JPH11222869A - Foundation work member, jig for foundation work, and foundation work method - Google Patents

Foundation work member, jig for foundation work, and foundation work method

Info

Publication number
JPH11222869A
JPH11222869A JP2559598A JP2559598A JPH11222869A JP H11222869 A JPH11222869 A JP H11222869A JP 2559598 A JP2559598 A JP 2559598A JP 2559598 A JP2559598 A JP 2559598A JP H11222869 A JPH11222869 A JP H11222869A
Authority
JP
Japan
Prior art keywords
crushed stone
crushed
storage frame
jig
foundation work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2559598A
Other languages
Japanese (ja)
Inventor
Katsuya Matsushita
克也 松下
Atsushi Kawasaki
淳志 川崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2559598A priority Critical patent/JPH11222869A/en
Publication of JPH11222869A publication Critical patent/JPH11222869A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a foundation work member, a jig for foundation works and a foundation work method, by which operating efficiency at a construction site can be improved and foundation works can be conducted at low cost. SOLUTION: When the foundation work member 20 is manufactured, a plurality of rubble-shaped members 21 are connected mutually, and these members 21 are formed in a block shape from precast concrete. Accordingly, the foundation work member 20 can be manufactured beforehand in a factory, cast-in-place concrete and the curing of concrete are made unnecessary because the foundation work member 20 may be arranged and rolled on a cutting bottom 11 formed to a ground surface at a construction site and operating efficiency at the construction site can be improved.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、住宅等の基礎を施
工するにあたって行われる地業に係る地業部材、地業用
治具および地業方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a local business member, a local business jig, and a local business method related to local business performed when constructing a foundation such as a house.

【0002】[0002]

【背景技術】従来より、住宅等の基礎を施工するにあた
って、割栗地業や砕石地業が行われている。割栗地業に
おいては、地盤面に形成された根切り底に所定大きさの
くさび状の割栗石を尖った方を下にして立てた状態で並
べ、その割栗石を締固め機械により締固める。しかし、
割栗石に利用できる玉砂利等が不足しているため、良質
の割栗石が少なくかつ割栗石のコストが高くなってしま
う。このため、大きさの揃った割栗石を入手することは
困難であった。また、割栗石を隙間なく尖った方を下に
して立てた状態で並べるので、現場での作業が大変であ
った。
2. Description of the Related Art Conventionally, when constructing a foundation for a house or the like, splittering and quarrying are performed. In the splittering industry, wedge-shaped splitter stones of a predetermined size are lined up on the root bottom formed on the ground surface with the sharp side down, and the splitter stones are compacted by a compacting machine . But,
Since there is a shortage of gravel and the like that can be used for split stone, there are few high quality split stones and the cost of split stone increases. For this reason, it has been difficult to obtain cracked stones of uniform size. Also, since the split stones were lined up with no gap and the sharp side down, the on-site work was difficult.

【0003】そこで、これらの問題を解消する方法とし
て、凹部を有する薄膜を根切り底に敷設し、この凹部に
コンクリートスラリを打ち込んで人工的に割栗石を施工
する方法が提案されている(特開平1−235727
号)。
Therefore, as a method for solving these problems, a method has been proposed in which a thin film having a concave portion is laid at the root of the root, and concrete slurry is driven into the concave portion to artificially apply the split stone (Japanese Patent Application Laid-Open No. H10-157572). Kaihei 1-235727
issue).

【0004】また、砕石地業においては、根切り底に砕
石を敷込み、次に、その砕石をタイヤローラ等の締固め
機械により転圧した後、前記砕石の厚さを測定するレベ
ルチェックを行い、これらを砕石の厚さが所定の厚さに
なるまで繰り返し行っている。
In the crushed stone industry, crushed stone is laid at the bottom of the root, and then the crushed stone is compacted by a compacting machine such as a tire roller, and then a level check for measuring the thickness of the crushed stone is performed. These are repeated until the thickness of the crushed stone reaches a predetermined thickness.

【0005】[0005]

【発明が解決しようとする課題】しかし、割栗地業にお
いて、建設現場で、コンクリートを現場打ちし、養生し
なければならないので、現場作業の作業効率を向上させ
ることが困難であるという問題がある。また、砕石地業
において、この地業の施工品質は、砕石自体の硬度、地
業厚さおよび締固めに影響されるので、これらが不足す
ると所定の剛性が得られず、建物の不同沈下の原因とな
ってしまう。さらに、砕石自体の硬度に基準が設けられ
ているため、使用可能な砕石が制限され、コストがかか
ってしまう。そして、砕石の厚さが所定厚さになるまで
砕石敷込み、転圧およびレベルチェックを何度も行わな
ければならないので、現場作業の作業効率を向上させる
ことが困難であるという問題がある。
However, there is a problem that it is difficult to improve the work efficiency of the on-site work, since the concrete must be cast on the construction site and cured in the construction site. is there. In the crushed stone industry, the construction quality of the crushed stone is affected by the hardness of the crushed stone itself, the thickness of the crushed stone, and compaction. Cause it. In addition, since a standard is set for the hardness of the crushed stone itself, usable crushed stone is limited and costs increase. Since the crushed stone must be laid, compacted, and level checked repeatedly until the crushed stone reaches a predetermined thickness, there is a problem that it is difficult to improve the work efficiency of the on-site work.

【0006】ところで、砕石地業においては、化学的方
法により地固めを行う方法も知られている。この地業
は、安定処理剤を根切り底に散布し、養生して地盤を固
めて行われるが、根切り底に均一に安定処理剤を散布
し、強度発現まで養生しなければならないので、地業施
工に時間がかかってしまうという問題がある。
[0006] In the quarrying industry, there is also known a method of solidifying the ground by a chemical method. This groundwork is performed by spraying the stabilizing agent on the root bottom, curing and solidifying the ground, but since the stabilizing agent must be evenly sprayed on the root bottom and cured until the strength is developed, There is a problem that it takes time for the construction of the local business.

【0007】本発明の目的は、建設現場の作業効率を向
上させることができ、低コストで地業を行うことができ
る地業部材、地業用治具および地業方法を提案すること
にある。
[0007] An object of the present invention is to propose a local business member, a local business jig, and a local business method capable of improving the working efficiency of a construction site and performing local business at low cost. .

【0008】[0008]

【課題を解決するための手段】本発明に係る地業部材
は、図面を参照して説明すると、複数の割栗石状の部材
21が互いに連結されるとともに、これらがプレキャス
トコンクリートからブロック状に形成されていることを
特徴とする。このような本発明においては、予め工場
で、地業部材20を製造することができ、また、建設現
場においては、地盤面に形成された根切り底11に地業
部材20を配置して転圧するだけでよいので、コンクリ
ートを現場打ちして養生する必要がなくなり、建設現場
の作業効率を向上させることができる。
The ground member according to the present invention will be described with reference to the drawings. A plurality of split-stone-like members 21 are connected to each other, and they are formed into blocks from precast concrete. It is characterized by having been done. According to the present invention, the ground member 20 can be manufactured in advance at a factory, and at the construction site, the land member 20 is arranged at the root bottom 11 formed on the ground surface and the land member 20 is turned. Since it is only necessary to press the concrete, it is not necessary to cast and cure the concrete on site, and the work efficiency at the construction site can be improved.

【0009】上記構成において、前記割栗石状の部材2
1は、下方に向かうに従って先細りに形成されるくさび
状の先端部22を有していることが望ましい。このよう
にすれば、先端部22が下方に向かうに従って先細りに
なっているので、根切り底11に地業部材20を埋込み
やすくなるだけではなく、建物の基礎2にかかる力を地
盤に分散させることができる。
In the above structure, the split-stone-shaped member 2
1 preferably has a wedge-shaped tip 22 that tapers downwardly. With this configuration, the tip 22 is tapered downward, so that the land work member 20 can be easily embedded in the root bottom 11 and the force applied to the foundation 2 of the building is dispersed to the ground. be able to.

【0010】本発明に係る地業用治具は、地盤面に形成
された根切り底11に配置され、内部に複数の砕石32
が収納される砕石収納用枠31を含んで構成されている
ことを特徴とする。このような本発明においては、根切
り底11に複数の砕石32が収納された砕石収納用枠3
1を配置しているので、砕石32の強度が大きくなり、
また、従来の地業における地業厚さおよび締固め作業
は、作業者の技能や経験によってばらつきが生じていた
が、砕石収納用枠31を使用することにより、そのばら
つきが少なくなる。従って、地業厚さおよび締固め不足
に影響されず、所定の剛性が得られ、建物の不同沈下を
防止することができる。
The jig for ground work according to the present invention is disposed on a root bottom 11 formed on the ground surface and has a plurality of crushed stones 32 therein.
Is characterized by including a crushed stone storage frame 31 in which is stored. In such a present invention, the crushed stone storage frame 3 in which the plurality of crushed stones 32 are stored in the root cutting bottom 11.
Since 1 is arranged, the strength of the crushed stone 32 increases,
In addition, variations in the thickness and compaction work of the conventional land work in the local work were caused by the skill and experience of the worker, but the use of the crushed stone storage frame 31 reduces the dispersion. Therefore, a predetermined rigidity can be obtained without being affected by the thickness of the groundwork and insufficient compaction, and uneven settlement of the building can be prevented.

【0011】さらに、砕石収納用枠31により砕石32
の強度が増すので、所定の剛性が得られ、使用する砕石
の制限が緩和される。従って、砕石自体の硬度が低いも
のも使用できるので、コストを低減することができる。
そして、砕石収納用枠31の高さをこの地業の所定厚さ
と同一寸法またはそれ以上に形成しておけば、砕石収納
用枠31内部に砕石32を敷き詰め、その砕石32の上
端を均すだけでよい。これにより、従来のように砕石敷
込み、転圧およびレベルチェックを繰り返し行う必要が
なくなり、また、従来の化学的方法による地業のように
強度発現まで養生する必要がないので、地業施工に費や
される時間を短縮することができる。従って、現場作業
の作業効率を向上させることができる。
Further, a crushed stone 32 is provided by a crushed stone storage frame 31.
Since the strength of the crushed stone increases, a predetermined rigidity can be obtained, and restrictions on the crushed stone used can be relaxed. Therefore, the crushed stone itself having a low hardness can be used, so that the cost can be reduced.
If the height of the crushed stone storage frame 31 is equal to or greater than the predetermined thickness of the groundwork, the crushed stones 32 are spread inside the crushed stone storage frame 31 and the upper ends of the crushed stones 32 are leveled. Just need. This eliminates the need to repeatedly perform crushed stone laying, compaction and level checking as in the past, and eliminates the need to cure to the development of strength as in the traditional chemical-based land business. The time spent can be reduced. Therefore, the work efficiency of the on-site work can be improved.

【0012】上記構成において、前記砕石収納用枠31
の内部には、補強用リブ34が格子状に設けられている
ことが望ましい。このようにすれば、補強用リブ34に
より、砕石の強度がさらに大きくなり、基礎2にかかる
力を各補強用リブに均一に分散できるので、硬度のない
再生砕石等を利用することができる。また、補強用リブ
34は、格子状に形成されているので、砕石32を均一
に収納することができる。
In the above configuration, the crushed stone storage frame 31
It is desirable that the reinforcing ribs 34 are provided in a lattice shape inside the. With this configuration, the strength of the crushed stone is further increased by the reinforcing ribs 34, and the force applied to the foundation 2 can be evenly distributed to the respective reinforcing ribs, so that recycled crushed stone having no hardness can be used. In addition, since the reinforcing ribs 34 are formed in a lattice shape, the crushed stones 32 can be stored uniformly.

【0013】上記構成において、前記砕石収納用枠31
および補強用リブ34は、プラスチックから形成されて
いることが望ましい。このようにすれば、砕石収納用枠
31および補強用リブ34をペットボトル等の再生品か
ら製造することができるので、製造コストを低減するこ
とができ、また、資源リサイクルにも寄与することがで
きる。
In the above structure, the crushed stone storage frame 31
The reinforcing ribs 34 are preferably formed of plastic. In this way, the crushed stone storage frame 31 and the reinforcing ribs 34 can be manufactured from recycled products such as PET bottles, so that manufacturing costs can be reduced and resources can be recycled. it can.

【0014】本発明の地業方法は、地盤面に形成された
根切り底11に砕石32を敷込み、その砕石32を転圧
して所定厚さに形成する地業において、内部に複数の砕
石32が収納される砕石収納用枠31を含んで構成され
た地業用治具30を用いて行う地業方法であって、根切
り底11に砕石収納用枠31を配置し、この砕石収納用
枠31内部に複数の砕石32を収納し、その砕石32の
上面を均すことを特徴とする。このような方法によれ
ば、予め工場で、砕石収納用枠31を製造することがで
き、また、建設現場においては、根切り底11に砕石収
納用枠31を配置し、この砕石収納用枠31内部に複数
の砕石32を収納し、その砕石32の上面を均すだけで
よいので、現場における作業を簡略化することができ
る。
According to the method of the present invention, a crushed stone 32 is laid on the root bottom 11 formed on the ground surface, and the crushed stone 32 is rolled to form a predetermined thickness. In this method, a crushed stone storage frame 31 is arranged on the root cutting bottom 11 using a jig 30 for crushed stone storage. A plurality of crushed stones 32 are stored inside the use frame 31, and the upper surface of the crushed stones 32 is leveled. According to such a method, the crushed stone storage frame 31 can be manufactured in advance at the factory, and at the construction site, the crushed stone storage frame 31 is arranged at the root cutting bottom 11 and the crushed stone storage frame 31 is provided. A plurality of crushed stones 32 are stored in the inside 31 and the upper surface of the crushed stones 32 need only be leveled, so that work on site can be simplified.

【0015】[0015]

【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて説明する。 [第一実施形態]図1(A),(B)には、割栗地業で用い
られる地業部材20が示されている。この地業部材20
は、複数の割栗石状の部材21が互いに連結されるとと
もに、これらがプレキャストコンクリートからブロック
状に形成されている。また、前記割栗石状の部材21
は、略円錐状に形成され、具体的には、全体が紡錘形を
軸方向中間から切断した形状で、下方に向かうに従って
先細りに形成されるくさび状の先端部22を有し、縦横
にそれぞれ一定ピッチ間隔に配列されている。前記割栗
石状の部材21が互いに連結された部分の厚さは、転圧
作業により各割栗石状の部材21ごとに分割できる程度
の厚さに形成されている。
Embodiments of the present invention will be described below with reference to the drawings. [First Embodiment] FIGS. 1 (A) and 1 (B) show a land-working member 20 used in a split chestnut ground business. This local business member 20
Is formed by connecting a plurality of split-stone-like members 21 to each other and forming them in a block shape from precast concrete. Further, the split-stone-shaped member 21
Is formed in a substantially conical shape, specifically, has a wedge-shaped tip portion 22 which is formed in a shape obtained by cutting the spindle shape from the middle in the axial direction, and which is tapered downward as it goes downward. They are arranged at pitch intervals. The thickness of the portion where the split-stone members 21 are connected to each other is formed to a thickness that can be divided into each split-stone member 21 by the rolling work.

【0016】このような構成からなる本実施形態の地業
方法を説明する。図2に示すように、地盤面に形成され
た根切り1の根切り底11に地業部材20をくさび状の
先端部22を下方に向けて配置する。その後、図3(A)
に示すように、前記地業部材20をロードローラ3等の
締固め機械により転圧し、前記くさび状の先端部22か
ら根切り底11の地盤内に埋め込んでいく。やがて、地
業部材20全体が埋め込まれ、地業部材20の周囲の地
盤とともに密実に締め固められる。この転圧により、地
業部材20は地盤となじみ、アンカとしての働きが十分
となり、基礎2にかかる力を地盤に十分に分散させるこ
とができる。
A description will be given of a local business method according to the present embodiment having such a configuration. As shown in FIG. 2, a groundwork member 20 is disposed on a root bottom 11 of a root root 1 formed on the ground surface, with a wedge-shaped tip 22 directed downward. Then, FIG.
As shown in FIG. 5, the ground member 20 is rolled by a compacting machine such as the load roller 3 and is embedded in the ground at the root bottom 11 from the wedge-shaped tip portion 22. Eventually, the entire groundwork member 20 is buried and compacted tightly together with the ground around the groundwork member 20. Due to this rolling, the groundwork member 20 becomes compatible with the ground, and the function as an anchor becomes sufficient, so that the force applied to the foundation 2 can be sufficiently dispersed in the ground.

【0017】この際、図3(B)に示すように、埋め込ま
れた地業部材20は、前記ロードローラ3の転圧作業に
より割栗石状の部材21ごとに破断している。なお、こ
の転圧作業で破断されていない部分は、加振機やハンマ
等で叩くなどして割って、別々の部材になるようにす
る。最後に、図3(C)に示すように、前記地業部材20
の上面に基礎2を立設する。
At this time, as shown in FIG. 3 (B), the embedded earthwork member 20 has been broken into each split-stone-like member 21 by the rolling operation of the load roller 3. In addition, the part which is not broken by this rolling work is divided by hitting it with a vibrator, a hammer, or the like so that it becomes a separate member. Finally, as shown in FIG.
The foundation 2 is erected on the upper surface of the.

【0018】前述のような第一実施形態によれば、次の
ような効果が得られる。すなわち、地業部材20は、予
め工場で製造することができ、また、地盤面に形成され
た根切り底11に配置されて転圧されるだけでよいの
で、コンクリートを現場打ちして養生する必要がなくな
り、建設現場の作業効率を向上させることができる。
According to the above-described first embodiment, the following effects can be obtained. In other words, the earthwork member 20 can be manufactured in a factory in advance, and is only required to be placed on the root bottom 11 formed on the ground surface and compacted. This eliminates the necessity and improves the work efficiency at the construction site.

【0019】また、地業部材20を構成する割栗石状の
部材21は、くさび状の先端部22を有しているので、
根切り底11に埋め込みやすくなり、また、転圧により
分割された同一形状、同一容積の割栗石状の部材が縦横
に一定ピッチ間隔で根切り底11に埋め込まれているの
で、建物の基礎2にかかる力を地盤に均等に分散させる
ことができる。
Further, since the split-stone-shaped member 21 constituting the ground-working member 20 has a wedge-shaped tip portion 22,
It is easy to embed in the root bottom 11, and the split-stone-shaped members of the same shape and the same volume divided by the compaction are embedded vertically and horizontally at constant pitch intervals in the root bottom 11, so that the building foundation 2 Can be evenly distributed on the ground.

【0020】[第二実施形態]以下、本発明の第二実施
形態を図4〜図6に基づいて説明する。なお、これらの
図の説明にあたって、前述した図1〜図3と同一構成要
件については、同一符号を付し、その説明を省略もしく
は簡略化する。図4には、砕石地業で用いられる地業用
治具30が示されている。この地業用治具30は、前記
根切り底11に配置され、内部に複数の砕石32(図5
参照)が収納される砕石収納用枠31を含んで構成され
ている。この砕石収納用枠31は、周囲に立設された周
囲枠33を備え、また、前記砕石収納用枠31の内部に
は、格子状の補強用リブ34が設けられている。この補
強用リブ34で囲まれた升状部分35は、横断面が正方
形の直方体形状に形成されており、この正方形の各辺の
寸法は、前記砕石収納用枠31の高さ寸法の二倍に形成
されている。なお、前記砕石収納用枠31および補強用
リブ34は、プラスチックから形成されており、前記砕
石収納用枠31の高さは、この地業の所定厚さ(60m
m以上)と同一寸法またはそれ以上に形成されている。
[Second Embodiment] Hereinafter, a second embodiment of the present invention will be described with reference to FIGS. In the description of these drawings, the same components as those in FIGS. 1 to 3 described above are denoted by the same reference numerals, and description thereof will be omitted or simplified. FIG. 4 shows a jig 30 for land use used in the crushed stone industry. The jig 30 for ground work is disposed on the root bottom 11 and has a plurality of crushed stones 32 (FIG. 5).
(See FIG. 1) is stored. The crushed stone storage frame 31 includes a peripheral frame 33 erected on the periphery, and a lattice-shaped reinforcing rib 34 is provided inside the crushed stone storage frame 31. The square portion 35 surrounded by the reinforcing ribs 34 is formed in a rectangular parallelepiped shape having a square cross section, and the size of each side of the square is twice the height of the crushed stone storage frame 31. Is formed. The crushed stone storage frame 31 and the reinforcing ribs 34 are made of plastic, and the height of the crushed stone storage frame 31 is a predetermined thickness (60 m
m or more).

【0021】このような構成からなる本実施形態の地業
方法を説明する。図5に示すように、根切り底11に砕
石収納用枠31を配置し、この砕石収納用枠31内部、
つまりは補強用リブ34で囲まれた複数の升状部分35
に複数の砕石32を収納する。その後、図6(A),(B)
に示すように、前記砕石収納用枠31をロードローラ3
等の締固め機械で転圧して根切り底11の地盤内に埋め
込み、これと同時に収納された砕石32の上面が均され
る。最後に、図6(C)に示すように、この埋め込まれた
砕石収納用枠31の上面に基礎2を立設する。
A description will be given of a local business method according to the present embodiment having the above configuration. As shown in FIG. 5, a crushed stone storage frame 31 is disposed on the root cutting bottom 11, and inside the crushed stone storage frame 31,
That is, a plurality of square portions 35 surrounded by the reinforcing ribs 34
A plurality of crushed stones 32 are stored. Then, FIG. 6 (A), (B)
As shown in FIG.
Rolling is carried out by a compacting machine such as the one described above and embedded in the ground of the root cutting bottom 11, and at the same time, the upper surface of the stored crushed stone 32 is leveled. Finally, as shown in FIG. 6C, the foundation 2 is erected on the upper surface of the embedded crushed stone storage frame 31.

【0022】前述のような第二実施形態によれば、次の
ような効果が得られる。すなわち、根切り底11に複数
の砕石32が収納された砕石収納用枠31を配置してい
るので、砕石32の強度が大きくなり、また、従来の地
業における地業厚さおよび締固め作業は、作業者の技能
や経験によってばらつきが生じていたが、砕石収納用枠
31を使用することにより、そのばらつきが少なくな
る。従って、地業厚さおよび締固め不足に影響されず、
所定の剛性が得られ、建物の不同沈下を防止することが
できる。
According to the above-described second embodiment, the following effects can be obtained. That is, since the crushed stone storage frame 31 in which the plurality of crushed stones 32 are stored at the root bottom 11 is arranged, the strength of the crushed stones 32 is increased, and the thickness and compaction work of the conventional territory are performed. Has been varied due to the skill and experience of the operator, but the use of the crushed stone storage frame 31 reduces the variation. Therefore, it is not affected by the thickness of the land and the lack of compaction,
A predetermined rigidity can be obtained, and uneven settlement of the building can be prevented.

【0023】また、砕石収納用枠31により砕石32の
強度が増すので、所定の剛性が得られ、使用する砕石3
2の制限が緩和される。従って、砕石自体の高度が低い
ものも使用できるので、コストを低減することができ
る。
Further, since the strength of the crushed stone 32 is increased by the crushed stone storage frame 31, a predetermined rigidity is obtained and
2 is relaxed. Therefore, the crushed stone itself having a low altitude can be used, so that the cost can be reduced.

【0024】また、砕石収納用枠31の高さをこの地業
の所定厚さと同一寸法またはそれ以上に形成しているこ
とにより、砕石収納用枠31内部に砕石32を敷き詰
め、その砕石32の上端を均すだけでよい。これによ
り、従来のように砕石敷込み、転圧およびレベルチェッ
クを繰り返し行う必要がなくなり、また、従来の化学的
方法による地業のように強度発現まで養生する必要がな
いので、地業施工に費やされる時間を短縮することがで
きる。従って、現場作業の作業効率を向上させることが
できる。
Further, the height of the crushed stone storage frame 31 is set to be equal to or greater than the predetermined thickness of the groundwork, so that the crushed stones 32 are spread inside the crushed stone storage frame 31 and You only need to level the top. This eliminates the need to repeatedly perform crushed stone laying, compaction and level checking as in the past, and eliminates the need to cure to the development of strength as in the traditional chemical-based land business. The time spent can be reduced. Therefore, the work efficiency of the on-site work can be improved.

【0025】また、砕石収納用枠31および補強用リブ
34は、プラスチックから形成されているので、砕石収
納用枠31および補強用リブ34をペットボトル等の再
生品から製造することができるので、製造コストを低減
することができ、資源リサイクルにも寄与することがで
きる。
Further, since the crushed stone storing frame 31 and the reinforcing ribs 34 are formed of plastic, the crushed stone storing frame 31 and the reinforcing ribs 34 can be manufactured from a recycled product such as a PET bottle. Manufacturing costs can be reduced, and resources can be recycled.

【0026】また、砕石収納用枠31の内部には、補強
用リブ34が設けられているので、砕石32の強度がさ
らに増し、基礎2にかかる力を各補強用リブ34に均一
に分散できるので、硬度のない再生砕石等を利用するこ
とができる。さらに、補強用リブ34は、格子状に形成
されているので、砕石32を均一に敷き詰めることがで
きる。
Further, since the reinforcing ribs 34 are provided inside the crushed stone storage frame 31, the strength of the crushed stones 32 is further increased, and the force applied to the foundation 2 can be evenly distributed to the respective reinforcing ribs 34. Therefore, recycled crushed stone having no hardness can be used. Further, since the reinforcing ribs 34 are formed in a lattice shape, the crushed stones 32 can be spread uniformly.

【0027】なお、本発明は前記実施形態に限定される
ものではなく、本発明の目的を達成できる他の構成等を
含み、以下に示すような変形なども本発明に含まれる。
すなわち、第二実施形態では、補強用リブ34で囲まれ
た升状部分35の寸法は、砕石収納用枠31の高さ寸法
の二倍に形成されているが、これに限らず、適宜応じた
寸法に形成されていればよい。また、升状部分35の横
断面は、正方形に形成されているが、これに限らず、三
角形、他の四角形および正六角形や正八角形等の多角形
に形成されていてもよい。
It should be noted that the present invention is not limited to the above-described embodiment, but includes other configurations capable of achieving the object of the present invention, and also includes the following modifications.
That is, in the second embodiment, the size of the square portion 35 surrounded by the reinforcing ribs 34 is formed to be twice the height of the crushed stone storage frame 31; It is only necessary that they be formed in the dimensions described above. In addition, the cross section of the square portion 35 is formed in a square shape, but is not limited thereto, and may be formed in a triangular shape, another quadrangular shape, and a polygonal shape such as a regular hexagon or a regular octagon.

【0028】また、第二実施形態では、地業用治具30
には、底面が形成されていないが、これに限らず、底面
が形成されていてもよい。
Further, in the second embodiment, the jig 30
Does not have a bottom surface, but is not limited thereto, and may have a bottom surface.

【0029】[0029]

【発明の効果】本発明によれば、建設現場の作業効率を
向上させることができ、低コストで地業作業を行うこと
ができる。
According to the present invention, the work efficiency at the construction site can be improved, and the local business can be performed at low cost.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第一実施形態に係る地業部材を示す斜
視図である。
FIG. 1 is a perspective view showing a ground member according to a first embodiment of the present invention.

【図2】上記実施形態に係る地業部材を根切り底に配置
した状態を示す斜視図である。
FIG. 2 is a perspective view showing a state in which the land work member according to the embodiment is arranged at a root bottom.

【図3】上記実施形態に係る地業方法を示す断面図であ
る。
FIG. 3 is a cross-sectional view illustrating a land practice method according to the embodiment.

【図4】本発明の第二実施形態に係る地業用治具を示す
斜視図である。
FIG. 4 is a perspective view showing a jig for land use according to a second embodiment of the present invention.

【図5】上記実施形態に係る地業用治具を根切り底に配
置した状態を示す斜視図である。
FIG. 5 is a perspective view showing a state in which the jig for land use according to the embodiment is arranged at a root bottom.

【図6】上記実施形態に係る地業方法を示す断面図であ
る。
FIG. 6 is a cross-sectional view illustrating a land practice method according to the embodiment.

【符号の説明】[Explanation of symbols]

11 根切り底 20 地業部材 21 割栗石状の部材 22 くさび状の先端部 30 地業用治具 31 砕石収納用枠 32 砕石 34 補強用リブ DESCRIPTION OF SYMBOLS 11 Root bottom 20 Ground work member 21 Split stone-like member 22 Wedge-shaped tip 30 Jig for ground work 31 Crushed stone storage frame 32 Crushed stone 34 Reinforcing rib

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 複数の割栗石状の部材が互いに連結され
るとともに、これらがプレキャストコンクリートからブ
ロック状に形成されていることを特徴とする地業部材。
An earthwork member comprising a plurality of split-stone-like members connected to each other and formed of a block from precast concrete.
【請求項2】 請求項1に記載した地業部材において、
前記割栗石状の部材は、下方に向かうにしたがって先細
りに形成されるくさび状の先端部を有していることを特
徴とする地業部材。
2. The member according to claim 1, wherein:
A land-working member, wherein the split-stone-shaped member has a wedge-shaped tip portion that is tapered downward.
【請求項3】 地盤面に形成された根切り底に配置さ
れ、内部に複数の砕石が収納される砕石収納用枠を含ん
で構成されていることを特徴とする地業用治具。
3. A jig for earthwork comprising a crushed stone storage frame arranged at a root bottom formed on a ground surface and containing a plurality of crushed stones therein.
【請求項4】 請求項3に記載した地業用治具におい
て、前記砕石収納用枠の内部には、補強用リブが格子状
に設けられていることを特徴とする地業用治具。
4. The jig for land business according to claim 3, wherein a reinforcing rib is provided in a lattice shape inside the crushed stone storage frame.
【請求項5】 請求項4に記載した地業用治具におい
て、前記砕石収納用枠および補強用リブは、プラスチッ
クから形成されていることを特徴とする地業用治具。
5. The jig according to claim 4, wherein the crushed stone storage frame and the reinforcing rib are made of plastic.
【請求項6】 地盤面に形成された根切り底に砕石を敷
込み、その砕石を転圧して所定厚さに形成する地業にお
いて、内部に複数の砕石が収納される砕石収納用枠を含
んで構成された地業用治具を用いて行う地業方法であっ
て、前記根切り底に砕石収納用枠を配置し、この砕石収
納用枠内部に複数の砕石を収納し、その砕石の上面を均
すことを特徴とする地業方法。
6. A crushed stone storage frame in which a plurality of crushed stones are stored in a ground business in which crushed stones are laid on a root cut bottom formed on the ground surface and the crushed stones are compacted to a predetermined thickness. A territory method performed using a jig for territory comprising a crushed stone, wherein a crushed stone storage frame is arranged at the root cutting bottom, a plurality of crushed stones are stored inside the crushed stone storage frame, Land business method characterized by leveling the upper surface of the building.
JP2559598A 1998-02-06 1998-02-06 Foundation work member, jig for foundation work, and foundation work method Withdrawn JPH11222869A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2559598A JPH11222869A (en) 1998-02-06 1998-02-06 Foundation work member, jig for foundation work, and foundation work method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2559598A JPH11222869A (en) 1998-02-06 1998-02-06 Foundation work member, jig for foundation work, and foundation work method

Publications (1)

Publication Number Publication Date
JPH11222869A true JPH11222869A (en) 1999-08-17

Family

ID=12170271

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2559598A Withdrawn JPH11222869A (en) 1998-02-06 1998-02-06 Foundation work member, jig for foundation work, and foundation work method

Country Status (1)

Country Link
JP (1) JPH11222869A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017025633A (en) * 2015-07-24 2017-02-02 大成ロテック株式会社 Road ancillary facility construction method, and movement direction instruction program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017025633A (en) * 2015-07-24 2017-02-02 大成ロテック株式会社 Road ancillary facility construction method, and movement direction instruction program

Similar Documents

Publication Publication Date Title
CN102505709A (en) Concrete-formwork-precast foundation construction method
US20160305076A1 (en) Treating particulate and connecting slab portions
US4023325A (en) Load bearing reinforced ground slab
JPH11222869A (en) Foundation work member, jig for foundation work, and foundation work method
KR101270697B1 (en) Precast Concrete Blocks and Remodeling Reinforcing Construction Methods for Low and Middle-rise Beam-column Buildings by Using that Blocks
RU2231596C2 (en) Method of pile forming in preliminary formed well
JP2011157804A (en) Sand ground improvement method and apparatus used for the same
KR101452454B1 (en) Truncated pyramid block for reinforcing ground and foundation construction method using the truncated pyramid blocks
JPH1161845A (en) Building structure utilizing pile for column
JPH1129927A (en) Ground subsidence preventive foundation pile using old tire block
JPH0931993A (en) Installation of pressure-receiving board for side slope protection
CN108589461B (en) Hollow model and garden road construction process applying same
JPH09158206A (en) Base isolating structure for structure
JPH10317486A (en) Bearing structure of floor slab in building structure utilizing pile for column
KR101189041B1 (en) Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same
JP2013221347A (en) Ground structure and ground improvement method
US20220154418A1 (en) Foundation for a tower structure, tower for a wind power installation, and wind power installation, and also method for establishing a foundation for a tower structure
WO2023175836A1 (en) Method for constructing foundation of structure
JPH077385Y2 (en) Civil engineering and building foundation blocks
JP2000045295A (en) Existing pile mixed type pile foundation structure and construction method
KR20130136323A (en) Spin pile construction method using spin pile stamp
JP3162654B2 (en) Construction method of floor slab support structure in building structure using pile as pillar
JP3457440B2 (en) Building construction method using earth anchor
KR20040110387A (en) Structure and method reinforcing the unbreakable head of high-stress concrete pile
CN117108096A (en) Construction method based on old building reconstruction and used for reinforcing cross section

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20050510