total length of a formwork in correspondence with a curved portion of a tunnel, and a method for casting concrete. It concerns the device.
In the present specification, “placement” refers to filling fluid concrete, which has not been cured and hardened, between a mold and a tunnel excavation surface or a primary lining surface (such as a steel segment).

【0002】[0002]

【従来の技術】元来、一本のトンネルにおいて、直線と
曲線が混在する場合が多く、曲線部において、型枠の両
側外形線は直線として表出するため、型枠長を縮短さ
せ、この縮短させた型枠を使用して多段階打設させるこ
とにより、曲線部に対応した形状を表出させる配慮がな
されている(図6、図8、図9参照)。
2. Description of the Related Art Originally, a straight line and a curved line are often mixed in a single tunnel. In a curved portion, the outer shape lines on both sides of the form are expressed as straight lines. Consideration is given to expressing a shape corresponding to a curved portion by performing multi-stage casting using a shortened formwork (see FIGS. 6, 8, and 9).

【0003】この際、分割させた使用する型枠の移動
は、まず使用する型枠を作業員により解体し、コンクリ
ート打設位置へ移動台車を介して移動させた後、一対の
走行台車間を梁材により連結させてなる、型枠の全長に
対応した長さのガントリーに、使用する型枠を固着させ
ることにより、行っていた。
[0003] At this time, the divided formwork to be used is firstly dismantled by an operator, moved to a concrete placing position via a movable carriage, and then moved between a pair of traveling carriages. This has been done by fixing a form to be used to a gantry having a length corresponding to the entire length of the form, which is connected by beams.

【0004】トンネルの曲線部におけるガントリーの移
動は、ガントリー下部が旋回不能であったため、コンク
リート打設された床面上を無理やり滑らせて移動させて
いた。
When the gantry is moved in the curved part of the tunnel, since the lower part of the gantry cannot be turned, the gantry is forcibly slid on the concrete-placed floor.

【0005】なお、図6、図8、図9中、14はトンネ
ル、16は二次覆工用コンクリート、42はトンネル1
4の直線部、44はトンネル14の曲線部、46は型
枠、48はガントリー、50は走行台車、52は梁材、
54はトンネル掘削面または一次覆工面、56はコンク
リート床面、58は既二次覆工用コンクリート打設部、
62は移動台車を示す。
In FIGS. 6, 8 and 9, 14 is a tunnel, 16 is a secondary lining concrete, and 42 is a tunnel 1
4 is a straight section, 44 is a curved section of the tunnel 14, 46 is a formwork, 48 is a gantry, 50 is a traveling trolley, 52 is a beam,
54 is a tunnel excavation surface or a primary lining surface, 56 is a concrete floor surface, 58 is a concrete placing portion for a secondary lining,
Reference numeral 62 denotes a movable cart.

【0006】[0006]

【発明が解決しようとする課題】従来、トンネルの曲線
部における二次覆工用コンクリート打設において、型枠
の全長に対応する長さのガントリーにより、分割された
使用する型枠および使用しない型枠を何度も移動させる
必要があり、ガントリー移動によりコンクリート打設さ
れた床面が損傷し易く、床面を修正する必要があること
が問題となっていた。
Conventionally, in placing concrete for secondary lining on a curved portion of a tunnel, a gantry having a length corresponding to the entire length of the form is divided into a form used and a form not used. The frame has to be moved many times, and the floor surface on which the concrete is cast is easily damaged by the movement of the gantry.

【0007】また、トンネル曲線部におけるガントリー
の移動は、ガントリー下部が旋回不能であったため、狭
い坑内においてトンネルの幅方向に対してガントリーお
よび型枠とトンネル掘削面または一次覆工面との間の距
離があまりなく、接触しないように細心の注意を払って
行うと共に、多大な労力が必要であることが問題となっ
ていた。
[0007] In addition, the movement of the gantry in the curved section of the tunnel is caused by the fact that the lower part of the gantry cannot be turned, so that the distance between the gantry and the formwork and the tunnel excavation surface or the primary lining surface in the width direction of the tunnel in the narrow mine. However, there has been a problem that the method is carried out with great care so as not to make contact and that a great deal of effort is required.

【0008】また、ガントリーを使用することなく作業
員による場合には、型枠の解体、移動作業が3〜10日
間必要であり、その作業も狭い坑内で行う必要があり、
苦渋作業となり、危険であることが問題となっていた。
[0008] In the case where the gantry is used by an operator without using the gantry, dismantling and moving of the formwork is required for 3 to 10 days, and the operation also needs to be performed in a narrow mine.
It was a tough job and the danger was a problem.

【0009】また、作業員による場合、曲線部の曲率が
大きければ大きいほど、型枠の解体、移動作業が増大
し、工期が大幅に遅延することが問題となっていた。
In addition, in the case of a worker, there has been a problem that as the curvature of the curved portion is larger, the dismantling and moving operations of the formwork are increased, and the construction period is greatly delayed.

【0010】本発明は、このような欠点に鑑み、トンネ
ルの曲線部における型枠およびガントリーの移動が容易
であり、安全で、かつ効率良く二次覆工用コンクリート
を打設することができるトンネル用コンクリート打設方
法およびその装置を提供することを目的とするものであ
る。
In view of the above drawbacks, the present invention makes it easy to move a formwork and a gantry in a curved portion of a tunnel, and can safely and efficiently cast concrete for secondary lining. It is an object of the present invention to provide a concrete casting method and a device therefor.

【0011】[0011]

【課題を解決するための手段】本発明は、一対の走行台
車からなるガントリー上に、天端フォームおよび両側フ
ォームからなる型枠を、配設させ、この型枠を介してト
ンネル内に二次覆工用コンクリートを打設する方法にお
いて、型枠を長さ方向に対して分割自在とし、各走行台
車を型枠内を移動自在とすることにより、打設すべきト
ンネル長に対応させて型枠の長さおよび一対の走行台車
間の距離を変更可能とし、打設完了後、打設すべきトン
ネル長に対応させて型枠を分割させた後、走行台車を使
用する型枠内へ移動させて使用する型枠と固着させ、ま
たは使用する型枠の長さに対応した梁材により一対の走
行台車を連結させて使用する型枠内に移動させて固着さ
せると共に、使用する型枠を折り畳み、打設位置へ移動
させた後、型枠を展張させ、トンネル内に二次覆工用コ
ンクリートを打設することを特徴とするもの、または分
割させた使用しない型枠を一対の走行台車に固着し、ま
たは型枠の長さに対応した梁材により連結させた一対の
走行台車に固着し、この型枠を折り畳み、一対の走行台
車によりコンクリート打設進行側へ移動させた後、走行
台車を使用する型枠内へ移動させて使用する型枠と固着
させ、または使用する型枠の長さに対応した梁材により
一対の走行台車を連結させて使用する型枠内へ移動させ
て固着させると共に、使用する型枠を折り畳み、打設位
置へ移動させた後、型枠を展張させ、トンネル内に二次
覆工用コンクリートを打設することを特徴とするもの、
または走行台車を、駆動ローラー部とこの駆動ローラー
部と旋回自在に上設された門型部とにより構成し、門型
部に対して駆動ローラー部を旋回させることにより、型
枠内の走行台車の移動、およびトンネルの曲線部におけ
る走行台車の移動、を容易とすることを特徴とするもの
である。
According to the present invention, a formwork comprising a top end form and both side forms is disposed on a gantry comprising a pair of traveling carts, and a secondary form is placed in a tunnel through this formwork. In the method of casting concrete for lining, the form is divided in the length direction and each traveling vehicle is movable in the form, so that the mold is adapted to the length of the tunnel to be cast. The length of the frame and the distance between the pair of traveling vehicles can be changed.After the casting is completed, the mold is divided according to the length of the tunnel to be cast, and then moved into the mold using the traveling truck. The formwork to be used is fixed to the formwork to be used, or a pair of traveling trolleys are connected by a beam material corresponding to the length of the formwork to be used, and moved into the formwork to be used and fixed. After folding and moving to the casting position, Characterized by placing concrete for secondary lining in a tunnel, or fixing a divided unused formwork to a pair of traveling carts, or a beam corresponding to the length of the formwork After being fixed to a pair of traveling vehicles connected by a material, folding the formwork, moving the pair of traveling vehicles to the concrete placing progress side, moving the traveling vehicle into the formwork using the mold Affixed to the frame, or connected to a pair of traveling carts by a beam material corresponding to the length of the form to be used, moved into the form to be used, and fixed, and the form to be used was folded and placed. After being moved to, the formwork is expanded, and concrete for secondary lining is poured into the tunnel,
Alternatively, the traveling vehicle is constituted by a driving roller portion, the driving roller portion, and a gate portion rotatably provided on the traveling roller portion, and the driving roller portion is rotated with respect to the portal portion, so that the traveling vehicle in the formwork is formed. And the movement of the traveling vehicle in the curved part of the tunnel is facilitated.

【0012】[0012]

【発明の実施の形態】本発明に係るトンネル用コンクリ
ート打設装置は、図1〜図6に示すように、以下の構成
からなるものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A concrete casting device for a tunnel according to the present invention has the following configuration as shown in FIGS.

【0013】本発明で使用する型枠12は、トンネル1
4内に二次覆工用コンクリート16を打設するためのも
のであり、ガントリー18上に天端フォーム20、両側
フォーム22,22が配設され、各フォーム20,22
は伸縮自在である。
The formwork 12 used in the present invention is a tunnel 1
4 is for placing the concrete 16 for secondary lining into the gantry 4. A top end form 20 and both side forms 22, 22 are arranged on a gantry 18.
Is telescopic.

【0014】本例において、天端フォーム20の伸縮手
段はガントリー18に装着された油圧ジャッキ24であ
り、両側フォーム22,22の伸縮手段は両側フォーム
22,22に個別に装着された油圧ジャッキ26であ
る。
In the present embodiment, the expansion and contraction means of the top end foam 20 is a hydraulic jack 24 mounted on the gantry 18, and the expansion and contraction means of the both side forms 22 and 22 are hydraulic jacks 26 individually mounted on the both side forms 22 and 22. It is.

【0015】型枠12の長さ方向に対して天端フォーム
20および両側フォーム22,22を複数分割させると
共に、分割した各フォーム20,22,22はボルト等
の止着手段28を介して結合されている。
The top end form 20 and both side forms 22 and 22 are divided into a plurality of parts in the longitudinal direction of the formwork 12, and the divided forms 20, 22, and 22 are connected via fastening means 28 such as bolts. Have been.

【0016】ガントリー18は、一対の走行台車30か
らなるものであり、この一対の走行台車30間に各フォ
ーム20,22,22を止着手段28を介して結合され
た型枠12が固着され、さらに走行台車30は、駆動ロ
ーラー部34と門型部36とにより構成され、駆動ロー
ラー部34と門型部36とは旋回自在に連結されてい
る。
The gantry 18 is composed of a pair of traveling vehicles 30, and the formwork 12 in which the respective foams 20, 22, 22 are connected via fastening means 28 is fixed between the pair of traveling vehicles 30. Further, the traveling vehicle 30 includes a drive roller section 34 and a portal section 36, and the drive roller section 34 and the portal section 36 are rotatably connected.

【0017】本例において、走行台車30の駆動ローラ
ー部34と門型部36との旋回機構は、駆動ローラー部
34と門型部36とを旋回軸38を介して連結させ、駆
動ローラー部34上に門型部36を旋回させるための旋
回ジャッキ40を装着させ、旋回ジャッキ40を作動さ
せることにより、門型部36に対して駆動ローラー部3
4を旋回させるものである。
In this embodiment, the turning mechanism of the driving roller section 34 and the gate section 36 of the traveling vehicle 30 connects the driving roller section 34 and the gate section 36 via a turning shaft 38, and the driving roller section 34. A pivot jack 40 for pivoting the portal section 36 is mounted on the top, and the pivot jack 40 is actuated.
4 is turned.

【0018】なお、図中12aは分割させた使用する型
枠、12bは分割させた使用しない型枠、54はトンネ
ル掘削面または一次覆工面、56はトンネル床面、58
は既二次覆工用コンクリート打設部、60は型枠12を
支持するための妻側およびラップ側の各ビームを示す。
In the figure, 12a is a divided used formwork, 12b is a divided unused formwork, 54 is a tunnel excavation surface or a primary lining surface, 56 is a tunnel floor surface, 58
Numeral denotes a concrete placing part for the secondary lining, and numeral 60 denotes beams on the wife side and the lap side for supporting the formwork 12.

【0019】本装置を使用して、図6に示すトンネル1
4の曲線部44に二次覆工用コンクリート16を打設す
る方法(請求項1および請求項2記載の方法)を、図5
に基づいて以下に詳述する。
Using this apparatus, the tunnel 1 shown in FIG.
FIG. 5 shows a method of placing the concrete 16 for secondary lining on the curved portion 44 of FIG. 4 (the method according to claim 1 and claim 2).
This will be described in detail below.

【0020】まず、打設完了後、打設すべきトンネル1
4の曲線部44のトンネル長に対応させて型枠12を長
さ方向に対して分割させる。
First, after completion of the installation, the tunnel 1 to be installed
The mold 12 is divided in the length direction corresponding to the tunnel length of the curved portion 44 of No. 4.

【0021】この際、型枠12は打設したままにしてお
けばよく、予め型枠12を既コンクリート打設側(図5
において左側)へ一対の走行台車30を介して移動させ
てもよい。
At this time, the formwork 12 may be left as it is cast, and the formwork 12 is previously placed on the side where the concrete is cast (FIG. 5).
May be moved to the left) via a pair of traveling carts 30.

【0022】次に、一対の走行台車30を使用する型枠
12a内に移動させる。
Next, the pair of traveling vehicles 30 is moved into the mold 12a to be used.

【0023】この際、長さ方向の両端(図5(イ)にお
いて左右両端)の型枠12には妻側またはラップ側の各
ビーム60が装着されているため必要ないが、長さ方向
の中間部の型枠12には各ビーム60が装着されていな
いため、使用する型枠12aの長さに対応した梁材32
により一対の走行台車30を連結させる。
At this time, since the beam 60 on the wife side or the lap side is mounted on the formwork 12 at both ends in the length direction (left and right ends in FIG. 5A), it is not necessary. Since each beam 60 is not mounted on the intermediate form 12, a beam 32 corresponding to the length of the form 12 a to be used is used.
To connect the pair of traveling vehicles 30.

【0024】また、各走行台車30の門型部36に対し
て駆動ローラー部34を旋回させて移動させることによ
り、トンネル掘削面または一次覆工面54と門型部36
との距離を広く(長く)し、型枠12内の走行台車30
の移動スペースを十分確保することができ、移動作業に
おいて細心の注意を必要とすることなく、容易に行うこ
とができる。
Further, by rotating the drive roller portion 34 with respect to the portal portion 36 of each traveling vehicle 30 and moving the same, the tunnel excavation surface or the primary lining surface 54 and the portal portion 36 are moved.
To a longer (longer) distance from the traveling carriage 30 in the formwork 12
The moving space can be sufficiently secured, and the moving operation can be easily performed without requiring careful attention.

【0025】次に、一対の走行台車30と使用する型枠
12aとを固着させると共に、使用する型枠12aを折
り畳み、打設位置へ移動させる(図5(ロ)、(ハ)参
照)。
Next, the pair of traveling carts 30 and the formwork 12a to be used are fixed, and the formwork 12a to be used is folded and moved to a driving position (see FIGS. 5B and 5C).

【0026】この際、トンネル14の曲線部44に対応
させて各走行台車30の門型部36に対して駆動ローラ
ー部34を旋回させて移動させることにより、無理やり
走行台車30を床面に対して滑らせて移動させることが
ないため、床面の損傷を防止できると共に、作業員の労
力を激減させることができる。
At this time, the driving roller unit 34 is swiveled and moved with respect to the gate-shaped portion 36 of each traveling vehicle 30 corresponding to the curved portion 44 of the tunnel 14, thereby forcibly moving the traveling vehicle 30 with respect to the floor surface. Since it is not slid and moved, damage to the floor can be prevented and the labor of the operator can be drastically reduced.

【0027】次に、型枠12aを油圧ジャッキ24,2
6を介して展張させる。
Next, the mold 12a is moved to the hydraulic jacks 24,2.
6 to be extended.

【0028】この際、型枠12aのラップ側は、既二次
覆工用コンクリート打設部58と重合させておく必要が
ある。
At this time, the wrap side of the formwork 12a needs to be overlapped with the already placed concrete placing portion 58 for secondary lining.

【0029】次に、型枠12aの妻側周縁を確実に被覆
(妻止め)する。
Next, the edge on the wife side of the mold frame 12a is securely covered (stopped).

【0030】次に、トンネル掘削面または一次覆工面5
4と型枠12aとの間に二次覆工用コンクリート16を
打設させ、二次覆工用コンクリート16を養生硬化させ
る。
Next, the tunnel excavation surface or the primary lining surface 5
The secondary lining concrete 16 is cast between the mold 4 and the mold 12a, and the secondary lining concrete 16 is cured and hardened.

【0031】次に、型枠12aを脱型させる。Next, the mold 12a is removed.

【0032】前記工程により、型枠12aが設置された
トンネル14の曲線部の所定個所の二次覆工用コンクリ
ートの打設が完成する。
Through the above process, the concrete for the secondary lining is completed at a predetermined location in the curved portion of the tunnel 14 where the formwork 12a is installed.

【0033】この二次覆工用コンクリートの打設を、コ
ンクリート打設進行側(図5において右側)へ向けて順
次型枠12を分割、移動させて行い、トンネル14の曲
線部全域にわたり行う。
The casting of the secondary lining concrete is performed by sequentially dividing and moving the formwork 12 toward the concrete placement progressing side (the right side in FIG. 5), and is performed over the entire curved portion of the tunnel 14.

【0034】また、本装置を使用して、トンネル14の
曲線部44に二次覆工用コンクリート16を打設する方
法(請求項3および請求項4記載の方法)を、図7に基
づいて以下に詳述する。
A method of placing the concrete 16 for secondary lining on the curved portion 44 of the tunnel 14 using the present apparatus (the method according to claims 3 and 4) will be described with reference to FIG. Details will be described below.

【0035】まず、打設すべきトンネル14の曲線部4
4のトンネル長に対応させて型枠12を長さ方向に対し
て分割させる(図7(イ)参照)。
First, the curved portion 4 of the tunnel 14 to be cast
The mold 12 is divided in the length direction corresponding to the tunnel length of No. 4 (see FIG. 7A).

【0036】次に、分割させた使用しない型枠12bを
一対の走行台車30(ガントリー18)に固着する。
Next, the divided unused formwork 12b is fixed to the pair of traveling carriages 30 (gantry 18).

【0037】また、長さ方向の中間部の使用しない型枠
12bを移動させる際、予めこの型枠12bの長さに対
応した梁材32により一対の走行台車30を連結させて
おく(図7(ロ)参照)。
When the unused formwork 12b at the intermediate portion in the longitudinal direction is moved, a pair of traveling carriages 30 are connected in advance by beams 32 corresponding to the length of the formwork 12b (FIG. 7). (B)).

【0038】次に、型枠12bを折り畳み、一対の走行
台車30によりコンクリート打設進行側へトンネル曲線
部の二次覆工作業の支障とならないように移動(退避)
させる(図7(ハ)参照)。
Next, the formwork 12b is folded and moved (evacuated) by the pair of traveling carts 30 to the concrete placing progression side so as not to hinder the secondary lining work of the tunnel curved portion.
(See FIG. 7C).

【0039】次に、一対の走行台車30を使用する型枠
12a内へ移動させる。
Next, the pair of traveling carts 30 is moved into the mold 12a to be used.

【0040】また、長さ方向の中間部の使用する型枠1
2aを移動させる際、予めこの型枠12aの長さに対応
した梁材32により一対の走行台車30を連結させてお
く。
Further, the form 1 used in the middle portion in the length direction is used.
When moving 2a, a pair of traveling vehicles 30 is connected in advance by beam members 32 corresponding to the length of this formwork 12a.

【0041】次に、一対の走行台車30と使用する型枠
12aとを固着させると共に、使用する型枠12aを折
り畳み、打設位置へ移動させる(図7(ニ)参照)。
Next, the pair of traveling carts 30 and the formwork 12a to be used are fixed, and the formwork 12a to be used is folded and moved to the driving position (see FIG. 7 (d)).

【0042】型枠12aを油圧ジャッキ24,26を介
して展張させる。
The form 12a is extended via the hydraulic jacks 24 and 26.

【0043】この際、型枠12aのラップ側は、既二次
覆工用コンクリート打設部58と重合させておく必要が
ある。
At this time, the wrap side of the formwork 12a needs to be overlapped with the already placed concrete placing portion 58 for secondary lining.

【0044】次に、型枠12aの妻側周縁を確実に被覆
(妻止め)する。
Next, the peripheral edge of the form side of the formwork 12a is securely covered (with a stop).

【0045】次に、トンネル掘削面または一次覆工面5
4と型枠12aとの間に二次覆工用コンクリート16を
打設させ、二次覆工用コンクリート16を養生硬化させ
る。
Next, the tunnel excavation surface or the primary lining surface 5
The secondary lining concrete 16 is cast between the mold 4 and the mold 12a, and the secondary lining concrete 16 is cured and hardened.

【0046】次に、型枠12aを脱型させる。Next, the mold 12a is removed.

【0047】前記工程により、型枠12aが設置された
トンネル14の曲線部の所定個所の二次覆工用コンクリ
ートの打設が完成する。
Through the above-described steps, the concrete placement for the secondary lining is completed at a predetermined portion of the curved portion of the tunnel 14 where the formwork 12a is installed.

【0048】この二次覆工用コンクリートの打設を、コ
ンクリート打設進行側へ向けて順次型枠12を分割、移
動させて行い、トンネル14の曲線部全域にわたり行
う。
The casting of the secondary lining concrete is performed by sequentially dividing and moving the formwork 12 toward the concrete placing progressing side, and is performed over the entire curved portion of the tunnel 14.

【0049】なお、本発明に係る請求項1および請求項
2に係る方法の方が、請求項3および請求項4に係る方
法と比較して、より効率良くコンクリート打設を行うこ
とができる。
The method according to the first and second aspects of the present invention can perform concrete casting more efficiently than the methods according to the third and fourth aspects.

【0050】また、本発明に係る装置の使用はトンネル
の曲線部における型枠12の縮短、復元作業に限定され
ることはなく、トンネルの直線部における型枠12の復
元作業にも使用可能であることは自明である。
The use of the apparatus according to the present invention is not limited to the shortening and restoring work of the formwork 12 at the curved part of the tunnel, but can also be used for the work of restoring the formwork 12 at the straight part of the tunnel. It is self-evident.

【0051】また、本例において、天端フォーム20、
両側フォーム22,22の伸縮手段は、いずれも油圧ジ
ャッキによるものであるが、他の移動手段、例えばスク
リュージャッキによるものでもよく、他の伸縮機構でも
よい。
In the present embodiment, the top end foam 20,
The expansion and contraction means of the two-sided foams 22 and 22 are both formed by hydraulic jacks, but may be formed by other moving means such as a screw jack or another expansion and contraction mechanism.

【0052】また、本例において、走行台車30は門型
部36に対して駆動ローラー部38が旋回自在な構造を
採用しているが、門型部36と駆動ローラー部38とが
旋回不能な一体構造であっても、型枠12内の移動時、
トンネル14の曲線部における移動に作業負担はかかる
ものの、分割させた型枠の移動に関しては極めて容易な
作業となる。
In the present embodiment, the traveling carriage 30 employs a structure in which the drive roller portion 38 can freely rotate with respect to the gate portion 36. However, the gate portion 36 and the drive roller portion 38 cannot rotate. Even if it is an integral structure,
Although a work load is required to move the curved portion of the tunnel 14, moving the divided formwork is an extremely easy operation.

【0053】また、本例において、一対の走行台車30
間へ長さの異なる梁材32を着脱させることにより、1
個のガントリー18のみを使用して行うものであるが、
予め長さの異なる梁材32をそれぞれ一対の走行台車3
0間へ固着させた複数のガントリー18を併用して行う
ことは自明のことである。
In this embodiment, a pair of traveling vehicles 30
By attaching and detaching beam members 32 of different lengths between
This is performed using only the gantry 18,
The beam members 32 having different lengths are previously paired with the pair of traveling carts 3.
It is self-evident that the gantry 18 is fixedly attached to the space 0 and the gantry 18 is used in combination.

【0054】また、本例は略半円形のトンネル等のコン
クリート打設におけるものであるが、円形のトンネル、
例えば海中トンネル、下水道関係の構築にも利用でき
る。
In this embodiment, the concrete is cast in a substantially semicircular tunnel or the like.
For example, it can be used for construction of underwater tunnels and sewer systems.

【0055】[0055]

【発明の効果】本発明に係るトンネル用コンクリート打
設方法およびその装置によれば、型枠を長さ方向に対し
て分割自在とし、各走行台車を型枠内を移動自在とする
ことにより、打設すべきトンネル長に対応させて型枠の
長さおよび一対の走行台車間の距離を変更可能としてあ
るため、型枠の全長より短いトンネル長の二次覆工時
に、使用しない型枠および使用する型枠の長さに対応さ
せて随時一対の走行台車間の距離を変更して型枠の移動
を行うことができ、トンネル曲線部の覆工作業終了後、
トンネル直線部の覆工作業時に型枠の長さを復元する際
にも作業時間の短縮が図れ、狭い坑内でも安全に作業が
行え、かつ効率良く型枠の移動および二次覆工用コンク
リート打設を行うことができ、工期を大幅に短縮するこ
とができる。
According to the method and the apparatus for placing concrete for a tunnel according to the present invention, the form can be divided in the longitudinal direction and each traveling vehicle can be moved in the form. Since the length of the formwork and the distance between the pair of traveling vehicles can be changed in accordance with the length of the tunnel to be cast, the formwork not to be used during secondary lining of a tunnel length shorter than the entire length of the formwork and Depending on the length of the formwork to be used, the distance between the pair of traveling vehicles can be changed at any time to move the formwork, and after finishing the lining work of the tunnel curved part,
When the length of the formwork is restored during the lining work of the straight section of the tunnel, the working time can be shortened, the work can be done safely even in a narrow mine, and the concrete can be moved efficiently and the concrete for secondary lining Installation, and the construction period can be significantly reduced.

【0056】また、走行台車を、駆動ローラー部とこの
駆動ローラー部と旋回自在に上設された門型部とにより
構成し、門型部に対して駆動ローラー部を旋回させるこ
とにより、トンネル掘削面または一次覆工面と門型部と
の距離を広く(長く)し、型枠内の走行台車の移動スペ
ースを十分確保することができ、移動作業において細心
の注意を必要とすることなく、型枠内の走行台車の移
動、およびトンネルの曲線部における走行台車の移動、
を容易とすることができる。
Further, the traveling vehicle is constituted by a drive roller portion, a drive roller portion, and a gate portion which is rotatably provided on the drive roller portion, and the drive roller portion is turned with respect to the gate portion to excavate the tunnel. The distance between the surface or the primary lining surface and the gate-type part is widened (long), and a sufficient space for moving the traveling cart in the formwork can be secured. The movement of the traveling vehicle in the frame, and the traveling vehicle in the curved part of the tunnel,
Can be facilitated.

【0057】また、門型部に対して駆動ローラー部を旋
回させることにより、トンネルの曲線部におけるガント
リー(走行台車)の移動において、無理やり床面に対し
て滑らせて移動させることがないため、床面の損傷を防
止できると共に、作業員の労力を激減させることができ
る。
Further, since the drive roller section is turned with respect to the portal section, the gantry (traveling cart) at the curved section of the tunnel is not forced to slide on the floor surface. The floor can be prevented from being damaged, and the labor of the operator can be drastically reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るトンネル用コンクリート打設装置
の正面図。
FIG. 1 is a front view of a concrete casting device for a tunnel according to the present invention.

【図2】同、側面図。FIG. 2 is a side view of the same.

【図3】同、使用状態を示す側面図。FIG. 3 is a side view showing the state of use.

【図4】ガントリー(走行台車)の使用状態を示す簡略
平面図。
FIG. 4 is a simplified plan view showing a use state of a gantry (traveling cart).

【図5】本発明の請求項1および請求項2に係る型枠の
移動工程を示す要部簡略側面図。
FIG. 5 is a simplified side view of a main part showing a mold moving step according to claims 1 and 2 of the present invention.

【図6】トンネルの直線部および曲線部における型枠の
配置を示す平面図。
FIG. 6 is a plan view showing an arrangement of a formwork in a straight portion and a curved portion of the tunnel.

【図7】本発明の請求項3および請求項4に係る型枠の
移動工程を示す要部簡略側面図。
FIG. 7 is a simplified side view of a main part showing a mold moving step according to claims 3 and 4 of the present invention.

【図8】従来のガントリー(走行台車)の使用状態を示
す簡略正面図。
FIG. 8 is a simplified front view showing a use state of a conventional gantry (traveling vehicle).

【図9】従来の型枠の移動工程を示す要部簡略側面図。FIG. 9 is a simplified side view of a main part showing a conventional mold moving process.

【符号の説明】[Explanation of symbols]

12 型枠 14 トンネル 16 二次覆工用コンクリート 18 ガントリー 20 天端フォーム 22 側フォーム 30 走行台車 32 梁材 34 駆動ローラー部 36 門型部 44 トンネルの曲線部 12 Formwork 14 Tunnel 16 Secondary Lining Concrete 18 Gantry 20 Top Form 22 Side Form 30 Traveling Cart 32 Beam 34 Drive Roller 36 Gate Section 44 Curved Section of Tunnel

───────────────────────────────────────────────────── フロントページの続き (72)発明者 内田 雅人 岡山市内山下1丁目1番13号 株式会社大 本組内 (72)発明者 三枝 輝昭 東京都千代田区神田駿河台6丁目8番10号 大末建設株式会社内 (72)発明者 北川 勉 岐阜県本巣郡真正町十四条144番地 岐阜 工業株式会社内 (72)発明者 青井 雅人 岐阜県本巣郡真正町十四条144番地 岐阜 工業株式会社内 ────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Masato Uchida 1-1-13 Yamashita, Okayama City Large Hongumi Co., Ltd. (72) Inventor Teruaki Saegusa 6-8-10 Kanda Surugadai, Chiyoda-ku, Tokyo Large (72) Inventor: Tsutomu Kitagawa 144, 14-14, Masamasa, Motosu-gun, Gifu Gifu Kogyo Co., Ltd. (72) Masato Aoi 144, 144, Masamasa, Motosu-gun, Gifu Gifu Kogyo Co., Ltd. Inside

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 一対の走行台車(30)からなるガントリー
(18)上に、天端フォーム(20)および両側フォーム(22),
(22)からなる型枠(12)を、配設させ、この型枠(12)を介
してトンネル(14)内に二次覆工用コンクリート(16)を打
設する方法において、 型枠(12)を長さ方向に対して分割自在とし、各走行台車
(30)を型枠(12)内を移動自在とすることにより、打設す
べきトンネル長に対応させて型枠(12)の長さおよび一対
の走行台車(30)間の距離を変更可能とし、 打設完了後、打設すべきトンネル長に対応させて型枠(1
2)を分割させた後、 走行台車(30)を使用する型枠(12a) 内へ移動させて使用
する型枠(12a) と固着させると共に、使用する型枠(12
a) を折り畳み、打設位置へ移動させた後、 型枠(12a) を展張させ、トンネル(14)内に二次覆工用コ
ンクリート(16)を打設することを特徴とするトンネル用
コンクリート打設方法。
1. A gantry comprising a pair of traveling carts (30).
(18) On top form (20) and bilateral forms (22),
In a method of disposing a formwork (12) consisting of (22) and placing concrete (16) for secondary lining in a tunnel (14) through the formwork (12), 12) can be divided freely in the length direction,
By making the (30) movable within the formwork (12), the length of the formwork (12) and the distance between the pair of traveling vehicles (30) can be changed according to the length of the tunnel to be cast After the installation is completed, the formwork (1
After dividing 2), the traveling vehicle (30) is moved into the formwork (12a) to be used, and is fixed to the formwork (12a) to be used.
a) is folded and moved to the casting position, then the formwork (12a) is expanded, and the concrete for secondary lining (16) is poured into the tunnel (14). Casting method.
【請求項2】 一対の走行台車(30)間に梁材(32)を着脱
自在とし、 打設完了後、打設すべきトンネル長に対応させて型枠(1
2)を分割させた後、 使用する型枠(12a) の長さに対応した梁材(32)により一
対の走行台車(30)を連結させ、この走行台車(30)を使用
する型枠(12a) 内へ移動させて使用する型枠(12a) と固
着させると共に、使用する型枠(12a) を折り畳み、打設
位置へ移動させた後、 型枠(12a) を展張させ、トンネル(14)内に二次覆工用コ
ンクリート(16)を打設することを特徴とする請求項1記
載のトンネル用コンクリート打設方法。
2. A beam (32) is made detachable between a pair of traveling carts (30), and after completion of the casting, a form (1) is formed corresponding to a tunnel length to be cast.
After dividing 2), a pair of traveling vehicles (30) is connected by beams (32) corresponding to the length of the formwork (12a) to be used, and the formwork (30) using this traveling vehicle (30) is used. 12a) Move it inside and fix it to the formwork (12a) to be used.Fold the formwork (12a) to be used, move it to the casting position, expand the formwork (12a), 2. The method for placing concrete for tunnels according to claim 1, wherein concrete for secondary lining (16) is placed in the inside of (1).
【請求項3】 一対の走行台車(30)からなるガントリー
(18)上に、天端フォーム(20)および両側フォーム(22),
(22)からなる型枠(12)を、配設させ、この型枠(12)を介
してトンネル(14)内に二次覆工用コンクリート(16)を打
設する方法において、 型枠(12)を長さ方向に対して分割自在とし、各走行台車
(30)を型枠(12)内を移動自在とすることにより、打設す
べきトンネル長に対応させて型枠(12)の長さおよび一対
の走行台車(30)間の距離を変更可能とし、 打設すべきトンネル長に対応させて型枠(12)を分割させ
た後、 分割させた使用しない型枠(12b) を、一対の走行台車(3
0)に固着し、この型枠(12b) を折り畳み、一対の走行台
車(30)によりコンクリート打設進行側へ移動させた後、 走行台車(30)を使用する型枠(12a) 内へ移動させて使用
する型枠(12a) と固着させると共に、使用する型枠(12
a) を折り畳み、打設位置へ移動させた後、 型枠(12a) を展張させ、トンネル(14)内に二次覆工用コ
ンクリート(16)を打設することを特徴とするトンネル用
コンクリート打設方法。
3. A gantry comprising a pair of traveling carts (30).
(18) On top form (20) and bilateral forms (22),
In a method of disposing a formwork (12) consisting of (22) and placing concrete (16) for secondary lining in a tunnel (14) through the formwork (12), 12) can be divided freely in the length direction,
By making (30) movable within the formwork (12), the length of the formwork (12) and the distance between the pair of traveling vehicles (30) can be changed according to the length of the tunnel to be cast After dividing the formwork (12) according to the tunnel length to be cast, the divided unused formwork (12b) is
0), this formwork (12b) is folded, moved to the concrete placement progress side by a pair of traveling carriages (30), and then moved into the formwork (12a) using the traveling carriage (30). And the formwork (12a) to be used is fixed.
a) is folded and moved to the casting position, then the formwork (12a) is expanded, and the concrete for secondary lining (16) is poured into the tunnel (14). Casting method.
【請求項4】 一対の走行台車(30)間に梁材(32)を着脱
自在とし、 打設完了後、打設すべきトンネル長に対応させて型枠(1
2)を分割させた後、 分割させた使用しない型枠(12b) を、この型枠(12b) の
長さに対応した梁材(32)により連結させた一対の走行台
車(30)に固着し、この型枠(12b) を折り畳み、一対の走
行台車(30)によりコンクリート打設進行側へ移動させた
後、 使用する型枠(12a) の長さに対応した梁材(32)により一
対の走行台車(30)を連結させ、この走行台車(30)を使用
する型枠(12a) 内へ移動させて使用する型枠(12a) と固
着させると共に、使用する型枠(12a) を折り畳み、打設
位置へ移動させた後、 型枠(12a) を展張させ、トンネル(14)内に二次覆工用コ
ンクリート(16)を打設することを特徴とする請求項3記
載のトンネル用コンクリート打設方法。
4. A beam (32) is made detachable between a pair of traveling carts (30), and after the installation is completed, the formwork (1) is made to correspond to the tunnel length to be installed.
After dividing 2), the divided unused formwork (12b) is fixed to a pair of traveling carts (30) connected by beams (32) corresponding to the length of this formwork (12b). Then, the formwork (12b) is folded and moved to the concrete placing progress side by a pair of traveling carts (30), and then a pair of beams (32) corresponding to the length of the formwork (12a) to be used is used. The traveling vehicle (30) is connected, the traveling vehicle (30) is moved into the formwork (12a) to be used and fixed to the formwork (12a) to be used, and the used formwork (12a) is folded. 4. The tunnel according to claim 3, wherein after being moved to the casting position, the formwork (12a) is expanded and concrete for secondary lining (16) is poured into the tunnel (14). Concrete casting method.
【請求項5】 走行台車(30)を、駆動ローラー部(34)と
この駆動ローラー部(34)と旋回自在に上設された門型部
(36)とにより構成し、門型部(36)に対して駆動ローラー
部(34)を旋回させることにより、型枠(12)内の走行台車
(30)の移動、およびトンネル(14)の曲線部における走行
台車(30)の移動、を容易とすることを特徴とする請求項
1、請求項2、請求項3または請求項4記載のトンネル
用コンクリート打設方法。
5. A driving roller (34), a driving roller (34), and a gate-shaped portion which is pivotally mounted on the traveling vehicle (30).
(36), and by rotating the drive roller section (34) with respect to the gate section (36), the traveling carriage in the formwork (12)
The tunnel according to claim 1, 2 or 3, wherein the movement of the traveling vehicle (30) and the traveling carriage (30) in the curved portion of the tunnel (14) are facilitated. Concrete casting method.
【請求項6】 一対の走行台車(30)からなるガントリー
(18)上に、天端フォーム(20)および両側フォーム(22),
(22)を配設させてなる型枠(12)を、配設させ、この型枠
(12)を介してトンネル(14)内に二次覆工用コンクリート
(16)を打設する装置において、 型枠(12)を長さ方向に対して各フォーム(20),(22),(2
2)を分割自在とし、 各走行台車(30)を型枠(12)内を移動自在とすることによ
り、 一対の走行台車(30)を介して分割した使用する型枠(12
a) または使用しない型枠(12b) を移動させることを特
徴とするトンネル用コンクリート打設装置。
6. A gantry comprising a pair of traveling carts (30).
(18) On top form (20) and bilateral forms (22),
(22), formwork (12) is arranged, and this formwork
Concrete for secondary lining in tunnel (14) through (12)
In the apparatus for placing (16), the form (12) is moved in the longitudinal direction of each form (20), (22), (2).
2) can be freely divided, and each traveling vehicle (30) can be freely moved in the mold (12), so that the used form (12) can be divided through a pair of traveling vehicles (30).
a) A concrete casting device for a tunnel, which moves an unused formwork (12b).
【請求項7】 一対の走行台車(30)間に梁材(32)を着脱
自在とすることにより、 一対の走行台車(30)間の距離を変更自在としたことを特
徴とする請求項6記載のトンネル用コンクリート打設装
置。
7. The distance between the pair of traveling vehicles (30) can be changed freely by detachably attaching the beam member (32) between the pair of traveling vehicles (30). The concrete casting device for tunnels according to the above.
【請求項8】 走行台車(30)を、駆動ローラー部(34)と
この駆動ローラー部(34)と旋回自在に上設された門型部
(36)とにより構成し、門型部(36)に対して駆動ローラー
部(34)を旋回させることにより、型枠(12)内の走行台車
(30)の移動、およびトンネル(14)の曲線部における走行
台車(30)の移動、を容易とすることを特徴とする請求項
6または請求項7記載のトンネル用コンクリート打設装
置。
8. A driving roller (34) and a gate-shaped part which is pivotally mounted on the driving roller (34).
(36), and by rotating the drive roller section (34) with respect to the gate section (36), the traveling carriage in the formwork (12)
The concrete placing device for a tunnel according to claim 6 or 7, wherein the movement of the (30) and the movement of the traveling carriage (30) in the curved portion of the tunnel (14) are facilitated.
JP10110165A 1998-04-06 1998-04-06 Method for placing concrete for tunnel, and its device Pending JPH11294093A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10110165A JPH11294093A (en) 1998-04-06 1998-04-06 Method for placing concrete for tunnel, and its device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10110165A JPH11294093A (en) 1998-04-06 1998-04-06 Method for placing concrete for tunnel, and its device

Publications (1)

Publication Number Publication Date
JPH11294093A true JPH11294093A (en) 1999-10-26

Family

ID=14528708

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10110165A Pending JPH11294093A (en) 1998-04-06 1998-04-06 Method for placing concrete for tunnel, and its device

Country Status (1)

Country Link
JP (1) JPH11294093A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1136650A1 (en) * 2000-03-24 2001-09-26 MECSIDER S.p.A. Size adjustable tunnel form carriage
WO2016207967A1 (en) * 2015-06-23 2016-12-29 新日鐵住金株式会社 Steel sheet for container, and method for producing steel sheet for container
CN108868829A (en) * 2018-07-18 2018-11-23 中建市政工程有限公司 Moveable door type combined formwork for Varied section tunnel double-lining
CN112855218A (en) * 2021-03-01 2021-05-28 中铁十六局集团有限公司 Intelligent monitoring system for tunnel secondary lining concrete pouring
CN112879047A (en) * 2021-03-01 2021-06-01 中铁十六局集团有限公司 Intelligent comprehensive judgment method for concrete pouring and emptying of secondary lining vault of tunnel
CN114703896A (en) * 2022-05-06 2022-07-05 保利长大工程有限公司 Self-compacting concrete pouring method for bottom plate of steel shell immersed tube tunnel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1136650A1 (en) * 2000-03-24 2001-09-26 MECSIDER S.p.A. Size adjustable tunnel form carriage
WO2016207967A1 (en) * 2015-06-23 2016-12-29 新日鐵住金株式会社 Steel sheet for container, and method for producing steel sheet for container
CN108868829A (en) * 2018-07-18 2018-11-23 中建市政工程有限公司 Moveable door type combined formwork for Varied section tunnel double-lining
CN112855218A (en) * 2021-03-01 2021-05-28 中铁十六局集团有限公司 Intelligent monitoring system for tunnel secondary lining concrete pouring
CN112879047A (en) * 2021-03-01 2021-06-01 中铁十六局集团有限公司 Intelligent comprehensive judgment method for concrete pouring and emptying of secondary lining vault of tunnel
CN114703896A (en) * 2022-05-06 2022-07-05 保利长大工程有限公司 Self-compacting concrete pouring method for bottom plate of steel shell immersed tube tunnel

Similar Documents

Publication Publication Date Title
JP2018105029A (en) Movable type form device
JPH11294093A (en) Method for placing concrete for tunnel, and its device
JP6125882B2 (en) Elector device and segment assembly device using the same
JP3174037B2 (en) Center trolley
JP7210895B2 (en) Lining concrete construction system
JPH0639878B2 (en) Moving mechanism for mobile formwork for lining
JP2001020688A (en) Forms for tunnel
JP3079197B2 (en) Laterally movable pier and construction method using the pier
JP3822525B2 (en) Tunnel invert construction method using mobile jetty and mobile jetty
JP2542327B2 (en) Wife formwork for tunnel lining equipment
JP4118420B2 (en) Tunnel excavation and lining method and its equipment
JPH09310589A (en) Method and equipment for moving form
JP4172330B2 (en) Widening equipment and widening method for existing tunnels
JP2589537B2 (en) Tunnel lining method and device
JP2898818B2 (en) Tunnel construction method
JP3449478B2 (en) Tunnel working equipment
JP2530520B2 (en) Form moving and assembling equipment for shield method
JP4034442B2 (en) Electa interlocking segment assembly scaffold
JP2540000B2 (en) Reinforcing bar mounting work cart
JPH07113393A (en) Gantry backhoe of concrete form loaded type
JPH08199993A (en) Device for assembling and arranging reinforcing bar for culvert
JP2797218B2 (en) Wife stop
JPH01187300A (en) Demounting and lining device for covering concrete form of tunnel
JP2832139B2 (en) Rebar transfer equipment
JPH1150797A (en) Concrete placing method and device for tunnel using formwork which can be widened