CN108868829A CN201810789683.1A CN201810789683A CN108868829A CN 108868829 A CN108868829 A CN 108868829A CN 201810789683 A CN201810789683 A CN 201810789683A CN 108868829 A CN108868829 A CN 108868829A
Authority
CN
China
Prior art keywords
portal
formwork
portal frame
steel
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810789683.1A
Other languages
Chinese (zh)
Inventor
曾怀明
杨春雷
王二平
李谦
李波
王达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201810789683.1A priority Critical patent/CN108868829A/en
Publication of CN108868829A publication Critical patent/CN108868829A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明属于一种用于变断面隧道二衬的可移动门式组合模架,由满堂脚手架和行走装置所组成,所述的用于变断面隧道二衬的可移动门式组合模架包括可移动门式台车、满堂脚手架、装配式模板、定型梳型模和小钢模。可移动门式台车:用于承载和移动满堂脚手架、装配式模板、定型梳型模和小钢模,可移动门式台车由门式架体和行走装置所构成。门式架体由钢板箱体立柱、钢板箱体横梁、钢板箱体底梁和螺栓拼装而成。本发明能够适用于超大断面、变断面尺寸及轮廓、大角度转弯线路的矿山法隧道二衬,具有操作灵活方便、适用性强,省工省力,成本低,施工和经济效率高,节约工期和使用效果好的优点。

The invention belongs to a movable portal-type combined formwork for the second lining of variable-section tunnels, which is composed of full-scale scaffolding and walking devices. The movable portal-type combined formwork for the second lining of variable-section tunnels includes movable Mobile gantry trolley, full hall scaffolding, prefabricated formwork, shaping comb mold and small steel mold. Movable portal trolley: it is used to carry and move full-scale scaffolding, assembled templates, shaping comb molds and small steel molds. The movable portal trolley is composed of portal frame and walking device. The portal frame is assembled by steel plate box column, steel plate box beam, steel plate box bottom beam and bolts. The invention can be applied to the secondary lining of mining tunnels with super large section, variable section size and profile, and large-angle turning lines. Advantages of using the effect well.

Description

用于变断面隧道二衬的可移动门式组合模架Movable Portal Combined Formwork for Secondary Lining of Variable Cross-section Tunnel

技术领域technical field

本发明属于一种用于变断面隧道二衬的可移动门式组合模架。The invention belongs to a movable door-type combined formwork used for the second lining of variable-section tunnels.

背景技术Background technique

二次衬砌(简称二衬)是矿山法隧道工程施工时,在初期支护内侧施作的模筑混凝土或钢筋混凝土衬砌。二次衬砌与初期支护共同组成复合式衬砌;二次衬砌承担由于隧道初期支护可能劣化而作用于二次衬砌上的荷载,或由于软岩蠕变、环境条件变化等引起的附加荷载以及作为安全储备。The secondary lining (referred to as the secondary lining) is the molded concrete or reinforced concrete lining applied on the inner side of the primary support during the construction of the mining method tunnel project. The secondary lining and the primary support form a composite lining; the secondary lining bears the load acting on the secondary lining due to the possible deterioration of the primary support of the tunnel, or the additional load caused by soft rock creep and changes in environmental conditions, etc. as a safety reserve.

针对矿山法隧道二衬拱墙施工,一般采用整体衬砌台车或满堂脚手架,但现有技术均存在缺陷,如整体衬砌台车只适用于围岩较好、线路较长、单一尺寸断面、小半径隧道。而对于变断面尺寸及轮廓变化的隧道,需根据隧道断面尺寸的变化采购多组台车,不但增加了投入的成本,而且各断面交叉作业,材料、设备运输不便。For the construction of the second lining arch wall of the mine tunnel, the integral lining trolley or the full hall scaffolding are generally used, but there are defects in the existing technology, such as the integral lining trolley is only suitable for the surrounding rock is good, the line is long, a single size section, small radius tunnel. For tunnels with variable cross-section size and profile changes, it is necessary to purchase multiple sets of trolleys according to the change in tunnel cross-section size, which not only increases the investment cost, but also cross-section operations make the transportation of materials and equipment inconvenient.

采用满堂脚手架(即用脚手架支撑满施工隧道,脚手架需从施工隧道地面搭建)虽适用于任意断面、地质条件良好地段的二衬施工,但脚手架搭设拆除工程体量大,不能移动,阻隔设备材料通道,高空作业多,安全隐患大,尤其针对CRD工法超大断面隧道,成本区大和工期也不可控制。Although the use of full scaffolding (i.e. the construction tunnel is fully supported by scaffolding, which needs to be built from the ground of the construction tunnel) is suitable for the secondary lining construction of any cross-section and good geological conditions, but the erection and dismantling of the scaffolding is of large volume and cannot be moved, blocking equipment and materials There are many high-altitude operations in the passageway, and there are great potential safety hazards. Especially for the super-large cross-section tunnel of the CRD construction method, the cost area is large and the construction period is uncontrollable.

因此,当前迫切需解决软弱围岩地层超大断面、变断面尺寸及轮廓、大角度转弯线路矿山法隧道二衬作业空间受限、存在交叉作业、需投入多组台车、断面适应性单一、作业效率低等问题。Therefore, there is an urgent need to solve the problems of super-large cross-sections in weak surrounding rock formations, variable cross-section sizes and contours, limited working space for the second lining of mining tunnels with large-angle turning lines, cross operations, the need to invest in multiple sets of trolleys, single cross-section adaptability, and difficult operations. Low efficiency and other issues.

发明内容Contents of the invention

本发明的目的是提供一种用于变断面隧道二衬的可移动门式组合模架,能够适用于超大断面、变断面尺寸及轮廓、大角度转弯线路的矿山法隧道二衬,具有操作灵活方便、适用性强,省工省力,成本低,施工和经济效率高,节约工期和使用效果好的优点。The purpose of the present invention is to provide a movable door-type combined formwork for the second lining of variable-section tunnels, which can be applied to the second lining of mining tunnels with super large sections, variable section sizes and contours, and large-angle turning lines, and has flexible operation. The utility model has the advantages of convenience, strong applicability, labor and labor saving, low cost, high construction and economic efficiency, saving construction period and good use effect.

为此,本发明由满堂脚手架和行走装置所组成,所述的用于变断面隧道二衬的可移动门式组合模架包括可移动门式台车、满堂脚手架、装配式模板、定型梳型模和小钢模。其中:For this reason, the present invention is composed of a full hall scaffolding and a walking device. The movable portal-type combined formwork for the second lining of a variable-section tunnel includes a movable portal trolley, a full hall scaffolding, an assembled formwork, and a shaped comb. molds and small steel molds. in:

可移动门式台车:用于承载和移动满堂脚手架、装配式模板、定型梳型模和小钢模,可移动门式台车由门式架体和行走装置所构成。Movable portal trolley: it is used to carry and move full-scale scaffolding, assembled templates, shaping comb molds and small steel molds. The movable portal trolley is composed of portal frame and walking device.

门式架体由钢板箱体立柱、钢板箱体横梁、钢板箱体底梁和螺栓拼装而成,数根呈间隔距离分布的钢板箱体立柱对称分布在门式架体两侧,数根钢板箱体横梁的两端分别连接两侧对应的钢板箱体立柱的上端,工字钢梁连接相邻的钢板箱体横梁,两侧的钢板箱体立柱的下端位于两钢板箱体底梁上。The portal frame is assembled by steel plate box columns, steel box beams, steel plate box bottom beams and bolts. Several steel box columns distributed at intervals are symmetrically distributed on both sides of the portal frame. Several steel plates The two ends of the box beams are respectively connected to the upper ends of the corresponding steel box columns on both sides, the I-shaped steel beams are connected to the adjacent steel box beams, and the lower ends of the steel box columns on both sides are located on the bottom beams of the two steel box boxes.

门式台架每侧两端各安装一套竖向液压升降系统,液压升降系统下端的顶出杆位于行走装置的车体上,液压升降系统上端的缸座与对应部的门式架体连接。A set of vertical hydraulic lifting system is installed at both ends of each side of the portal frame. The ejector rod at the lower end of the hydraulic lifting system is located on the vehicle body of the traveling device, and the cylinder seat at the upper end of the hydraulic lifting system is connected with the corresponding portal frame. .

门式架体的钢板箱体横梁一侧内轴设有水平滑块,水平滑块的内侧与水平液压件的顶出杆连接,水平滑块的外侧轴接可调丝杆的一端,可调丝杆的另一端连接对应部的装配式模板的上端内侧壁,与可调丝杆下端对应的装配式模板的内侧壁与对应部的门式架体侧端之间呈间隔距离设有数根可调丝杆。The inner shaft of the steel plate box beam side of the portal frame is equipped with a horizontal slider, the inner side of the horizontal slider is connected with the ejector rod of the horizontal hydraulic part, and the outer shaft of the horizontal slider is connected with one end of the adjustable screw rod, which can be adjusted The other end of the screw rod is connected to the inner side wall of the upper end of the prefabricated formwork of the corresponding part, and the inner side wall of the prefabricated formwork corresponding to the lower end of the adjustable screw rod and the side end of the portal frame body of the corresponding part are separated by several adjustable Adjust screw.

门式架体的另一侧端与门式架体的上端依次设有满堂脚手架、定型梳型模和小钢模。The other side end of the portal frame body and the upper end of the portal frame body are successively provided with a full scaffolding, a shaping comb mold and a small steel mold.

满堂脚手架:用于支撑定型梳型模和小钢模,满堂脚手架位于门式架体的上端和一侧端,满堂脚手架的一侧端位于门式架体的一侧端及门式架体上端的工字钢梁上,满堂脚手架的另一侧端支撑定型梳型模的一端,定型梳型模的另一端设有小钢模。Mantang scaffolding: used to support the shaping comb mold and small steel mold, the mantang scaffolding is located on the upper end and one side of the portal frame, and the one side of the mantang scaffolding is located on one side of the portal frame and the upper end of the portal frame On the I-shaped steel beam, the other side of the scaffolding supports one end of the shaping comb mold, and the other end of the shaping comb mold is provided with a small steel mold.

装配式模板:位于门式架体的另一侧端,装配式模板的上端内侧壁与对应部的门式架体侧壁之间的距离由水平滑块和水平液压件实现,装配式模板的中部和下端内侧壁与对应部的门式架体侧壁之间的距离由呈间隔距离设置的数根可调丝杆配合水平液压件完成。Prefabricated formwork: located on the other side of the portal frame body, the distance between the inner side wall of the upper end of the prefabricated formwork and the side wall of the corresponding part of the portal frame body is realized by horizontal sliders and horizontal hydraulic parts. The distance between the inner wall of the middle part and the lower end and the side wall of the portal frame body of the corresponding part is completed by several adjustable screw rods arranged at intervals in cooperation with horizontal hydraulic components.

定型梳型模:用于承接小钢模,定型梳型模位于满堂脚手架与小钢模之间。Shaping comb mold: used to undertake the small steel mold, the shaping comb mold is located between the scaffolding and the small steel mold.

小钢模:用于顶持位于满堂脚手架部的变断面隧道二衬。Small steel formwork: used to support the second lining of variable cross-section tunnel located in the scaffolding part of the whole hall.

所述的可移动门式台车呈门字体形。The movable gantry trolley is in the shape of a door font.

所述的行走装置分为动力行走装置和支撑行走装置。动力行走装置位于门式台架的后端下部两侧,支撑行走装置位于门式台架的前端下部两侧,动力行走装置是驱动门式台架和支撑行走装置。所述的动力行走装置由车体、电机、驱动轨轮、行走轨轮、小链轮、大链轮和轴承副所构成。驱动轨轮和行走轨轮分别位于车体下部的后、前部,驱动轨轮和行走轨轮中部的轨轮轴的两端通过两轴承副与车体下部轴接,驱动轨轮的轨轮轴上设有大链轮,位于驱动轨轮上部的车体上固定有电机,小链轮位于电机轴上,电机轴通过小链轮和链条传动大链轮,驱动轨轮和行走轨轮位于轨道上。The walking device is divided into a power walking device and a supporting walking device. The power running device is positioned at both sides of the rear end lower part of the portal frame, and the supporting running device is positioned at both sides of the front end lower part of the portal frame, and the power running device is to drive the portal frame and support the running device. The power traveling device is composed of a car body, a motor, a driving rail wheel, a traveling rail wheel, a small sprocket, a large sprocket and a bearing pair. The driving rail wheel and the traveling rail wheel are respectively located at the rear and front of the lower part of the car body. The two ends of the rail wheel shaft in the middle part of the driving rail wheel and the traveling rail wheel are connected to the lower part of the car body through two bearing pairs, and the rail wheel shaft of the driving rail wheel There is a large sprocket, the motor is fixed on the car body above the driving rail wheel, the small sprocket is located on the motor shaft, the motor shaft drives the large sprocket through the small sprocket and the chain, the driving rail wheel and the traveling rail wheel are located on the track .

所述的各钢板箱体立柱与对应的钢板箱体横梁之间设有加强肋板。所述的位于装配式模板下端的可调丝杆的一端可与地面作为顶点。所述的位于门式架体上的装配式模板与满堂脚手架的位置可依需要互换。所述的门式架体的后端一侧设有爬梯。所述的门式架体的前端两侧设有防撞架。所述的每侧相邻的各钢板箱体立柱之间设有加强槽钢柱,各钢板箱体立柱与钢板箱体底梁之间设有斜向钢柱。Reinforcing ribs are provided between the steel plate box columns and the corresponding steel plate box beams. One end of the adjustable threaded mandrel located at the lower end of the assembled formwork can be the apex with the ground. The positions of the assembled formwork on the portal frame and the full scaffolding can be interchanged as required. A climbing ladder is provided on the rear end side of the portal frame body. Both sides of the front end of the portal frame are provided with anti-collision frames. Reinforced channel steel columns are arranged between the steel plate box columns adjacent to each side, and oblique steel columns are arranged between each steel plate box column and the steel plate box bottom beam.

所述的门式架体的上部周边设有操作平台。The upper periphery of the portal frame is provided with an operating platform.

上述结构达到了本发明的目的。The above structure achieves the object of the present invention.

本发明能够适用于超大断面、变断面尺寸及轮廓、大角度转弯线路的矿山法隧道二衬,具有操作灵活方便、适用性强,省工省力,成本低,施工和经济效率高,节约工期和使用效果好的优点。The invention can be applied to the secondary lining of mining tunnels with super large section, variable section size and profile, and large-angle turning lines. Advantages of using the effect well.

本发明与已有技术相比具有以下优点和积极效果:Compared with the prior art, the present invention has the following advantages and positive effects:

(1)采取了行走装置使门式台架整体移动无需消耗大量人力,操作简单。(1) The walking device is adopted to make the overall movement of the portal platform without consuming a lot of manpower, and the operation is simple.

(2)采取门式台架结构,在保证门式台架整体刚度和稳固性的前提下,使得门式台架轻量化,方便吊装及运输,且门式台架的下部空间形成通道,即便同时投入多组台架也可满足材料运输、车辆通行需求。(2) The portal platform structure is adopted, under the premise of ensuring the overall rigidity and stability of the portal platform, the portal platform is lightweight, convenient for hoisting and transportation, and the lower space of the portal platform forms a channel, even if Simultaneously investing multiple sets of platforms can also meet the needs of material transportation and vehicle traffic.

(3)门式台架采用螺栓连接,便于在隧道内空间受限情况下快速完成拼装、拆卸。(3) The portal frame is connected by bolts, which is convenient for quick assembly and disassembly when the space in the tunnel is limited.

(4)本发明可根据断面突变设定安装满堂脚手架及小钢模和可通过水平液压件的调整装配式模板调整即可,可最大化减少人工作业工程量,降低了作业中安全风险。(4) The present invention can be set to install a full house of scaffolding and small steel molds according to the sudden change of the section, and can adjust the assembled formwork through the adjustment of the horizontal hydraulic parts, which can minimize the amount of manual work and reduce the safety risk during operation.

(5)本发明可根据实际需求调整满堂脚手架在门式台架上的分配比例、台架长度,针对变断面隧道轮廓、大角度转弯隧道适用性显著,减少了人力、设备的投入,提高了作业效率。(5) The present invention can adjust the distribution ratio and length of the scaffolding on the portal platform according to the actual needs, and has remarkable applicability to tunnel profiles with variable cross-sections and large-angle turning tunnels, reducing the investment in manpower and equipment, and improving the work efficiency.

(6)本发明构思独特、结构简单、紧凑合理、工作性能安全可靠、操作灵活省力,具有适宜施工使用、便于进行推广等优点。(6) The present invention has the advantages of unique concept, simple structure, compactness and reasonableness, safe and reliable working performance, flexible and labor-saving operation, suitable for construction and use, and convenient for promotion.

附图说明Description of drawings

图1是本发明的涉及的施工区剖面支撑结构示意图。Fig. 1 is a schematic diagram of a cross-sectional support structure in a construction area involved in the present invention.

图2是本发明的侧面结构示意图。Fig. 2 is a schematic view of the side structure of the present invention.

图3是本发明的结构示意图。Fig. 3 is a structural schematic diagram of the present invention.

图4是图2的A-A剖面结构示意图。FIG. 4 is a schematic diagram of the A-A section structure in FIG. 2 .

图5是本发明的动力行走装置的传动结构示意图。Fig. 5 is a schematic diagram of the transmission structure of the power traveling device of the present invention.

图6是本发明的动力行走装置的结构示意图。Fig. 6 is a schematic structural view of the power walking device of the present invention.

具体实施方式Detailed ways

如图1至图6所示,一种用于变断面隧道二衬的可移动门式组合模架由满堂脚手架20和行走装置36所组成。As shown in FIGS. 1 to 6 , a movable door-type combined formwork used for the second lining of a variable-section tunnel is composed of a full hall scaffold 20 and a walking device 36 .

如图1至图4所示,所述的用于变断面隧道二衬的可移动门式组合模架包括可移动门式台车、满堂脚手架、装配式模板19、定型梳型模21和小钢模22。其中:As shown in Figures 1 to 4, the movable portal formwork for the second lining of variable-section tunnels includes a movable portal trolley, full scaffolding, assembled formwork 19, shaping comb mold 21 and small Steel mold 22. in:

可移动门式台车:用于承载和移动满堂脚手架、装配式模板、定型梳型模和小钢模。可移动门式台车由门式架体35和行走装置36所构成。所述的可移动门式台车呈门字体形。Movable portal trolley: used to carry and move full-scale scaffolding, assembled templates, shaping comb molds and small steel molds. Movable portal trolley is made of portal frame body 35 and running gear 36. The movable gantry trolley is in the shape of a door font.

门式架体35由钢板箱体立柱1、钢板箱体横梁2、钢板箱体底梁4和螺栓拼装而成,钢板箱体立柱、钢板箱体横梁、钢板箱体底梁均为钢板箱体组成的中空结构,其两端设有连接法兰盘,各立柱、横梁和底梁的连接均通过螺栓及连接法兰盘拼装而成,以方便整体拆装。The portal frame body 35 is assembled by steel box column 1, steel box beam 2, steel box bottom beam 4 and bolts, steel box column, steel box beam, steel box bottom beam are steel box The hollow structure is composed of connecting flanges at both ends, and the connections of the columns, beams and bottom beams are assembled by bolts and connecting flanges to facilitate overall disassembly and assembly.

数根呈间隔距离分布的钢板箱体立柱对称分布在门式架体两侧,数根钢板箱体横梁的两端分别连接两侧对应的钢板箱体立柱的上端,工字钢梁3连接相邻的钢板箱体横梁,工字钢梁的下端位于钢板箱体横梁的上端。两侧的钢板箱体立柱的下端位于两钢板箱体底梁上。工字钢梁的两端下部亦通过螺栓连接相邻的钢板箱体横梁。所述的每侧相邻的各钢板箱体立柱之间设有加强槽钢柱11,各钢板箱体立柱与钢板箱体底梁之间设有斜向钢柱12,以增加各钢板箱体立柱和与对应的钢板箱体底梁之间的强度。Several steel box columns distributed at intervals are symmetrically distributed on both sides of the portal frame. The two ends of several steel box beams are respectively connected to the upper ends of the corresponding steel box columns on both sides. The adjacent steel plate box beam, the lower end of the I-shaped steel beam is located at the upper end of the steel plate box beam. The lower ends of the steel plate box columns on both sides are located on the bottom beams of the two steel plate box bodies. The lower parts of the two ends of the I-shaped steel beam are also connected to the adjacent steel plate box beams by bolts. Reinforced channel steel columns 11 are provided between the adjacent steel plate box columns on each side, and oblique steel columns 12 are arranged between each steel plate box column and the steel plate box bottom beam to increase the strength of each steel box body. The strength between the column and the corresponding steel plate box bottom beam.

所述的各钢板箱体立柱与对应的钢板箱体横梁之间设有加强肋板15,以增加钢板箱体立柱与对应的钢板箱体横梁之间的强度。加强肋板两端与钢板箱体立柱、钢板箱体横梁之间亦通过螺栓连接。Reinforcing ribs 15 are provided between each steel plate box column and the corresponding steel plate box beam to increase the strength between the steel plate box column and the corresponding steel plate box beam. The two ends of the reinforcement ribs are also connected by bolts to the column of the steel box body and the beam of the steel box body.

门式台架每侧两端各安装一套竖向液压升降系统5,液压升降系统下端的顶出杆17位于行走装置的车体6上;即:液压升降系统下端的顶出杆通过位于车体中部的连接轴33与车体轴接。A set of vertical hydraulic lift system 5 is respectively installed at both ends of each side of the portal frame, and the ejector rod 17 at the lower end of the hydraulic lift system is located on the car body 6 of the traveling device; that is: the ejector rod at the lower end of the hydraulic lift system passes through the The connecting shaft 33 in the middle of the body is pivotally connected with the vehicle body.

液压升降系统上端的缸座32与对应部的门式架体连接。当液压升降系统下端的顶出杆从缸座顶出或缩进时,可实现门式台架的整体升降。显然,液压升降系统用于支撑门式台架于行走装置上且实现门式台架的整体升降。The cylinder block 32 at the upper end of the hydraulic lifting system is connected with the portal frame body of the corresponding part. When the ejector rod at the lower end of the hydraulic lifting system is pushed out or retracted from the cylinder base, the overall lifting of the portal frame can be realized. Apparently, the hydraulic lifting system is used to support the portal frame on the traveling device and realize the overall lifting of the portal frame.

门式架体的钢板箱体横梁一侧内轴设有水平滑块16,水平滑块与对应部的钢板箱体横梁可通过滑道及滑槽轴接,水平滑块的内侧与水平液压件18的顶出杆连接,水平液压件的缸体固定在对应部的钢板箱体横梁上。水平滑块的外侧轴接可调丝杆10的一端,可调丝杆的另一端连接对应部的装配式模板的上端内侧壁。与可调丝杆下端对应的装配式模板的内侧壁与对应部的门式架体侧端之间呈间隔距离设有数根可调丝杆。显然,上述一组的水平滑块及可调丝杆分布结构,可根据装配式模板的宽度设呈间隔距离分布的数组。可调丝杆可通过位于门式架体上的吊耳与门式架体侧连接。The inner shaft of one side of the steel plate box beam of the gantry frame is provided with a horizontal slider 16, and the horizontal slider and the steel plate box beam of the corresponding part can be connected through slideways and chute shafts, and the inner side of the horizontal slider and the horizontal hydraulic parts The ejector rod of 18 is connected, and the cylinder body of the horizontal hydraulic part is fixed on the steel plate box beam of the corresponding part. The outer shaft of the horizontal slider is connected to one end of the adjustable screw rod 10, and the other end of the adjustable screw rod is connected to the inner side wall of the upper end of the assembled formwork of the corresponding part. Several adjustable screw rods are arranged at intervals between the inner side wall of the assembled formwork corresponding to the lower end of the adjustable screw rod and the side end of the portal frame body of the corresponding part. Apparently, the distribution structure of the above-mentioned group of horizontal sliders and adjustable screw rods can be arranged in arrays distributed at intervals according to the width of the fabricated formwork. The adjustable screw rod can be connected with the side of the portal frame body through the lifting lug located on the portal frame body.

门式架体的另一侧端与门式架体的上端依次设有满堂脚手架、定型梳型模和小钢模。The other side end of the portal frame body and the upper end of the portal frame body are successively provided with a full scaffolding, a shaping comb mold and a small steel mold.

满堂脚手架20:用于支撑定型梳型模和小钢模,满堂脚手架位于门式架体的上端和一侧端,满堂脚手架的一侧端位于门式架体的一侧端及门式架体上端的工字钢梁上,满堂脚手架的另一侧端支撑定型梳型模的一端,定型梳型模的另一端设有小钢模。Mantang scaffolding 20: used to support the shaping comb mold and small steel mold, the mantang scaffolding is located on the upper end and one side of the portal frame, and the one side of the mantang scaffolding is located on one side of the portal frame and the portal frame On the I-shaped steel beam at the upper end, the other end of the scaffolding supports one end of the shaping comb mold, and the other end of the shaping comb mold is provided with a small steel mold.

装配式模板19:位于门式架体的另一侧端,装配式模板的上端内侧壁与对应部的门式架体侧壁之间的距离由水平滑块和水平液压件实现,装配式模板的中部和下端内侧壁与对应部的门式架体侧壁之间的距离由呈间隔距离设置的数根可调丝杆配合水平液压件完成。装配式模板的外侧为变断面隧道二衬23。所述的位于装配式模板下端的可调丝杆的一端可与地面作为顶点,以方便顶固装配式模板于变断面隧道二衬上。Assembled formwork 19: located on the other side of the portal frame body, the distance between the inner side wall of the upper end of the assembled formwork and the side wall of the portal frame body of the corresponding part is realized by horizontal sliders and horizontal hydraulic parts, the assembled formwork The distance between the inner wall of the middle part and the lower end and the side wall of the portal frame body of the corresponding part is completed by several adjustable screw rods arranged at intervals and coordinated with horizontal hydraulic parts. The outer side of the prefabricated template is the second lining 23 of the variable-section tunnel. One end of the adjustable threaded rod located at the lower end of the prefabricated formwork can be apex with the ground, so as to facilitate the fastening of the prefabricated formwork on the second lining of the variable-section tunnel.

所述的位于门式架体上的装配式模板与满堂脚手架的位置可依需要互换。即:装配式模板可依需要位于门式架体上的任意一侧,门式架体上的其余位置可设满堂脚手架。The positions of the assembled formwork on the portal frame and the full scaffolding can be interchanged as required. That is: the assembled formwork can be located on any side of the portal frame as required, and the rest of the portal frame can be equipped with scaffolding.

定型梳型模21:用于承接小钢模,定型梳型模位于满堂脚手架与小钢模之间。Shaping comb mold 21: used to accept small steel moulds, the shaping comb mold is located between the scaffolding and the small steel moulds.

小钢模22:用于顶持位于满堂脚手架部的变断面隧道二衬。Small steel mold 22: used to support the second lining of variable cross-section tunnel located in the scaffolding part of the whole hall.

所述的门式架体的后端一侧设有爬梯13,以方便施工人员上下可移动门式台车。所述的门式架体的上部周边设有操作平台14,以方便施工人员站在其上施工。A ladder 13 is provided on one side of the rear end of the portal frame body to facilitate construction workers to move the portal trolley up and down. An operation platform 14 is provided on the upper periphery of the portal frame body, so that construction personnel can stand on it for construction conveniently.

所述的门式架体的前端两侧设有防撞架24,以防止可移动门式台车与隧道壁碰撞损坏。Both sides of the front end of the portal frame body are provided with anti-collision frames 24 to prevent collision damage between the movable portal trolley and the tunnel wall.

如图5和图6所示,所述的行走装置分为动力行走装置和支撑行走装置。动力行走装置位于门式台架的后端下部两侧。支撑行走装置位于门式台架的前端下部两侧。As shown in Figure 5 and Figure 6, the walking device is divided into a powered walking device and a supporting walking device. The power running device is located at both sides of the rear end lower part of the portal frame. The supporting walking device is located at both sides of the lower front end of the portal frame.

动力行走装置是驱动门式台架和支撑行走装置。所述的动力行走装置由车体6、电机7、驱动轨轮26、行走轨轮34、小链轮27、大链轮30和轴承副29所构成。驱动轨轮位于车体下端的后部,行走轨轮位于车体下端的前部。驱动轨轮和行走轨轮中部的轨轮轴25的两端通过两轴承副与车体下部轴接。驱动轨轮的轨轮轴上设有大链轮。位于驱动轨轮上部的车体上固定有电机,小链轮位于电机轴上。电机轴通过小链轮和链条28传动大链轮,驱动轨轮和行走轨轮位于轨道8上。轨道下端位于枕木9上。小链轮的齿数与大链轮的齿数比为1∶3~5。为安全,在电机轴和小链轮外设防护罩31。The power traveling device is to drive the portal frame and support the traveling device. Described power traveling device is made of car body 6, motor 7, drive rail wheel 26, travel rail wheel 34, small sprocket wheel 27, large sprocket wheel 30 and bearing pair 29. The driving rail wheel is positioned at the rear portion of the lower end of the car body, and the traveling rail wheel is positioned at the front portion of the lower end of the car body. The two ends of the rail wheel shaft 25 in the middle part of the driving rail wheel and the traveling rail wheel are in axial connection with the lower part of the car body through two bearing pairs. A large chain wheel is arranged on the rail wheel axle of the driving rail wheel. A motor is fixed on the car body at the top of the driving rail wheel, and the small sprocket is positioned on the motor shaft. The motor shaft drives the large sprocket through the small sprocket and chain 28, and the driving rail wheel and the traveling rail wheel are positioned on the track 8. The lower end of the track is positioned on the sleeper 9. The ratio of the number of teeth of the small sprocket to the number of teeth of the large sprocket is 1:3-5. For safety, a protective cover 31 is installed on the motor shaft and the small sprocket.

前端两个支撑行走装置仅起支撑和移动门式架体的作用,前端两个支撑行走装置与后端两个动力行走装置不同的是:不设电机及大、小链轮和链条,其余相同,故不再累述。The two supporting running devices at the front end only support and move the portal frame. The difference between the two supporting running devices at the front end and the two power running devices at the rear end is that there is no motor, large and small sprockets and chains, and the rest are the same. , so it will not be repeated.

使用时,可同时启动后端两个动力行走装置上的电机,使电机正、反转,电机轴通过小链轮和链条传动大链轮带动驱动轨轮移动,使各支撑行走车沿轨道前进和后退,带动门式架体及其上的满堂脚手架、装配式模板、定型梳型模和小钢模移至隧道适合位置作业。而后,启动液压升降系统调整好门式架体的高度。启动水平液压件调整装配式模板的上端内侧壁与对应部的门式架体侧壁之间的距离后,再固定其后的呈间隔距离设置的数根可调丝杆。在门式架体的一侧端及门式架体上端的工字钢梁上设满堂脚手架的一侧端,满堂脚手架的另一侧端支撑定型梳型模的一端,定型梳型模的另一端设有小钢模。在小钢模外侧及装配式模板外侧施工变断面隧道二衬,变断面隧道二衬完工后。启动液压升降系统收缩门式架体的高度,拆除可调丝杆,启动水平液压件收进水平滑块,使小钢模和装配式模板外侧壁脱离施工完成断面隧道二衬。重复前行施工即可。When in use, the motors on the two power walking devices at the rear end can be started at the same time to make the motors rotate forward and reverse, and the motor shaft drives the drive rail wheels to move through the small sprocket and the chain drive large sprocket, so that each supporting walking vehicle advances along the track And retreat, drive the portal frame body and the full scaffolding on it, the assembled formwork, the shaping comb mold and the small steel mold to move to the suitable position of the tunnel for operation. Then, start the hydraulic lifting system to adjust the height of the portal frame. After starting the horizontal hydraulic parts to adjust the distance between the inner side wall of the upper end of the assembled formwork and the side wall of the portal frame body of the corresponding part, fix several adjustable screw rods arranged at intervals thereafter. Set one end of the full scaffolding on one side of the portal frame and the I-beam on the upper end of the portal frame, and the other side of the full scaffold supports one end of the shaping comb mold, and the other end of the shaping comb mold One end is provided with a small steel mold. The second lining of the variable-section tunnel is constructed on the outside of the small steel formwork and the outside of the assembled formwork, and the second lining of the variable-section tunnel is completed. Start the hydraulic lifting system to shrink the height of the portal frame, remove the adjustable screw rod, start the horizontal hydraulic parts to retract the horizontal slider, so that the small steel formwork and the outer side wall of the assembled formwork are separated from the second lining of the tunnel after construction. Repeat the previous construction.

总之,本发明能够适用于超大断面、变断面尺寸及轮廓、大角度转弯线路的矿山法隧道二衬,具有操作灵活方便、适用性强,省工省力,成本低,施工和经济效率高,节约工期和使用效果好的优点。In a word, the present invention can be applied to the secondary lining of mining tunnels with super-large section, variable section size and profile, and large-angle turning lines. It has the advantages of flexible and convenient operation, strong applicability, labor and labor saving, low cost, high construction and economic The advantages of good construction period and use effect.

Claims (10)

1.一种用于变断面隧道二衬的可移动门式组合模架, 由满堂脚手架和行走装置所组成,其特征在于:所述的用于变断面隧道二衬的可移动门式组合模架包括可移动门式台车、满堂脚手架、装配式模板、定型梳型模和小钢模,其中:1. A movable portal-type combined formwork for the second lining of variable-section tunnels, which is composed of full scaffolding and walking devices, characterized in that: the movable portal-type combined formwork for the second lining of variable-section tunnels The frame includes movable portal trolley, full hall scaffolding, assembled formwork, shaping comb mold and small steel mold, among which: 可移动门式台车:用于承载和移动满堂脚手架、装配式模板、定型梳型模和小钢模,可移动门式台车由门式架体和行走装置所构成;Movable portal trolley: used to carry and move full-scale scaffolding, assembled formwork, shaping comb molds and small steel molds. The movable portal trolley is composed of portal frame and walking device; 门式架体由钢板箱体立柱、钢板箱体横梁、钢板箱体底梁和螺栓拼装而成,数根呈间隔距离分布的钢板箱体立柱对称分布在门式架体两侧,数根钢板箱体横梁的两端分别连接两侧对应的钢板箱体立柱的上端,工字钢梁连接相邻的钢板箱体横梁,两侧的钢板箱体立柱的下端位于两钢板箱体底梁上;The portal frame is assembled by steel plate box columns, steel box beams, steel plate box bottom beams and bolts. Several steel box columns distributed at intervals are symmetrically distributed on both sides of the portal frame. Several steel plates The two ends of the box beams are respectively connected to the upper ends of the corresponding steel box columns on both sides, the I-shaped steel beams are connected to the adjacent steel box beams, and the lower ends of the steel box columns on both sides are located on the bottom beams of the two steel box boxes; 门式台架每侧两端各安装一套竖向液压升降系统,液压升降系统下端的顶出杆位于行走装置的车体上,液压升降系统上端的缸座与对应部的门式架体连接;A set of vertical hydraulic lifting system is installed at both ends of each side of the portal frame. The ejector rod at the lower end of the hydraulic lifting system is located on the vehicle body of the traveling device, and the cylinder seat at the upper end of the hydraulic lifting system is connected with the corresponding portal frame. ; 门式架体的钢板箱体横梁一侧内轴设有水平滑块,水平滑块的内侧与水平液压件的顶出杆连接,水平滑块的外侧轴接可调丝杆的一端,可调丝杆的另一端连接对应部的装配式模板的上端内侧壁,与可调丝杆下端对应的装配式模板的内侧壁与对应部的门式架体侧端之间呈间隔距离设有数根可调丝杆;The inner shaft of the steel plate box beam side of the portal frame is equipped with a horizontal slider, the inner side of the horizontal slider is connected with the ejector rod of the horizontal hydraulic part, and the outer shaft of the horizontal slider is connected with one end of the adjustable screw rod, which can be adjusted The other end of the screw rod is connected to the inner side wall of the upper end of the prefabricated formwork of the corresponding part, and the inner side wall of the prefabricated formwork corresponding to the lower end of the adjustable screw rod and the side end of the portal frame body of the corresponding part are separated by several adjustable adjusting screw; 门式架体的另一侧端与门式架体的上端依次设有满堂脚手架、定型梳型模和小钢模;The other side end of the portal frame body and the upper end of the portal frame body are successively provided with full scaffolding, shaping comb molds and small steel molds; 满堂脚手架:用于支撑定型梳型模和小钢模,满堂脚手架位于门式架体的上端和一侧端,满堂脚手架的一侧端位于门式架体的一侧端及门式架体上端的工字钢梁上,满堂脚手架的另一侧端支撑定型梳型模的一端,定型梳型模的另一端设有小钢模;Mantang scaffolding: used to support the shaping comb mold and small steel mold, the mantang scaffolding is located on the upper end and one side of the portal frame, and the one side of the mantang scaffolding is located on one side of the portal frame and the upper end of the portal frame On the I-shaped steel beam, the other side of the full hall scaffolding supports one end of the shaping comb mold, and the other end of the shaping comb mold is provided with a small steel mold; 装配式模板:位于门式架体的另一侧端,装配式模板的上端内侧壁与对应部的门式架体侧壁之间的距离由水平滑块和水平液压件实现,装配式模板的中部和下端内侧壁与对应部的门式架体侧壁之间的距离由呈间隔距离设置的数根可调丝杆配合水平液压件完成;Prefabricated formwork: located on the other side of the portal frame body, the distance between the inner side wall of the upper end of the prefabricated formwork and the side wall of the corresponding part of the portal frame body is realized by horizontal sliders and horizontal hydraulic parts. The distance between the inner side wall of the middle part and the lower end and the side wall of the portal frame of the corresponding part is completed by several adjustable screw rods arranged at intervals and coordinated with horizontal hydraulic parts; 定型梳型模:用于承接小钢模,定型梳型模位于满堂脚手架与小钢模之间;Shaping comb mold: used to undertake the small steel mold, the shaping comb mold is located between the scaffolding and the small steel mold; 小钢模:用于顶持位于满堂脚手架部的变断面隧道二衬。Small steel formwork: used to support the second lining of variable cross-section tunnel located in the scaffolding part of the whole hall. 2.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的可移动门式台车呈门字体形。2. The movable portal-type combined formwork for the secondary lining of variable-section tunnels according to claim 1, characterized in that: said movable portal trolley is in the shape of a door font. 3.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的行走装置分为动力行走装置和支撑行走装置,动力行走装置位于门式台架的后端下部两侧,支撑行走装置位于门式台架的前端下部两侧,动力行走装置是驱动门式台架和支撑行走装置,所述的动力行走装置由车体、电机、驱动轨轮、行走轨轮、小链轮、大链轮和轴承副所构成,驱动轨轮和行走轨轮分别位于车体下部的后、前部,驱动轨轮和行走轨轮中部的轨轮轴的两端通过两轴承副与车体下部轴接,驱动轨轮的轨轮轴上设有大链轮,位于驱动轨轮上部的车体上固定有电机,小链轮位于电机轴上,电机轴通过小链轮和链条传动大链轮,驱动轨轮和行走轨轮位于轨道上。3. The movable portal-type combined formwork for the second lining of variable-section tunnels according to claim 1, characterized in that: the traveling device is divided into a power traveling device and a supporting traveling device, and the power traveling device is located in the portal type On both sides of the lower rear end of the stand, the supporting walking device is located on both sides of the lower front end of the portal stand, and the power walking device is to drive the portal stand and the supporting walking device. The power walking device is driven by a car body, a motor, Rail wheel, traveling rail wheel, small sprocket, large sprocket and bearing pair, the driving rail wheel and traveling rail wheel are respectively located at the rear and front of the lower part of the car body, the driving rail wheel and the rail wheel shaft in the middle of the traveling rail wheel The two ends are connected to the lower part of the car body through two bearing pairs. There is a large sprocket on the rail wheel shaft of the driving rail wheel, and a motor is fixed on the car body on the upper part of the driving rail wheel. The small sprocket is located on the motor shaft, and the motor shaft passes through The small sprocket and the chain drive the large sprocket, and the driving rail wheel and the traveling rail wheel are located on the track. 4.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的各钢板箱体立柱与对应的钢板箱体横梁之间设有加强肋板。4. The movable portal formwork for the second lining of variable-section tunnels according to claim 1, characterized in that: there are reinforcing ribs between the steel plate box columns and the corresponding steel plate box beams plate. 5.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的位于装配式模板下端的可调丝杆的一端可与地面作为顶点。5. The movable portal formwork for the second lining of variable-section tunnels according to claim 1, characterized in that: one end of the adjustable screw located at the lower end of the assembled formwork can be the apex with the ground. 6.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的位于门式架体上的装配式模板与满堂脚手架的位置可依需要互换。6. The movable portal formwork for the second lining of variable-section tunnels according to claim 1, characterized in that: the position of the assembled formwork on the portal frame and the full scaffolding can be adjusted according to the needs. exchange. 7.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的门式架体的后端一侧设有爬梯。7. The movable portal formwork for the secondary lining of variable-section tunnels according to claim 1, characterized in that: a ladder is provided at the rear end of the portal frame body. 8.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的门式架体的前端两侧设有防撞架。8. The movable portal formwork for the secondary lining of variable-section tunnels according to claim 1, characterized in that: the two sides of the front end of the portal frame body are provided with anti-collision frames. 9.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的每侧相邻的各钢板箱体立柱之间设有加强槽钢柱,各钢板箱体立柱与钢板箱体底梁之间设有斜向钢柱。9. The movable portal formwork for the second lining of variable-section tunnels according to claim 1, characterized in that: reinforced channel steel columns are arranged between the adjacent steel plate box columns on each side , an oblique steel column is arranged between each steel plate box body column and the steel plate box body bottom beam. 10.根据权利要求1所述的用于变断面隧道二衬的可移动门式组合模架,其特征在于:所述的门式架体的上部周边设有操作平台。10. The movable portal formwork for the secondary lining of variable-section tunnels according to claim 1, characterized in that: an operating platform is provided on the upper periphery of the portal frame body.
CN201810789683.1A 2018-07-18 2018-07-18 Movable door type combined die carrier for variable cross-section tunnel secondary lining Pending CN108868829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810789683.1A CN108868829A (en) 2018-07-18 2018-07-18 Movable door type combined die carrier for variable cross-section tunnel secondary lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810789683.1A CN108868829A (en) 2018-07-18 2018-07-18 Movable door type combined die carrier for variable cross-section tunnel secondary lining

Publications (1)

Publication Number Publication Date
CN108868829A true CN108868829A (en) 2018-11-23

Family

ID=64303246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810789683.1A Pending CN108868829A (en) 2018-07-18 2018-07-18 Movable door type combined die carrier for variable cross-section tunnel secondary lining

Country Status (1)

Country Link
CN (1) CN108868829A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565600A (en) * 2019-08-19 2019-12-13 中电建十一局工程有限公司 long tunnel lining construction method
CN110593908A (en) * 2019-10-11 2019-12-20 江苏开放大学(江苏城市职业学院) Die carrier structure for tunnel construction
CN111364741A (en) * 2020-04-01 2020-07-03 中交第三航务工程局有限公司南京分公司 Construction process for integrally moving disc buckle type full-hall support
WO2021189746A1 (en) * 2020-03-26 2021-09-30 中铁三局集团有限公司 Rapid construction structure and method for secondary lining of multiple variable-cross-section bored tunnels
CN113530569A (en) * 2021-06-23 2021-10-22 中交二公局第四工程有限公司 A construction method for the second lining of the bell mouth of a buried tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11294093A (en) * 1998-04-06 1999-10-26 Ohmoto Gumi Co Ltd Concrete casting method and device for tunnel
CN101230785A (en) * 2008-02-22 2008-07-30 中铁二局股份有限公司 Construction method for large section and multiple sections tunnel lining
CN203531924U (en) * 2013-11-20 2014-04-09 中国水利水电第十工程局有限公司 Lifting type moving trolley provided with tracks, wheels and templates
CN105350986A (en) * 2015-11-15 2016-02-24 贵阳鼎辉科技有限公司 Double-wheel driven assembly mechanism for tunnel lining trolley
CN205445631U (en) * 2016-03-18 2016-08-10 中国水利水电第三工程局有限公司 Variable-diameter steel formwork trolley for tunnel lining construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11294093A (en) * 1998-04-06 1999-10-26 Ohmoto Gumi Co Ltd Concrete casting method and device for tunnel
CN101230785A (en) * 2008-02-22 2008-07-30 中铁二局股份有限公司 Construction method for large section and multiple sections tunnel lining
CN203531924U (en) * 2013-11-20 2014-04-09 中国水利水电第十工程局有限公司 Lifting type moving trolley provided with tracks, wheels and templates
CN105350986A (en) * 2015-11-15 2016-02-24 贵阳鼎辉科技有限公司 Double-wheel driven assembly mechanism for tunnel lining trolley
CN205445631U (en) * 2016-03-18 2016-08-10 中国水利水电第三工程局有限公司 Variable-diameter steel formwork trolley for tunnel lining construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨春雷 等: "超大断面地铁隧道二衬模架技术研究与应用", 《山西建筑》 *
王达 等: "超大断面岩溶地铁隧道二衬施工技术研究与应用", 《山西建筑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565600A (en) * 2019-08-19 2019-12-13 中电建十一局工程有限公司 long tunnel lining construction method
CN110593908A (en) * 2019-10-11 2019-12-20 江苏开放大学(江苏城市职业学院) Die carrier structure for tunnel construction
CN110593908B (en) * 2019-10-11 2020-12-22 江苏开放大学(江苏城市职业学院) Die carrier structure for tunnel construction
WO2021189746A1 (en) * 2020-03-26 2021-09-30 中铁三局集团有限公司 Rapid construction structure and method for secondary lining of multiple variable-cross-section bored tunnels
CN111364741A (en) * 2020-04-01 2020-07-03 中交第三航务工程局有限公司南京分公司 Construction process for integrally moving disc buckle type full-hall support
CN113530569A (en) * 2021-06-23 2021-10-22 中交二公局第四工程有限公司 A construction method for the second lining of the bell mouth of a buried tunnel

Similar Documents

Publication Publication Date Title
CN108868829A (en) Movable door type combined die carrier for variable cross-section tunnel secondary lining
CN110273695B (en) Tunnel secondary lining template trolley and stage type mould closing pouring method thereof
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN103452052B (en) Movable mold hanging equipment for closing swivel bridges and closure section construction method
CN103742168B (en) Cast anchor hole, switch hole independence lining trolley in tunnel
CN107060823B (en) Non-dismantling trolley for tunnel anchor section secondary lining concrete construction
CN106089253A (en) A fully hydraulic formwork system for culvert pouring
CN207944955U (en) Tunnel widening section second lining trolley
CN205778918U (en) Loess tunnel excavation and just formwork build concrete construction combined type chassis
CN208203298U (en) A kind of big punching block of rail type side wall
CN212867563U (en) A double-lined trolley with a super large section of a tunnel that can be widened multiple times
CN114575892B (en) Off-wall vault lining trolley and construction method thereof
CN115305952A (en) Self-propelled steel formwork trolley for construction of comprehensive pipe gallery
CN210217758U (en) A lining trolley for small cross-section tunnel construction
CN210564557U (en) Tunnel secondary lining form trolley
CN203419675U (en) Traveling track for girder crane
CN205936645U (en) A full liquid die plate system for culvert is pour
CN108798714B (en) Portable moving mold trolley for construction of passage wall body and construction method thereof
CN213510651U (en) Integral type two lining platform trucks for tunnel construction
CN214577048U (en) Prefabricated scaffolding for tunnel lining reinforcement
CN118933885A (en) A single-track railway tunnel secondary lining construction trolley and construction method thereof
CN210975880U (en) Adjustable open cut tunnel is hydraulic pressure platform truck by oneself
CN211230492U (en) Hydraulic self-propelled movable formwork support for tunnel center ditch
CN209703467U (en) A mobile formwork system for ship lock water delivery corridor
CN204552760U (en) Traveling type hydraulic formwork jumbo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123