JPH11247390A - Stairs - Google Patents
StairsInfo
- Publication number
- JPH11247390A JPH11247390A JP10053051A JP5305198A JPH11247390A JP H11247390 A JPH11247390 A JP H11247390A JP 10053051 A JP10053051 A JP 10053051A JP 5305198 A JP5305198 A JP 5305198A JP H11247390 A JPH11247390 A JP H11247390A
- Authority
- JP
- Japan
- Prior art keywords
- riser
- fixed
- plate
- stairs
- staircase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、木造住宅等の木造
建築物における木造の階段に関し、詳しくは、外観美麗
で、施工性に優れた階段に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wooden stair in a wooden building such as a wooden house, and more particularly to a stair having a beautiful appearance and excellent workability.
【0002】[0002]
【従来の技術及び発明が解決しようとする課題】従来、
木造住宅等の木造建築物における階段として、階段状の
縁部を有する一対のササラ桁間に、段板及び蹴込み板を
装着して構成されるササラ桁階段が知られている。この
ササラ桁階段の施工方法としては、各段板のみを取り付
けた後、各段板間に蹴込み板を装着する方法や、上方か
ら下方に向かって段板及び蹴込み板を順次取り付けてい
く方法等があるが、従来の階段においては、段板及び/
又は蹴込み板の取付作業に時間と手間が掛かり、また、
仕上がりが悪化する等の問題があった。2. Description of the Related Art
As a staircase in a wooden building such as a wooden house, a Sasara girder staircase configured by attaching a step board and a riser plate between a pair of Sasara girders having a stepped edge is known. As a method of constructing this sasara girder stairs, after installing only each step board, a method of mounting a riser between each step, or sequentially installing a step and a riser from top to bottom There are methods and the like, but in the conventional stairs, the steps and / or
Or it takes time and effort to install the riser,
There were problems such as deterioration in finish.
【0003】また、従来の木造建築物における階段は、
一般に、建築の比較的初期の段階に完成され、各種造作
施工時等には、損傷や汚れを防止するため、樹脂フィル
ムや合板等の各種資材を用いて養生されていたが、この
ような従来の方法は、養生用資材の取り外しに手間が掛
かる等の問題を有しており、また、損傷や汚れを完全に
防止することは不可能である。In addition, the stairs in a conventional wooden building are as follows:
Generally, construction is completed at a relatively early stage of construction, and at the time of various works, it is cured using various materials such as resin film and plywood to prevent damage and dirt. The method of (1) has a problem that it takes time to remove the curing material, and it is impossible to completely prevent damage and dirt.
【0004】そこで、段板のみを取り付けて作業用の仮
階段とし、造作工事後半に、段板化粧材に張り替え、ま
た、蹴込み板を装着したりして、本来の階段として完成
させる工法が提案されており、このような工法によれ
ば、養生用資材を取り外しの手間や資源の無駄を減少さ
せることができる。しかし、このような工法において
も、段板のみの仮階段に上記蹴込み板等を装着するため
の作業に時間と手間が掛かり、また、その作業中に段板
や蹴込み板等に傷が付いてしまう等の問題があった。Therefore, there is a construction method in which only the steps are attached to form a temporary staircase for work, and in the latter half of the construction work, the steps are replaced with decorative materials for the steps and a riser is attached to complete the original steps. According to such a construction method, it is possible to reduce the trouble of removing the curing material and the waste of resources. However, even in such a construction method, it takes time and effort to attach the above-mentioned riser to the temporary stairs including only the stepboard, and furthermore, during the work, the stepboard and the riser are damaged. There were problems such as sticking.
【0005】従って、本発明の目的は、外観美麗で、施
工性に優れた階段を提供することにある。Accordingly, it is an object of the present invention to provide a staircase having a beautiful appearance and excellent workability.
【0006】[0006]
【課題を解決するための手段】請求項1に記載の発明
は、段板の端部が載置固定される複数の水平段部と、蹴
込み板が当接固定される複数の鉛直部とを有する一対の
ササラ桁における相対向する水平段部間に段板が掛け渡
されて固定され、上部段板の先端部と下部段板の後端部
との間それぞれに蹴込み板が装着されてなる階段におい
て、上記各段板は、上記水平段部に載置固定され、上記
各蹴込み板は、その上端が上記上部段板の先端部下面に
当接され、その背面が上記鉛直部に当接され、且つその
下端部前面が上記下部段板の後端面に当接されて固定さ
れており、上記鉛直部の下端部に、上記蹴込み板の装着
案内用の案内部が設けられ、該案内部と上記蹴込み板の
背面との間に空間が形成されていることを特徴とする階
段を提供することにより、上記目的を達成したものであ
る。According to the first aspect of the present invention, there are provided a plurality of horizontal steps on which the ends of the steps are placed and fixed, and a plurality of vertical sections on which the risers are abutted and fixed. A step board is stretched and fixed between the opposing horizontal step sections of the pair of Sasara girders having a riser plate, and a riser plate is attached between a front end of the upper step board and a rear end of the lower step board. In the stairs, each of the step plates is placed and fixed on the horizontal step portion, and each of the riser plates has an upper end abutting on a lower surface of a tip end portion of the upper step plate, and a rear surface thereof has the vertical portion. And a lower end portion front surface thereof is fixed by being abutted on a rear end surface of the lower step plate, and a guide portion for guiding installation of the riser plate is provided at a lower end portion of the vertical portion. Providing a staircase wherein a space is formed between the guide portion and the back surface of the riser. Ri, are those that have achieved the above objects.
【0007】請求項2に記載の発明は、上記案内部が、
上記蹴込み板を装着する際、該蹴込み板の下端部を所定
の固定位置に案内するようになされていることを特徴と
する請求項1に記載の階段を提供することにより、上記
目的を達成したものである。According to a second aspect of the present invention, the guide portion includes:
The stairs according to claim 1, wherein when the riser is mounted, the lower end of the riser is guided to a predetermined fixed position. It has been achieved.
【0008】請求項3に記載の発明は、上記案内部の上
端部と上記下部段板の後端上部との間の距離が、上記蹴
込み板の厚みより大であることを特徴とする請求項1に
記載の階段を提供することにより、上記目的を達成した
ものである。According to a third aspect of the present invention, the distance between the upper end of the guide portion and the upper rear end of the lower step board is greater than the thickness of the riser plate. The above object has been attained by providing the stairs according to item 1.
【0009】請求項4に記載の発明は、請求項1に記載
の階段の施工方法であって、上記各段板を一対の上記サ
サラ桁に固定し作業用の仮階段とした後、固定された該
各段板間に上記各蹴込み板をそれぞれ装着することを特
徴とする階段の施工方法を提供するものである。According to a fourth aspect of the present invention, there is provided the method of constructing a staircase according to the first aspect, wherein each of the step boards is fixed to the pair of Sasara girders to form a temporary staircase for work and then fixed. In addition, the present invention provides a method of constructing a staircase, wherein each of the riser plates is mounted between the respective step plates.
【0010】請求項5に記載の発明は、請求項1に記載
の階段の施工方法であって、上記各蹴込み板を上記上部
段板の先端下面に固定一体化しておき、この蹴込み板と
上部段板とが一体化されたものを、対向配置された一対
の上記ササラ桁に下方から上方に向かって順次取り付け
ることを特徴とする階段の施工方法を提供するものであ
る。According to a fifth aspect of the present invention, there is provided the method for constructing a staircase according to the first aspect, wherein each of the riser plates is fixedly integrated with the lower surface of the tip of the upper step plate, and the riser plate is provided. And an upper step board, which is integrated, is sequentially attached to the pair of Sasara girders arranged opposite to each other in an upward direction from below.
【0011】[0011]
【発明の実施の形態】以下、本発明の階段の一実施形態
について図1〜図5を参照して説明する。ここで、図1
は、本形態の階段を模式的に示す断面図であり、図2
は、図1の階段の一部を拡大して示す断面図であり、図
3は、図1の階段における段板のみを取り付けた状態を
示す断面図であり、図4及び図5は、図1の階段の施工
方法を説明するための説明図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of a staircase according to the present invention will be described below with reference to FIGS. Here, FIG.
FIG. 2 is a cross-sectional view schematically showing a staircase of the present embodiment, and FIG.
3 is an enlarged cross-sectional view showing a part of the staircase in FIG. 1, FIG. 3 is a cross-sectional view showing a state in which only the step board in the staircase in FIG. 1 is attached, and FIGS. It is explanatory drawing for demonstrating the construction method of 1 stairs.
【0012】本形態の階段は、図1及び図2に示される
ように、段板1の端部が載置固定される複数の水平段部
3aと、蹴込み板2が当接固定される複数の鉛直部3b
とを有する一対のササラ桁3(一方のみ図示する)にお
ける相対向する水平段部3a間に段板1が掛け渡されて
固定され、図2に示されるように、上部段板1Aの先端
部と下部段板1Bの後端部との間それぞれに蹴込み板2
が装着されてなる階段であり、上記各段板1は、上記水
平段部3aに載置固定され、上記各蹴込み板2は、その
上端2aが上記上部段板1Aの先端部下面に当接され、
その背面2bが上記鉛直部3bに当接され、且つその下
端部前面2cが上記下部段板1Bの後端面に当接されて
固定されており、上記鉛直部3bの下端部に、上記蹴込
み板2の装着案内用の案内部4が設けられ、該案内部4
と上記蹴込み板2の背面との間に空間Sが形成されてい
る。In the staircase of this embodiment, as shown in FIGS. 1 and 2, a plurality of horizontal steps 3a on which the ends of the step board 1 are placed and fixed, and the riser 2 are abutted and fixed. Multiple vertical parts 3b
The step board 1 is stretched over and fixed between the opposing horizontal step parts 3a of the pair of Sasara girders 3 (only one of which is shown), and as shown in FIG. Riser 2 between the lower end plate 1B and the rear end
Each step board 1 is mounted and fixed on the horizontal step section 3a, and each of the riser boards 2 has an upper end 2a contacting the lower surface of the distal end portion of the upper step board 1A. Touched,
The rear surface 2b is in contact with the vertical portion 3b, and the lower front surface 2c is in contact with and fixed to the rear end surface of the lower step board 1B. A guide portion 4 for guiding the mounting of the plate 2 is provided.
A space S is formed between the riser 2 and the rear surface of the riser 2.
【0013】上記各ササラ桁3は、段板1を載置固定す
る水平段部3aと蹴込み板2を当接固定する鉛直部3b
とが交互に配された階段状の上縁部を有し、下縁部は傾
斜した直線形状となっている。そして、本形態の階段に
おいては、このような一対のササラ桁3(一方のみ図示
する)が互いに対向するように配設され、一対の該ササ
ラ桁における相対向する水平段部3a間に段板1が掛け
渡されて固定され、蹴込み板2が上部段板の先端部と下
部段板の後端部との間に、相対向する鉛直部3b間に掛
け渡すようにして装着されている。本形態の階段におけ
る、このような構成については、従来のササラ桁階段に
おけるのと同様である。尚、図示しないが、各ササラ桁
3は、柱や間柱等の構造材に固定されたプラスターボー
ド上にそれぞれビスや釘等の固定具により面接固定され
ている。Each of the above-mentioned Sasara girders 3 has a horizontal step portion 3a for placing and fixing the step plate 1 and a vertical portion 3b for contacting and fixing the riser plate 2.
Have a stair-like upper edge portion alternately arranged, and the lower edge portion has an inclined linear shape. In the stairs of the present embodiment, such a pair of Sasara girders 3 (only one is shown) are disposed so as to face each other, and a step board is provided between the opposing horizontal step portions 3a of the pair of Sasara girders. 1 is stretched and fixed, and the riser 2 is mounted between the front end of the upper step board and the rear end of the lower step board so as to bridge between the opposed vertical portions 3b. . Such a configuration of the staircase of the present embodiment is the same as that of the conventional Sasara girder staircase. Although not shown, each Sasara girder 3 is fixed in a face-to-face manner by a fixture such as a screw or a nail on a plaster board fixed to a structural material such as a pillar or a stud.
【0014】而して、上記各段板1は、その両端部のそ
れぞれを、上記水平段部3aに載置固定されている。即
ち、水平段部3a上に載せられた各段板1の端部は、上
方からビスや釘等を打着されて該水平段部3aに固定さ
れている。また、図3に示すように、各段板1は、その
後端面11が上記鉛直部3bの位置Pよりも上記蹴込み
板2の厚みの分だけ前方に位置するように固定されてい
る。また、図2に示すように、上記各段板1の先端部下
面には、溝12が形成されており、後述の蹴込み板2の
上端2aが該溝12に嵌合するようになっている。Thus, each of the step boards 1 is fixedly mounted on the horizontal step section 3a at both ends thereof. That is, the end of each step board 1 placed on the horizontal step 3a is fixed to the horizontal step 3a by screwing a screw, a nail or the like from above. As shown in FIG. 3, each step board 1 is fixed such that its rear end face 11 is located forward of the position P of the vertical portion 3b by the thickness of the riser plate 2. As shown in FIG. 2, a groove 12 is formed in the lower surface of the leading end of each of the step boards 1, and an upper end 2a of a later-described riser 2 fits into the groove 12. I have.
【0015】上記各蹴込み板2は、図2に示すように、
その上端2aが、上部段板1Aの先端部下面に当接さ
れ、その背面2bが、ササラ桁3における上記鉛直部3
bに当接され、且つその下端部前面2cが、上記下部段
板1Bの後端面に当接された状態で、一対のササラ桁3
間に掛け渡されて固定されている。尚、上記上部段板1
Aは、個々の蹴込み板2について、その上側に配設され
ている段板1であり、上記下部段板1Bは、個々の蹴込
み板2について、その下側に配設されている段板1であ
る。As shown in FIG. 2, each of the risers 2 is
The upper end 2a is in contact with the lower surface of the distal end portion of the upper step board 1A, and the rear surface 2b is connected to the vertical portion 3
b, and the lower end front surface 2c thereof is in contact with the rear end surface of the lower step board 1B.
It is hung between and fixed. In addition, the upper step board 1
A is a step board 1 provided above each riser plate 2, and the lower step board 1B is a step board disposed below each riser plate 2. Plate 1.
【0016】上記各ササラ桁3は、上記各鉛直部3bの
下端部に、上記各蹴込み板2の下端部を上記水平段部3
aに固定された下部段板1Bの後方にスムーズに挿入可
能とする装着案内用の案内部4を有している。上記各案
内部4は、図2に示すように、上記鉛直部3bの下端部
に切欠形成されており、鉛直線Lと平行に形成された鉛
直縁部41と、該鉛直線Lに対する角度αが30度〜9
0度、好ましくは45度〜60度である傾斜縁部42と
からなる。そして、この案内部4により、上記下部段板
1Bを取り付けた状態においては、図3に示すように、
上記傾斜縁部42の上端部42aと該下部段板1Bの後
端上部11aとの間に上記蹴込み板2の板厚より幅の大
きな隙間Dが形成され、上記蹴込み板2を装着した状態
においては、該案内部4と上記蹴込み板2の背面2bと
間に所定の空間Sが形成されるようになっている。Each of the sasara girders 3 has a lower end of each of the riser plates 2 attached to a lower end of each of the vertical portions 3b.
and a guide portion 4 for mounting guide that enables the lower guide plate 1B to be smoothly inserted into the rear of the lower step plate 1B fixed to a. As shown in FIG. 2, each of the guide portions 4 is formed by cutting out a lower end portion of the vertical portion 3b, and includes a vertical edge portion 41 formed in parallel with the vertical line L, and an angle α with respect to the vertical line L. Is 30 degrees to 9
0 °, preferably 45 ° to 60 °. Then, in a state where the lower step plate 1B is attached by the guide portion 4, as shown in FIG.
A gap D having a width greater than the thickness of the riser 2 is formed between the upper end 42a of the inclined edge 42 and the upper rear end 11a of the lower step board 1B, and the riser 2 is mounted. In the state, a predetermined space S is formed between the guide portion 4 and the back surface 2b of the riser plate 2.
【0017】本形態の階段の施工方法の一例を以下に説
明する。尚、本階段の施工方法は、本発明の請求項4に
記載の階段の施工方法の一実施形態である。先ず、一対
のササラ桁3、各段板1、各蹴込み板2をプレカットし
ておき、更に、必要な巾木5等を用意しておく。そし
て、階段の両側の壁面を想定して配設された柱や間柱に
プラスターボートを固定して、上記ササラ桁3を固定す
る壁面を形成する。次いで、一対の上記ササラ桁3を、
それぞれ互いに対向するように該プラスターボート上に
面接固定し、このように対向配置された一対のササラ桁
3における相対向する水平段部3a間に、各段板1を掛
け渡して固定する。本形態の階段は、各段板1を一対の
ササラ桁3間に載置固定した状態、即ち図3に示すよう
な状態で、作業用の仮階段として安全に使用可能であ
る。An example of the method for constructing the stairs according to the present embodiment will be described below. The construction method of the stairs is an embodiment of the construction method of the stairs according to claim 4 of the present invention. First, a pair of Sasara girders 3, each step board 1, and each riser board 2 are precut, and further, a necessary baseboard 5 and the like are prepared. Then, the plaster boat is fixed to pillars and studs provided on the assumption of the wall surfaces on both sides of the stairs, and the wall surface for fixing the Sasara beam 3 is formed. Next, the pair of Sasara girders 3 is
The stage plates 1 are fixed to the plaster boat so as to face each other so as to face each other, and each step board 1 is bridged between the opposing horizontal step portions 3a of the pair of sasaras girders 3 arranged in such a manner. The stairs of the present embodiment can be safely used as temporary stairs for work in a state where each step board 1 is placed and fixed between a pair of sasara girders 3, that is, as shown in FIG.
【0018】そして、その後、例えば造作施工の後半に
おいて、図4に示すように、各蹴込み板2を下方から順
次装着固定する。このとき、各蹴込み板2の下端部は、
釘やビス等により各段板1の後端面に止め付けられる。
そして、このようにして一対のササラ桁3に固定された
上記各段板1の端部及び上記各蹴込み板2の端部上に巾
木5を装着する。この巾木5により、上記各段板1を固
定する際に用いた釘等の固定具が覆い隠される。このよ
うにして、本形態の階段は、外観美麗に完成する。尚、
必要に応じて上記各段板1上に段板化粧板が設けられ、
また、その他の仕上げ処理が施される。Then, in the latter half of the construction, for example, as shown in FIG. 4, the risers 2 are sequentially mounted and fixed from below. At this time, the lower end of each riser 2
Each step board 1 is fixed to the rear end face of the step board 1 with a nail or a screw.
Then, the baseboard 5 is mounted on the end of each of the step boards 1 and the end of each of the risers 2 fixed to the pair of Sasara beams 3 in this manner. The baseboard 5 covers and hides fixing tools such as nails used when fixing the step boards 1. In this way, the stairs of this embodiment are completed with a beautiful appearance. still,
A step board decorative board is provided on each of the step boards 1 as necessary,
Further, other finishing processes are performed.
【0019】この階段の施工方法によれば、上記案内部
4により各蹴込み板2の下端部を下部段板1Bの後方に
楽に挿入でき、更に、該案内部4により蹴込み板2の下
端部が図2に示す所定の固定位置に案内されるようにな
っているので、各蹴込み板2の装着が極めて簡単であり
施工時間が短縮される。According to this stair construction method, the lower end of each riser 2 can be easily inserted behind the lower step board 1B by the guide 4 and the lower end of the riser 2 can be inserted by the guide 4. Since the portion is guided to a predetermined fixed position shown in FIG. 2, the mounting of each riser plate 2 is extremely simple and the construction time is reduced.
【0020】次に、本形態の階段の他の施工方法を以下
に説明する。尚、本階段の施工方法は、本発明の請求項
5に記載の階段の施工方法の一実施形態である。上記の
階段の施工方法と同様に、一対のササラ桁3、各段板
1、各蹴込み板2をプレカットしておき、更に、必要な
巾木5等を用意しておく。また、階段の両側の壁面を想
定して配設された柱や間柱にプラスターボートを固定し
て、上記ササラ桁3固定用の壁面を、階段を形成する空
間の両側に形成する。次いで、一対の上記ササラ桁3
を、それぞれ互いに対向するように該プラスターボート
上に面接固定し対向配置させる。Next, another method of constructing the stairs of this embodiment will be described below. The construction method of the stairs is an embodiment of the construction method of the stairs according to claim 5 of the present invention. In the same manner as in the above-described stairs construction method, a pair of sasaras girders 3, each step board 1, and each riser board 2 are pre-cut, and further, necessary baseboards 5 and the like are prepared. In addition, a plaster boat is fixed to pillars or studs provided on the assumption of the wall surfaces on both sides of the stairs, and the wall surface for fixing the Sasara girder 3 is formed on both sides of the space forming the stairs. Then, a pair of Sasara girders 3
Are fixed on the plaster boat so as to face each other and face each other.
【0021】本階段の施工方法においては、図5に示す
ように、上記各蹴込み板2の上端を、対応する上記上部
段板1Aの先端下面に形成された上記溝12内に嵌合固
定して、該蹴込み板2と該上部段板1Aとを一体化させ
たものを用意する。そして、蹴込み板2と上部段板1A
との一体化物6それぞれを、対向配置された一対の上記
ササラ桁3(一方のみ図示する)に下方から上方に向か
って順次取り付ける。この取り付けに際しては、各段板
1の両端部を上記水平段部3aに釘やビス等により固定
すると共に、各蹴込み板2の下端部を、釘やビス等によ
り各段板1の後端面11に止め付ける。そして、上述し
た施工方法におけるのと同様に、巾木が装着固定され、
必要に応じて上記各段板1上に段板化粧板が設けられ、
その他の仕上げ処理が施される。In the construction method of the stairs, as shown in FIG. 5, the upper end of each riser plate 2 is fitted and fixed in the groove 12 formed on the lower surface of the tip of the corresponding upper step plate 1A. Then, one in which the riser plate 2 and the upper step plate 1A are integrated is prepared. And riser 2 and upper step board 1A
Are sequentially attached to the pair of Sasara girders 3 (only one of which is shown) facing from top to bottom. At the time of this attachment, both ends of each step board 1 are fixed to the horizontal step section 3a with nails or screws, and the lower end of each riser 2 is fixed to the rear end face of each step board 1 with nails or screws. Attach to 11. And, as in the construction method described above, the baseboard is attached and fixed,
A step board decorative board is provided on each of the step boards 1 as necessary,
Other finishing processes are performed.
【0022】この階段の施工方法によれば、上記案内部
4により各蹴込み板2の下端部を既に固定された下部段
板1Bの後方に楽に挿入でき、更に、該案内部4により
蹴込み板2の下端部が図2に示す所定の固定位置に案内
されるようになっているので、蹴込み板2と上部段板1
Aとの一体化物6の取り付けが極めて簡単である。ま
た、段板1及び蹴込み板2が、下段から順次取り付けら
れるので、作業効率が良く、安全性でもある。また、予
め工場での養生が徹底できる。尚、上記蹴込み板2と上
記上部段板1Aとの一体化は、工場等で行うことが好ま
しいが、現場作業で行っても良い。また、仮設の段板を
設けて作業用の仮階段として使用し、仕上げ時に、該仮
設の段板を除去して付け替えるようにしても良い。According to the construction method of the stairs, the lower end of each riser plate 2 can be easily inserted behind the lower step plate 1B already fixed by the guide portion 4, and furthermore, the riser is performed by the guide portion 4. The lower end of the plate 2 is guided to a predetermined fixed position shown in FIG.
The attachment of the integrated member 6 with A is extremely simple. In addition, since the step board 1 and the riser 2 are sequentially attached from the lower step, work efficiency is high and safety is also achieved. In addition, the curing at the factory can be thoroughly performed in advance. The integration of the riser plate 2 and the upper step board 1A is preferably carried out in a factory or the like, but may be carried out on site. Further, a temporary step board may be provided and used as a temporary stair for work, and the temporary step board may be removed and replaced at the time of finishing.
【0023】本形態の階段によれば、一対の上記ササラ
桁3それぞれに、上記案内部4が設けられているため、
各段板1のみを固定した状態において作業用の仮階段と
して使用した後、固定された各段板1間に容易且つ迅速
に蹴込み板2を装着して、外観美麗な階段として完成さ
せることができる。また、一体化された各蹴込み板2及
び上部段板1Aを下方から順次装着して施工することも
可能であり、作業効率及び安全性の向上、延いては施工
時間の短縮を図ることができる。また、各蹴込み板2、
又は蹴込み板2と上部段板1Aとの一体化物6を装着す
る際、上記案内部4が設けられているため、蹴込み板2
の下端部と段板1とが強く接触して該蹴込み板2や該段
板1に傷や汚れが生じることが防止される。従って、外
観美麗な階段となる。According to the stairs of the present embodiment, since the guide portions 4 are provided on each of the pair of Sasara beams 3,
After using as a temporary staircase for work in a state where only each step board 1 is fixed, a riser 2 is easily and quickly mounted between each fixed step board 1 to complete the stairs with beautiful appearance. Can be. In addition, it is possible to perform the work by sequentially mounting the integrated riser plate 2 and the upper step board 1A from below, thereby improving work efficiency and safety, and shortening the work time. it can. In addition, each riser 2,
Alternatively, when the integrated member 6 of the riser plate 2 and the upper step board 1A is mounted, since the guide portion 4 is provided, the riser plate 2 is provided.
Of the riser 2 and the step board 1 due to strong contact between the lower end portion of the step board 1 and the step board 1 is prevented. Therefore, the stairs have a beautiful appearance.
【0024】また、上記案内部4により、上記段板のみ
を固定した状態、即ち上記蹴込み板2を装着する前の状
態において、該案内部4の上端部と固定された上記段板
1の後端上部11aとの間に、上記蹴込み板2の板厚よ
り幅の大きな隙間Dが形成されるため、上記蹴込み板
2、又は蹴込み板2と上部段板1Aとの一体化物6の装
着を更にスムーズに行うことができる。Further, in a state where only the step board is fixed by the guide section 4, that is, in a state before the riser board 2 is mounted, the step board 1 fixed to the upper end of the guide section 4 is fixed. Since a gap D having a width larger than the thickness of the riser plate 2 is formed between the rear end upper portion 11a and the riser plate 2, or an integrated product 6 of the riser plate 2 and the upper step plate 1A. Can be mounted more smoothly.
【0025】以上、本発明の階段及びその施工方法の実
施形態について説明したが、本発明は上記実施形態に制
限されることなく本発明の趣旨を逸脱しない範囲で適宜
変更が可能である。例えば、本発明の階段は、踊り場の
ない直階段、踊り場を有する直階段、折返し階段、回り
階段等、その形式を問わない。また、上記ササラ桁3
は、一つの部材からなるものであっても良いし、複数の
部材を、端部が連続するように連設してなるものであっ
ても良い。また、一つのササラ桁3は、一つの壁面に配
設されていても良いが、複数の壁面に跨るようにして配
設されていても良い。Although the embodiments of the stairs and the method of constructing the steps according to the present invention have been described above, the present invention is not limited to the above-described embodiments, and can be appropriately modified without departing from the spirit of the present invention. For example, the stairs of the present invention may be in any form, such as straight stairs without a landing, straight stairs with a landing, turn-around stairs, and round stairs. Also, the above Sasara digit 3
May be composed of one member, or a plurality of members may be continuously provided so that their ends are continuous. In addition, one Sasara girder 3 may be provided on one wall surface, or may be provided so as to straddle a plurality of wall surfaces.
【0026】また、上記案内部4は、上記鉛直縁部41
と上記傾斜縁部42とからなるものに限られず、上記鉛
直縁部41の上方に円弧状の縁部を有するもの、その全
体が円弧状に形成されているもの等、上記蹴込み板2の
装着性を向上し得る形状であれば、その形状を問わな
い。更に、その他各部材の形成材料や寸法等、また、各
部材に施される強度や取付性を向上させるために加工等
については、本発明の趣旨を逸脱しない範囲内で適宜に
変更することができることは言うまでもない。Further, the guide portion 4 is provided with the vertical edge portion 41.
And the inclined edge 42, the riser plate 2 having an arc-shaped edge above the vertical edge 41, an arc-shaped edge formed as a whole, or the like. Any shape can be used as long as the shape can improve the mounting property. Further, the forming material and dimensions of each of the other members, and the processing and the like for improving the strength and the attachability applied to each of the members may be appropriately changed without departing from the spirit of the present invention. It goes without saying that you can do it.
【0027】[0027]
【発明の効果】本発明によれば、外観美麗で、施工性に
優れた階段及びその施工方法を提供することができる。According to the present invention, it is possible to provide a staircase having a beautiful appearance and excellent workability and a method for constructing the staircase.
【図1】図1は、本発明の階段の一実施形態を模式的に
示す断面図である。FIG. 1 is a sectional view schematically showing one embodiment of a staircase of the present invention.
【図2】図2は、図1の階段の一部を拡大して示す断面
図である。FIG. 2 is an enlarged sectional view showing a part of the stairs in FIG. 1;
【図3】図3は、図1の階段における段板のみを固定し
た状態を示す断面図である。FIG. 3 is a cross-sectional view showing a state in which only a step board in the stairs in FIG. 1 is fixed.
【図4】図4は、図1の階段の施工方法の一例を説明す
るための説明図である。FIG. 4 is an explanatory diagram for explaining an example of a construction method of the stairs of FIG. 1;
【図5】図5は、図1の階段の施工方法の他の例を説明
するための説明図である。FIG. 5 is an explanatory diagram for explaining another example of the method of constructing the stairs of FIG. 1;
1 段板 11 後端面 1A 上部段板 1B 下部段板 2 蹴込み板 2b 背面 3 ササラ桁 3a 水平段部 3b 鉛直部 4 案内部 41 鉛直縁部 42 傾斜縁部 5 巾木 6 蹴込み板と上部段板との一体化物 REFERENCE SIGNS LIST 1 step board 11 rear end face 1A upper step board 1B lower step board 2 riser 2b back 3 sasara girder 3a horizontal step 3b vertical 4 guide 4 41 vertical edge 42 inclined edge 5 baseboard 6 riser and upper Integrated with board
Claims (5)
段部と、蹴込み板が当接固定される複数の鉛直部とを有
する一対のササラ桁における相対向する水平段部間に段
板が掛け渡されて固定され、上部段板の先端部と下部段
板の後端部との間それぞれに蹴込み板が装着されてなる
階段において、 上記各段板は、上記水平段部に載置固定され、 上記各蹴込み板は、その上端が上記上部段板の先端部下
面に当接され、その背面が上記鉛直部に当接され、且つ
その下端部前面が上記下部段板の後端面に当接されて固
定されており、 上記鉛直部の下端部に、上記蹴込み板の装着案内用の案
内部が設けられ、該案内部と上記蹴込み板の背面との間
に空間が形成されていることを特徴とする階段。1. A pair of opposed horizontal steps of a pair of Sasara girders having a plurality of horizontal steps on which end portions of a step board are mounted and fixed, and a plurality of vertical sections to which a riser is abutted and fixed. In the stairs in which a step board is hung and fixed in between, and a riser is attached between a leading end of the upper step board and a rear end of the lower step board, each of the step boards is the horizontal Each of the riser plates is mounted and fixed on a step portion, and the upper end of the riser plate is in contact with the lower surface of the tip end of the upper step plate, the back surface is in contact with the vertical portion, and the front surface of the lower end portion is the lower portion. At the lower end of the vertical portion, a guide portion for guiding the installation of the riser plate is provided, and the guide portion and the back surface of the riser plate are provided at the lower end of the vertical portion. A staircase characterized by a space formed between the steps.
際、該蹴込み板の下端部を所定の固定位置に案内するよ
うになされていることを特徴とする請求項1に記載の階
段。2. The guide according to claim 1, wherein the guide section guides a lower end of the riser to a predetermined fixed position when the riser is mounted. Stairs.
端上部との間の距離が、上記蹴込み板の厚みより大であ
ることを特徴とする請求項1に記載の階段。3. The staircase according to claim 1, wherein a distance between an upper end of the guide portion and an upper rear end of the lower step board is larger than a thickness of the riser.
て、 上記各段板を一対の上記ササラ桁に固定し作業用の仮階
段とした後、固定された該各段板間に上記各蹴込み板を
それぞれ装着することを特徴とする階段の施工方法。4. The method for constructing a staircase according to claim 1, wherein each of the step boards is fixed to a pair of the Sasara girders to form a temporary staircase for work, and between the fixed step boards. A method for constructing a staircase, wherein each of the above-mentioned risers is mounted.
て、 上記各蹴込み板を上記上部段板の先端下面に固定一体化
しておき、この蹴込み板と上部段板とが一体化されたも
のを、対向配置された一対の上記ササラ桁に下方から上
方に向かって順次取り付けることを特徴とする階段の施
工方法。5. The method for constructing a stair according to claim 1, wherein each of the riser plates is fixedly integrated with the lower surface of the tip of the upper step plate, and the riser plate and the upper step plate are integrated. A method for constructing a staircase, comprising sequentially attaching the slabs to the pair of Sasara girders arranged opposite to each other from below to above.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP05305198A JP3989077B2 (en) | 1998-03-05 | 1998-03-05 | Staircase |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP05305198A JP3989077B2 (en) | 1998-03-05 | 1998-03-05 | Staircase |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH11247390A true JPH11247390A (en) | 1999-09-14 |
JP3989077B2 JP3989077B2 (en) | 2007-10-10 |
Family
ID=12932075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP05305198A Expired - Fee Related JP3989077B2 (en) | 1998-03-05 | 1998-03-05 | Staircase |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3989077B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013152126A1 (en) * | 2012-04-03 | 2013-10-10 | Signature Companies | Staircase and method for construction |
JP2017008567A (en) * | 2015-06-22 | 2017-01-12 | 朝日ウッドテック株式会社 | Safety construction stair |
JP2017115415A (en) * | 2015-12-24 | 2017-06-29 | 株式会社竹中工務店 | Installation structure of step floor material, and installation method of step floor material |
-
1998
- 1998-03-05 JP JP05305198A patent/JP3989077B2/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013152126A1 (en) * | 2012-04-03 | 2013-10-10 | Signature Companies | Staircase and method for construction |
JP2017008567A (en) * | 2015-06-22 | 2017-01-12 | 朝日ウッドテック株式会社 | Safety construction stair |
JP2017115415A (en) * | 2015-12-24 | 2017-06-29 | 株式会社竹中工務店 | Installation structure of step floor material, and installation method of step floor material |
Also Published As
Publication number | Publication date |
---|---|
JP3989077B2 (en) | 2007-10-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5894701A (en) | Wooden modular paneling for interior decoration | |
JP6150657B2 (en) | Stair structure and stairs construction method | |
US6604331B1 (en) | Baseboard molding strip unit | |
JPH10102641A (en) | Wall construction for partition wall and construction method | |
JPH11247390A (en) | Stairs | |
JP5986385B2 (en) | Temporary combined stairs and construction method | |
JPH06240833A (en) | Decorative structure of stair | |
JP3590347B2 (en) | Stair skirting | |
JP6697735B2 (en) | Stairs | |
JP2014227658A (en) | Doorway foot and floor edge member | |
CN210598022U (en) | Skirting line assembly with face decoration closing-in function | |
CN210263690U (en) | External corner assembly | |
CN210263691U (en) | Internal corner splicing decoration strip | |
JP6587229B2 (en) | Staircase | |
JPH07207865A (en) | Indoor wooden stair and execution method thereof | |
JPH03212551A (en) | Ceiling structure of residence unit | |
JPH08144461A (en) | Constitutional way of stairs | |
JPH11181980A (en) | Stairs construction method | |
JP3364754B2 (en) | Indoor handrail stairs | |
JP2828205B2 (en) | Construction method of transparent ceiling | |
JPH1136490A (en) | Building panel, partition wall structure using it, and wall part constructing method | |
JPH09228598A (en) | Stairs and assembling device for therefor | |
JP2005336705A (en) | Stairs | |
JP2003301588A (en) | Interior wall structure | |
JP2001123570A (en) | Mounting structure of interiorly finished partition wall in building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050114 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070530 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070703 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070717 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100727 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130727 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |