CN205260050U - Lining cutting liquid die plate platform truck in loess tunnel - Google Patents

Lining cutting liquid die plate platform truck in loess tunnel Download PDF

Info

Publication number
CN205260050U
CN205260050U CN201521042942.2U CN201521042942U CN205260050U CN 205260050 U CN205260050 U CN 205260050U CN 201521042942 U CN201521042942 U CN 201521042942U CN 205260050 U CN205260050 U CN 205260050U
Authority
CN
China
Prior art keywords
template
support
portal
guide rail
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521042942.2U
Other languages
Chinese (zh)
Inventor
董合林
赵祥允
贺胜利
席兵印
王丽锋
高晓磊
周亮
吴金龙
吴方明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Highway Engineering Co Ltd filed Critical CCCC Fourth Highway Engineering Co Ltd
Priority to CN201521042942.2U priority Critical patent/CN205260050U/en
Application granted granted Critical
Publication of CN205260050U publication Critical patent/CN205260050U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a lining cutting liquid die plate platform truck in loess tunnel, include door shaped frame and two templates that are located door shaped frame upper portion, door shaped frame establishes the tire in the bottom, and the guide rail is established at the top, is equipped with on the guide rail to follow the gliding formwork support frame of guide rail, and formwork support frame passes through bolt swing joint with the template. The last hoist engine that pulls formwork support frame and slide that still is equipped with of door shaped frame. The utility model discloses a lining masonry quality can be carried to the bold template, after the completion drawing of patterns was built to during operation, a preceding template, the accessible hoist engine drew and passes through a back template, and two mould web wheel flow and build, can shorten the mould and build the strong times such as concrete, improve work efficiency.

Description

Loess tunnel once lining hydraulic template trolley
Technical field
The utility model relates to lining construction field, is specifically related to one and builds mixed for highway and railway loess tunnel one-off patternSolidifying soil is built the formwork jumbo of use.
Background technology
After tunnel excavation moulding, need to carry out preliminary bracing. Current Tunnel adopts the shotcrete of New Austrian Tunneling Method principle conventionallySupport form. But to special geology structures such as collapsible loesses, adopt combined bolting and shotcrete and be not exclusively suitable for, current loess both at home and abroadTunnel starts to adopt one-off pattern to build concrete lining cutting and secondary mould is built this composite lining mode of concrete lining cutting, and a lining mould is built concrete construction generallyAdopt little punching block assembling construction, after having excavated, by the installation of manually carrying out fritter steel form and form bracing system, template is spelledDress carries out concrete pouring construction after having reinforced, this kind of construction method because of tunnel cross-section large, fritter punching block quantity is many, line style is difficult to controlSystem, simultaneously workman's set-up time long, cause personnel having piece cave in longevity of service, therefore the party below the excavation face of hidden dangerMethod mechanization degree is low, consumption labour is many, construction speed is slow, working security is poor.
Summary of the invention
The purpose of this utility model is to provide a kind of hydraulic template trolley that is applicable to loess tunnel once lining, to simplify coagulationSoil is built and is applied operating process, overcomes the shortcoming of original conventional construction method, saves manpower from basic realization, improves and produces effectRate, guarantee workmen's safety.
For achieving the above object, the utility model is by the following technical solutions:
A kind of loess tunnel once lining hydraulic template trolley, comprises portal and the template that is positioned at portal top, described door shapeFrame mainly comprises the two lower longerons that are parallel to each other, and lower longeron is provided with perpendicular support, and perpendicular support upper end is provided with the upper longeron parallel with lower longeronCrossbeam with vertical with upper longeron, is characterized in that: described crossbeam be provided with two with the guide rail of beam vertical, on described guide railBe provided with the formwork-support of a rectangle, two of described formwork-support with the bottom on the limit of guide rail parallel, be provided with along described guide railThe slide rail sliding; Described template has two, and two templates are set up in parallel on portal top, and every template comprises the top of an archMould, the two ends of described backform are each connects a large limit mould, every large limit mould connects a little limit mould, described backform and large limit mould itBetween, between the mould of Mo Yu little limit, large limit, be all rotationally connected by connecting plate and bearing pin; The top of described formwork-support and described backformBottom between be flexibly connected by connecting plate and latch; The every end down either side of lower longeron of described portal has two walkingsWheel, two road wheels of the every end of lower longeron connect by bearing, and the middle part of described bearing is provided with bearings piece, described bearingsThe vertical activity of piece interts in the end of lower longeron; On described portal, be also provided with hydraulic system, described hydraulic system comprises adjustment doorsThe vertical oil cylinder of shape frame height, and the horizontal oil cylinder of adjusting template transverse shifting, described vertical oil cylinder lower end is supported on live axleHold on back-up block, the perpendicular support of portal is provided with lip block, and described vertical jack upper end is supported in described lip block bottom;Described horizontal oil cylinder is fixed on described formwork-support, be arranged in parallel with crossbeam; On described portal, be also provided with the described mould of tractionThe hoist engine that plate bracing frame slides along guide rail, described hoist engine is positioned on the crossbeam of portal rear portion, on the anterior crossbeam of gate-type frame, establishesHave angle pulley, the pull rope of described hoist engine is walked around described angle pulley and is connected with described formwork-support.
The utility model is a kind of to build the custom-designed lining hydraulic template trolley of lining concrete in tunnel for secondary mould, have withLower advantage and beneficial effect:
(1) have formwork erection, demoulding functions, template adopts overall bulk steel form, has ensured a lining concrete outward appearance line style, lining cuttingSurface smoothness is high; Lining cutting speed is fast, has greatly simplified concreting and has applied operating process, realizes Quick mechanicalization construction,Greatly improve production efficiency, ensured workmen's safety.
(2) vertical and horizontal oil cylinder is set realizes the adjusting in place of template, simplified the adjusting work in place of loaded down with trivial details template, onlyNeed a workman to operate template in place, easily complete formwork erection task.
(3) adopt template and chassis support piece-rate system particular design, guide rail is established at chassis top, two templates is set, oneTemplate can be slided and pass through another piece template along guide rail, and two alternately constructions of template, can effectively overcome the strong times such as form concreteGrow, affect the feature of construction efficiency.
(4) trolley traveling adopts the dilatory traveling of rubber-tyred, can effectively utilize the existing plant equipment of constructing tunnel, and walking is convenient fastPrompt.
(5) when chassis is built, support and adopt leading screw jack over the ground, tire is set for trolley traveling, can meet poor groundBase requirement.
(6) template-setup working window is built and vibrates for concrete, can overcome fritter punching block concrete and build the difficult shortcoming of vibrating.
Brief description of the drawings
Fig. 1 is hydraulic jumbo structure front view of the present utility model, demonstration be that chassis is in formwork erection state;
Fig. 2 is the side direction structural representation of hydraulic jumbo;
Fig. 3 is the plan structure schematic diagram of template;
Fig. 4 is the view of template of the utility model while passing through another piece template.
Detailed description of the invention
As shown in Figure 1, Figure 2, Figure 3, Figure 4, a kind of loess tunnel once lining hydraulic template trolley of the present utility model,Comprise portal and the template that is positioned at portal top, described portal mainly comprises the two lower longerons 1 that are parallel to each other, lower longeron1 is provided with perpendicular support 2, and perpendicular support 2 upper ends are provided with the upper longeron 3 parallel with lower longeron and the crossbeam 4 vertical with upper longeron, described horizontal strokeBeam 4 be provided with two with the guide rail 5 of beam vertical, described guide rail 5 is provided with the formwork-support 6 of a rectangle, described templateTwo of bracing frame 6 with the bottom on the limit of guide rail parallel, be provided with the slide rail 7 sliding along described guide rail; Described template 8 has two,Two templates are set up in parallel on portal top, and every template comprises the backform 81 of an arch, and the two ends of described backform 81 respectively connectConnect a large limit mould 82, every large limit mould 82 connects a little limit mould 83, between described backform 81 and large limit mould 82, large limitBetween mould 82 and little limit mould 83, be all rotationally connected by connecting plate and bearing pin; The top of described formwork-support 6 and described backformBetween 81 bottom, be flexibly connected by connecting plate and latch; The every end down either side of lower longeron 1 of described portal is provided with two rowTravelling wheel 9, two road wheels 9 of the every end of lower longeron connect by bearing 10, and the middle part of described bearing 10 is provided with bearings piece 11,The vertical activity of described bearings piece 11 interts in the end of lower longeron 1; On described portal, be also provided with hydraulic system, described inHydraulic system comprises the vertical oil cylinder 12 that regulates portal height, and the horizontal oil cylinder 13 of adjusting template transverse shifting, described perpendicularBe supported on road wheel bearing back-up block 11 to oil cylinder 12 lower ends, the perpendicular support 2 of portal is provided with lip block 14, described perpendicularBe supported in described lip block 14 bottoms to oil cylinder 12 upper ends; Described horizontal oil cylinder 13 is fixed on described formwork-support 6,And be arranged in parallel with crossbeam 4; On described portal, be also provided with the hoist engine 15 that the described formwork-support of traction slides along guide rail, instituteState hoist engine 15 and be positioned on the crossbeam of portal rear portion, on the anterior crossbeam of gate-type frame, be provided with angle pulley 16, described hoist engine 15Pull rope 17 walk around described angle pulley 16 and be connected with the front end of described formwork-support 6.
When the utility model is specifically implemented, for convenience of the upper and lower chassis of constructing operation personnel, be provided with for construction at described portal sidepieceThe cat ladder 18 that personnel are upper and lower.
For convenience of constructing operation personnel construction, described perpendicular support is provided with and stretches out and the worktable support beam vertical with vertical supporting18, on described worktable support beam 19, be equipped with backing plate.
The inner side of described large limit mould is provided with chain block, and described little limit mould inner side and gate-type frame are provided with cucurbit chain hanging part.
The utility model, in the time of formwork erection, support large and small limit mould, and therefore chassis is also provided with multiple template lateral support leading screws20; Described template inner side arranges multiple leading screw connectors according to design support zone, on described gate-type frame, is also provided with corresponding leading screwConnector, described template lateral support leading screw one end is connected with leading screw connector inside template, the silk on one end and gate-type frame leading screwThick stick connector connects.
When the utility model is specifically implemented, described road wheel 9 can adopt rubber tyre.
As shown in Figure 3, the utility model, on large limit mould 82 and backform 81, is staggeredly from bottom to top provided with multiple concretes and builds workWindow 84, concrete build operation window place be provided with can folding cover plate; The middle part of described backform is provided with injected hole 85.
Below pass through concrete Application Example of the utility model, by reference to the accompanying drawings, to structure of the present utility model and the course of workBe elaborated. In the present embodiment, chassis support body is (along tunnel direction) long 6.8m longitudinally, two templates, every wide (edgeChassis is longitudinal) 2.2m, template beam overall 4.4m; 2.2m is built in each lining cutting, and two templates are built in turn.
The utility model course of work is as follows:
(1) formwork erection:
After tunnel excavation completes, before lining cutting, formwork jumbo is drawn to lining cutting position and starts formwork erection, formwork erection front template chassis placeIn demoulding state, now between the backform of template and formwork-support, be connected by latch. Referring to Fig. 1, Fig. 2, below formwork erection is pressedSeveral steps are carried out:
A, draw formwork-support 6 by hoist engine 15 and move, template lengthwise position is adjusted to the right place;
B, primer fluid Medium-voltage Motor, the vertical oil cylinder 12 of operation hydraulic jumbo rises, and gate-type frame raises, and template 8 is approached predetermined highDegree;
C, operate horizontal oil cylinder 13 lateral pushing templates 8, template is adjusted to its center line and aligns with tunnel-liner center line;And then the vertical vertical oil cylinder 12 of operation rises, make template 8 reach predetermined altitude;
D, on ground, lower longeron bottom, chassis support jack 21 is installed, is made it upwards hold out against longeron under chassis, make chassis wheelTire is in the state of not stressing;
E, installation adjusting template lateral support leading screw 20, hold out against side template, makes side template reach perfusion state;
G, mould vertically jack 22 over the ground in little limit is installed on ground below the mould of little limit, is made it upwards hold out against little limit mould. Finally peaceDress bulkhead. Formwork erection completes.
(2) casting concrete:
After completing, formwork erection can carry out concreting. First build a template above. Before concreting, template appearanceFace smearing release agent, the surperficial viscous force when reducing the demoulding. While building, first from template the working window in below carry out, buildSoon when concordant operation window, close working window to concrete, then build from a upper operation window, upwards build successively,Finally bind by grouting port. After last template built, use the same method and build a rear template.
(3) demoulding:
Last template concrete setting during to designing requirement, starts the demoulding. The demoulding is undertaken by the following steps:
Vertically jack and bulkhead over the ground of the shuttering supporting leading screw of a, the last template of dismantling, little limit mould;
B, take off after connecting bolt between backform and the bracing frame of a template;
C, referring to Fig. 4, the cucurbit chain that utilizes chain block chain 23 to connect on little limit mould and the gate-type frame of last template connectsPart, operation chain block is first packed up little limit mould, then receives large limit mould, then packs up the chassis support jack of longeron below under stand,Chassis weight is placed on tire by vertical oil cylinder.
D, shrink vertical oil cylinder gradually, make the backform of last template also depart from lining cutting surface, complete the demoulding of monoblock template.
(4) template is walked:
As shown in Figure 4, after the last template demoulding, after its backform aspect ratio, the backform height of a template is low, its large and small limitMould is also because chain block chain 23 tightens up in contraction state. Now, a template and chassis are in released state. Traction tableCar moves forward the distance of the width of a template, and now last template moves to the below of a rear template with chassis. Start elevatorMachine, traction formwork-support, along the distance of a template width of guide rail slip, drives last template to wear from rear template belowMore, arrive a rear template rear, then by same formwork erection operation, by its formwork erection, build. Now aforesaid forward and backward templatePosition exchange. After aforesaid, a template has reached demoulding strength, then by its demoulding, walk, so iterative cycles is verticalMould, water concrete, the demoulding, trolley running, template and walk this five courses of work, until complete the lining cutting in whole tunnel.

Claims (7)

1. a loess tunnel once lining hydraulic template trolley, comprise portal and the template that is positioned at portal top, described portal mainly comprises the two lower longerons that are parallel to each other, lower longeron is provided with perpendicular support, perpendicular support upper end is provided with the upper longeron parallel with lower longeron and the crossbeam vertical with upper longeron, it is characterized in that: described crossbeam be provided with two with the guide rail of beam vertical, described guide rail is provided with the formwork-support of a rectangle, two of described formwork-support with the bottom on the limit of guide rail parallel, be provided with the slide rail sliding along described guide rail; Described template has two, two templates are set up in parallel on portal top, every template comprises the backform of an arch, a large limit mould of the each connection in two ends of described backform, every large limit mould connects a little limit mould, between described backform and large limit mould, be all rotationally connected by connecting plate and bearing pin between the mould of Mo Yu little limit, limit greatly; Between the top of described formwork-support and the bottom of described backform, be flexibly connected by connecting plate and latch; The every end down either side of lower longeron of described portal is provided with two road wheels, and two road wheels of the every end of lower longeron connect by bearing, and the middle part of described bearing is provided with bearings piece, and the vertical activity of described bearings piece interts in the end of lower longeron; On described portal, be also provided with hydraulic system, described hydraulic system comprises the vertical oil cylinder that regulates portal height, horizontal oil cylinder with adjusting template transverse shifting, described vertical oil cylinder lower end is supported on road wheel bearing back-up block, the perpendicular support of portal is provided with lip block, and described vertical jack upper end is supported in described lip block bottom; Described horizontal oil cylinder is fixed on described formwork-support, be arranged in parallel with crossbeam; On described portal, be also provided with the hoist engine that the described formwork-support of traction slides along guide rail, described hoist engine is positioned on the crossbeam of portal rear portion, on the anterior crossbeam of gate-type frame, be provided with angle pulley, the pull rope of described hoist engine is walked around described angle pulley and is connected with described formwork-support is anterior.
2. loess tunnel once lining hydraulic template trolley according to claim 1, is characterized in that: described portal sidepiece is provided with the upper and lower cat ladder for workmen.
3. loess tunnel once lining hydraulic template trolley according to claim 1, is characterized in that: described perpendicular support is provided with and stretches out and the worktable support beam vertical with perpendicular support, on described worktable support beam, is equipped with backing plate.
4. loess tunnel once lining hydraulic template trolley according to claim 1, is characterized in that: on described limit mould and backform, staggered be provided with multiple concretes and build working window, concrete build operation window place be provided with can folding cover plate; The middle part of described backform is provided with injected hole.
5. loess tunnel once lining hydraulic template trolley according to claim 1, is characterized in that: the inner side of described large limit mould is provided with chain block, in described little limit mould inner side and perpendicular support, is equipped with cucurbit chain hanging part.
6. loess tunnel once lining hydraulic template trolley according to claim 1, is characterized in that: described chassis is provided with multiple template lateral support leading screws; In the perpendicular support of described template inner side and gate-type frame, multiple leading screw connectors are set, described template lateral support leading screw one end is connected with the leading screw connector on template inner side, and one end is connected with the leading screw connector on gate-type frame leading screw.
7. loess tunnel once lining hydraulic template trolley according to claim 1, is characterized in that: described road wheel adopts rubber tyre.
CN201521042942.2U 2015-12-15 2015-12-15 Lining cutting liquid die plate platform truck in loess tunnel Active CN205260050U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521042942.2U CN205260050U (en) 2015-12-15 2015-12-15 Lining cutting liquid die plate platform truck in loess tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521042942.2U CN205260050U (en) 2015-12-15 2015-12-15 Lining cutting liquid die plate platform truck in loess tunnel

Publications (1)

Publication Number Publication Date
CN205260050U true CN205260050U (en) 2016-05-25

Family

ID=56001580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521042942.2U Active CN205260050U (en) 2015-12-15 2015-12-15 Lining cutting liquid die plate platform truck in loess tunnel

Country Status (1)

Country Link
CN (1) CN205260050U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370298A (en) * 2015-12-15 2016-03-02 中交第四公路工程局有限公司 Loess tunnel one-off lining hydraulic formwork trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370298A (en) * 2015-12-15 2016-03-02 中交第四公路工程局有限公司 Loess tunnel one-off lining hydraulic formwork trolley

Similar Documents

Publication Publication Date Title
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN103967050B (en) Construction system of subway station
CN109505630B (en) Full-hydraulic crawler-type self-propelled trestle and construction method
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN102146799B (en) Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN107882064A (en) A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN109736840B (en) New tunnel secondary lining construction method
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN110905554B (en) Tunnel inverted arch and filled concrete paver and construction process
CN103470272A (en) Trolley for concrete construction on multiple sections by employing mining method and construction method thereof
CN207567810U (en) A kind of formwork jumbo for pipe gallery cast-in-place concrete slding form operation
CN105736012B (en) A kind of tunnel lining concrete grouting device
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN211314235U (en) Tunnel inverted arch and filling concrete paver
CN203499697U (en) Trolley used for concrete construction of various cross sections through mining method
CN205936645U (en) A full liquid die plate system for culvert is pour
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN204851287U (en) Big section moving as a whole formula formwork support
CN106223983A (en) A kind of diversion tunnel inclined shaft, flat section tunneling boring primary steel mould trolley
CN204662270U (en) A kind of case girder transferring system
CN105927247A (en) Large section full-automatic mechanical numeric control bogie and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant